Text
November 15, 2006 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Dear Administrative Judges:
Pursuant to 10 C.F.R. § 2.1203(a), the staff of the Nuclear Regulatory Commission (Staff) herein notifies the Licensing Board and the parties that a hearing file has been created for this proceeding. The hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336(b). Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1.
On or about Wednesday, November 15, 2006, the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:
http://www.nrc.gov/reading-rm/ehd.html/. The hearing file will be contained in a sub-folder entitled, Pilgrim Hearing File in the Pilgrim 293-LR" folder of the EHD.
R. Cole November 15, 2006 P. Abramson A. Young In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log at this time, which is appended hereto as Attachment 2. Also attached is the Declaration of Frank Gillespie formally invoking the deliberative process privilege with respect to each of the documents in Attachment 2. The Staff will preserve and maintain all privileged documents during the pendency of this proceeding.
10 C.F.R. § 2.336(c) requires that all disclosures are accompanied by a certification (by sworn affidavit) that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as of the date of the certification. The required affidavit of the Perry Buckberg, is attached but unsigned due to Mr. Buckberg's unavailability.
Mr. Buckberg's signed Affidavit will be provided upon his return to the office on or about November 16, 2006.
Sincerely,
/RA/
David E. Roth Counsel for NRC Staff
Enclosures:
Hearing File Index Privilege Log - Deliberative Process Affidavit of Perry Buckberg Declaration of Frank Gillespie cc:
Office of Commission Diane Curran, Esq.
Molly H. Bartlett, Esq.
Appellate Adjudication Matthew Brock, Esq.
Sheila Slocum Hollis Office of the Secretary Terence A. Burke, Esq.
David R. Lewis, Esq.
ATTN: Rulemaking and Paul A. Gaukler, Esq.
Town Manager, Adjudications Staff Richard R. MacDonald Town of Plymouth Atomic Safety and Licensing Board Panel
Page 1 of 15 ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Initial Disclosures - November 15, 2006 ID #
Accession Number Document Date Title/Description:
00-001 ML003678174 1/7/2000 Letter informing that Entergy Nuclear Generation Company plans to submit a license renewal application in accordance with 10CFR54 for the Pilgrim Nuclear Power Station in the second half of 2004.00-002 ML041140047 4/15/2004 Deferral of the Pilgrim License Renewal Application.00-003 ML043440123 12/2/2004 Pilgrim, Notice of Intent to Submit License Renewal Application.00-004 ML062120491 1/25/2006 Email: (PA) Re: Checking In 00-005 ML060300028 1/25/2006 Pilgrim Nuclear Power Station License Renewal Application.00-006 ML060300026 1/25/2006 Transmittal of Pilgrim Nuclear Power Station License Renewal Application.00-007 ML060830611 1/25/2006 Pilgrim Nuclear Power Station Applicants Environmental Report Operating License Renewal Stage, Appendix E.00-008 ML060470240 1/25/2006 Package-Pilgrim, License Renewal Application Boundary Drawings.00-009 ML062120498 1/27/2006 Email: (PA) Receipt of License Renewal Applications for VY and Pilgrim 00-010 ML060310043 1/31/2006 Press Release-06-011: NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim.00-011 ML060310593 1/31/2006 Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station.00-012 ML060370581 2/3/2006 Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application.00-013 ML062120499 2/3/2006 Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License Renewal
ID #
Accession Number Document Date Title/Description:
Page 2 of 15 00-014 ML062120543 2/15/2006 Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY.00-015 ML061430204 2/23/2006 Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts00-016 ML062120549 2/28/2006 Email: (PA) Closeout: G20060065/LTR-06-0042 - Letter for Mark D. Sylvia, Town of Plymouth, Regarding Relicensing of Pilgrim and Vermont Yankee and Response Letter from J.E. Dyer, NRR 00-017 ML062120625 3/21/2006 Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing 00-018 ML062480291 3/30/2006 Email: (PA) PNPS Audit Plan.00-019 ML062120629 3/31/2006 Email: (PA) Re: Request - License Renewal Work for CFEB 00-020 ML062120631 4/3/2006 Email: (PA) Re: Request - License Renewal Work for CFEB 00-021 ML062480085 4/4/2006 E-mail: (PA) Pilgrim Audit Plan 00-022 ML062120636 4/6/2006 Email: (PA) Audit Questions00-023 ML062120642 4/7/2006 Email: (PA) AMP, AMR, and TLAA questions for PNPS00-024 ML062130095 4/10/2006 Email: (PA) 1999 LR Guidance on Dams00-025 ML061160613 4/21/2006 Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.00-026 ML061170085 4/21/2006 Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.00-027 ML062120415 4/24/2006 E-mail: (PA) PNPS AMP Questions00-028 ML061160283 4/25/2006 Request for a List of Protected Species and Essential Fish Habitat Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review.
ID #
Accession Number Document Date Title/Description:
Page 3 of 15 00-029 ML061160303 4/25/2006 Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review.00-030 ML063070331 4/25/2006 E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule.00-031 ML062090546 4/27/2006 Email: (PA) PNPS LRA Appendix C - BWRVIP Actions00-032 ML061180424 4/28/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA)00-033 ML062090499 4/28/2006 Email: (PA) Pilgrim Questions to be Discussed at the Audit 00-034 ML062010482 4/30/2006 Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005 00-035 ML061430177 5/2/2006 Email from Gerard Zavaski to Fred Mogolesko re: Dose Data 2002-2005 inclusive 00-036 ML062090488 5/4/2006 Email: (PA) AMP questions00-037 ML062090496 5/4/2006 Email: (PA) PNPS Template for not consistent with Gall AMRs00-038 ML062120647 5/4/2006 Email: (PA) Re: Re-assignment of Tables 3.3.2.14-X 00-039 ML062090322 5/5/2006 EMAIL: (PA) AMR Template for Not Consistent with Gall Section 00-040 ML062090498 5/5/2006 Email: (PA) Re: Bolting Integrity Program 00-041 ML062090493 5/5/2006 Email: (PA) Re: PNPS Template for not consistent with GALL AMRs00-042 ML062090324 5/8/2006 Email: (PA) AMR Questions for Pilgrim 00-043 ML062090328 5/9/2006 EMAIL: (PA) AMR Review of Section 3.3 00-044 ML063070393 5/10/2006 E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit -
for Pilgrim LRA.
ID #
Accession Number Document Date Title/Description:
Page 4 of 15 00-045 ML062480272 5/10/2006 Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim.00-046 ML062480283 5/10/2006 Email: (PA) FWD: Pilgrim AMP Combined Questions00-047 ML061310234 5/11/2006 Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661)00-048 ML063070402 5/11/2006 E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1.00-049 ML062090333 5/11/2006 EMAIL: (PA) Table 3.3.1 AMR questions00-050 ML063050518 5/11/2006 EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations.00-051 ML061380549 5/11/2006 Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1.00-052 ML062410406 5/12/2006 PNPS License Scoping Comment - Tom Belcher.00-053 ML061420164 5/17/2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts.00-054 ML063060296 5/19/2006 EMAIL: (PA-LR) Information re: Pilgrim LRA.00-055 ML061410001 5/19/2006 Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station.00-056 ML063050506 5/22/2006 EMAIL: (PA-LR) Pilgrim ETE Comments.00-057 ML061440026 5/22/2006 Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676).00-058 ML061650016 5/23/2006 U.S. Dept. Of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding:
Formal Consultation on Pilgrim License Renewal Not Required.00-059 ML061710601 5/24/2006 Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim.00-060 ML062090338 5/28/2006 Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL Report 00-061 ML061560215 5/30/2006 Culture Resources Site Maps
ID #
Accession Number Document Date Title/Description:
Page 5 of 15 00-062 ML063060299 5/30/2006 EMAIL: (PA-LR) PNPS License Renewal - Environmental.00-063 ML063050504 6/2/2006 EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim.00-064 ML063060322 6/2/2006 EMAIL: (PA-LR) PNPS - Spotted Turtle.00-065 ML061650255 6/7/2006 Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01, Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell.00-066 ML061710422 6/7/2006 Pilgrim, License Renewal Application, Amendment 2.00-067 ML063070330 6/8/2006 E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information).00-068 ML061710600 6/8/2006 Ltr from Mr. Colosi, NOAA to DLR addressing EFH.00-069 ML063070327 6/9/2006 E-Mail: The second set of AMR Questions.00-070 ML063050512 6/9/2006 EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions.00-071 ML061670101 6/12/2006 Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrims License Renewal Application.00-072 ML061710104 6/14/2006 Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System.00-073 ML061770277 6/15/2006 Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006).00-074 ML061770407 6/15/2006 Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Stations License Renewal Application-Federal Register Notice, April 14, 2006.00-075 ML061770043 6/16/2006 Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period.
