ML18214A667

From kanterella
Jump to navigation Jump to search

FENOC Fleet - Perry Nuclear Power Plant, Unit No. 1 - Correction to the Issuance of Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules (CAC No. MG0136; EPID L-2017-LLA-0259)
ML18214A667
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/22/2018
From: Bhalchandra Vaidya
Plant Licensing Branch III
To: Moul D
FirstEnergy Nuclear Operating Co
Vaidya B
References
CAC MG0136, EPID L-2017-LLA-0259
Download: ML18214A667 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 22, 2018 Mr. Don Moul President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 341 White Pine Drive Akron, OH 44320

SUBJECT:

FENOC FLEET- PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -

CORRECTION TO THE ISSUANCE OF AMENDMENT RE: REQUEST TO ADOPT TSTF-529, "CLARIFY USE AND APPLICATION RULES" (CAC NO. MG0136; EPID L-2017-LLA-0259)

Dear Mr. Moul:

By letter dated July 30, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18179A467), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 303 and Amendment No. 192 to Renewed Facility Operating License No. DPR-66 and NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2, respectively, Amendment No. 298 to Renewed Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1; and Amendment No. 182 to Facility Operating License No.

NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. The amendments were in response to your application dated August 11, 2017.

The amendments revised and clarified the technical specification usage rules for completion times, limiting conditions for operation, and surveillance requirements, based on Technical Specification Task Force (TSTF) Traveler TSTF-529, "Clarify Use and Application Rules,"

Revision 4.

The NRC staff has noted that inadvertently, in paragraph 2 for the Amendment No. 182 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, the license number was stated as "DPR-58" instead of "NPF-58."

The corrected Amendment No. 182 for Perry Nuclear Power Plant, Unit 1, is enclosed.

D. Moul We apologize for the inconvenience this may have caused.

Sincerely,

~

~Bhalchandra Vaidya, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Corrected Amendment No. 182 to NPF-58 cc:

Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Additional Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION, LLC DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 182 License No. NPF-58

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by FirstEnergy Nuclear Operating Company et al.

(the licensee, FENOC) dated August 11, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 182, are hereby incorporated into the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Previously signed David J. Wrona, Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Facility Operating License Date of Issuance: July 30, 2018

ML18214A667 OFFICE NRR/LPL3/PM NRR/LPL3/LA NRR/LPL3/BC NRR/LPL3/PM NAME BVaidya SRohrer DWrona BVaidya DATE 08/06/18 08/06/18 08/22/18 08/22/18