MONTHYEARML0603903012006-02-0909 February 2006
[Table View]GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677) Project stage: RAI ML0817601002008-06-27027 June 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Approval of Extension Request Project stage: Other ML0835004652008-11-26026 November 2008 Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter Project stage: Request ML0916604102009-05-11011 May 2009 E-mail Draft Request for Additional Information, Licensee'S Supplemental Responses Dated February 29 and November 26, 2008, to GL 2004-02 Project stage: Draft RAI ML0916604222009-05-11011 May 2009 Request for Additional Information Supplemental Responses to Generic Letter (GL) 2004-02 Dated 02/29/2008 and 11/26/2008 Project stage: RAI ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response Project stage: Draft RAI ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing Project stage: Request ML0919400842009-07-0909 July 2009 Luminant RAI 22 and 23 SBLOCA, Vortex, Air Ingestion, Void Fraction and Flashing Issues Project stage: Request ML0919402762009-07-0909 July 2009 NRC Opening Remarks Discuss the Draft Us Nuclear Regulatory Commission Request for Additional Information for Generic Letter GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressur Project stage: Draft RAI ML0919402772009-07-0909 July 2009 Luminant Holistic Overview: Presentation Will Cover Information Related to RAIs 1 - 5, 7, 12 - 14,16 - 19, 21, 25 - 36 and Overall Response to GL 2004-02 Project stage: Request ML0919400832009-07-0909 July 2009 Pci RAI 8, Test Protocol, Erosion Issue, RAI 15, Test Protocol, Latent Fiber Issue, Areva RAI 20, Test Flume, Fiberglass Larges Question Project stage: Request ML0919400852009-07-0909 July 2009 Luminant RAI 24 and 37, Secondary Line Breaks, Debris Load and Testing Project stage: Request ML0916707382009-07-15015 July 2009 Request for Additional Information Supplemental Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 Project stage: Draft RAI ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Meeting ML0926107912009-09-10010 September 2009 Comanche Peak Supplement Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request CP-200901396, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors.2009-10-12012 October 2009 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors. Project stage: Supplement ML0930800032009-10-13013 October 2009 Comanche Peak - Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1009505642010-04-19019 April 2010 Generic Letter 2004-02 Supplemental Response Project stage: Other ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting ML13059A2022013-02-28028 February 2013 Email Licensee Slides for 2/28/13 Meeting Via Conference Call Project stage: Meeting ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, Project stage: Meeting ML13067A0292013-03-15015 March 2013 2/28/13 - Summary of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting CP-201300670, Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance Project stage: Other ML13267A1972013-09-30030 September 2013 Request for Additional Information, Closure of Option 2a to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage; Related to Generic Safety Issue 191 Project stage: RAI CP-201301214, Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 1912013-10-31031 October 2013 Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 191 Project stage: Response to RAI 2009-07-31 |
ML092020343 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 07/22/2009 |
From: | Balwant Singal Plant Licensing Branch IV |
To: | Markley M Plant Licensing Branch IV |
Singal, Balwant, 415-3016, NRR/DORL/LPL4 | |
References | |
TAC MC4676, TAC MC4677 | |
Download: ML092020343 (4) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20241399, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant2024-11-0505 November 2024
[Table view]Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant PMNS20231415, Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application2023-12-22022 December 2023 Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application ML23345A2122023-12-11011 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A2282023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A0902023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23313A0622023-11-0909 November 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23296A1232023-10-23023 October 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23215A1922023-08-0707 August 2023 – August 7, 2023 Presubmittal Meeting Presentation - Relocation of Technical Specification 3.9.3 Nuclear Instrumentation to a Licensee Controlled Document (EPID: L?2023?LRM-0052) PMNS20230863, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual2023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual PMNS20230867, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20230624, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 22023-05-12012 May 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 ML23094A2722023-04-0606 April 2023 – April 6, 2023 Presubmittal Meeting Presentation - Extension Request for Thermal Relief Valves (EPID: L?2023?LRM-0023) PMNS20230363, Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves2023-04-0606 April 2023 Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves PMNS20230232, Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.32023-03-0909 March 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.3 PMNS20230133, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-02-15015 