ID #
Accession Number Document Date Title/Description:
Page 6 of 15 00-076 ML061770045 6/16/2006 Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts.00-077 ML061770395 6/20/2006 Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006.00-078 ML062510359 6/21/2006 Email: (PA) Additional Missing AMPs00-079 ML062510361 6/22/2006 Email: (PA) Additional Missing AMPs00-080 ML062510295 6/22/2006 Email: (PA) Additional missing AMPs00-081 ML061740031 6/23/2006 Press Release-I-06-038: Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding.00-082 ML062120410 6/25/2006 E-mail: (PA) Additional AMR Question - Section 3.1.1 00-083 ML061780159 6/26/2006 Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re:
Limited Appearance Statements00-084 ML063070323 6/26/2006 E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01.00-085 ML062130145 6/26/2006 Email: (PA) Audit Report Attachment 5 - List of Documents00-086 ML063050509 6/26/2006 EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006.00-087 ML063060267 6/26/2006 EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping].00-088 ML062120407 6/27/2006 E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses00-089 ML062090388 6/27/2006 Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses
ID #
Accession Number Document Date Title/Description:
Page 7 of 15 00-090 ML063050396 6/27/2006 EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses.00-091 ML062120406 6/29/2006 E-mail: (PA) - None -
00-092 ML062130057 6/29/2006 Email: (PA) Additional Question from Bob Jackson 00-093 ML062090309 6/29/2006 Email: (PA) Jim and Peter 00-094 ML062130056 6/29/2006 Email: (PA) Non-Safety Related SCs00-095 ML062090319 6/29/2006 Email: (PA) PNPS Shell 00-096 ML062090318 6/29/2006 Email: (PA) Re: QA for Aging Management of NSR Components00-097 ML062130058 6/29/2006 Email: (PA) Re: QA for Aging Management of NSR Components00-098 ML063050603 6/29/2006 EMAIL: (PA-LR) Additional Questions From Bob Jackson 00-099 ML063050610 6/29/2006 EMAIL: (PA-LR) Non-Safety Related SCs.00-100 ML061810424 6/30/2006 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Power Station.00-101 ML062120423 6/30/2006 Email: (PA) Draft AMP Section of Audit Report 00-102 ML062510364 6/30/2006 Email: (PA) Draft AMP Section of Audit Report 00-103 ML062480379 6/30/2006 Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews.00-104 ML062480297 6/30/2006 Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews.00-105 ML062090380 6/30/2006 Email: (PA) Response to ARM Questions 482 and 483 00-106 ML063050613 6/30/2006 EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews.00-107 ML062130018 6/30/2006 Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews
ID #
Accession Number Document Date Title/Description:
Page 8 of 15 00-108 ML062090565 7/3/2006 Email: (PA) Re: QA for Aging Management of NSR Components00-109 ML062130053 7/5/2006 Email: (PA) Comments on the AMP writeup 00-110 ML062130091 7/5/2006 Email: (PA) FW: Handing of Generic Issues00-111 ML062090297 7/5/2006 Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 00-112 ML062090563 7/5/2006 Email: (PA) PNPSs TLAA Section 4.6 00-113 ML062090305 7/5/2006 Email: (PA) PNPSs TLAA Section 4.6 00-114 ML062090304 7/5/2006 Email: (PA) Quality Assurance for Aging Management of NSR Components00-115 ML062090561 7/5/2006 Email: (PA) Quality Asurance for Aging Management of NSR Components00-116 ML062090303 7/5/2006 Email: (PA) Re: Draft AMP Section of Audit Report 00-117 ML062130064 7/5/2006 Email: (PA) Re: Quality Assurance for aging management of NSR components00-118 ML062130054 7/5/2006 Email: (PA) Re: Quality Assurance for aging management of NSR components00-119 ML061940175 7/5/2006 Pilgrim - License Renewal Application Amendment 3.00-120 ML061930418 7/5/2006 Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives.00-121 ML061930218 7/6/2006 Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding.00-122 ML062130061 7/6/2006 Email: (PA) Additional AMR questions00-123 ML062130086 7/6/2006 Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 00-124 ML062120477 7/6/2006 Email: (PA) Re: Quality Assurance for Aging Management of NSR Components.00-125 ML063060309 7/6/2006 EMAIL: (PA-LR) FW: PNPS ER EJ writeup.
ID #
Accession Number Document Date Title/Description:
Page 9 of 15 00-126 ML062070067 7/7/2006 Pilgrim - Limited Appearance Statement by Maurice C. Cion.00-127 ML062060607 7/7/2006 Pilgrim - Limited Appearance Statement by W. Bramhall 00-128 ML062120412 7/7/2006 E-mail: (PA) Re: Comments on Pilgrim AMP document 00-129 ML062120480 7/7/2006 Email: (PA) Comments on Pilgrim AMP document 00-130 ML062090293 7/7/2006 Email: (PA) Re: Comments on Pilgrim AMP Document 00-131 ML063070319 7/10/2006 E-Mail: FWD: Response to your question regarding Radwaste Piping.00-132 ML062090362 7/11/2006 CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth.00-133 ML063060302 7/11/2006 EMAIL: (PA-LR) FW: Pilgrim Document 83.00-134 ML063070536 7/12/2006 E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A.00-135 ML062070224 7/13/2006 Pilgrim - Limited Appearance Statement of John R. Glover.00-136 ML061940368 7/13/2006 Press Release-I-06-040: NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings.00-137 ML061700055 7/13/2006 Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application.00-138 ML062070051 7/17/2006 Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG).00-139 ML063070252 7/17/2006 E-Mail: Core shroud tie rod upper support cracking-information request.00-140 ML063060239 7/17/2006 Email: (PA-LR) Additional info for ER.00-141 ML063060259 7/17/2006 EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson].00-142 ML063060249 7/17/2006 EMAIL: (PA-LR) Re: Pilgrim.
ID #
Accession Number Document Date Title/Description:
Page 10 of 15 00-143 ML062090075 7/19/2006 Pilgrim - License Renewal Application Amendment 5.00-144 ML062080142 7/19/2006 Pilgrim Nuclear Power Station - License Renewal Application Amendment 5.00-145 ML062090383 7/21/2006 Email: (PA) Fwd: Re: RAI for section 3.5 00-146 ML063070318 7/24/2006 E-Mail: FW: Pilgrim LRA Amendment 5.00-147 ML062090387 7/24/2006 Email: (PA) Re: Any Correspondences from PNPS on LRA Changes.00-148 ML062070305 7/25/2006 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim.00-149 ML062510296 7/25/2006 Email: (PA) Piligrim AMP/AMR Audit Report 00-150 ML062480362 7/25/2006 EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis.00-151 ML062070240 7/25/2006 Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-152 ML062070295 7/25/2006 Summary of Conference Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676).00-153 ML063070241 7/26/2006 E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening.00-154 ML062480388 7/26/2006 EMAIL: (PA) Revised AMR 3.4 Input 00-155 ML062120464 7/26/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).00-156 ML063070246 7/27/2006 E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim.00-157 ML063070595 7/27/2006 Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found.
ID #
Accession Number Document Date Title/Description:
Page 11 of 15 00-158 ML062510306 7/27/2006 Email: (PA) PNPS Q&Q 00-159 ML063070232 7/31/2006 E-Mail: Fwd: PNPS Q&A Data Base.00-160 ML062510302 7/31/2006 Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRA 00-161 ML062510299 7/31/2006 Email: (PA) Urgent - revised section 3.0.4 input for QA program 00-162 ML062120662 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.00-163 ML062120743 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.00-164 ML062120752 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.00-165 ML062480391 8/2/2006 EMAIL: (PA) AMR Audit Report Section 3.3 00-166 ML062480361 8/2/2006 EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject)00-167 ML062510324 8/2/2006 Fax to Brian Ford/Fred Mogolesko from RAMS.00-168 ML063070332 8/2/2006 FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3.00-169 ML062480385 8/3/2006 EMAIL: (PA) Ducs Audit and Review Report Input 00-170 ML062480383 8/3/2006 EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections.00-171 ML062480381 8/3/2006 EMAIL: (PA) TLAA Input 00-172 ML062480395 8/3/2006 EMAIL: (PA) TLAA Section 4.3 Input 00-173 ML063070219 8/7/2006 E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm.
ID #
Accession Number Document Date Title/Description:
Page 12 of 15 00-174 ML063070220 8/7/2006 E-Mail: FW: RAM.00-175 ML063070239 8/7/2006 E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am.00-176 ML063070225 8/10/2006 E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06.00-177 ML063070228 8/11/2006 E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA.00-178 ML062510343 8/11/2006 Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRA 00-179 ML062510350 8/14/2006 Email: (PA) LRA B.1.1, Boraflex Program 00-180 ML062510346 8/14/2006 Email: (PA) RAIs 3.5.1-1 and 3.5.1-2 00-181 ML062290474 8/14/2006 RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-182 ML062280218 8/15/2006 Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear Power Station.00-183 ML063040463 8/16/2006 EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam).00-184 ML063070230 8/18/2006 E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6.00-185 ML063070188 8/21/2006 E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006).00-186 ML062990442 8/21/2006 EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach.00-187 ML062990253 8/21/2006 EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA.00-188 ML062420060 8/22/2006 Pilgrim - License Renewal Application Amendment 6.00-189 ML062350440 8/22/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-190 ML063070217 8/23/2006 E-Mail: FW: Pilgrim License Renewal Application Amendment 6.
ID #
Accession Number Document Date Title/Description:
Page 13 of 15 00-191 ML063070190 8/23/2006 E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am.00-192 ML063050296 8/23/2006 EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA).00-193 ML062360514 8/23/2006 Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No. MC9676).00-194 ML062980322 8/25/2006 Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA.00-195 ML062510307 8/25/2006 Email: (PA) Pilgrim Audit Report Peer Review AMP Sections00-196 ML062410379 8/25/2006 Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006.00-197 ML063070361 8/28/2006 E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence.00-198 ML063070375 8/28/2006 E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am.00-199 ML063070367 8/28/2006 E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am.00-200 ML062650221 8/30/2006 Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney Generals Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006).00-201 ML062980258 8/30/2006 E-mail: (PA) SER Input.00-202 ML062500117 8/30/2006 Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7.00-203 ML063110209 9/5/2006 EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24).00-204 ML063060595 9/7/2006 E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA.
ID #
Accession Number Document Date Title/Description:
Page 14 of 15 00-205 ML062490501 9/7/2006 Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).00-206 ML062990446 9/8/2006 EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA.00-207 ML062500431 9/8/2006 Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2.00-208 ML062500401 9/8/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-209 ML063070420 9/13/2006 E-Mail: Entergy Memo of 9/13/2006 - Pilgrim.00-210 ML062650072 9/13/2006 Pilgrim - License Renewal Application Amendment 8.00-211 ML062710517 9/26/2006 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Entergy Nuclear Operations, Inc., for Renewal of the Operating License for Pilgrim Nuclear Power Station.00-212 ML063050380 10/3/2006 E-MAIL: (PA-LR) Information from the Conference call on 9/26/06.00-213 ML063110171 10/6/2006 Email: (NPA-PD-LR) Fwd: Pilgrim LRA Amendment 9 10/6/2006.00-214 ML062910173 10/6/2006 Pilgrim, License Renewal Application Amendment 9, Revised List of Regulatory Commitments and Response to RAIs on Aging Management Review in LRA Section 3.2 Engineered Safety Features and Time Limiting Aging Analysis in LRA Section 4.2 Reactor Vessel....00-215 ML063070406 10/12/2006 Email: (NPA-PD-LR) Requested Documents [Sending USPS 2 Documents].00-216 ML063050385 10/19/2006 E-MAIL: (PA-LR) FW: Figure 2-1.00-217 ML063050392 10/19/2006 EMAIL: (PA-LR) FW: Drawing.00-218 ML063050388 10/19/2006 EMAIL: (PA-LR) FW: Figure 3-1.00-219 ML063050501 10/23/2006 EMAIL: (PA-LR) Re: Pilgrim - Amendments to the LRA.
