MONTHYEARCNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And.2015-09-16016 September 2015 Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. Project stage: Request CNL-15-198, Commitment Revision Associated with Flood Hazard Reevaluation Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights..2015-09-28028 September 2015 Commitment Revision Associated with Flood Hazard Reevaluation Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights.. Project stage: Response to RAI ML16028A0962016-02-0101 February 2016 Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal Logic, and Unit Priority Re-Trip Logic License Amendment Request Project stage: Request ML16043A2772016-03-14014 March 2016 Summary of Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Modify Browns Ferry Technical Specifications (TS) by Adding New TS 3.3.8.3 (CAC Nos. MF6738, MF6739 and MF6740) Project stage: Meeting CNL-16-078, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486)2016-05-11011 May 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) Project stage: Response to RAI CNL-16-082, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) - Letter 42016-05-25025 May 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) - Letter 4 Project stage: Response to RAI CNL-16-092, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740)- Letter 52016-06-16016 June 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740)- Letter 5 Project stage: Response to RAI CNL-16-126, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486)2016-08-24024 August 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) Project stage: Response to RAI ML16236A0732016-08-31031 August 2016 Request for Additional Information Related to License Amendment Request to Add New Technical Specification 3.3.8.3 Project stage: RAI CNL-16-133, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 72016-09-15015 September 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 7 Project stage: Response to RAI CNL-17-054, Withdrawal of License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486)2017-05-0808 May 2017 Withdrawal of License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) Project stage: Withdrawal 2016-05-25
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23157A1272023-06-13013 June 2023 Meeting Summary for Environmental Pre-Submittal Meeting for Subsequent License Renewal Application on May 11, 2023 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22319A1952022-12-0202 December 2022 Summary of October 13, 2022, Meeting with Tennessee Valley Authority to Discuss Planned Alternative Requests for the Fifth 10-Year Inservice Testing Program Interval for Brown'S Ferry Nuclear Plant, Units 1, 2, and 3 ML22298A1612022-11-17017 November 2022 Summary of Public Meeting on SAMA with TVA ML22266A2742022-09-28028 September 2022 Summary of September 22, 2022, Public Meeting with Tennessee Valley Authority to Discuss a Request to Use a Later Edition of the ASME OM Code ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22103A2472022-04-14014 April 2022 Summary of April 12, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Revised Criticality Analysis License Amendment Request ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22083A0762022-03-24024 March 2022 Summary of March 17, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Atrium 11 License Amendment Request (EPID L-2021-LLA-0132 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21266A0532021-10-20020 October 2021 Summary of September 22, 2021, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-205 and TSTF-563 ML21273A1922021-10-12012 October 2021 September 27, 2021, Summary of Meeting with Browns Ferry Nuclear Plant, Units 1 & 2 Related to a Planned Alternative Request Per American Society of Mechanical Engineers (Asmee) Code Case N-526, Alternative Requirements for Successive Sect ML21251A1122021-09-14014 September 2021 Summary of September 7, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21155A0212021-06-0808 June 2021 Summary of Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20162A1532020-06-25025 June 2020 Summary of June 8, 2020, Partially Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20094M9012020-04-13013 April 2020 Summary of April 2, 2020 Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of a License Amendment Request Adoption of 10 CFR 50.69 ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18242A4882018-09-24024 September 2018 Summary of Pre-Application Conference Call with Tennessee Valley Authority to Discuss Proposed Changes to Modifications Associated with Approved NFPA 805 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant ML18068A0792018-03-15015 March 2018 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 ML18053A5362018-03-0101 March 2018 Summary of February 7, 2018, Pre-Application Conference Call with TVA a Planned License Amendment Request to Change the Emergency Response Organization Staffing ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML17131A2512017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17061A6722017-04-0606 April 2017 Summary of February 15, 2017, Meeting with Tennessee Valley Authority on Updates to the Transmission System Regarding Extended Power Uprate for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17017A4552017-02-0303 