Correction to License Amendment No. 184 Related to Adoption of Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control
ML19072A012
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/15/2019
From: Kimberly Green
Plant Licensing Branch III
To: Hamilton D
FirstEnergy Nuclear Operating Co
Green K
References
EPID L-2017-LLA-0405
Download: ML19072A012 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 March 15, 2019 Mr. David 8. Hamilton Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - CORRECTION TO LICENSE AMENDMENT NO. 184 RELATED TO ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (EPID L-2017-LLA-0405)

Dear Mr. Hamilton:

On December 12, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 184 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18292A816). The amendment consisted of changes to technical specifications related to operations with the potential for draining the reactor vessel in response to FirstEnergy Nuclear Operating Company's (FENOC) request dated December 6, 2017 (ADAMS Accession No. ML17347A788), as supplemented by letter dated July 24, 2018 (ADAMS Accession No. ML18207A268).

During FENOC's review of the amendment, it identified an error in the NRC staff's safety evaluation table on page 13. The last row in the table erroneously refers to TS LCO 3.8.10, Distribution Systems - Shutdown. The table entry should refer to TS LCO 3.8.8, Distribution Systems - Shutdown. The amendment request correctly identified the LCO as LCO 3.8.8, "Distribution Systems - Shutdown," and the correct TS page 3.8-39 was issued with the amendment.

The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment, and does not affect the associated notice to the public.

Enclosed, please find corrected safety evaluation page 13.

D. Hamilton If you have any questions regarding this matter, I can be reached at (301) 415-1627 or Kimberly.Green@nrc.gov.

Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Corrected Page 13 to the Safety Evaluation cc: Listserv

ENCLOSURE PERRY NUCLEAR POWER PLANT, UNIT NO. 1 FACILITY OPERATING LICENSE NPF-58 DOCKET NO. 50-440 AMENDMENT NO. 184 CORRECTED PAGE TO SAFETY EVALUATION

the reactor vessel," or (2) if certain conditions are not met, the required actions direct the licensee to: (a) "initiate action to suspend OPDRVs," (b) "initiate action to suspend operations with a potential for draining the reactor," (c) "initiate action to suspend operations with a potential for draining the reactor vessel (OPDRV)." The following table lists these TSs and their affected sections:

PNPP LCO Location of OPDRVs References 3.3.6.1, Primary Containment and Drywell Table 3.3.6.1-1, "Primary Containment and Isolation Drywell Isolation Instrumentation," Footnotes (c) and (f)- completely deleted; Footnote (d) revised to remove OPDRV reference.

(see Section 2.2.2.4) 3.3.7.1, Control Room Emergency Table 3.3.7.1-1, "Control Room Emergency Recirculation (CRER) System Recirculation System Instrumentation" Instrumentation Footnote (a) deleted.

Footnote (b) was revised to: "During movement of recently irradiated fuel assemblies in the primary containment or fuel handling building." This affects Function 3, Control Room Ventilation Radiation Monitor (no lonQer required for OPDRVs).

3.6.1.2, Primary Containment Air Locks Applicability, Condition E, Required Action E.2 3.6.1.3, Primary Containment Isolation Valves Condition G (PCIVs) 3.6.1.10, Primary Containment - Shutdown Applicability, Required Action A.2 3.6.1.11, Containment Vacuum Breakers Applicability, Required Action B.2 Note, Required Action B.2.2 3.6.1.12, Containment Humidity Control Applicability, Condition C, Required Action C.2 3.6.4.1, Secondary Containment Applicability, Condition C, Required Action C.2 3.6.4.2, Secondary Containment Isolation Applicability, Condition D, Required Action Valves (SCIVs) D.2 3.6.4.3, Annulus Exhaust Gas Treatment Applicability, Condition C, Required Action (AEGT) System C.2.2, Condition E, Required Action E.2 3.7.3, Control Room Emergency Applicability, Condition D, Condition F, Recirculation (CRER) System Required Actions D.2.2 and F.2 3.7.4, Control Room Heating, Ventilating, and Applicability, Condition D, Condition E, Air Conditioning (HVAC) System Required Actions D.2.2 and E.2 3.8.2, AC Sources - Shutdown Required Action A.2.3, Required Action B.3 3.8.5, DC Sources - Shutdown Required Action A.2.3 3.8.8, Distribution Systems - Shutdown Required Action A.2.3

ML19072A012 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC DORL/LPL3/PM NAME KGreen IBetts DWrona KGreen DATE 03/14/19 03/14/19 03/15/19 03/15/19