Letter Sequence Request |
---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) TAC:MC3812, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results
|
MONTHYEARML0607202531975-05-23023 May 1975 May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:Technical Specification
MONTHYEARML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML21335A0672021-11-26026 November 2021 Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions ML24019A1192021-04-0808 April 2021 Technical Specification 3.1.6, Rod Pattern Control CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-062, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 12018-04-19019 April 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)32018-03-16016 March 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 12018-03-0707 March 2018 Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus ML18066A1202018-02-20020 February 2018 Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions - Updated CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change2016-10-31031 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change NL-16-165, Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificat2016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificati CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates2016-07-13013 July 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information CNL-16-073, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information2016-04-22022 April 2016 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information CNL-15-240, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information2015-11-13013 November 2015 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In..2015-09-25025 September 2015 Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. NL-15-169, Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 22015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 22015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 32015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 3 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 42015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 4 ML15282A1692015-09-21021 September 2015 Proposed Technical Specification Markups, Part 2 of 2 ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 52015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 5 ML15282A1802015-09-21021 September 2015 Retyped Technical Specifications Bases Changes, Attachment 5 ML15282A1782015-09-21021 September 2015 Retyped Proposed Technical Specifications Changes, Attachment 3 ML15282A1672015-09-21021 September 2015 License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes ML15282A1792015-09-21021 September 2015 Proposed Technical Specification Bases Markups, Attachment 4 ML15282A1662015-09-21021 September 2015 Proposed Technical Specification Markups, Part 1 of 2 CNL-15-002, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499)2015-03-0606 March 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499) CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479)2015-02-17017 February 2015 Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)2015-01-29029 January 2015 (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) ML12242A4772012-08-28028 August 2012 License Amendment Request to Change Technical Specifications to Delete References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25 Percent Extension of Surveillance Intervals to Accel ML1106004082011-02-25025 February 2011 Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets ML1032103342010-11-12012 November 2010 Revised Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, & 3D ML1024305282010-08-27027 August 2010 Technical Specifications Change TS-474 - Request to Add TS 3.7.3, Control Room Emergency Ventilation (Crev) System, Action to Address Two Crev Subsystems Inoperable Due to Inoperable Crev System High Efficiency Particulate ML1005507002010-02-18018 February 2010 Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, and 3D ML0933506552009-11-17017 November 2009 Technical Specification Change TS-467-S - Utilization of Areva Fuel & Associated Analysis Methodologies - Non EPU Supplement ML0930801582009-10-23023 October 2009 Technical Specification Change TS-467 - Utilization of Areva Fuel and Associated Analysis Methodologies ML0929503402009-10-20020 October 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 ML0922904712009-08-11011 August 2009 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 25 - Request for Additional Information - SCVB-82 Through SCVB-86 and Replacement Documentation ML0921101192009-07-27027 July 2009 Technical Specifications Change 465 - Revision of Technical Specifications to Eliminate Unnecessary Water Local Leak Rate Tests 2023-03-10
[Table view] Category:Bases Change
MONTHYEARML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) ML21335A0672021-11-26026 November 2021 Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)32018-03-16016 March 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 12018-03-0707 March 2018 Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 ML18066A1202018-02-20020 February 2018 Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions - Updated CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change2016-10-31031 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change NL-16-165, Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificat2016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificati CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates2016-07-13013 July 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates CNL-16-073, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information2016-04-22022 April 2016 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information CNL-15-240, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information2015-11-13013 November 2015 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In..2015-09-25025 September 2015 Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)2015-01-29029 January 2015 (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) ML1106004082011-02-25025 February 2011 Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets