Similar Documents at Perry |
---|
Category:Letter
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18214A6672018-08-22022 August 2018 FENOC Fleet - Perry Nuclear Power Plant, Unit No. 1 - Correction to the Issuance of Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules (CAC No. MG0136; EPID L-2017-LLA-0259) ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17163A3542017-06-29029 June 2017 Issuance of Amendment Concerning Adoption of Tstf-501, Revision 1, Relocation of Diesel Fuel and Lube Oil Volume Values to Licensee Control (CAC No. MF8693) (L-16-236) ML17139C3722017-06-19019 June 2017 Issuance of Amendment Concerning Reduction of Steam Dome Pressure Value Specified in Technical Specification 2.1.1 (CAC No. MF8760) (L-16-179) ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17033A0142017-02-16016 February 2017 Issuance of Amendment Concerning Revision to Technical Specifications to Permit Installation of Upper Containment Pool Gate During Modes 1, 2, and 3 (CAC No. MF7476) (L-16-083) ML16158A3312016-09-14014 September 2016 Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan ML16130A5362016-05-31031 May 2016 Issuance of Conforming Amendment Related to the Direct License Transfer of the Facility Operating License NPF-58 ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) ML15075A1392015-03-30030 March 2015 Issuance of Amendment Concerning Full Implementation of Alternative Source Term (TAC No. MF3197) (L-13-306) L-14-325, Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325)2015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML15075A0912015-03-27027 March 2015 Issuance of Amendment Concerning Safety Limit Critical Power Ratio Values (TAC No. MF5007)(L-14-325) ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML13136A1432013-05-16016 May 2013 Nucelar Power Plant, Unit 1 - Re-Issuance of Amendment Regarding Adoption of TSTF-275 and TSTF-300 ML13051B1442013-05-0606 May 2013 Issuance of Amendment Regarding Adoption of TSTF-275, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-Up, and TSTF-300 ML13017A4312013-04-18018 April 2013 Issuance of Amendment Revise Technical Specification 3.10.1, Inservice Leak, and Hydrostatic Testing Operation ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC 2024-03-01
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) ML21063A1572021-03-0404 March 2021 Safety Evaluation for Alternative Request SR-2, Revision 0 Related to one-time Extension Snubbers Testing to ASME OM Code for the Fourth 10-year Inservice Interval at Perry Nuclear Power Plant Unit 1, Docket Nos. 50-440 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval ML20311A6582020-11-10010 November 2020 Issuance of Relief Proposed Alternative Request Associated with Fourth Ten Year Interval Inservice Inspection Interval ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20266G2652020-09-24024 September 2020 Correction Letter for Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20189A0032020-07-10010 July 2020 Relief Request PR-3 for Fourth 10-Year Pump and Valve Inservice Testing Program ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML19072A0122019-03-15015 March 2019 Correction to License Amendment No. 184 Related to Adoption of Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML19072A0852019-03-15015 March 2019 Correction to Request for Alternatives Related to Inservice Testing Program for the Fourth 10 Year Inservice Testing Interval ML19029A0902019-02-25025 February 2019 Request for Alternatives Related to Inservice Testing Program for the Fourth 10-Year Inservice Testing Interval (EPID Nos. L-2018-LLR-0092, 0093, 0094, 0095, and 0096) ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML19037A0412019-02-25025 February 2019 Request for Alternative to Use ASME Code Case N-831 ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML18023A6252018-01-29029 January 2018 Approval of Alternative to Use BWRVIP Guidelines in Lieu of Certain ASME Code Requirements (CAC No. MG0149; EPID 2017-LLR-0112) (L-17-183) ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17270A0302017-10-16016 October 2017 Approval of Alternative to Use ASME Code Case N-513-4 for Repair of Emergency Service Water System Piping (CAC No. MG0130; EPID L-2017-LLR-0080)(L-17-278) ML17193A3822017-07-18018 July 2017 Correction to Safety Evaluation for License Amendment No. 177 2024-09-13
[Table view] Category:Technical Specifications
MONTHYEARML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21361A2172021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21307A1762021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17305A2132017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15243A1532015-09-0202 September 2015 Correction of Typographical Error Incurred During Prior License Amendment No. 162 ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) L-11-338, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-17017 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-13013 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-0303 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. ML1116608152011-06-16016 June 2011 Correction Letter License Amendment No. 157 L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 02010-12-15015 December 2010 License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 ML1029804462010-10-21021 October 2010 License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0824608772008-08-28028 