Letter Sequence Approval |
|---|
|
|
MONTHYEARML0323302242003-08-14014 August 2003 License Amendment Request Pursuant to 10 CFR 50.90: Increase in Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: Request ML0330904002003-11-10010 November 2003 Request for Additional Information, Increase in Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: RAI ML0335000942004-01-0606 January 2004 Request for Additional Information for License Amendment Request, Increase in Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: RAI ML0402006692004-01-16016 January 2004 RAI, Increase in Main Steamline Turbine Building High Temperature Trip Setpoint Allowable Value (Tac. No. MC0342) Project stage: RAI ML0403701412004-01-22022 January 2004 Response to RAI Regarding License Amendment Request to Increase Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: Response to RAI ML0408605702004-03-31031 March 2004 Request for Additional Information (Rai), Review of License Amendment Request to Increase the Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: RAI ML0413402602004-05-0606 May 2004 Response to Second Request for Additional Information Regarding License Amendment Request to Increase Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: Request ML0412801022004-05-0606 May 2004 Note 05/06/2004 to All Region III Facility Training Managers Re Reprint of NRC Form 396 Project stage: Request ML0418106862004-07-0909 July 2004 Amendment, Primary Containment and Drywell Isolation Instrumentation Project stage: Other ML0419401992004-07-0909 July 2004 Technical Specifications, Issuance of Amendment Regarding Primary Containment and Drywell Isolation Instrumentation to Increase the Analytical Limit for Detected Temperature Project stage: Approval ML0423606802004-08-26026 August 2004 Letter, Correction to Safety Evaluation Report in Support of License Amendment 130. TAC No. MC0342 Project stage: Approval 2004-01-06
[Table View] |
Similar Documents at Perry |
|---|
|
Text
Primary Containment and Drywell Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 1 of 6)
Primary Containment and Drywell Isolation Instrumentation APPLICABLE CONDITIONS MOOES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 1. Hain Steam Line Isolation
- a. Rcactor Vessel Water Level-Low Low Low, Level 1
- b. Main Steam Line Pressure-Low 1,2,3 1
2 2
D SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.6 E
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.L SR 3.3.6.1.5 SR 3.3.6.1.6
> 14.3 inches a 795.2 psig
- c. Main Steam Line Flow-High 1,2,3 2 per MSL D
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.6 S 256.5 psid
- d. Condenser Vacuum -Low 1,2(a),
3 (a) 2 D
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.4 SR 3.3.6.1.5 2 7.6 inches Hg vacuum
- e.
Main Steam Line Pipe Tunnel Teffperature-High
- f. Main Steam Line Turbine Building Temperature-High
- 9. Manual Initiation 1,2,3 1,2,3 2
2 D
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.7 D
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.5 G
SR 3.3.6.1.5 C 158.9F S 149.6 0F I
1,2,3 NA
- 2. Primary Containment and Drywell Isolation
- a. Reactor vessel Water Level-Low Lou, Level 2 1,2,3 2(b)
H SR 3.3.6.1.1 SR 3.3.6.1.2 SR -3.3.6.1.3 SR 3.3.6.1.4 SR 3.3.6.1.5
> 127.6 inches (continued)
(a) with any turbine stop valve not closed.
(b) Required to initiate the associated dryweal isolation function.
PERRY - UNIT I 3.3-54 AEmendment No. 130