MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23157A1272023-06-13013 June 2023 Meeting Summary for Environmental Pre-Submittal Meeting for Subsequent License Renewal Application on May 11, 2023 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22319A1952022-12-0202 December 2022 Summary of October 13, 2022, Meeting with Tennessee Valley Authority to Discuss Planned Alternative Requests for the Fifth 10-Year Inservice Testing Program Interval for Brown'S Ferry Nuclear Plant, Units 1, 2, and 3 ML22298A1612022-11-17017 November 2022 Summary of Public Meeting on SAMA with TVA ML22266A2742022-09-28028 September 2022 Summary of September 22, 2022, Public Meeting with Tennessee Valley Authority to Discuss a Request to Use a Later Edition of the ASME OM Code ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22103A2472022-04-14014 April 2022 Summary of April 12, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Revised Criticality Analysis License Amendment Request ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22083A0762022-03-24024 March 2022 Summary of March 17, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Atrium 11 License Amendment Request (EPID L-2021-LLA-0132 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21266A0532021-10-20020 October 2021 Summary of September 22, 2021, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-205 and TSTF-563 ML21273A1922021-10-12012 October 2021 September 27, 2021, Summary of Meeting with Browns Ferry Nuclear Plant, Units 1 & 2 Related to a Planned Alternative Request Per American Society of Mechanical Engineers (Asmee) Code Case N-526, Alternative Requirements for Successive Sect ML21251A1122021-09-14014 September 2021 Summary of September 7, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21155A0212021-06-0808 June 2021 Summary of Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20162A1532020-06-25025 June 2020 Summary of June 8, 2020, Partially Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20094M9012020-04-13013 April 2020 Summary of April 2, 2020 Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of a License Amendment Request Adoption of 10 CFR 50.69 ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18242A4882018-09-24024 September 2018 Summary of Pre-Application Conference Call with Tennessee Valley Authority to Discuss Proposed Changes to Modifications Associated with Approved NFPA 805 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant ML18068A0792018-03-15015 March 2018 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 ML18053A5362018-03-0101 March 2018 Summary of February 7, 2018, Pre-Application Conference Call with TVA a Planned License Amendment Request to Change the Emergency Response Organization Staffing ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML17131A2512017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17061A6722017-04-0606 April 2017 Summary of February 15, 2017, Meeting with Tennessee Valley Authority on Updates to the Transmission System Regarding Extended Power Uprate for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17017A4552017-02-0303 February 2017 Summary of Meeting with Tennessee Valley Authority Regarding Maximum Extended Load Line Limit Plus Pre-Application Meeting for Browns Ferry Nuclear Plant ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16210A4532016-08-16016 August 2016 07/19/2016 Summary of Meeting with Tennessee Valley Authority Regarding Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant (CAC Nos. MF6741, MF6742, and MF6743) ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary ML16043A2772016-03-14014 March 2016 Summary of Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Modify Browns Ferry Technical Specifications (TS) by Adding New TS 3.3.8.3 (CAC Nos. MF6738, MF6739 and MF6740) ML15321A4942015-11-30030 November 2015 Summary of Public Meeting with Tennessee Valley Authority Regarding the Planned Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant ML15295A2602015-11-0404 November 2015 July 14, 2015, Summary of Public Meeting with Tennessee Valley Authority to Discuss Topics Regarding Seismic Risk Evaluations Related to the Seismic Hazard Reevaluation for Browns Ferry Nuclear Plant (TACs MF3764, MF3765 and MF3766) ML15146A2792015-05-21021 May 2015 Bf EOC Meeting Summary 2015 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14147A3222014-05-27027 May 2014 Public Meeting Summary 05/21/2014 to Present Annual Assessment ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14036A3872014-02-0505 February 2014 Summary of Meeting with Public to Discuss the Results of the Follow-up Inspection of the Items Identified in Confirmatory Action Letter (ML13232A105) of August 22, 2013, and the Status of Nrc'S Performance Assessment of Browns Ferry Unit 1 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop 2024-01-18
[Table view] |
Text
October 26, 2006 Tennessee Valley Authority ATTN: Mr. K. W. Singer Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
MEETING
SUMMARY
- CATEGORY 1 PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) - BROWNS FERRY UNIT 1 RECOVERY STATUS
Dear Mr. Singer:
This refers to the public meeting conducted at the Nuclear Regulatory Commission (NRC), Two White Flint North Auditorium, Rockville, Maryland on October 20, 2006. The purpose of the meeting was to discuss the Browns Ferry Unit 1 (BF1) Restart Project Status. Discussions during this meeting included the following topics: Unit 1 overview and schedule, returning systems to service, regulatory status, fire protection Appendix R, nuclear assurance, Browns Ferry Nuclear (BFN) operational readiness, BFN site status, and fuel load readiness. Enclosure 1 contains a list of attendees. Enclosure 2 contains the BF1 Restart Master Tracking Forecast Schedule which is an forecast estimate of NRC actions and processes required during the recovery process in accordance with NRC Inspection Manual Chapter (IMC), IMC 2509, Browns Ferry Unit 1 Restart Project Inspection Program. These actions are based on TVA milestones. Enclosure 3 contains the presentation material used by your staff to discuss the status of the Browns Ferry Unit 1 Restart Project.