August 2008 Tech Spec Page for Amendment 150 TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process, Per the Consolidated Line Item Improvement Process ML0817503002008-06-19019 June 2008 TS Pages - Issuance of Amendment Revise TSs 3.6.1, 3.6.4 and 3.6.5 ML0811905752008-04-25025 April 2008 TS Pages - Issuance of Amendment No. TSTF-448, Revision 3, Control Room Habitability. ML0726808522007-09-18018 September 2007 License Amendment Request Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0725505472007-09-0505 September 2007 License Amendment Request to Revise Technical Specification 3.6.1, 3.6.4, and 3.6.5 for Containment and Drywell Isolation Device ML0721102792007-07-30030 July 2007 Tech Spec Pages for Amendment 147 to Clarify Technical Specification Requirements Related to Annulus Exhaust Gas Treatment (Aegt) System ML0719402902007-07-12012 July 2007 Technical Specifications, Issuance of Amendment ASTM Standards for Fuel Oil Testing ML0717704662007-06-22022 June 2007 Tech Spec Page for Amendment 145 Scram Discharge Volume Vent and Drain Valves ML0717202522007-06-14014 June 2007 Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers ML0713403922007-05-0909 May 2007 Technical Specifications (Ts), Revise TS 5.5.7, Ventilation Filter Test Program, to Correct Referenced Flow Units ML0712005032007-04-30030 April 2007 Tech Spec Pages for Amendment 142 Regarding Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits ML0712102912007-04-27027 April 2007 Technical Specifications, Issuance of Amendment Revise TS to Change the Frequency of the Mode 5 Intermediate Range Monitoring Instrumentation Channel Functional Test L-06-172, Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2007-01-11011 January 2007 Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0700904852006-12-29029 December 2006 Application for a Technical Specification Improvement to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0629704472006-10-13013 October 2006 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications ML0618700962006-06-30030 June 2006 Technical Specification, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5 ML0615903492006-06-0101 June 2006 License Amendment Request - Revise Mode 3 Hot Shutdown Requirements to Add a Note Addressing Situations When Both Residual Heat Removal (RHR) Shutdown Cooling Subsystems Are Inoperable ML0615903292006-06-0101 June 2006 License Amendment Request - Revise Mode 4 Residual Heat Removal Shutdown Cooling Requirements to Add a Default Condition Addressing Situations When Condition a Cannot Be Met within Its Completion Time ML0605404392006-02-14014 February 2006 Amendment Request to Revise Technical Specification 3.3.1.1 Intermediate Range Monitoring Instrumentation Mode 5 Channel Functional Testing Surveillance Frequency from 7 Days to 31 Days ML0605306202006-02-10010 February 2006 License Amendment Request to Revise Required Action B.1 in the Emergency Core Cooling System Instrumentation Technical Specification to Be Consistent with the Improved Standard Technical Specifications ML0529903232005-10-14014 October 2005 Submittal of Technical Specification Bases, Revision 5 ML0522902522005-08-16016 August 2005 Tech Spec Pages for Amendment 136 Elimination of Monthly Operating Reports and Occupational Radiation Exposure Reports ML0512501942005-04-19019 April 2005 4/19/05, Perry - TS Pages - Issuance of Amendment Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0509600872005-03-31031 March 2005 Tech Spec Pages for Amendment 134 Single Recirculation Loop Operation ML0504505712005-02-10010 February 2005 Tech Spec Pages for Amendment 133 Testing of Safety/Relief Valves ML0503503642005-02-0303 February 2005 Technical Specification Pages Revision of the Minimum Critical Power Ratio Safety Limit ML0419401992004-07-0909 July 2004 Technical Specifications, Issuance of Amendment Regarding Primary Containment and Drywell Isolation Instrumentation to Increase the Analytical Limit for Detected Temperature 2024-02-21
[Table view] |
Text
November 5, 2021
Mr. Rod L. Penfield Site Vice President Energy Harbor Nuclear Corp.
Perry Nuclear Power Plant P.O. Box 97, Mail Stop A-PY-A290 Perry, OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT NO. 195 REGARDING TH E ADOPTION OF TSTF-230, ADD NEW CONDITION B TO LCO 3.6.2.3, RHR SUPPRESSION POOL COOLING (EPID L-2021-LLA-0019)
Dear Mr. Penfield:
The U.S Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 195 to Renewed Facility Operating License No. NPF-58 for Perry Nuclear Power Plant, Unit No. 1 (Perry). The amendment consists of changes to the technical specifications (TS) in response to your application dated February 17, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21049A031).
The amendment revises TS 3.6.2.3, Suppression Pool Cooling, to modify the action for one inoperable loop from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days and modify the action for both loops inoperable to add an 8-hour allowed outage time in accordance with Technical Specifications Task Force Traveler, TSTF-230, Revision 1, Add New Condition B to LCO [Limiting Condition for Operation] 3.6.2.3, RHR [Residual Heat Removal] Suppression Pool Cooling.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-440
Enclosures:
- 1. Amendment No. 195 to NPF-58
- 2. Safety Evaluation
cc w/encls: Listserv
ENERGY HARBOR NUCLEAR CORP.