ML1032103342010-11-12012 November 2010 Revised Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, & 3D ML1024305282010-08-27027 August 2010 Technical Specifications Change TS-474 - Request to Add TS 3.7.3, Control Room Emergency Ventilation (Crev) System, Action to Address Two Crev Subsystems Inoperable Due to Inoperable Crev System High Efficiency Particulate ML1005507002010-02-18018 February 2010 Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, and 3D ML0922904712009-08-11011 August 2009 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 25 - Request for Additional Information - SCVB-82 Through SCVB-86 and Replacement Documentation ML0921101192009-07-27027 July 2009 Technical Specifications Change 465 - Revision of Technical Specifications to Eliminate Unnecessary Water Local Leak Rate Tests ML0915400152009-05-29029 May 2009 Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.209 Regarding Steam Dryer Analyses ML0912000642009-04-24024 April 2009 Technical Specifications Change 464 - Application for Technical Specification Improvement to Adopt Technical Specification Task Force TSTF-476, Rev. 1, Improved BPWS Control Rod Insertion Process ML0904402062009-02-0909 February 2009 Response for Additional Information Regarding - Technical Specifications (TS) Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force (Tstf). ML0836501092008-12-22022 December 2008 Technical Specifications Change 463-T, One-time Extension of Surveillance Requirements (Srs) ML0835306192008-12-15015 December 2008 Technical Specifications Change TS-431 - Extended Power Uprate - Response to Round 22 Request for Additional Information - Unit 1 Large Transient Testing (Ltt) - ML0829602272008-10-17017 October 2008 Technical Specifications Change TS-418 - Extended Power Uprate - Response to Round 21 Request for Additional Information on Channel Bow ML0723602632007-08-31031 August 2007 07-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0 ML0723602622007-08-31031 August 2007 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0 ML0721303752007-07-31031 July 2007 CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz ML0721303822007-07-31031 July 2007 CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 Hz ML0721303862007-07-31031 July 2007 CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution ML0721304152007-07-31031 July 2007 CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components ML0721304292007-07-31031 July 2007 C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings ML0721304012007-07-31031 July 2007 CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz ML0710100922007-04-0606 April 2007 (BFN) - Unit 3 - Technical Specifications (TS) Change TS-460-T - Request for One-Time Extension of Allowed Outage Time (AOT) - Emergency Diesel Generator (EDG) 3D ML0706003392007-02-26026 February 2007 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) - Response to Round 12 Request for Additional Information (RAI) ML0628602672006-10-0505 October 2006 Technical Specification Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 10 Request for Additional Information ML0627902302006-10-0303 October 2006 Technical Specifications Changes TS-431 and TS 418 - Extended Power Uprate - Steam Dryer Stress Report, Revision 4 ML0627901402006-10-0202 October 2006 Technical Specifications Change TS-443 - Request for Additional Information (RAI) Regarding Oscillation Power Range Monitor ML0629201562006-09-13013 September 2006 Rev 1 to Technical Specification, NPSH Transient Study RHR and Core Spray Pumps, E12.5.1296 ML0617803082006-06-15015 June 2006 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 5 Request for Additional Information ML0625103852006-05-31031 May 2006 Enclosure 3, Browns Ferry, Units 1, 2 & 3 - CDI Report No. 05-28P, Rev 1, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements. ML0613004432006-05-31031 May 2006 GE-NE-0000-0053-7413-R0-NP, Browns Ferry, Units 1, 2 & 3 Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions. ML0613004412006-05-31031 May 2006 C.D.I. Report 06-11, Rev 1, Hydrodynamic Loads on Browns Ferry, Unit 1 Steam Dryer to 200 Hz. ML0613601482006-05-11011 May 2006 Supplemental Response to NRC Round 3 Request for Additional Information Related to Technical Specifications Change No. TS-418 - Extended Power Uprate Operation ML0613004362006-05-0505 May 2006 Transmittal of Browns Ferry, Units 1, 2 & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Steam Dryer Stress Report ML0606203282006-02-28028 February 2006 Technical Specifications (TS) Change TS-431 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head 2023-03-10
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 June 15, 2006 TVA-BFN-TS-431 TVA-BFN-TS-418 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D. C. 20555-0001 Gentlemen:
In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -
TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 -
EXTENDED POWER UPRATE (EPU) - RESPONSE TO ROUND 5 REQUEST FOR ADDITIONAL INFORMANTION (TAC NOS. MC3812, MC3743, AND MC3744)
By letters dated June 28, 2004 (ADAMS Accession No. ML041840109) and June 25, 2004 (ML041840301), TVA submitted applications to the NRC for EPU of BFN Unit 1 and BFN Units 2 and 3, respectively. This letter provides TVA's response to the NRC staff's June 2, 2006, Round 5 Request for Additional Information (RAI) (ML061460137) in support of the BFN Units 1, 2, and 3 EPU license amendment requests. Enclosure 1 to this letter provides responses to each of the ten questions that are contained in the NRC staff's RAI.
TVA has determined that the additional information provided by this letter does not affect the no significant hazards considerations associated with the proposed TS changes. The proposed TS changes still qualify for a categorical exclusion Toy)
U.S. Nuclear Regulatory Commission Page 2 June 15, 2006 from environmental review pursuant to the provisions of 10 CFR 51.22(c) (9).
A new regulatory commitment is made in this submittal. summarizes the commitment regarding future inspections of top guide components.
If you have any questions regarding this letter, please contact me at (256)729-2636.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 15th day of June, 2006.
