SDV Vent and Drain 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV)
Vent and Drain Valves Valves 3.1.8 LCO
3.1.8 APPLICABILITY
Each SDV vent and drain valve shall be OPERABLE.
MODES I and 2.
ACTIONS NOTES--------------------------
- 1. Separate Condition entry is allowed for each SDV vent and drain line.
- 2.
An isolated line may be unisolated under administrative draining and venting of the SDV.
control to allow CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent A.1 Isolate the 7 days or drain lines with associated line.
one valve inoperable.
B.
One or more SDV vent B.1 Isolate the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or drain lines with associated line.
both valves inoperable.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
PERRY - UNIT I 3.1-24 Amendment No145