ID #
Accession Number Document Date Title/Description:
Page 15 of 15 00-220 ML062850407 10/23/2006 Summary of Conference Call on October 10, 2006 with Entergy Nuclear Operations. Inc.,
to Clarify Information Sent to the NRC in Response to Requests for Additional Information Regarding the Pilgrim License Renewal Application (TAC NO. MC9669).00-221 ML062890001 10/24/2006 Summary of Conference Call with Entergy Nuclear Operations, Inc, to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station.
Page 1 of 40 ATTACHMENT 2 PILGRIM NUCLEAR POWER STATION HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Initial Disclosures - November 15, 2006 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP-00-001 ML062980597 Hurley B, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Pre-Audit Draft TER.
04/19/2006 E-Mail Schaaf R G, Williamson A R, RC Associates, Inc Status of the Pre-Audit Draft Version of the TER 2
DP-00-002 ML063050403 Schaaf R G, NRC/NRR EMAIL: (NPA-PD-LR)
Pilgrim Scout Trip Notes.
04/20/2006 E-Mail Williamson A R, NRC Scouting Trip Notes 16 DP-00-003 ML063050408 Schaaf R G, NRC/NRR EMAIL: (NPA-PD-LR)
Re: Possible Tribe Info.
04/20/2006 E-Mail Mullins A J, Williamson A R, NRC Discussions on tribal recognition 2
DP-00-004 ML062990242 Schaaf R G, NRC/NRR EMAIL: (NPA-PD-LR)
Draft Audit Checklists.
04/24/2006 E-Mail Hurley B, Szeligowski J, Earth Tech, Inc Internal transmission of draft checklists to aid subject matter experts 20 DP-00-005 ML062980602 Schaaf R G, NRC EMAIL: (NPA-PD-LR)
Comments/Questions Re: Information Requests.
04/24/2006 E-Mail Szeligowski J, Earth Tech, Inc Discussions on water quality, socio-economics, and alternatives 4
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 2 of 40 DP-00-006 ML062980600 Schaaf R G, NRC/NRR EMAIL: (NPA-PD-LR)
Resending - Another Question on Info Requests [Another 2 Questions].
04/24/2006 E-Mail Szeligowski J, Earth Tech, Inc Internal questions on regional demography 3
DP-00-007 ML062980598 Schaaf R G, NRC EMAIL: (NPA-PD-LR)
Fwd: Revised RAIs.
04/24/2006 E-Mail, Request for Additional Information (RAI)
Palla R L, Williamson A R, NRC Coordination of review of revised SAMA RAIs 19 DP-00-008 ML062980599 Schaaf R G, NRC/NRR EMAIL: (NPA-PD-LR)
Resending - Another Question on Info Requests.
04/24/2006 E-Mail Szeligowski J, Earth Tech, Inc Internal questions and comments on state criteria 3
DP-00-009 ML062990243 Schaaf R G, NRC/NRR EMAIL: (NPA-PD-LR)
Info Needs Clarification Requested.
04/25/2006 E-Mail Szeligowski J, Earthtech, Inc Internal request to clarify RA 3
DP-00-010 ML063110133 Rubin M P, NRC/NRR/
ADRA/DRA/AP LA (NPA-PD-LR) Memo to R. Franovich Re:
Request for Additional Information to Support the Staff's Severe Accident Mitigation Alternative Review for Pilgrim Nuclear Power Station (TAC No.
MC9676).
04/26/2006 Memoranda Franovich R L, NRC/NRR/
ADRO/DLR/R EBA Internal transmission of RAIs from Probabilistic Risk Assessment Licensing Branch A Division of Risk Assessment Office of Nuclear Reactor Regulation 8
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 3 of 40 DP-00-011 ML062070233 Prepared by Advanced Technologies and Laboratories International, Inc. Contract No. DR 06-030 S117763 04/26/2006 OCR from Scanned Image Prepared for Division of License Renewal Audit and Review Plan for Plant Aging Management Reviews and Programs DP-00-012 ML063040439 Szeligowski J, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Final Set of PNPS Audit Questions.
04/27/2006 E-Mail Williamson A R,
Internal transmission of RAIs 6
DP-00-013 ML063040432 Palla R L, NRC EMAIL: (NPA-PD-LR)
04/27/2006 E-Mail, Request for Additional Information (RAI)
Emch R L, Schaaf R G, NRC Internal transmission of and discussion of SAMA RAIs 18 DP-00-014 ML063060385 Emch R L, NRC EMAIL: (NPA-PD-LR)
Re: Pilgrim and VY RAI Deletions.
04/28/2006 E-Mail Palla R L, Schaaf R G, NRC Discussions of draft RAIs 3
DP-00-015 ML063110599 Pope S, ISL, Inc EMAIL: (NPA-PD-LR)
Delivery of Subtasks 1 and 2a for Contract
- NRC-03-03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC No. MC9669.
05/05/2006
- No Document Type Applies, E-Mail Stubbs A, NRC Internal Transmission of review results and RAIs 17
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 4 of 40 DP-00-016 ML063050413 Nash H L, NRC EMAIL: (NPA-PD-LR)
Winter Flounder Hatchery.
05/08/2006 E-Mail Benner E J, Duda S, Schaaf R G, Williamson A R, Earth Tech, Inc, NRC Internal Comment on internet information on hatchery.
2 DP-00-017 ML063060152 Szeligowski J, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Document Request List.
05/09/2006 E-Mail, Graphics incl Charts and Tables Williamson A R, NRC Internal transmission of document request list generated during the PNPS Site Audit.
10 DP-00-018 ML062980359 Wen P C, NRC Email: (NPA-PD-LR)
Fwd: Pilgrim AMP Combined Questions.
05/10/2006 E-Mail Subbaratnam R, NRC Internal transmission of Pilgrim AMP Combined Questions 48 DP-00-019 ML063060156 Nash H L, NRC EMAIL: (NPA-PD-LR)
Re: EFH meeting with NMFS (5/16).
05/10/2006 E-Mail Benner E J, Mullins A, Schaaf R G, Williamson A R, NRC Discussion of policy for meeting 2
DP-00-020 ML062980360 Subbaratnam R, NRC Email: (NPA-PD-LR)
Re: AMP Questions for Pilgrim.
05/10/2006 E-Mail Davis J A, NRC Discussion/request of form and status of AMP questions 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 5 of 40 DP-00-021 ML062980357 Davis J A, NRC Email: (NPA-PD-LR)
Questions for the Pilgrim AMP Audit.
05/10/2006 E-Mail Subbaratnam R, NRC Internal transmission of questions for the Pilgrim AMP audit.
40 DP-00-022 ML063060094 Flynn C, Earth Tech, Inc EMAIL: (NPA-PD-LR)
FW: PNPS Site Audit, Radwaste Systems.
05/11/2006 E-Mail Emch R L, NRC Comment on team makeup and document keeping 5
DP-00-023 ML062980361
, - No Known Affiliation Email: (NPA-PD-LR)
Table 3.3.1 AMR Questions.
05/11/2006 E-Mail Davis J A, Hoang D V, Jackson W R, Nguyen D T, Patel E, Pavinich W, Pavinich W A, Subbaratnam R, Wen P C, -
No Known Affiliation, NRC Internal transmission of AMR questions 10 DP-00-024 ML062980364 Weaver K D, NRC EMAIL: (NPA-PD-LR)
Fwd: Re: Pilgrim's Progress, CDBI Daily Update 5/11.
05/12/2006 E-Mail Subbaratnam R, NRC SRI's comments on LRA review 5
DP-00-025 ML063060158 Franovich R L, NRC Email: (NPA-PD-LR)
Script for Rani.
05/15/2006 E-Mail Williamson A J, NRC Speaker's Notes for public meeting.
13
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 6 of 40 DP-00-026 ML063060161 Duda S, Earthtech, Inc Email: (NPA-PD-LR)
Addt'l Questions for Entergy.
05/17/2006 E-Mail Williamson A, NRC Internal transmission of RAIs on environment 4
DP-00-027 ML062970384 Raymond W J, NRC/RGN-I/DRP/PB5 Email: (NPA-PD-LR)
Comments on LRA Public Meeting.
05/18/2006 E-Mail Powell R J, NRC Internal thoughts on May 17th LRA Public Meeting on Environmental Scoping Process 8
DP-00-028 ML063100088 Pappalardo M, Earthtech, Inc EMAIL: (NPA-PD-LR)
Re: Pilgrim Site Audit Data Requests.
05/23/2006 E-Mail Williamson A R, NRC Discussions of data/report information requests and a plant contact 2
DP-00-029 ML063100116 Craig N, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: Pilgrim Site Audit Data Requests
[missing information].
05/24/2006 E-Mail Williamson A R, NRC Discussion regarding documentation 3
DP-00-030 ML063060358 Franovich R L, NRC EMAIL: (NPA-PD-LR)
T-line for VY/constructive feedback to Entergy on the Pilgrim and VY Audits.
05/31/2006 E-Mail Emch R L, NRC Comment on strategy for feedback 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 7 of 40 DP-00-031 ML063040435 Patel E, - No Known Affiliation EMAIL: (NPA-PD-LR)
Guidelines for AMP write-up.
05/31/2006 E-Mail Davis J A, Hoang D V, Nguyen D T, Subbaratnam R, Wen P C, NRC Internal guidelines to make all sections consistent.
5 DP-00-032 ML063100109 Nash H L, NRC EMAIL: (NPA-PD-LR)
Re: PNPS License Renewal - Spotted Turtle [one more thought].