February 2017 Summary of Meeting with Tennessee Valley Authority Regarding Maximum Extended Load Line Limit Plus Pre-Application Meeting for Browns Ferry Nuclear Plant ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16210A4532016-08-16016 August 2016 07/19/2016 Summary of Meeting with Tennessee Valley Authority Regarding Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant (CAC Nos. MF6741, MF6742, and MF6743) ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary ML16043A2772016-03-14014 March 2016 Summary of Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Modify Browns Ferry Technical Specifications (TS) by Adding New TS 3.3.8.3 (CAC Nos. MF6738, MF6739 and MF6740) ML15321A4942015-11-30030 November 2015 Summary of Public Meeting with Tennessee Valley Authority Regarding the Planned Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant ML15295A2602015-11-0404 November 2015 July 14, 2015, Summary of Public Meeting with Tennessee Valley Authority to Discuss Topics Regarding Seismic Risk Evaluations Related to the Seismic Hazard Reevaluation for Browns Ferry Nuclear Plant (TACs MF3764, MF3765 and MF3766) ML15146A2792015-05-21021 May 2015 Bf EOC Meeting Summary 2015 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14147A3222014-05-27027 May 2014 Public Meeting Summary 05/21/2014 to Present Annual Assessment ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14036A3872014-02-0505 February 2014 Summary of Meeting with Public to Discuss the Results of the Follow-up Inspection of the Items Identified in Confirmatory Action Letter (ML13232A105) of August 22, 2013, and the Status of Nrc'S Performance Assessment of Browns Ferry Unit 1 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mm:h 14, 2016 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF February 1, 2016, MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO MODIFY BROWNS FERRY TECHNICAL SPECIFICATIONS (TS) BY ADDING NEW TS 3.3.8.3 (CAC NOS. MF6738, MF6739, AND MF6740)
On February 1, 2016, a Category I public meeting was held between members of the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. TVA submitted, on September 16, 2015, its license amendment request (LAR) to modify the Browns Ferry Nuclear Plant (BFN), Units 1 and 2 Technical Specifications (TSs) by adding new TS 3.3.8.3, "Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic," and Unit 3 TSs by adding new TS 3.3.8.3, "Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip-Logic."
The purpose of the meeting was for TVA to provide a description of logic functions and a summary of changes requested in the LAR, and for the NRC staff to discuss its draft request for additional information (RAI) and its preliminary concerns associated with pump logics, loss of power, and use of BFN probabilistic risk assessment (PRA) program with the TVA representative.
The meeting notice and agenda, dated December 23, 2015, is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML16028A313.
The licensee presented informational slides at the meeting. The presentation document provided by the licensee prior to the meeting and attached to the meeting notice, is publicly available under ADAMS Accession No. ML16028A096. A list of attendees is enclosed.
The overview of associated logic started with the history of the original design basis for the initial BFN Units 1, 2, 3 startup and operation, restart of each unit (following the extended shutdown of all three units), and development and modification of the three logic systems. TVA noted that BFN Safety Evaluation Report, Supplement 4 states that the system shall have capability to provide emergency power to accommodate any combination of accident signals (real or spurious), in all three units, in any order without operator action for the short term (0-10 minutes). The spurious accident signal is considered the design basis single failure for the event.
TVA staff provided an introduction and overview of the emergency core cooling system (ECCS) one-of-a-kind logic systems that are currently installed and working at the BFN Units 1, 2, and 3 for controlling ECCS loads during accidents and the focus of the LAR. These are the Preferred Pump Logic (PPL), CAS Logic, and Unit Priority Re-Trip Logic. The presentation included the
number of logic divisions, initiating signals for each logic, actions performed by the logic, and other characteristics and limitations and associated interactions with other systems.
Another logic system, the "Pre-Accident Signal," which anticipates an event and is redundant to the CAS logic, was also presented. The pre-accident signal (PAS) anticipates an accident and starts all eight BFN diesel generators for Unit 1 and 2 and Unit 3 so that they are ready for electrical loading when required by the load sequencing logic. This discussion specifically answered one of Instrumentation and Control Branch (EICB) draft RAI on why the PAS appeared in the Final Safety Analysis Report, but was not discussed in the LAR.
TVA explained that the subject logic systems were already in existence and have been in use for some time. Unit Priority Re-Trip Logic, which was added to support Unit 3 restart, is described in the current Bases for TS 3.8.1. Unit Priority Re-Trip Logic requires an existing CAS for actuation.