TVA also discussed the transition of Unit 1 staff, systems, procedures and schedule into overall site operations. As a result of the meeting, the NRC will continue to conduct inspections to ensure that all measures applicable to fuel load are in place prior to the fuel load date. We understand that BF1 system turnover process is dynamic; therefore, we will continue to facilitate communications between TVA and NRC staff regarding changes to your schedule.
The NRC plans to closely monitor recovery progress and inspect accordingly to maintain and ensure public health and safety as its overriding priority of the operating Units 2 and 3 and throughout the Unit 1 recovery process.
TVA 2 Documents associated with the NRC oversight of the BF1 Recovery can be found at on the NRCs website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html .
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning these meetings, please contact me at (404) 562-4600.
Sincerely,
/RA/
Joseph W. Shea, Director Division of Reactor Safety, Region II Docket No.: 50-259 License No.: DPR-33
Enclosures:
- 1. List of Attendees
- 2. BF1 Restart Master Tracking Forecast Schedule
- 3. TVA Presentation Handout - Browns Ferry Nuclear Plant - Unit 1 Restart cc w/encls: (See page 3)
OFFICE RII:DRP RII:DRP SIGNATURE TXN1 MTW NAME TNazario MWidmann DATE 10/26/2006 10/26/2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 3 cc w/encls: William D. Crouch, Manager Ashok S. Bhatnagar Licensing and Industry Affairs Senior Vice President Browns Ferry Nuclear Plant Nuclear Operations Tennessee Valley Authority Tennessee Valley Authority Electronic Mail Distribution Electronic Mail Distribution State Health Officer Larry S. Bryant, Vice President Alabama Dept. of Public Health Nuclear Engineering & RSA Tower - Administration Technical Services Suite 1552 Tennessee Valley Authority P. O. Box 303017 Electronic Mail Distribution Montgomery, AL 36130-3017 Brian O'Grady Chairman Site Vice President Limestone County Commission Browns Ferry Nuclear Plant 310 West Washington Street Tennessee Valley Authority Athens, AL 35611 Electronic Mail Distribution Masoud Bajestani, Vice President Preston D. Swafford Browns Ferry Unit 1 Restart Senior Vice President Browns Ferry Nuclear Plant Nuclear Support Tennessee Valley Authority Tennessee Valley Authority P. O. Box 2000 Electronic Mail Distribution Decatur, AL 35609 General Counsel Robert G. Jones, General Manager Tennessee Valley Authority Browns Ferry Site Operations Electronic Mail Distribution Browns Ferry Nuclear Plant Tennessee Valley Authority John C. Fornicola, General Manager P. O. Box 2000 Nuclear Assurance Decatur, AL 35609 Tennessee Valley Authority Electronic Mail Distribution Distribution w/encls: (See page 4)
Bruce M. Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Russell R. Thompson, Acting Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution Robert H. Bryan, Jr., General Manager Licensing & Industry Affairs Tennessee Valley Authority Electronic Mail Distribution
TVA 4 Meeting Summary to Karl W. Singer from Joseph W. Shea dated October 26, 2006.
SUBJECT:
MEETING
SUMMARY
- CATEGORY 1 PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) - BROWNS FERRY UNIT 1 RECOVERY STATUS Distribution w/encl:
C. Holden, NRR L. Raghavan, NRR J. Boska, NRR M. Widmann, DRP L. Mellen, DRP T. Nazario, DRP K. Clark, RII M. Lesser, DRS W. Bearden, DRP T. Ross, FRP C. Casto, DRP J. Shea, DRS V. McCree, RII S. Campbell, OEDO L. Slack, RII EICS T. McGinty, NRR C. Haney, NRR E. Brown, NRR M. Chernoff, NRR RIDSNRRDIRS PUBLIC
List of Attendees NRC/TVA Unit 1 Restart Management Meeting Nuclear Regulatory Commission B. Boger, Associate Director for Operating Reactor Oversight and Licensing, NRR C. Haney, Director of DORL, NRR J. Shea, Director, Division of Reactor Safety (DRS)
C. Holden, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR M. Widmann, Chief, Branch 6, DRP L. Raghavan, Branch Chief, DORL, NRR S. Weerakkody, Chief, Fire Protection Branch, NRR M. Lesser, Office of Regional Administrator-Region II W. Bearden, Senior Resident Inspector BF Unit 1, Branch 6, DRP T. Ross, Senior Resident Inspector BF Units 2 and 3, Branch 6, DRP T. Nazario, Project Engineer, Branch 6, DRP J. Boska, Project Manager, DORL, NRR C. Moulton, Fire Protection Engineer, NRR A. Muniz, Project Engineer, NRR J. Paige, NSPDP, NRR H. Harrington, Office of Public Affairs L. Regner, Project Manager, NRR P. Qualls, Fire Protection Engineer, NRR Browns Ferry (TVA)
A. Bahtnager, Senior Vice President, Nuclear Operations M. Bajestani, Vice President Unit 1 Restart T. McGrath, Senior Project Manager, Operational Readiness W. Crouch, Site Licensing & Industry Affairs Manager R. Baron, Unit 1 Nuclear Assurance Manager J. McCarthy, Unit 1 Licensing J. Valente, Engineering Restart Manager B. Bryan, Director of Licensing R. Moll, Recovery System Engineering Manager T. Langley, Supervisor for Licensing Units 2 and 3 Public B. Lawson, Huntsville Times Enclosure 1