ENERGY HARBOR NUCLEAR GENERATION, LLC
DOCKET NO. 50-440
PERRY NUCLEAR POWER PLANT, UNIT NO. 1
AMENDMENT TO FACILITY OPERATING LICENSE
Amendment No. 195 License No. NPF-58
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by Energy Harbor Nuclear Corp., et al., 1 dated February 17, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in 10 CFR Chapter I;
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
1 Energy Harbor Nuclear Corp. is authorized to act as agent for Energy Harbor Nuclear Generation, LLC and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
(2) Technical Specifications
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 195, are hereby incorporated into the license.
Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of its issuance and shall be implemented within 120 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. NPF-58 and Technical Specifications
Date of Issuance: November 5, 2021
ATTACHMENT TO LICENSE AMENDMENT NO. 195
PERRY NUCLEAR POWER PLANT, UNIT NO. 1
FACILITY OPERATING LICENSE NO. NPF-58
DOCKET NO. 50-440
Facility Operating License No. NPF-58
Replace the following page of Facility Operating License No. NPF-58 with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT
Technical Specifications
Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT
3.6-40 3.6-40
C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level
Energy Harbor Nuclear Corp. is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2) Technical Specifications
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 195, are hereby incorporated into the license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions
- a. Energy Harbor Nuclear Generation LLC shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.
Amendment No. 194, 195 RHR Suppression Pool Cooling System 3.6.2.3
3.6 CONTAINMENT SYSTEMS
3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling System
LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
CONDITION REQUIRED ACTION COMPLETION TIME
A. One RHR suppression A.1 Restore RHR suppression 7 days pool cooling subsystem pool cooling subsystem to inoperable. OPERABLE status.
B. Two RHR suppression B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pool cooling subsystems suppression pool cooling inoperable. subsystem to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND
C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
PERRY - UNIT 1 3.6-40 Amendment No. 195 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
RELATED TO AMENDMENT NO. 195 TO
FACILITY OPERATING LICENSE NO. NPF-58
ENERGY HARBOR NUCLEAR CORP.
ENERGY HARBOR NUCLEAR GENERATION LLC
PERRY NUCLEAR POWER PLANT, UNIT NO. 1
DOCKET NO. 50-440
1.0 INTRODUCTION
By letter dated February 17, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21049A031), Energy Har bor Nuclear Corp. (EHNC or the licensee) submitted a license amendment request for the Perry Nuclear Power Plant (Perry). The amendment would revise Technical Specification (TS) 3.6.2.3, Suppression Pool Cooling, to adopt Technical Specifications Task Force Traveler, TSTF-230, Revision 1, Add New Condition B to LCO [Limiting Condition for Operation] 3.6.2.3, RHR [Residual Heat Removal] Suppression Pool Cooling (ADAMS Accession No. ML040570110). The licensees proposed change would add a new Condition B to LCO 3.6.2.3 to allow two RHR suppression pool cooling subsystems to be inoperable for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
2.0 REGULATORY EVALUATION
2.1 Description of RHR Suppression Pool Cooling
The Perry RHR system consists of three motor-driven pumps, four heat exchangers, and the valves and piping necessary to support operations. These components are divided into three independent closed loops, A, B, and C. All loops contain a motor-driven pump and the necessary valves and piping. Only loops A and B, however, contain heat exchangers.
Emergency service water (ESW) is used as the cooling medium for the RHR heat exchangers.
During normal plant operation, the suppression pool water must be kept less than 95 degrees Fahrenheit (°F) to ensure adequate condensation of the steam resulting from a design basis loss of cooling accident to prevent over pressurizing the containment. The suppression pool cooling mode is used to maintain proper suppression pool temperature during reactor core isolation cooling or safety relief valve operation, and to reduce suppression pool temperature in accident conditions. Both RHR loops A and B can be used for this mode. The two RHR subsystems perform suppression pool cooling function by circulating water from the suppression pool through the RHR heat exchangers and returning it to the suppression pool. ESW
Enclosure 2
circulating through the tube side of the heat exchangers, exchanges heat with the suppression pool water, and discharges this heat to the external heat sink. The heat removal capability of one RHR subsystem is sufficient to meet the overall design basis accident pool cooling requirement.