05/31/2006 E-Mail Dillard S, Williamson A R, Earth Tech, Inc, NRC Discussion regarding spotted turtle 2
DP-00-033 ML063060354 Franovich R L, NRC EMAIL: (NPA-PD-LR)
Need a conference call on VY/Pilgrim SAMA analysis RAIs.
05/31/2006 E-Mail Emch R L, Palla R L, Schaaf R G, Williamson A R, NRC Comments on SAMA analysis reviews 2
DP-00-034 ML063100114 Nash H L, NRC Email: (NPA-PD-LR)
Re: PNPS License Renewal - Spotted Turtle.
05/31/2006 E-Mail Dillard S, Earth Tech, Inc Discussion regarding spotted turtle 2
DP-00-035 ML063060360 Palla R L, NRC EMAIL: (NPA-PD-LR)
Re: Availability for SAMA phone call for Pilgrim.
06/01/2006 E-Mail Williamson A R, NRC Planned discussion topics for phone call 3
DP-00-036 ML063100059 Hurley B, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: Pilgrim Scoping Meeting Transcripts.
06/05/2006 E-Mail, Meeting Transcript Williamson A R, NRC Internal discussion of transcript 21
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 8 of 40 DP-00-037 ML063060333 Craig N, Earth Tech, Inc Email: (NPA-PD-LR)
Re: Pilgrim Site Audit Data Requests.
06/08/2006 E-Mail Williamson A R, NRC Pilgrim Nuclear Power Station Site Audit Document Request List (last updated 6/6/06) plus comments/
corrections 12 DP-00-038 ML063100107 Palla R L, NRC EMAIL: (NPA-PD-LR)
Fwd: Re: Pilgrim Site Audit Data Requests.
06/12/2006 E-Mail Jacobs C J, Williamson A R, NRC Discussion of unresolved items 2
DP-00-039 ML063060378 Emch R L, NRC Email: (NPA-PD-LR)
Andy - Take a look at these for me [from R.
Emch to A. Luu Pilgrim Contention 1
& 5].
06/12/2006 E-Mail Luu A, NRC Internal review request 5
DP-00-040 ML063060374 Emch R L, NRC Email: (NPA-PD-LR)
Re: Plutonium Sediment Report.
06/13/2006 E-Mail Luu A, NRC Discussions on Pu Levels 3
DP-00-041 ML063060367 Emch R L, NRC Email: (NPA-PD-LR)
Re: Plutonium Sediment Report
[closer look].
06/13/2006 E-Mail Luu A, NRC Assessment of Pu Levels 4
DP-00-042 ML063060104 Duda S, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Pilgrim - NMFS Meeting Notes.
06/13/2006 E-Mail Nash H L, Williamson A R, NRC Draft meeting minutes for Pilgrim License Renewal Meeting with NMFS May16, 2006 8
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 9 of 40 DP-00-043 ML063050416 Subbaratnam R, NRC Email: (NPA-PD-LR)
Re: LR -VY and Pilgrim contentions -
Revised [from R.
Subbaratnam.]
06/14/2006 E-Mail Auluck R C, Dudley N F, Rowley J G, Uttal S L, Young M A, NRC Internal Comment on contentions information 3
DP-00-044 ML063060109 Jacobs C, NRC EMAIL: (NPA-PD-LR)
Re: Potential Followup call on Pilgrim.
06/14/2006 E-Mail Palla R L, Schmidt B, -
No Known Affiliation, ISL, Inc, NRC Discussion/
coordination of open issues 3
DP-00-045 ML063060351 Craig N, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Document Request.
06/15/2006 E-Mail, Graphics incl Charts and Tables Williamson A R, NRC Internal corrections to/ comments onPilgrim Nuclear Power Station Site Audit Document Request List 20 DP-00-046 ML063110602 Pope S L, ISL, Inc Email: (NPA-PD-LR)
Delivery of Subtask 5, Site Visit Trip Report of Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC MC9669.
06/15/2006 E-Mail, Letter, Trip Report Stubbs A, NRC Internal transmission of trip report.
10
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 10 of 40 DP-00-047 ML063110607 Pope S, Information Systems Labs, Inc Email: (NPA-PD-LR)
Delivery of Subtask 2c for Contract #
NRC-03-03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC No. MC9669.
06/15/2006 E-Mail,
- Letter, Request for Additional Information (RAI)
Stubbs A, NRC Internal transmission of review results 5
DP-00-048 ML063050342 Dudley N F, NRC EMAIL: (NPA-PD-LR)
Re: LR - VY and Pilgrim Contentions -
Revised.
06/15/2006 E-Mail Subbaratnam R, NRC Discussions of Contentions 2
DP-00-049 ML063060408 Ellis D, Entergy Nuclear Operations, Inc (NPA-PD-LR) Notes 6/15/06.
06/15/2006 Environmen tal Impact Statement,
- Note, Status Report Handwritten notes plus portion of open item list 4
DP-00-050 ML063050346 Shea J J, NRC/NRR/
ADRO/DORL/L PLA EMAIL: (NPA-PD-LR)
Pilgrim License Renewal Status for Briefing Package.
06/16/2006 E-Mail Schaaf R G, Subbaratnam R, NRC Discussions and review of draft briefing package 2
DP-00-051 ML063060349 Duda S, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Entergy Meeting Notes.
06/19/2006 E-Mail, Meeting Summary Nash H L, Williamson A R, NRC Draft of the minutes from meeting with Entergy.
10
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 11 of 40 DP-00-052 ML063100101 Palla R L, NRC EMAIL: (NPA-PD-LR)
Pilgrim RAIs Vs the NEI Guidelines.
06/19/2006 E-Mail Emch R L, Williamson A R, NRC Internal comment/
suggestion regarding RAIs and NEI guidelines 2
DP-00-053 ML063040430 Williamson A R, NRC EMAIL: (NPA-PD-LR)
Re: Need Pilgrim Bullets by COB today.
06/19/2006 E-Mail Fields L C, NRC Internal transmission of review status and Lessons Learned 5
DP-00-054 ML063050354 Fields L C, NRC EMAIL: (NPA-PD-LR)
Pilgrim and VY briefing sheets for Frank.
06/20/2006 E-Mail Franovich R L, Lund L A, Mathew R K, Zimmerman J I,
Review copy including Lessons Learned and Technical Issues 6
DP-00-055 ML063050348 Lavretta A, NRC Email: (NPA-PD-LR)
Pilgrim LRA - Draft RAIs for FP Scoping.
06/20/2006 E-Mail, Memoranda
, Request for Additional Information (RAI)
Iqbal N, NRC Draft Fire Protection RAIs 10 DP-00-056 ML063110619 Pope S, ISL, Inc EMAIL: (NPA-PD-LR)
Reworded Draft RAls for Pilgrim under Subtask 2.
06/20/2006 E-Mail Stubbs A, NRC Comments on draft RAIs 5
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 12 of 40 DP-00-057 ML063050358 Dudley N F, NRC/NRR EMAIL: (NPA-PD-LR)
LR - S&S Shell Pilgrim.
06/22/2006 E-Mail Subbaratnam R, NRC/NRR Shell for the Scoping and Sreening Results:
Mechanical Systems for Pilgrim.
67 DP-00-058 ML063110242 Stubbs A, NRC EMAIL: (NPA-PD-LR)
SER Shell for Pilgrim LRA Section 2.3.
06/22/2006 E-Mail Pope S, ISL, Inc Transmission of draft writeup 70 DP-00-059 ML063100086 Hurley B, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: Status on RAIs.
06/23/2006 E-Mail Williamson A R, NRC Discussion of RAI status and scheduling 3
DP-00-060 ML063050360 Subbaratnam R, NRC Email: (NPA-PD-LR)
Fwd: Pilgrim LRA -
Draft Pilgrim Scoping and Screening Qs.
06/26/2006 E-Mail Iqbal N, Lavretta A, NRC discussion on pre-submittal call for RAI 2
DP-00-061 ML063050361 Rogers B H, NRC/NRR EMAIL: (NPA-PD-LR)
Draft Pilgrim RAIs.
06/26/2006 E-Mail Subbaratnam R, NRC Internal submittal of RAI 6
DP-00-062 ML061780081 Wilson G A, NRC/NRR/
ADES/
DE/EEEB Pilgrim Nuclear Station Regarding Request for Additional Information - License Renewal Application, Section 2.5.
06/27/2006 Memoranda
, Request for Additional Information (RAI)
Lund A L, NRC/NRR/
ADRO/DORL/
LPLA Internal RAIs from Electrical Engineering BranchDivision of Engineering 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 13 of 40 DP-00-063 ML061730041 Tatum J E, NRC/NRR/
ADES/
DSS/SBPB SBPB Request for Additional Information for the Review of the Pilgrim license renewal application (Tac No. MC9669).
06/27/2006 Memoranda
, Request for Additional Information (RAI)
Zimmerman J I, NRC/NRR/
ADRO/DLR/R
- EBB, NRC/NRR/
ADRO/DLR/R LRB Internal RAIs from Balance-of-Plant BranchDivision of Safety Systems 13 DP-00-064 ML061700514 Weerakkody S D, NRC/NRR/
ADRA/DRA/AF PB Request for Additional Information Regarding the License Renewal Application - Pilgrim Nuclear Power Station - Fire Protection (TAC No.
MC9669).
06/27/2006 Memoranda Lund A L, NRC/NRR/
ADRO/DLR/R LRA Internal RAIs from Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 7
DP-00-065 ML063100103 Duda S, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Pilgrim Reference.
06/28/2006 E-Mail Williamson A R, NRC Internal transmission of reference from a previous discussion 2
DP-00-066 ML063100095 Craig N, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: Requested Documents.
06/28/2006 E-Mail Williamson A R, NRC Internal discussion of receipt of two documents 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 14 of 40 DP-00-067 ML061790540 Hamzehee H G, NRC/NRR/
ADES/
DE/EQVB Request for Additional Information (RAI)
Regarding Entergy Nuclear Operations, Inc., License Renewal Application for the Pilgrim Nuclear Power Station, Dated January 27, 2006.
