IR 05000440/2023403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000440/2023403
ML23328A038
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/27/2023
From: Michael Ziolkowski
NRC/RGN-III/DRSS/SEPIR
To: Penfield R
Energy Harbor Nuclear Corp
References
IR 2023403
Download: ML23328A038 (7)


Text

SUBJECT:

PERRY NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000440/2023403

Dear Rod Penfield:

On November 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant and discussed the results of this inspection with Christopher Elliott, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000440 License No. NPF-58

Enclosure:

As stated

Inspection Report

Docket Number:

05000440

License Number:

NPF-58

Report Number:

05000440/2023403

Enterprise Identifier:

I-2023-403-0029

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Perry Nuclear Power Plant

Location:

Perry, OH

Inspection Dates:

October 30, 2023 to November 16, 2023

Inspector:

N. Egan, Sr. Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The Inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.07 - Security Training

The inspector evaluated the security training program through completion of the following

procedure elements: Security Training

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 a-c; 02.07 a; 02.09 a-b
  • Tier III: 02.11 a; 02.12 a-b; 02.13 a, c

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) October 1, 2022 through October 1,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The Inspector verified no proprietary information was retained or documented in this report.

  • On November 16, 2023, the inspector presented the security baseline inspection results to Christopher Elliott, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

National Rifle Association Law Enforcement Course of Fire

Review & Approval Application for Reduced Light Rifle

2/28/2022

National Rifle Association Law Enforcement Course of Fire

Review & Approval Application for Rifle Daylight Qualification

2/28/2022

FELP Task 22

Comply with Physical Fitness Performance Requirements

Miscellaneous

SC-2131-20

Tactical Qualification Course

NOBP-LP-1304

Security On the Job Training Program

NOP-LP-1401

Security Training Program

Procedures

NOP-LP-1402

Performance Evaluation Program

Current Firearm Instructor Certifications for All Site Firearm

Instructors

71130.07

Self-Assessments

ATL-2023-0377-

ATA-01

Security Training Self-Assessment

71130.09

Miscellaneous

Perry Nuclear Power Plant Physical Security Plan

16