L-11-338, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011

From kanterella
Jump to navigation Jump to search

Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011
ML112910159
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/17/2011
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-11-338, TAC ME7263
Download: ML112910159 (2)


Text

FENOC Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating

"""" Company Perry. Ohio 44081 Marfc B. 88zl118 440-280-5382 Vice President Fax: 440-280-8029 October 17,2011 L-11-338 10 CFR 50.90 A TIN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability until December 12.2011 (TAC No. ME7263l By letter dated October 11, 2011, FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request to revise the Perry Nuclear Power Plant Technical Specifications to temporarily use a delayed access circuit as one of the required offsite circuits between the offsite transmission network and the onsite Class 1E alternating current electric power distribution system. By letters dated October 13, 201.1, and October 16, 2011, FENOC responded to Nuclear Regulatory Commission (NRC) staff information requests. As a result of further discussions with the NRC staff, the proposed Technical Specification wording has been revised. The enclosure provides the proposed change. .

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Supervisor- Fleet Licensing, at (330) 315-6808.

I declare under penalty of perjury that the foregoing is true and correct. Executed on October !!L, 2011.

Si~/{I/

Mark B. Bezilla I-V

Enclosure:

Proposed Technical Specification Wording, Page 3.8-2 cc: NRC Region III Administrator NRC Resident Inspector Office NRC Project Manager Executive Director, Ohio Emergency Management Agency (NRC Liaison)

Utility Radiological Safety Board

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> offsite circuit to OPERABLE status. AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of two divisions with no offsite power AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from aiscover~ t~at onl~

availaole circuit is a aelayea access circuit and may oe use_d in place of tne associatea Dnit 1 startuB transformer until ecemoer 12 20n AND 17 days from discovery of failure to meet LCO B. One required DG B.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. for OPERABLE required offsite circuit(s). AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s). sug~orted discovery of by the inopera e DG. Condition B inoperable when the concurrent with redundant required inoperability feature(s) are of redundant inoperable. required feature(s)

AND (continued)

, PERRY - UNIT 1 3.8-2 Amendment No.