06/28/2006 Memoranda
, Request for Additional Information (RAI)
Kuo P T, NRC/NRR/
ADRO/DLR Internal RAIs from Quality & Vendor Branch B Division of Engineering Office of Nuclear Reactor Regulation 6
DP-00-068 ML063050579 Dudley N F, NRC EMAIL: (NPA-PD-LR)
LR - Shell to S&S for Pilgrim.
06/28/2006 E-Mail,
- Report, Miscellaneo us Rodriguez V M, NRC Internal shell for Scoping and Screening Results for Mechanical Systems (sec. 2.3),
Structures (sec.
2.4), and Electrical and Instrumentation and Control Systems 90 DP-00-069 ML063110610 Pope S M, Information Systems Labs, Inc Email: (NPA-PD-LR)
Delivery of Subtask 2, Recommended Inspection Items for Regional Inspection, for Contract # NRC-03-03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC No. MC9669.
06/29/2006 E-Mail, Letter Stubbs A, NRC/NRR/
ADES/ DSS Internal transmission of inspection recommendations 5
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 15 of 40 DP-00-070 ML063040425 Cheruvenki G S, NRC EMAIL: (NPA-PD-LR)
06/30/2006 E-Mail Subbaratnam R, NRC Internal transmission of RAI 3
DP-00-071 ML063040428 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Questions and Answers of Pilgrim LRA Aging Management Reviews.
06/30/2006 E-Mail, Status Report Medoff J, NRC Internal review copies of Questions and Answers of Pilgrim LRA Aging Management Reviews 79 DP-00-072 ML061860006 Cranston G V, NRC/NRR/
ADES/
DSS/SBWB Request for Additional Information (RAI) on Pilgrim License Renewal Application.
06/30/2006 Memoranda Lund L A, NRC/NRR/
ADRO/DLR/R LRA Internal RAIs from BWR Systems Branch Division of Safety Systems Office of Nuclear Reactor Regulation 3
DP-00-073 ML063060143 Jacobs C, NRC EMAIL: (NPA-PD-LR)
Re: Site Audit
[Revised attached with corrections incorporated].
07/07/2006 E-Mail Williamson A R, NRC Draft copy of References Collected at the Pilgrim Nuclear Power Station Site Audit May 1-4, 2006 9
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 16 of 40 DP-00-074 ML063120214 Pope S M, ISL, Inc EMAIL: (NPA-PD-LR)
Delivery of Subtask 3, SER Input Using the SER Shell for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3269, TAC No.
07/10/2006 E-Mail Stubbs A, NRC Transmission of draft SER shell writeup 102 DP-00-075 ML063040427 Reddy D K, NRC EMAIL: (NPA-PD-LR)
Fwd: Response to your question regarding Radwaste Piping.
07/10/2006 E-Mail Subbaratnam R, NRC Internal discussions on radwaste piping 4
DP-00-076 ML063060148 Hurley B, Earthtech, Inc Email: (NPA-PD-LR)
Monitoring Programs.
07/10/2006 E-Mail Williamson A R, NRC Draft answer to question about monitoring program 3
DP-00-077 ML063100090 Hurley B, Earth Tech, Inc Email: (NPA-PD-LR)
Response to comment - preliminary report.
07/11/2006 E-Mail,
- Report, Miscellaneo us Williamson A R, NRC Internal Transmission of draft Pilgrim generic responses report 120 DP-00-078 ML063040424 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Pilgrim Briefing notes for 3-State meeting attached.
07/12/2006 E-Mail Dudley N F, NRC Talking notes for project managers 4
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 17 of 40 DP-00-079 ML063040423 Jeng D C, NRC EMAIL: (NPA-PD-LR)
Fwd: Pilgrim LRA Amendment 1.
07/13/2006 E-Mail Subbaratnam R, NRC Internal request for review material 2
DP-00-080 ML063040422 Jeng D C, NRC EMAIL: (NPA-PD-LR)
Pilgrim LRA Drywell Corrosion issue review.
07/13/2006 E-Mail Subbaratnam R, NRC Internal request for review material 2
DP-00-081 ML062980412 Jeng D C, NRC EMAIL: (NPA-PD-LR)
Re: Pilgrim LRA Drywell Corrosion Issue Review (from David Jeng).
07/14/2006 E-Mail Subbaratnam R, NRC EGCB response to e-mail on Internal work coordination on Pilgrim LRA Drywell Corrosion issue review 3
DP-00-082 ML062980411 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Re: Pilgrim LRA Drywell Corrosion Issue Review.
07/14/2006 E-Mail Jeng D C, NRC Internal work coordination on Pilgrim LRA Drywell Corrosion issue review 3
DP-00-083 ML063040410 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Pilgrim LRA Drywell Corrosion issue review.
07/14/2006 E-Mail Hoang D V, NRC Internal work coordination 2
DP-00-084 ML063040453 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Re: Fwd: Pilgrim requested a telephone call on the Fire Protection RAIs on Pilgrim LRA.
07/17/2006 E-Mail Lavretta A, NRC Discussions on Call content plus call coordination 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 18 of 40 DP-00-085 ML063040457 Lavretta A, NRC EMAIL: (NPA-PD-LR)
Re: Fwd: Pilgrim requested a telephone call on the Fire Protection RAIs on Pilgrim LRA [from Angela Lavretta].
07/17/2006 E-Mail, Note to File incl Telcon
- Record, Verbal Comm Subbaratnam R, NRC Draft of conference call summary plus comments 13 DP-00-086 ML063070588 Hurley B, Earth Tech, Inc Email: (NPA-PD-LR)
Response to Comments - Pilgrim.
07/17/2006 E-Mail Williamson A R, NRC Internal transmission of draft responses to public comments 35 DP-00-087 ML062980416 Stubbs A, NRC/NRR E-MAIL: (NPA-PD-LR) Fwd: Delivery of Subtask 2, Recommended Inspection Items for Regional Inspection, for Contract #NRC-03-03.
07/17/2006 E-Mail Subbaratnam R, NRC/NRR Recommendations for systems to be included as inspection items.
5 DP-00-088 ML063100053 Hurley B, Earthtech, Inc EMAIL: (NPA-PD-LR)
SAMA Comments
[Initial Start].
07/17/2006 E-Mail Williamson A R, NRC/NRR Internal transmission of proposed skeleton writeup for SAMA comments 5
DP-00-089 ML062980590 Lavretta A, NRC EMAIL: (NPA-PD-LR)
Re: As discussed-2 RAI for the review of Pilgrim.
07/18/2006 E-Mail, Request for Additional Information (RAI)
Subbaratnam R,
Internal transmission of Draft RAIs 22
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 19 of 40 DP-00-090 ML063040390
, - No Known Affiliation EMAIL: (NPA-PD-LR)
[erachp@comcast.net
] review of AMR audit report section 3.5 07/19/2006 E-Mail Hoang D V, NRC/NRR Audit report with comments 76 DP-00-091 ML062990245 Medoff J, NRC EMAIL: (NPA-PD-LR)
FYI: Forwarding What We Want DCI/CFEB to look at for the Pilgrim Flaw Growth Analyses.
07/20/2006 E-Mail Subbaratnam R, NRC Internal work coordination 4
DP-00-092 ML062990247 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Your Pilgrim RAIs for e-concurrence.
07/20/2006 E-Mail, Request for Additional Information (RAI)
Lavretta A, NRC Internal transmission of fire protection RAIs 11 DP-00-093 ML062980405 Hoang D V, NRC E-MAIL: (NPA-PD-LR) RAI for section 3.5.
07/21/2006 E-Mail Subbaratnam R, NRC Internal transmission of fire protection RAIs 3
DP-00-094 ML062980409 Cheruvenki G S, NRC EMAIL: (NPA-PD-LR)
Emailing: Pilgrim LRA-RA (7-21).wpd.
07/21/2006 E-Mail Subbaratnam R, NRC Internal transmission of RAIs 7
DP-00-095 ML063040449
, - No Known Affiliation EMAIL: (NPA-PD-LR)
Re: RAI for section 3.5 [from erachp@comcast.net]
07/21/2006 E-Mail Hoang D V, Subbaratnam R, NRC Internal discussion of draft RAIs 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 20 of 40 DP-00-096 ML062080554 Mitchell M A, NRC/NRR/
ADES/
DCI/CVIB Request for Additional Information on Management of Aging of Reactor Vessels and Internals, Pilgrim Nuclear Power Station, License Renewal Application 07/21/2006 Memoranda
, Request for Additional Information (RAI)
Lund A L, NRC/NRR/
ADRO/DLR/R LRA Internal RAI from Vessels & Internals Integrity Branch Division of Component Integrity Office of Nuclear Reactor Regulation 4
DP-00-097 ML062980406 Subbaratnam R, NRC E-MAIL: (NPA-PD-LR) Re: RAI for section 3.5 (from Ram Subbaratnam).
07/21/2006 E-Mail Hoang D V, NRC Acknowledgment of Internal transmission of fire protection RAIs 2
DP-00-098 ML063040446 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
No. of Staff RAIs Received on Pilgrim LRA (docket 50-293) as of date [July 24, 2006].
07/24/2006 E-Mail Kuo P T, NRC Status of RAIs and comments on possible more 3
DP-00-099 ML063100061 Cheruvenki G S, NRC EMAIL: (NPA-PD-LR)
Fwd: FYI: Forwarding What We Want DCI/CFEB to Look at For the Pilgrim, Flaw,
Growth Analyses.
07/25/2006 E-Mail Gruss K A, NRC Discussion of evaluations of the effect of the crack growth 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 21 of 40 DP-00-100 ML063040443 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: FYI: Forwarding What We Want DCI/CFEB to Look at For the Pilgrim-Flaw Growth Analyses.
07/25/2006 E-Mail Cheruvenki G, Sydnor C R, NRC Coordination of discussion on crack growth 4
DP-00-101 ML063070463 Palla R L, NRC EMAIL: (NPA-PD-LR)
Pilgrim Scoping Comments and Response. doc.
