ML051250194

From kanterella
Jump to navigation Jump to search

4/19/05, Perry - TS Pages - Issuance of Amendment Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process
ML051250194
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/19/2005
From: Macon W
NRC/NRR/DLPM/LPD3
To: Myers L
FirstEnergy Nuclear Operating Co
Macon W, NRR/DLPM,415-3965
Shared Package
ML051170074 List:
References
TAC MC5024
Download: ML051250194 (3)


Text

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days SR 3.3.3.1.2 Deleted.

SR 3.3.3.1.3 Perform CHANNEL CALIBRATION. 24 months PERRY - UNIT I 3.3-22 Amendment No. 135

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS FUNCTION REQUIRED REFERENCED FROM CHANNELS REQUIRED ACTION D.1

1. Reactor Steam Dome Pressure 2 E
2. Reactor Vessel Water Level-Wide Range 2 E
3. Reactor Vessel Water Level-Fuel Zone 2 E
4. Suppression Pool Water Level 2 E
5. Suppression Pool Sector Water Temperature 2 (c) E
6. DryweLL Pressure 2 E
7. DrywelL Air Temperature 2 E
8. Primary Contairynent/Drywell Area Gross Gamma 2 F Radiation Monitors
9. Penetration Flow Path, PCIV Position 2 per penetration E flow path (a)(b)
10. Deleted I
11. Primary Containment Pressure 2 E
12. Primary Containment Air Temperature 2 E (a) Not required for isolation valves whose associated penetration fLow path is isolated.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

(c) Monitoring each of eight sectors.

PERRY - UNIT 1 3.3-23 Amendment No. 135

SPMU System 3.6.2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4

SR 3.6.2.4.1 Verify upper containment pool water level 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is:

a. Ž 22 ft 9 inches above the reactor pressure vessel (RPV) flange.

OR

b. Ž 22 ft 5 inches above the RPV flange, and suppression pool water level Ž 17 ft 11.7 inches.

SR 3.6.2.4.2 Verify upper containment pool water 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> temperature is < 1100F.

SR 3.6.2.4.3 Verify each SPMU subsystem manual, power 31 days operated. and automatic valve that is not locked, sealed, or otherwise secured in position is in the correct position.

SR 3.6.2.4.4 Verify all required upper containment 31 days pool gates are in the stored position or are otherwise removed from the upper containment pool.

SR 3.6.2.4.5 -------------- NOTE-------------------

Actual makeup to the suppression pool may be excluded.

Verify each SPMU subsystem automatic 24 months valve actuates to the correct position on an actual or simulated automatic initiation signal.

PERRY - UNIT 1 3.6-43 (next page is 3.6-46) Amendment No. 135 I