S/RVs 3.4.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.4.4.2 NOTE-----------

Valve actuation may be excluded.

Verify each required relief function S/RV 24 months actuates on an actual or simulated automatic initiation signal.

SR 3.4.4.3


NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each required S/RV actuator strokes 24 months on a when manually actuated.

STAGGERED TEST BASIS for each valve solenoid I

PERRY - UNIT 1 3.4-11 Amendment No.133

ECCS-Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.5


NOTE--------------------

Vessel injection/spray may be excluded.

Verify each ECCS injection/spray subsystem 24 months actuates on an actual or simulated automatic initiation signal.

SR 3.5.1.6


NOTE--------------------

Valve actuation may be excluded.

Verify the ADS actuates on an actual or 24 months simulated automatic initiation signal.

SR 3.5.1.7


NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each ADS valve actuator strokes when 24 months on a manually actuated.

STAGGERED TEST BASIS for each valve solenoid SR 3.5.1.8


NOTE---------------------

ECCS actuation instrumentation is excluded.

Verify the ECCS RESPONSE TIME for each ECCS 24 months injection/spray subsystem is within limits.

I PERRY - UNIT 1 3.5-5 Amendment No. 133

LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1


NOTE-------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each LLS valve actuator strokes when manually actuated.

24 months on a STAGGERED TEST BASIS for each valve solenoid I

SR 3.6.1.6.2


NOTE-------------------

Valve actuation may be excluded.

Verify the LLS function of the six 24 months safety/relief valves actuates on an actual or simulated automatic initiation signal.

PERRY - UNIT 1 3.6-23 Amendment No. 133