07/27/2006 E-Mail Williamson A R, NRC Internal question on SAMA writeup 6
DP-00-102 ML063070579 Jacobs C J, NRC/NRR/
ADRO/DLR Email: (NPA-PD-LR)
Proposed Response Language re:
Radioactive Release to GW.
07/27/2006 E-Mail Williamson A R, NRC Internal transmission of draft writeup of groundwater release info.
2 DP-00-103 ML063100047 Jacobs C J, NRC/NRR EMAIL: (NPA-PD-LR)
Proposed KI Responses.
07/27/2006 E-Mail Williamson A R, NRC/NRR Internal transmission of proposed writeup for potassium iodide 2
DP-00-104 ML063070566 Jacobs C J, NRC Email: (NPA-PD-LR)
Re: SAMA Words.
07/27/2006 E-Mail Williamson A R,
Internal transmission of draft portion of SAMA writeup 2
DP-00-105 ML063100045 Hurley B, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: PNPS Scoping Summary [Human Health Demographics].
07/27/2006 E-Mail Williamson A R, NRC/NRR Internal discussion of proposed human health -
demographics writeup 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 22 of 40 DP-00-106 ML063050586 Jacobs C, NRC EMAIL: (NPA-PD-LR)
Link to NRC Inspection Procedure for Sirens.
07/27/2006 E-Mail Williamson A R, NRC Comment on siren inspection procedure 2
DP-00-107 ML063070471 Jacobs C J, NRC EMAIL: (NPA-PD-LR)
More KI Info.
07/27/2006 E-Mail Williamson A R, NRC Internal discussions of NRC policy 2
DP-00-108 ML063030451
, - No Known Affiliation EMAIL: (NPA-PD-LR)
LRA Amendment letter July 19, 2006.
07/30/2006 E-Mail Davis J A, NRC Internal comments on LRA Amendment letter July 19, 2006 3
DP-00-109 ML063030448 Stubbs A, NRC EMAIL: (NPA-PD-LR)
Fwd: Site Visit Trip, for Contract No. NRC-03-03-038, Pilgrim Task Order 24, B.
07/31/2006 E-Mail Subbaratnam R, NRC Internal trip report on BOP systems 10 DP-00-110 ML063030446
, - No Known Affiliation E-MAIL: (NPD-PD-LR) Urgent - revised section 3.0.4 Input for QA Program 07/31/2006 E-Mail Davis J A, NRC/NRR Revisions to SER writeup 6
DP-00-111 ML063070475 Hurley B, Earth Tech, Inc Email: (NPA-PD-LR)
Thoughts on the following?
07/31/2006 E-Mail Williamson A R, NRC questions on status of several issues 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 23 of 40 DP-00-112 ML063030443 Rogers B H, NRC EMAIL: (NPA-PD-LR)
Re: Input for the Public exit meeting Summary for Pilgrim LRA AMP/AMR/Scoping and Screening audit 7/19.
08/01/2006 E-Mail Subbaratnam R, NRC Draft input for meeting summary 2
DP-00-113 ML063070546 Jacobs C J, NRC Email: (NPA-PD-LR)
Postulated Accident Search Results.
08/01/2006 E-Mail Williamson A R, NRC Internal transmission of NRC response to comments at Hatch 2
DP-00-114 ML063040459 Nguyen D T, NRC EMAIL: (NPA-PD-LR)
RAI for electrical audit report at Pilgrim.
08/02/2006 E-Mail Davis J A, NRC Internal transmission of electrical RAIs 4
DP-00-115 ML062990463 Davis J A, NRC EMAIL: (NPA-PD-LR)
Meeting Summary (July 19, 2006).
08/02/2006 E-Mail Subbaratnam R, NRC Transmission of Internal Draft meeting summary 4
DP-00-116 ML062990466 Hoang D V, NRC EMAIL: (NPA-PD-LR)
RAI for Section 3.5 (Dan Hoang).
08/02/2006 E-Mail Subbaratnam R, NRC Transmission of draft RAI 4
DP-00-117 ML062990460 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Draft Meeting Summary of the July 19, 2006 at Radisson.
08/02/2006 E-Mail Raymond W J, NRC Transmission of Internal Draft meeting summary 9
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 24 of 40 DP-00-118 ML063070559 Hurley B, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: Thoughts on the following?
08/02/2006 E-Mail Williamson A R, NRC Discussion of status of various tech.
issues 4
DP-00-119 ML063070465 Palla R L, NRC Email: (NPA-PD-LR)
Pilgrim Scoping Comments and Responses.
08/03/2006 E-Mail Williamson A R, NRC Draft of Pilgrim Scoping Comments and Response 6
DP-00-120 ML062990458 Medoff J, NRC EMAIL: (NPA-PD-LR)
(to Ram Subbaratnam from James Medoff) clarification of the Question tracking.
08/03/2006 E-Mail Subbaratnam R, NRC Discussing FSAR information 2
DP-00-121 ML063070466 Palla R L, NRC Email: (NPA-PD-LR)
Request for Clarification on Pilgrim RAI Responses.wpd.
08/07/2006 E-Mail, Request for Additional Information (RAI)
Williamson A R, NRC Internal request to provide attached RAIs to licensee 5
DP-00-122 ML062980428 Wen P C, NRC/NRR EMAIL: (NPA-PD-LR)
Asking ATL to Prepare the Final SER Input.
08/08/2006 E-Mail Adams S A, NRC/NRR Internal Request regarding internal work coordination 3
DP-00-123 ML062980432 Sheng C F, NRC EMAIL: (NPA-PD-LR)
[Simon] still Waiting on stress analysis, flaw evaluation, and a disposition.
08/08/2006 E-Mail Subbaratnam R, NRC Internal Statement of need of information 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 25 of 40 DP-00-124 ML062210412 Karas R L, NRC/NRR/
ADES/
DE/EGCB Request for Additional Information Regarding Section 2.4, "Scoping and Screening Results: Structures,"
Pilgrim Nuclear Power Station License Renewal Application.
08/09/2006 Memoranda
, Request for Additional Information (RAI)
Lund A L, NRC/NRR/
ADRO/DLR/R LRB Internal RAI from Geoscience and Civil Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation 4
DP-00-125 ML062980423 Sheng C F, NRC/NRR EMAIL: (NPA-PD-LR)
RAI for Flaw Issues for the Pilgrim LRA.
08/11/2006 E-Mail, Request for Additional Information (RAI)
Subbaratnam R, NRC Internal transmission of vessel internals RAIs 5
DP-00-126 ML062980410
, - No Known Affiliation EMAIL: (NPA-PD-LR)
RAIs 3.5.1-1 and 3.5.1-2.
08/14/2006 E-Mail Subbaratnam R, NRC Internal transmission of revised RAIs 4
DP-00-127 ML063070469 Emch R L, NRC EMAIL: (NPA-PD-LR)
Re: Fwd: Staff Response to Pilgrim Watch Petition for use in responding the GT20060714.
08/16/2006 E-Mail Franovich R L, NRC Strategy on response to comments 3
DP-00-128 ML062980593 Gruss K A, NRC EMAIL: (NPA-PD-LR)
Re: RAI on Chapter 4.0 TLAAs [From Kimberly Gruss].
08/17/2006 E-Mail Subbaratnam R, NRC Internal transmission of RAIs 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 26 of 40 DP-00-129 ML062990452 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
08/17/2006 E-Mail Gruss K A, NRC Discussion of work coordination 2
DP-00-130 ML062980591 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Re: Cable Vaults with Submerged Cables.
08/18/2006 E-Mail Raymond W J, NRC/RGN-I/DRP/PB5 Internal planning of scope of inspection 3
DP-00-131 ML062010413 Lavertta A, NRC/NRR/
ADRA/DRA/AF P
Summary of July 12, 2006, Teleconference Regarding Draft Request for Additional Information on Pilgrim License Renewal Application - Fire Protection Scoping Review.
08/20/2006 Memoranda Weerakkody S D, NRC/NRR/
ADRA/DRA/A FP Internal summary memo including assessment of information from teleconference DP-00-132 ML062990254 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Re: Cable Vaults with Submerged Cables.
08/21/2006 E-Mail Auluck R, NRC Discussion on scope of evaluation 5
DP-00-133 ML062990250
, - No Known Affiliation EMAIL: (NPA-PD-LR)
Re: Additional draft (draft RAIs) the Audit Team Requested (August 21, 2006).
08/21/2006 E-Mail Subbaratnam R, NRC/NRR Discussion of Draft RAIs 5
DP-00-134 ML062990444 Patel E, - No Known Affiliation EMAIL: (NPA-PD-LR)
FW: Additional AMR Questions.
08/21/2006 E-Mail Subbaratnam R, NRC Statement regarding need for RAI response 6
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 27 of 40 DP-00-135 ML062980329 Sydnor C R, NRC E-mail: (NPA-PD-LR)
08/23/2006 E-Mail, Memoranda
, Request for Additional Information (RAI)
Subbaratnam R, NRC Internal transmission of draft RAIs for the TLAA's in Section 4.2 of the PNPS LRA.
8 DP-00-136 ML063070460 Nash H L, NRC Email: (NPA-PD-LR)
Fwd: RE: EFH outline.
08/23/2006 E-Mail Williamson A R, NRC Internal discussions on EFH outline 3
DP-00-137 ML062980325 Subbaratnam R, NRC E-mail: (NPA-PD-LR)
Pilgrim LRA Section 2.5 Scoping &
Screening Review -
Your Draft RAI Request Dt: 6/27/06.
08/24/2006 E-Mail Pal A N, NRC Discussion of draft switchyard RAIs 3
DP-00-138 ML062980324 Subbaratnam R, NRC Email: (NPA-PD-LR)
Re: RAI on Chapter 4.0 TLAAs for Pilgrim LRA.
08/25/2006 E-Mail Sydnor C R, NRC Discussion of draft RAIs for Section 4.2 of the PNPS LRA.
2 DP-00-139 ML062980321 Subbaratnam R, NRC Email: (NPA-PD-LR)
Re: RAI on Chapter 4.0 TLAAs for Pilgrim LRA.
