Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005)
ML23235A261
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/24/2023
From: Karla Stoedter
NRC/RGN-III/DORS/RPB2
To: Penfield R
Energy Harbor Nuclear Corp
References
Download: ML23235A261 (1)


Text

August 24, 2023

SUBJECT:

UPDATED INSPECTION PLAN FOR PERRY NUCLEAR POWER PLANT (REPORT 05000440/2023005)

Dear Rod Penfield:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Perry Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

During this period, the NRC will perform Inspection Procedure (IP) 71002, License Renewal Inspection, and IP 71003, Post-Approval Site Inspection for License Renewal at your facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 630-829-9731 with any questions you have regarding this letter.

Sincerely, Signed by Stoedter, Karla on 08/24/23 Karla K. Stoedter, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket No. 05000440 License No. NPF-58 Enclosure:

Inspection Plan cc: Distribution via LISTSERV