February 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20221254, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-01-0909 January 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application ML22140A1082022-05-31031 May 2022 (CPNPP) First License Renewal (60 Years) Application Pre-Application Submittal Meeting 2, Meeting Slides PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2022-05-23023 May 2022 Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants ML21259A0312021-09-30030 September 2021 Initial License Renewal Pre-Application Submittal Meeting Sept 2021 - Safety ML21259A0352021-09-16016 September 2021 License Renewal Pre-Application Submittal Meeting Sept 2021 Environmental Report PMNS20211050, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental2021-08-13013 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental PMNS20211053, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2021-08-0909 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210373, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210370, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 ML21068A0292021-03-0909 March 2021 Presentation - 3/24/2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210249, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-0909 March 2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20201387, Initial License Renewal pre-application Meeting2020-12-16016 December 2020 Initial License Renewal pre-application Meeting ML20314A3422020-11-12012 November 2020 NRC Teleconference with Comanche Peak Regarding a Proposed Exigent License Amendment Request (LAR) 20-007 TS 3.7.8 Station Service Water System TS 3.8.1 AC Sources - Operating ML20302A2692020-10-28028 October 2020 Teleconference with Vistra Operations Company LLC Regarding a Proposed License Amendment Request to Make a One-Time TS Change to Replace a Station Service Water Pump at Comanche Peak Nuclear Power Plant, Unit No. 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12328A1252012-11-20020 November 2012 Licensee Slides from 11/20/12 Pre-Submittal Meeting to Discuss LAR for Spent Fuel Criticality ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12159A1182012-06-11011 June 2012 Notice of 6/26/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME86 ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML1125702582011-09-13013 September 2011 Licensee Slides from 9/13/11 Meeting with Luminant Generation Company, LLC Regarding Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative... ML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0814400962008-05-23023 May 2008 Meeting Agenda for Closed Security Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 2024-11-05 Category:Meeting Notice MONTHYEARPMNS20241399, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant2024-11-0505 November 2024
[Table view]Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant PMNS20231415, Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application2023-12-22022 December 2023 Notice of Meeting for the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application ML23345A2122023-12-11011 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A0902023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23340A2282023-12-0606 December 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23313A0622023-11-0909 November 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23296A1232023-10-23023 October 2023 Environmental Meeting Related to the Comanche Peak Nuclear Power Plant Draft Supplemental Environmental Impact Statement, Units 1 and 2, License Renewal Application ML23215A1652023-08-0404 August 2023 – August 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053) PMNS20230867, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Extend the Diesel Generator Allowed Outage Time from 3 Days to 14 Days at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20230863, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual2023-07-26026 July 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Relocate Refueling Operations Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual PMNS20230624, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 22023-05-12012 May 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 PMNS20230363, Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves2023-04-0606 April 2023 Meeting with Vistra Operations Company LLC Proposed Alternative for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, for Inservice Testing of Component Cooling Water Heat Exchanger Relief Valves PMNS20230232, Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.32023-03-0909 March 2023 Meeting with Vistra Operations Company LLC Proposed License Amendment Request for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, to Take Exception to Regulatory Guide 1.81, Revision 1, Position C.3 PMNS20230133, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-02-15015 February 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20221254, Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application2023-01-0909 January 2023 Environmental Scoping Meeting Related to the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2022-05-23023 May 2022 Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20211050, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental2021-08-13013 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Environmental PMNS20211053, Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety2021-08-0909 August 2021 Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210370, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Biennial Emergency Planning Exercise for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210373, Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-25025 March 2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20210249, Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 22021-03-0909 March 2021 Meeting with Vistra Operations Company LLC Proposed License Amendment Request to Adopt TSTF-505, Revision 2, to Provide Risk-Informed Extended Completion Times at Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 PMNS20201387, Initial License Renewal pre-application Meeting2020-12-16016 December 2020 Initial License Renewal pre-application Meeting ML20302A2692020-10-28028 October 2020 Teleconference with Vistra Operations Company LLC Regarding a Proposed License Amendment Request to Make a One-Time TS Change to Replace a Station Service Water Pump at Comanche Peak Nuclear Power Plant, Unit No. 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15191A2512015-07-0909 July 2015 July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML12159A1182012-06-11011 June 2012 Notice of 6/26/12 Meeting with Luminant Generation Company LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME86 ML12048A8612012-02-17017 February 2012 Notice of Meeting to Discuss the Scope of Plant Modifications Being Implemented for Comanche Peak Nuclear Power Plant - Fire Protection Modifications ML1122119682011-08-26026 August 2011 Notice of Meeting with Luminant Generation Company LLC to Discuss Comanche Peak, Units 1 and 2, Proposed License Amendment Request for Risk-Informed Technical Specification Task Force Initiative 8a ML1112406132011-05-0404 May 2011 Notice of *Errata* Public Meeting with Luminant Generation Company, LLC, to Discuss Performance Results for the Period of 01/01/10 - 12/31/10 ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1035702882010-12-23023 December 2010 Notice of Regulatory Conference with Luminant Generation Company, LLC ML1011210342010-04-22022 April 2010 Notice of Meeting with Luminant Generation Company, LLC to Discuss Issues Related to Comanche Peak Nuclear Power Plant ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0915905632009-06-0808 June 2009 Notice of Public Meeting with Luminant Generation to Discuss Performance Results of the Comanche Peak Steam Electric Station for the Period of January 1 Through December 31, 2008 ML0814400882008-05-23023 May 2008 Notice of Closed Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 ML0814106622008-05-20020 May 2008 Notice of Meeting to Discuss End-of-cycle Public Meeting Between the NRC & Luminant Generation Company, LLC to Present & Discuss Performance Results of the Comanche, Units 1 & 2, Facility for the Period of January 1 Though December 31, 200 ML0813001312008-05-0909 May 2008 Notice of Significant Licensee Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 & 2 ML0812800772008-05-0606 May 2008 Notice of Meeting with Luminant Generating Corporation, LLC to Discuss Security Related Issues and Inspection Results at Comanche Peak Steam Electric Station, Units 1 and 2 2024-11-05 Category:Memoranda MONTHYEARML24297A6392024-10-30030 October 2024
[Table view]Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML24088A2282024-04-0202 April 2024 License Renewal Application ML24019A0342024-01-30030 January 2024 Public Meeting Summary - 01-04-2024 - Comanche Peak LRA - Structures Monitoring Program ML23279A1052023-10-0606 October 2023 Memorandum from the Secretary to the Board and Parties ML22304A1912022-11-23023 November 2022 – Aging Management Audit Plan Regarding the License Renewal Application Review ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21259A1492021-10-26026 October 2021 CPNPP, Unit Nos. 1 and 2 - Meeting Summary for Environmental Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21259A1402021-10-0505 October 2021 Meeting Summary for Safety Pre Submittal Meeting for Initial License Renewal Application on September 21, 2021 ML21176A1292021-06-25025 June 2021 CPNPP FFD Inspection Doc Request 2021 ML21174A0942021-06-23023 June 2021 Reactor Trip on June 7, 2021 - Management Directive 8.3 Screening ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21124A0052021-05-10010 May 2021 Memo for Environmental Pre-Submittal Meeting for Initial License Renewal Application ML19120A3382019-04-26026 April 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for Luminant Generation Company, Llc'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and 10 CFR 72.30(c) for Comanche Peak ISFSI ML18346A1832019-01-0606 January 2019 FO Closure Audit Summary ML18221A6322018-08-15015 August 2018 Eicb Safety Evaluation - Comanche Peak Nuclear Power Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.2 Engineered Safety Feature Actuation System Instrumentation Docket/Epid 000976/05000446/L-2018-LLA-0 ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 ML12299A4102012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company, LLC, to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12306A3242012-11-0505 November 2012 Notice of Meeting with Luminant Generation Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12286A2792012-10-18018 October 2012 Notice of Meeting with Luminant Generating Company LLC to Discuss Indirect License Transfers for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML12216A2992012-08-27027 August 2012 9/13/12 Notice of Meeting with Luminant Generation