Text

PCIVs 3,6.1.3

ý ,I NI APTTnS -

CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 NOTES------ --------

I Isolation devices in high radiation areas may be verified by use of administrative means.

2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.

Verify the affected Once per 31 days penetration flow path for isolation is isolated. devices outside primary containment, drywell, and steam tunnel AND Prior to entering MODE 2 or 3 from MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment, drywell, or steam tunnel (continued)

PERRY - UNIT I 3.6-10 Amendment No. 149

PCIVs 3.6.1.3 ACTTnIN (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more B.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> penetration flow penetration flow path paths with two PCIVs Uy use of at least inoperable except due one closed and de-to leakage not within activated automatic limit. valve, closed manual valve, or blind flange.

C. One or more C.1 Restore leakage rate 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetration flow paths to within limit.

with leakage rate not within limit, except for purge valve leakage.

(continued)

PERRY - UNIT I 3.6-11 Amendment No.149

PCIVs 3.6.1.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One or more D.1 Isolate the affected 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> penetration flow paths enetration flow path with one or more y use of at least primary containment one closed and de-purge valves not activated automatic within purge valve valve, closed manual leakage limits. valve, or blind flange.

AND D.2 NOTES------ --------

1. Isolation devices in high radiation areas may be verified by use of administrative means.
2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.

Verify the affected Once per 31 days penetration flow path for isolation is isolated. devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if not performed within the previous 92 days for isolation devices inside primary containment I AND (cont,inued)

PERRY - UNIT 1 3.6-12 Amendment No. 149

PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. (continued) D.3 Peorm 3..1.3.6 Once per 92 days for the resilient seal purge valves closed to comply with Required Action D.I.

E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, AND B, C, or D not met in MODE 1, 2, or 3. E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. Required Action and F.1 Suspend movement of Immediately associated Completion recently irradiated Time of Condition A, fuel assemblies in B, C, or D not met primary containment.

for PCIV(s) required to be OPERABLE during movement of recently irradiated fuel assemblies in the primary containment.

(continued)

PERRY - UNIT 1 3.6-13 Amendment No. 149

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.3 --------------------- NOTES-----------------

1. Only required to be met in MODES 1, 2, and 3.
2. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
3. Not required to be met for PCIVs that are open under administrative controls.

Verify each primary containment isolation 31 days manual valve and blind flange that is located outside primary containment, drywell, and steam tunnel and not locked, sealed, or otherwise secured and is I required to be closed during accident conditions is closed.

(continued)

PERRY - UNIT 1 3.6-16 Amendment No. 149

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued) I SURVEILLANCE FREQUENCY SR 3.6.1.3.4 ---- ---- --- NOTES--------------

i. Only required to be met in MODES 1, 2, and 3.
2. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
3. Not required to be met for PCIVs that are open under administrative controls.
4. Not required to be met for the Inclined Fuel Transfer System (IFTS) penetration when the associated primary containment blind flange is removed, provided that the Fuel Handling Building Fuel Transfer Pool water level is maintained Ž 40', the upper containment pool water level is

Ž 22 ft 9 inches above the reactor pressure vessel flange and the suppression pool water level is maintained at Ž 17 ft 11.7 inches, the fuel transfer and storage. pool supply isolation valve is closed, the upper pool IFTS gate is installed, and the IFTS transfer tube drain valve remains closed. The IFTS transfer tube drain valve may be opened under administrative controls. Removal of the IFTS blind flange shall not exceed 60 days per cycle while in MODES 1, 2, or 3.

Verify each primary containment isolation Prior to manual valve and blind flange that is entering located inside primary containment, MODE 2 or 3 drywell, or steam tunnel and not locked, from MODE 4, sealed, or otherwise secured and is if not required to be closed during accident performed conditions is closed. within the previous 92 days (continued)

PERRY - UNIT 1 3. 6-16a Amendment No. 149

SCIVs 3.6.4,2 CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 -------- NOTES I, Isolation devices in high radiation areas may be verified by use of administrative means.

2ý Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.

Verify the affected Once per 31 days penetration flow path is isolated.


-NOTE--------

Only applicable to B.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetration flow paths penetration flow path with two isolation valves. by use of at least one closed manual valve or blind B. One or more flange.

penetration flow paths with two SCIVs inoperable.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND or B not met in MODE 1- 2, or 3. C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

PEI""RY - UNIT I 3,6-54 Amendment No. 14 9

SCfVs 3.6.4.2 ACTIONS (conti n.nued CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.I Suspend movement of Immediately associated Completion recently irradiated Time of Condition A fuel assemblies in or B not met during the primary movement of recently containment.

irradiated fuel assemblies in the AND primary containment.

or during OPDRVs. D.2 Initiate action to Immediately suspend OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.2.1 ----------------- NOTES--------------

1. Valves and-blind flanges in high radiation areas may be verified by use of'administrative means.
2. Not required to be met for SCIVs that are open under administrative controls, Verify each secondary containment 31 days isolation manual valve and blind flange that is not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.

)

PERRY - UNIT I 3.6-55 Amendment No. 149

Drywell Isolation Valves 3.6.5.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 -------- NOTES------

1. isolation devices in high radiation areas may be verified by use of administrative means.
2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.

Verify the affected Prior to penetration flow path entering MODE 2 is isolated. or 3 from MODE 4, if not performed within the previous 92 days B. One or more B.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetration flow paths penetration flow path with two drywell by use of at least isolation valves one closed and de-inoperable, activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> PERRY - UNIT 1 3.6-66 Amendment No.149

Drywell Isolation Valves 3.6.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.3.1 Verify each 24 inch and 36 inch drywell 31 days purge supply and exhaust isolation valve is sealed closed.

SR 3.6.5.3.2 Deleted.

SR 3.6.5.3.3 --------------- NOTES--------------

1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2. Not required to be met for drywell isolation valves that are open under administrative controls.

Verify each drywell isolation manual Prior to valve and blind flange that is not entering MODE 2 locked, sealed, or ,otherwise secured and or 3 from is required to be closed during accident MODE 4, if not conditions is closed, performed in the previous 92 days SR 3.6.5.3.4 Verify the isolation time of each power In accordance operated and each automatic d&ywel1 with the isolation valve is within limits. Inservice Testing Program SR 3.6.5.3.5 Verify each automatic drywell isolation 24, months valve actuates to the isolation position on an actual or simulated isolation signal.

PERRY - UNIT 1 3.6-67 Amendment No. 149