08/25/2006 E-Mail Sydnor C R, NRC Discussion of RV Chemistry and Temperature data 2
DP-00-140 ML062980323 Subbaratnam R, NRC Email: (NPA-PD-LR)
Pilgrim LRA Audit Review.
08/25/2006 E-Mail Nguyen D T, NRC Internal question of fuse program 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 28 of 40 DP-00-141 ML062980319
, - No Known Affiliation Email: (NPA-PD-LR)
Pilgrim SER.
08/28/2006 E-Mail Davis J A, Subbaratnam R, NRC Discussion of model for SER preparation 3
DP-00-142 ML062980316 Subbaratnam R, NRC E-mail: (NPA-PD-LR)
Fwd: Re: [Another]
Pilgrim LRA Audit Review.
08/29/2006 E-Mail Auluck R C, NRC Discussion of fuse program 2
DP-00-143 ML062980317 Auluck R C, NRC Email: (NPA-PD-LR)
Fwd: Pilgrim LRA Section 2.5 Scoping &
Screening Review -
Your draft RAI request Dt: 6/27/06.
08/29/2006 E-Mail Subbaratnam R, NRC Discussion of draft RAIs 2
DP-00-144 ML063000419
, - No Known Affiliation EMAIL: (NPA-PD-LR)
Pilgrim SER Input 08/29/2006 E-Mail Subbaratnam R, NRC/NRR Draft SER and comments 570 DP-00-145 ML062510043 Mitchell M A, NRC/NRR/
ADES/
DCI/CVIB Request For Additional Information On Time-Limited Aging Analyses For The Reactor Vessel And Internals, Pilgrim Nuclear Power Station, License Renewal Application (TAC NO. MC9669).
08/30/2006 Memoranda
, Request for Additional Information (RAI)
Lund A L, NRC/NRR/
ADRO/DLR/R LRA Internal RAI from Vessels and Internals Integrity Branch Division of Component Integrity Office of Nuclear Reactor Regulation 5
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 29 of 40 DP-00-146 ML063000417
, - No Known Affiliation EMAIL:(NPA-PD-LR)
Pilgrim SER Input 08/30/2006 E-Mail McCaughey B, - No Known Affiliation Draft SER 577 DP-00-147 ML063040409 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Pilgrim LRA -
RAIs for 4.2, 4.7.1, 4.7.2.1, and 4.7.2.2 (TLAAs).
08/31/2006 E-Mail Auluck R C, NRC Internal transmission of RAIs 7
DP-00-148 ML063040399 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Re: LRA: VY Section 2.3.3.13 and Pilgrim 2.3.3.14.
09/05/2006 E-Mail Stubbs A, NRC Internal discussion on SER input 2
DP-00-149 ML063040406 Stubbs A, NRC/NRR EMAIL: (NPA-PD-LR)
Pilgrim LRA - RAI Responses from Entergy (NRC Contract NRC-03 038, Task Order 24).
09/05/2006 E-Mail, Letter Pope S, Internal work coordination for review of licensee responses 66 DP-00-150 ML063040394 Subbaratnam R, NRC/NRR EMAIL: (NPA-PD-LR)
Re: Fwd: Revision to Commitments C-31 and C-35.
09/06/2006 E-Mail Medoff J, NRC Internal discussions on writeup for Revision to Commitments C-31 and C-35 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 30 of 40 DP-00-151 ML063040395 Sydnor C R, NRC/NRR EMAIL: (NPA-PD-LR)
Pilgrim TLAA RAIs revised per the Sept.
6, 2006 conference call.
09/06/2006 E-Mail, Request for Additional Information (RAI)
Subbaratnam R, NRC/NRR Internal draft Pilgrim TLAA RAIs revised per the Sept. 6, 2006 conference call 8
DP-00-152 ML063040398 Subbaratnam R, NRC/NRR EMAIL: (NPA-PD-LR)
Fwd: ATL-NRC meeting on Pilgrim SER.
09/06/2006 E-Mail Auluck R, NRC/NRR Internal notes on Pilgrim SER input meeting 4
DP-00-153 ML063070464 Emch R L, NRC EMAIL: (NPA-PD-LR)
Human Health Section of Pilgrim Scoping Summary Report.
09/06/2006 E-Mail Williamson A R, NRC Comment on and revision to Human Health Section of Pilgrim Scoping Summary Report 4
DP-00-154 ML063070437 Hurley B, Earthtech, Inc EMAIL: (NPA-PD-LR)
Appendix A, C, and G.
09/07/2006 E-Mail Williamson A R, NRC Internal work assignment discussions 2
DP-00-155 ML063060382 Emch R L, NRC EMAIL: (NPA-PD-LR)
Training.
09/08/2006 E-Mail Benner E J, Franovich R L,
Klementowicz S P, Luu A, NRC Human health and monitoring comments and responses for the Pilgrim Scoping Summary Report, 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 31 of 40 DP-00-156 ML063070440 Emch R L, NRC EMAIL: (NPA-PD-LR)
Monitoring Comments.
09/08/2006 E-Mail Williamson A R, NRC Recommendations regarding human health and monitoring comments and responses for the Pilgrim Scoping Summary Report 4
DP-00-157 ML063070444 Luu A, NRC Email: (NPA-PD-LR)
Travel and Tritium Issue.
09/13/2006 E-Mail Williamson A R, NRC Comment on Tritium and Pilgrim 2
DP-00-158 ML063120198 Stubbs A, NRC EMAIL: (NPA-PD-LR)
Pilgrim LRA - Chapter 3 Tables Impacted by Additional Components Added to Scope as a Result of RAIs.
09/14/2006 E-Mail Subbaratnam R, NRC Comments on previous answers to RAIs 2
DP-00-159 ML062990451 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Pilgrim SER - Chapter 4.0 Status.
09/14/2006 E-Mail Buckberg P H, NRC Status update on the last chapter 4.0 SER 3
DP-00-160 ML062990447 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Fwd: Pilgrim LRA -
Chapter 3 Tables impacted by additional components added to scope as a resu.
09/14/2006 E-Mail Buckberg P H, NRC Coordination of review 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 32 of 40 DP-00-161 ML062980594 Buckberg P, NRC/NRR EMAIL: (NPA-PD-LR)
Fwd: Pilgrim LRA -
Chapter 3 Tables impacted by additional components added to scope as a result.
09/14/2006 E-Mail Davis J A, NRC Discussion of RAIs 5
DP-00-162 ML062980596 Subbaratnam R, NRC EMAIL: (NPA-PD-LR)
Pilgrim SER - Chapter 4.0 Status.
09/14/2006 E-Mail Buckberg P H, NRC Internal status update on the last chapter 4.0 SER which relates to TLAAs.
3 DP-00-163 ML063060369 Emch R L, NRC EMAIL: (NPA-PD-LR)
Fwd: Re: Southeast Massachusetts Health Study [useful info from Senior Technical expert].
09/18/2006 E-Mail Hurley R, Luu A, Earth Tech, Inc, NRC Internal Peer Review of the Southeastern Massachusetts Health Study 4
DP-00-164 ML063070447 Emch R L, NRC Email: (NPA-PD-LR)
Southeast Massachusetts Health Study.
09/18/2006 E-Mail Holahan E V, NRC Internal status of review of health study 2
DP-00-165 ML063110153 Stubbs A, NRC Email: (NPA-PD-LR)
Follow Required to Applicant RAI Responses.
09/18/2006 E-Mail Subbaratnam R, NRC Discussion of RAIs 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 33 of 40 DP-00-166 ML063110622 Pope S, ISL, Inc EMAIL: (NPA-PD-LR)
Delivery of Subtask 6 Partial Results, RAI responses that Require Followup, for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC No.
09/18/2006
- No Document Type Applies, E-Mail Stubbs A, NRC Internal transmission of draft RAIs plus comments 3
DP-00-167 ML063050302 Subbaratnam R, NRC Email: (NPA-PD-LR)
Fwd: Follow Required to Applicant RAI Responses.
09/18/2006 E-Mail Buckberg P H, NRC Discussions of need for RAIs 2
DP-00-168 ML062650293 Mitchell M A, NRC/NRR/
ADES/
DCI/CVIB Pilgrim License Renewal Application Final Safety Evaluation Report Sections On The Aging Management Programs For The Reactor Vessel (TAC NO. MC9669) 09/18/2006 Final Safety Evaluation Report (FSER),
Memoranda Lund A L, NRC/NRR/
ADRO/DLR/R LRA Internal SER from Vessels & Internals Integrity Branch Division of Component Integrity Office of Nuclear Reactor Regulation 6
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 34 of 40 DP-00-169 ML063110616 Pope S, ISL, Inc EMAIL: (NPA-PD-LR)
Fwd: Re: Pilgrim LRA Technical Meeting -
Conference Call -
Additional RAI Clarification.
09/21/2006 E-Mail Stubbs A, NRC Internal request re RAIs for telecon.
3 DP-00-170 ML063110604 Stubbs A, NRC Email: (NPA-PD-LR)
Fwd: Re: Pilgrim LRA Technical Meeting -
Conference Call -
Additional RAI Clarification.
09/21/2006 E-Mail Buckberg P H, NRC Discussion of RAI clarification 3
DP-00-171 ML063070458 Franovich R L, NRC EMAIL: (NPA-PD-LR)
Questions/Revisions to the Scoping Summary Report for Pilgrim.
09/25/2006 E-Mail Schaaf R G, Uttal S L, Williamson A R, NRC Questions/revisions to the scoping summary report for Pilgrim 2
DP-00-172 ML063050292 Subbaratnam R, NRC Email: (NPA-PD-LR)
Re: Pilgrim A(2) scoping information.
09/26/2006 E-Mail Buckberg P H, NRC Discussions of review assignments 3
DP-00-173 ML062980595
, - No Known Affiliation EMAIL: (NPA-PD-LR)
Re: Section 4.3.
09/27/2006 E-Mail Davis J A, NRC Comment on UFSAR Supplement evaluation input.