Company LLC to Discuss Proposed License Request for Approval of Revised Spent Fuel Criticality Analysis to Update Comanche Peak, Units 1 and 2, Technical Specifications ML12191A1472012-07-11011 July 2012 8/6/12 Notice of Conference Call with Luminant to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 (TAC ME8615-ME8616) ML12171A1842012-06-11011 June 2012 6/26/12 Revised Notice of Meeting with Luminant Generation Company, LLC to Discuss Proposed License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, to Support Installation of Backup Transformer at Comanche Peak, Units 1 and 2 ML1117302232011-06-29029 June 2011 Staff Review of the Comanche Peak Independent Spent Fuel Storage Installation Physical Security Plan and Verification of Additional Security Measures Incorporation ML1107401282011-03-15015 March 2011 3/17/11 Notice of Forthcoming Closed Meeting with Luminant Generation Company Via Conference Call to Discuss Generic Request for Additional Information Pertaining to Its Cyber Security Submittal ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0921000502009-07-31031 July 2009 Notice of Pre-Application Meeting with Luminant Generation Company LLC to Discuss Future Amendment Request to Revise Comanche Peak Units 1 and 2 Startup Transformer Completion Times ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0724904812007-09-11011 September 2007 Notice of Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants ML0720800042007-07-31031 July 2007 Memo to File Request for Additional Information Application for Order Approving Indirect Transfer of Control of Licenses & License Amendments to Reflect Proposed Licensee'S Name Change ML0713003582007-05-11011 May 2007 Notice of Meeting with Txu Generation Company LP, Regarding Proposed Transition to Westinghouse Methodology and Other Methodologies Specific to Comanche Peak Steam Electric Station (CPSES) and Power Uprate Application ML0630400142006-10-31031 October 2006 Notice of Forthcoming Meeting with Txu Generation Company, LP Re Radiological Consequences of Design-Basis Accidents for Comanche Peak Steam Electric Station ML0627202212006-10-13013 October 2006 Staff'S Review of the Revision to Technical Specification Surveillance Requirements 3.3.1.2 & 3.3.1.3, Reactor Trip System Instrumentation (RTS) ML0612805802006-06-30030 June 2006 Memo with Enclosures 1 and 2, - Trip Report Regarding Staff Observations Regarding Flume Testing of a Prototype Portion of the Proposed Replacement Suction Screen Design for the Comanche Peak Steam Electric Station ML0607302642006-03-0707 March 2006 Closure Memorandum: Issue for Resolution 2005-083: Evaluation: Part 21 - Engine Systems - Governor Drive Coupling Element ML0527802152005-10-0505 October 2005 Forthcoming Meeting with Txu Analytical Methodologies Supporting the Comanche Peak, Unit 1, Steam Generators Replacement Project ML0525803232005-09-15015 September 2005 Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants ML0519301632005-07-14014 July 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0516003452005-06-14014 June 2005 Draft Information Memo - May 6 - May 27, 2005 ML0506104872005-03-23023 March 2005 Draft Information Memo - May 1, 2005 Thru May 27, 2005 ML0435701632005-01-24024 January 2005 Draft Information Memo - Inputs from March 2, 2004 Through March 31, 2004 ML0429402412004-10-25025 October 2004 Draft Information for June 1, 2004 to June 30, 2004 ML0426400682004-09-21021 September 2004 Draft Information Report from January 14 Thru February 26, 2004 2024-04-02 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2009 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Balwant K. Singal, Senior Project Managert~ .....:t t.-.8 \~
Plant Licensing Branch IV "" q 1" Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
REVISED FORTHCOMING CONFERENCE CALL WITH LUMINANT GENERATION COMPANY LLC (LUMINANT) (TAC NOS. MC4676 AND MC4677)
DATE & TIME: Monday, August 10,2009 1:00 p.m. - 3.00 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, 04B4 Rockville, Maryland PURPOSE: Follow-up Discussion of the Draft U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) for Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated May 11,2009 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML091660376).
CATEGORY:* This is a Category 1 meeting via conference call. The public is participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC LUMINANT Michael Scott NRR Jimmy Seawright Reg. Affairs John Lehning NRR Chuck Feist Engineering Stephen Smith NRR Ben Mays Engineering Balwant Singal NRR Stuart Cain ALDEN et al. LudWig Haber ALDEN et al .
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
M. Markley -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before August 6. 2009, 4:30 p.m.
(Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS: Balwant K. Singal, NRR Mohan C. Thadani, NRR 301-415-3016 301-415-1476 Balwant.Singal@nrc.gov Mohan.Thadani@nrc.gov This meeting notice is revised to indicate a change in the meeting date and time.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-445 and 50-446
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING CONFERENCE CALL WITH LUMINANT GENERATION COMPANY LLC AND NUCLEAR REGULATORY COMMISSION Monday, August 10,2009 1:00 p.m. - 3:00 p.m.
- 1. Introductions
- 2. Follow-up Discussion of the Draft U.S. Nuclear Regulatory Commission (NRC) Request for Addition Information (RAI) for Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091660376).
- 3. Public Input
- 4. Adjourn Enclosure