Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
ML23144A237
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/23/2023
From: Penfield R
Energy Harbor Nuclear Corp
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-23-134, RIS 2023-01
Download: ML23144A237 (1)


Text

energy harbor Energy Harbor Nuclear Corp Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear 724-462-0816 (cell)

May 23, 2023 L-23-134 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 2055-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations This letter provides the Perry Nuclear Power Plant response to the NRC Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations.

The proposed Operator Licensing Examination Schedule data, on enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2024 to 2027.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Scott Plymale, Manager, Perry Training Section at (440) 280-7534.

Sincerely, Ji(}vf Rod L. Penfield

L-23-134 Page 2

Enclosure:

OPERATOR LICENSING EXAMINATION DATA, NRC FORM 536 Cc: Ms. Colleen Schmidt, Operating Licensing Section, NRC Region Ill Ms. Patricia Pelke, Branch Chief, Operator Licensing Section, NRC Region Ill NRC Project Manager NRC Resident Inspector

Enclosure A L-23-134 Operator Licensing Examination Data, NRC Form 536

NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2024 (01-2021)

..-,,.*****,.. Estimated burden per response to comply with this voluntary information collection request: 45 minutes .

This information collection is used to plan budgets and resources for operator examinations. Send

  • ~~'-

~

~

~

"'+-"4 . . . ,I n

0 OPERATOR LICENSING EXAMINATION DATA comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 , or by e-mail to lnfocollects.Resource@nrc.gov, and the 0MB reviewer at: 0MB Office of Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira submission@omb.eop.gov. The NRG may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid 0MB control number.

FACILITY NRC REGION Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 111 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2024 CY 2025 CY 2026 cy2027 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2024 CY2025 CY2026 CY2027 NUMBER OF REACTOR OPERATORS 4 4 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/9/2024 12/7/2026 ALTERNATE DATE 1/13/2025 11/9/2026 NRG FORM 536 (01-2021)