ML082460877

From kanterella
Jump to navigation Jump to search

Tech Spec Page for Amendment 150 TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process, Per the Consolidated Line Item Improvement Process
ML082460877
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/28/2008
From:
Plant Licensing Branch III
To:
Goodwin, Cameron/DORL, 415-3719
References
TAC MD8194
Download: ML082460877 (1)


Text

Control Rod Block Instrumentation 3.3.2.1 Table 3.3.2.1-1 (page 1 of 1)

Control Rod Block Instrumentation APPLI CABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE FUNCTION CONDITIONS CHANNELS REQUIREMENTS

1. Rod Pattern Control System
a. Rod withdrawal limiter (a) 2 SR 3.3.2.1.1 SR 3.3.2.1.6 SR 3.3.2.1.9 (b) 2 SR 3.3.2.1.2 SR .3.3.2.1.5 SR 3.3.2.1.7 SR 3.3.2.1.9 (C) (c) 2 SR 3.3.2.1.3 b.- Rod pattern controller 1 ,2 SR 3.3.2.1.4 SR 3.3.2.1.5 SR 3.3.2.1.7 SR 3.3.2.1.9
2. Reactor Mode Switch-Shutdown Position (d) 2 SR 3.3.2.1.8 (a) THERMAL POWER > 66.7% RTP.

(b) THERMAL POWER > 33.3% RTP and

(c)

(d)

With THERMAL POWER

  • 19.0% RTP, except during the reactor shutdown process if withdrawn control rod has been confirmed.

Reactor mode switch in the shutdown position.

the coupling of each I

FIFRR.Y - UNIT 1 3.3-19 Amendment No.150