23
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 35 of 40 DP-00-174 ML062680079 Dennig R L, NRC/NRR/
ADES/
DSS/SCVB Safety Evaluation Report Regarding the License Renewal Application for Pilgrim Nuclear Power Station (TAC NO.
MC9669).
09/27/2006 Memoranda
, Safety Evaluation Report Lund A L, NRC/NRR/
ADRO/DLR/R EBA Internal SER from Containment and Ventilation Branch Division of Safety Systems Office of Nuclear Reactor Regulation 11 DP-00-175 ML063050288 Subbaratnam R, NRC/NRR E-MAIL: (NPA-PD-LR) Re: Vessels &
Internals Integrity Branch SER Input.
09/27/2006 E-Mail Buckberg P H, NRC Discussions of SER Inputs 2
DP-00-176 ML063060343 Flynn C, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Sections for CRF.
09/28/2006 E-Mail Emch R L, Hurley B, Luu A, Earth Tech, Inc, NRC Internal transmission of draft input 11 DP-00-177 ML063060095 Flynn C, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Section 4.7, 092806 1915H.
09/28/2006
- No Document Type Applies, E-Mail Emch R L, Hurley B, Luu A, Earth Tech, Inc, NRC Draft edits of Section 4.7 14 DP-00-178 ML062710173 Weerakkody S D, NRC/NRR/
ADRA/DRA Safety Evaluation Input Regarding the License Renewal Application - Pilgrim Nuclear Power Station - Fire Protection (TAC NO.
MC9669) 09/28/2006 Memoranda
, Safety Evaluation Report Lund A L, NRC/NRR/
ADRO/DLR Internal SER from Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 17
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 36 of 40 DP-00-179 ML063060165 Hurley B, Earth Tech, Inc EMAIL: (NPA-PD-LR)
Re: Section 4.7, 092806 1915H.
09/29/2006 E-Mail Emch R L, Flynn C, Luu A, Earth Tech, Inc, NRC Comments on writeup for Section 4.7 4
DP-00-180 ML063120241 Pope S M, ISL, Inc EMAIL: (NPA-PD-LR)
Delivery of Subtask 6, Evaluation of RAI Responses, Update of the Draft SER Input with Open Items for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3269, TAC No.
10/02/2006 E-Mail Stubbs A, NRC Transmission of Review and evaluation of rai responses, update of Draft ser input 64 DP-00-181 ML062770446 Cranston G V, NRC/NRR/
ADES/
DSS/SBWB Safety Evaluation of License Renewal Application for Pilgrim.
10/03/2006 Memoranda
, Safety Evaluation Lund A L, NRC/NRR/
ADRO/DLR/R LRA Internal SER from BWR Systems Branch Division of Safety Systems Office of Nuclear Reactor Regulation 18
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 37 of 40 DP-00-182 ML063120250 Pope S M, ISL, Inc EMAIL: (NPA-PD-LR)
Re: Delivery of Subtask 6, Evaluation of RAI Responses, Update of the Draft SER Input with Open Items, for Contract #
NRC-03-03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3269, TAC No. MC9669.
10/03/2006 E-Mail Stubbs A, NRC Transmission of word perfect version of the draft SER input.
63 DP-00-183 ML063070419 Palla R L, NRC Email: (NPA-PD-LR)
Pilgrim - Revised SER.
10/04/2006 E-Mail Fleishman L, Green K, Information Systems Labs, Inc Revised Probabilistic Risk Assessment Licensing Branch A Division of Risk Assessment input 45 DP-00-184 ML062790198 Rubin M P, NRC/NRR/
ADRA/DRA/AP LA Evaluation of Severe Accident Mitigation Alternatives for License Renewal of Pilgrim Nuclear Power Station.
10/04/2006 Memoranda
, Report, Technical Franovich R L, NRC/NRR/
ADRO/DLR/R EBB Internal Assessment of SAMAs from Probabilistic Risk Assessment Licensing Branch A Division of Risk Assessment Office of Nuclear Reactor Regulation 38
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 38 of 40 DP-00-185 ML063060344 Flynn C, Earth Tech, Inc EMAIL: (NPA-PD-LR)
FW: PNPS, Revisions to CRF assigned text.
10/04/2006 E-Mail,
- Report, Miscellaneo us Emch R L, NRC Internal transmission of revisions/
corrections to draft input 23 DP-00-186 ML063070430 Provenzano S, Earthtech, Inc EMAIL: (NPA-PD-LR_
FW: Pilgrim-Minority/Low-Income Tables.
10/05/2006 E-Mail Williamson A R, NRC Discussion of use of minority / low income tables 4
DP-00-187 ML063070435 Palla R L, NRC Email: (NPA-PD-LR)
Re: Fwd: FW: Pilgrim LRA Amendment 9 in pdf format.
10/10/2006 E-Mail Williamson A R, NRC Discussions of changes needed based on SAMA info 2
DP-00-188 ML063070414 Palla R L, NRC Email: (NPA-PD-LR)
Re: SAMA Memo.
10/10/2006 E-Mail Williamson A R, NRC Suggested changes to SAMA telecon memo 2
DP-00-189 ML063070418 Emch R L, NRC Email: (NPA-PD-LR)
Re: PNPS SEIS re Sections 4.2.1 and 4.2.2, Electromagnetic Effects.
10/10/2006 E-Mail Flynn C R, Earth Tech, Inc comments on PNPS SEIS re Sections 4.2.1 and 4.2.2, Electromagnetic Effects 5
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 39 of 40 DP-00-190 ML063060410 Flynn C, Earth Tech, Inc Email: (NPA-PD-LR)
PNPS SEIS re Section 4.2.1 and 4.2.2, Electromagnetic Effects.
10/10/2006 E-Mail, Environmen tal Impact Statement Emch R L, NRC review copy and request for assessment of SEIS Sections 4.2.1 and 4.2.2, Electromagnetic Effects 8
DP-00-191 ML063070410 Flemming J L, NRC EMAIL: (NPA-PD-LR)
RE: Pilgrim SEIS -
revised water sections.
10/11/2006 E-Mail Provenzano S, Earth Tech, Inc Internal assessment of Water Use and Water Quality sections 3
DP-00-192 ML063110156 Iqbal N, NRC EMAIL: (NPA-PD-LR)
Re: Ganesh/Naeem
[Revised Sentence on RAIs].
10/11/2006 E-Mail Buckberg P H, NRC Comments on documentation of RAI discussions 2
DP-00-193 ML063070412 Raymond W J, NRC/RGN-I/DRP/PB5 EMAIL: (NPA-PD-LR)
Re: PNPS Scoping Summary Report.
10/12/2006 E-Mail Williamson A R, NRC SRI's review of pertinent sections of the scoping report plus comments on public's comment 2
DP-00-194 ML063070407 Raymond W J, NRC/RGN-I/DRP/PB5 EMAIL: (NPA-PD-LR)
Reply: Requested Documents.
10/13/2006 E-Mail Powell R J, NRC SRI's assessment of public's comment 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count Page 40 of 40 DP-00-195 ML063110596 Pope S, ISL, Inc EMAIL: (NPA-PD-LR)
Delivery of Subtask 6, Evaluation of revised RAI Responses and Update of the draft SER input with Open Items using the Final Pilgrim SER Shell, for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of plant Branch, JCN J-3269...
10/16/2006
- No Document Type Applies, E-Mail Stubbs A, NRC Transmission of updated Draft SER input.
66 DP-00-196 ML062900196 Mitchell M A, NRC/NRR/
ADES/
DCI/CVIB Pilgrim License Renewal Application Final Safety Evaluation Report Sections on the Aging Management Reviews for the Reactor Vessel and its Internal Components (TAC NO. MC9669).
10/16/2006 Memoranda
, Safety Evaluation Report Lund A L, NRC/NRR/
ADRO/DLR/R LRA Internal SER from Vessels & Internals Integrity Branch Division of Component Integrity Office of Nuclear Reactor Regulation 5
DP-00-197 ML063110278
, Advanced Technologies &
Labs International, Inc Audit and Review Report for Plant Aging Management Reviews and Programs Pilgrim Nuclear Power Station 11/01/2006 Audit Report
, NRC/NRR/
ADRO/DLR/R LRC Draft audit report 563
November __, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Perry Buckberg, do hereby state as follows:
- 1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
- 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R.
§ 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Perry Buckberg Executed in Rockville, MD this __ day of November, 2006
November 15, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
DECLARATION OF FRANK GILLESPIE I, Frank Gillespie, do hereby state as follows:
- 1.
I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR).
My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.
- 2.
As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the November 15, 2006, submission of the Staffs Hearing File.
- 3.
I have personally reviewed the documents identified as privileged in, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staffs review of the pending license renewal application.
- 4.
Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
- 5.
Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the November 15, 2006 submission of the Staffs Hearing File.
- 6.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
Frank Gillespie Executed in Rockville, MD this 15th day of November, 2006
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S.
mail system, as indicated by a double asterisk (**) this 15th day of November, 2006.
Administrative Judge*
Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rfc1@nrc.gov Administrative Judge*
Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: amy@nrc.gov Diane Curran, Esq.**
Harmon, Curran, Spielberg
& Eisenberg, L.L.P.
1726 M Street, NW., Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.com Administrative Judge*
Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Office of Commission Appellate
- Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov Office of the Secretary*
Attn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov Atomic Safety and Licensing Board*
Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Matthew Brock, Esq.**
Assistant Attorney General Office of the Massachusetts Attorney General Environmental Protection Division One Ashburton Place, Room 1813 Boston, MA 02108-1598 E-mail: matthew.brock@ago.state.ma.us Molly H. Bartlett, Esq.**
52 Crooked Lane Duxbury, MA 02332 E-mail: mollyhbartlett@hotmail.com Richard R. MacDonald**
Town Manager 878 Tremont Street Duxbury, MA 02332 E-mail: macdonald@town.duxbury.ma.us Fax: 781-934-9011 Terence A. Burke, Esq.**
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 David R. Lewis, Esq.**
Paul A. Gaukler, Esq.
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager**
Town of Plymouth 11 Lincoln St.
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us Sheila Slocum Hollis**
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com
/RA/
David E. Roth Counsel for the NRC Staff