TVA also presented an overview of Unit 1/2 ECCS PPL. This logic is initiated by an accident signal in either Unit 1 or Unit 2. It assigns designated residual heat removal and core spray pumps to Unit 1 and Unit 2. It performs the same function with or without a loss of offsite power.
It also blocks the manual restart of the pumps in non-accident unit for 60 seconds. Proposed TS 3.3.8.3 Action A is entered with one or more required ECCS PPL divisions inoperable.
Proposed Condition A requires that the ECCS PPL division(s) be restored to operable within 7 days.
TVA staff continued its presentation by providing an overview of the LAR. The licensee discussed the proposed or relocated ACTIONS and COMPLETION TIMES applicable to ECCS PPL divisions, CAS logic, and Unit Priority Re-Trip logic in the proposed TS 3.3.8.3. The proposed TS 3.3.8.3 limiting condition for operation (LCO) for BFN Units 1 and 2 requires two divisions of ECCS PPL be operable in Modes 1, 2, and 3. BFN Units 1, 2, and 3 current TS 3.8.1, "AC Sources - Operating," LCO 3.8.1 b requires two divisions of CAS logic available in Modes 1, 2, and 3. The proposed LAR relocates CAS logic from TS 3.8.1 to the new TS 3.3.8.3. Explicit requirements for Unit Priority Re-Trip Logic are not provided in the current TS. Unit Priority Re-Trip logic is currently described for BFN Units 1, 2, and 3 in the Bases for TS 3.8.1. As Unit Priority Re-Trip works in conjunction with CAS, the licensee provided its associated requirements in TS 3.3.8.3. In addition TS Table 3.3.5.1-1 is revised to refer to TS 3.3.8.3 Conditions when a related ECCS function is inoperable. The proposed TS 3.3.8.3 consolidates the three logic systems, requirements, conditions, and surveillance test 1in one location for easier, safer, and more efficient operation. TVA stated that the proposed LAR does not modify the function or design of the subject logic systems.
The PRA analysis performed for this LAR was also presented, which provides the basis and justification for the increase in Completion Time from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days for the PPL. The licensee explained that this evaluation is only applicable to BFN Units 1 and 2, since BFN Unit 3 does not use PPL logic. TVA staff provided an overview of the PRA model, including PPL modeling, and stated that the CAS or Unit Priority Re-trip logic are not explicitly modeled. NRC staff inquired about the impact of the PPL outage on the plant response and a general discussion on this topic followed. RAls regarding the PRA analysis supporting this LAR will be sent to the licensee.
The draft RAI from EICB was presented and discussed. The NRC staff agreed that some of the draft RAI items were clarified or answered sufficiently during the meeting and can be withdrawn.
The preliminary question from the Electrical Engineering Branch regarding emergency diesel loading as it relates to ECCS logic was also discussed. Revised/Additional questions from Electrical Engineering Branch will be sent to the licensee.
There were no members of the public in attendance at the meeting or by telephone. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES FEBRUARY 1. 2016. PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT. UNITS 1, 2. AND 3 LICENSE AMENDMENT REQUEST REGARDING ADDITION OF TS 3.3.8.3 Name Organization Farideh Saba Nuclear Regulatory Commission Margaret Chernoff NRC Robert Beaton NRC Euqene Eagle NRC Mihaela Biro NRC Vijay Goel NRC Tania Martinez-Navedo NRC Daniel O'Neal NRC Edward Schrull Tennessee Valley Authority Clinton Szabo TVA Timothy Hayes TVA Charles Dollar TVA Eric Browne TVA Enclosure
ML16043A277 NRC-001
- By an email ** Per Jack Zimmerman (BC)
OFFICE LPL2-2/PM LPL2-2/LA EEEB** EICB/BC* APLA/BC* LPL2-2/BC LPL2-2/PM TMartinez-NAME FSaba BClayton MWaters SRosenberg BBeasley FSaba Navedo DATE 02/18/16 02/17/16 02/24/16 02/23/16 02/18/16 03/14/16 03/14/16