2.2 Proposed TS Changes to Adopt TSTF-230
In accordance with U.S. Nuclear Regulatory Commission (NRC or Commission)-approved TSTF-230, Revision 1, the licensee proposed changes that would revise the TS related to RHR suppression pool cooling. Specifically, the licensee proposed the following changes to TS 3.6.2.3 Actions content to adopt TSTF-230:
Add a new Condition (Condition B) for when two RHR suppression pool cooling subsystems are inoperable. The new Required Action B.1 requires operators to restore one RHR suppression pool cooling subsystem to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Since a new Condition B was added, rename current Condition B and its Required Actions (i.e., B.1 and B.2) as C., C.1, and C.2, respectively. In addition, revise new Condition C to reflect applicability to current Condition A and new Condition B.
TSTF-230, Revision 1, was submitted to the NRC on June 15, 1999, and was made available for plant-specific adoption via incorporation into Revision 2 of the improved Standard TS (NUREG-1434) on June 30, 2001 (ADAMS Accession No. ML011780537).
2.3 Applicable Regulatory Requirements
Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(c)(2) requires that TSs include LCOs. Per 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TS until the condition can be met.
3.0 TECHNICAL EVALUATION
3.1 Proposed TS Changes to Adopt TSTF-230
Perrys TS 3.6.2.3 currently requires that two RHR suppression pool cooling subsystems be operable in Modes 1, 2, and 3. When two RHR suppression pool cooling subsystems are inoperable, the current Required Action and Completion Time states that the licensee must be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and be in Mode 4 in 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> s. The licensee is proposing that when two RHR suppression pool cooling subsystems are inoperable, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> be given to restore one RHR suppression pool cooling subsystem to operable status. If this proposed Required Action cannot be completed within the proposed 8-hour Completion Time, then the licensee will be required to be in Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and be in Mode 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. As noted in its application, the licensees basis for the proposed change was NRC-approved Traveler TSTF-230, Revision 1, which was developed to allow this change for all BWR/6 plants.
The licensee states that allowing the proposed 8-hour Completion Time for two RHR suppression pool cooling subsystems to be i noperable is appropriate because an immediate plant shutdown, which is currently required, has the potential to result in a unit scram that could result in steam being discharged to the suppression pool. With both loops of RHR suppression
pool cooling inoperable, there would be no available means to remove heat from the suppression pool. The licensee stated that the 8-hour Completion Time would provide some time to restore one of the RHR suppression pool cooling subsystems prior to requiring a unit shutdown. The licensee also noted that the 8-hour Completion Time is consistent with Perry TS 3.6.1.7, Residual Heat Removal (RHR) Containment Spray System, Required Action B.1, which allows 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one RHR containment spray subsystem to operable status when in a condition where two RHR containment spray subsystems are inoperable.
3.2 Technical Evaluation Summary
The NRC staff reviewed the licensees submi ttal and plant design described above and in Section 2.0 of this safety evaluation. The NRC staff determined that the STS changes approved in TSTF-230 are applicable to Perry TSs because Perry is a BWR/6 design, and the NRC staff approved the TSTF-230 changes for BWR/6 designs. The staff compared the licensees proposed TS changes to the NRC approved changes contained in TSTF-230. Based on this review, the staff determined that the licensee adopted TSTF-230 without any variations.
Therefore, based on the discussion above, the NRC staff concludes that the licensees proposed changes to the Perry TSs are acceptable. As a result, the NRC staff finds that proposed changes to Perry TS 3.6.2.3 are adequate remedial actions to be taken that provide protection to the health and safety of the public until the LCO can be met, thereby satisfying 10 CFR 50.36(c)(2)(i).
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the State of Ohio official was notified of the proposed issuance of the amendment on September 27, 2021. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on April 20, 2021 (86 FR 20526).
Accordingly, the amendment meets the eligibility cr iteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: C. Ashley, NRR
Date: November 5, 2021
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - ISSUANCE OF AMENDMENT NO. 195 REGARDING THE ADOPTION OF TSTF-230, ADD NEW CONDITION B TO LCO 3.6.2.3, RHR SUPPRESSION POOL COOLING (EPID L-2021-LLA-0019) DATED NOVEMBER 5, 2021
DISTRIBUTION:
Public RidsNrrPMPerry Resource (hard copy)
RidsACRS_MailCTR Resource RidsRgn3MailCenter Resource RidsNrrDssStsb Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource CAshley, NRR NKaripineni, NRR
Accession No.: ML21271A078 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DSS/STSB/BC(A)
NAME SWall SRohrer NJordan DATE 9/27/2021 9/28/2021 09/22/2021 OFFICE NRR/DSS/SCPB/BC OGC - NLO NRR/DORL/LPL3/BC NAME BWittick RHarper NSalgado (RKuntz for)
DATE 9/29/2021 11/05/2021 11/5/2021 OFFICE NRR/DORL/LPL3/PM NAME SWall DATE 11/5/2021 OFFICIAL RECORD COPY