Sincerely, William D. Crouch Manager of Licensing and Industry Affairs
Enclosures:
- 1. Response to Round 5 Request for Additional Information
- 2. Commitment Summary cc: (see page 3)
U.S. Nuclear Regulatory Commission Page 3 June 15, 2006 Enclosures Cc: Enclosures State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017' Montgomery, AL 36130-3017 U.S. Nuclear Regulatory Commission
.Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Malcolm T. Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Ms. Eva A. Brown, Project Manager U.S Nuclear Regulatory Commission (MS 08G9)
One White Flint,-North 11555 Rockville Pike Rockville, Maryland 20852-2739
ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 -
EXTENDED POWER UPRATE (EPU) - RESPONSE TO ROUND 5 REQUEST-FOR ADDITIONAL INFORMATION (TAC NOS. MC3812, MC3743, AND MC3744)
(SEE ATTACHED)
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 -
EXTENDED POWER UPRATE (EPU) - RESPONSE TO ROUND 5 REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC3812, MC3743, AND MC3744)
This enclosure provides TVA's response to the NRC staff's June 2, 2006, Round 5 Request for Additional Information (ADAMS Accession No. ML061460137).
NRC Request EEEB.8 In a recent incident, a nuclear power station operator was requested by the local Reliability Council to roll back generator power output to the pre-extended power uprate (EPU) level because adequate post-trip voltages at the safety buses could not be supported if the generation was at the EPU level. In view of the above, please provide a discussion on how BFN EPU power levels have been co-ordinated with the area Reliability Council to assure that tripping of these units at the EPU level will not cause inadequate post-trip voltages at the safety-related buses.
TVA Reply to EEEB.8 TVA is an integrated utility where the transmission system is owned and operated by TVA's owner-operated grid operations known as the Power Systems Operations (PSO) group. Down-powering is not an option that is currently designed into the PSO grid operating guides to assure offsite power adequacy. Instead, PSO manages planned transmission line outage schedules and establishes minimum voltage levels based on system loading and configuration.
Unless there is an unplanned trip of a major 500-kV transmission line, any necessary down-powers (either due to grid reliability concerns or unacceptable generator angular instability) would be pre-scheduled and coordinated with plant maintenance activities.
BFN has coordinated with the PSO Transmission Planning organization the EPU power levels, post-trip'plant loading data, generator capabilities, and switchyard voltage acceptance criteria. PSO evaluated a range of grid conditions and identified bounding parameters (e.g , lines and transformers in service, system loading, and voltage levels) that will ensure the ability of the grid to meet the minimum switchyard voltage requirements during a unit trip with a postulated design basis event. PSO also investigated the need for system enhancements, including additional static and dynamic reactive sources in the El-I
region around the BFN plant, resulting from the restart of BFN Unit 1 at EPU and EPUs of BFN Units 2 and 3. PSO concluded that at the post-EPU generator reactive output levels, no additional reactive sources were.required to meet minimum post-trip voltage requirements and that the post-EPU reactive contribution to the grid from the BFN generators was sufficient.
NRC Request EEEB.9 State the differences between pre- and post-EPU Megavolt-ampere reactive (MVAR) capability for the BFN generators and the obligation of the BFN units to supply MVARs to the transmission system in order to assure adequate post-trip voltages at the safety buses.
TVA Reply to EEEB.9 The generator reactive power capability is a function of the generator hydrogen operating pressure, operating real power, and the generator capability curve. With consideration of the average operating hydrogen pressure, the operating real power, and the generator capability curves, the reactive power capability for pre-EPU and post-EPU conditions is summarized in Table EEEB.9-1 below.
Table EEEB.9-1 MVAR at Generator Terminals Unit 2 and Unit 3 Unit 1 120% OLTP 120% OLTP (EPU) (EPU)
Reduced H2 75 psig H2 75 psig H2 Pressure Pressure Pressure Generator Reactive Power Capability at 300 / -150 200 / -150 360 / -150 Rated Real Power Credited Reactive Power Capability for Post-Event Evaluated 300 / -150 200 / -150 360 / -150 in Transmission Studies This information is used by TVA's PSO Transmission Planning organization-along with plant post-trip load data and voltage acceptance criteria so that-the proper stability and loadflow/voltage studies could be run as part of the BFN EPU Grid Adequacy and Stability Study. The obligation of the BFN units to supply MVARs to the transmission system in order to assure E1-2
adequate post-trip voltages at the safety buses are those credited in the Transmission System Planning Study shown above.
This study establishes that grid voltages (both pre- and post-unit trip) satisfy the offsite power voltage acceptance criteria for the site. Plant studies show that the post-trip voltages at the safety buses remain adequate when the offsite power voltage acceptance criteria are met.
NRC Request EEEB.10 In Section 10.3..1.1 of NEDC-33101P regarding Environmental Qualification (EQ), it is stated that 1) normal temperatures are expected to increase slightly, but remain bounded by normal temperatures used in the EQ analysis, 2) the post-accident peak temperature and pressure do not significantly increase for EPU, and 3) the long-term post-accident temperatures inside containment increase, however the increase was determined not to adversely effect the qualification of safety-related electrical equipment. Specify the temperature and pressure before and after EPU and demonstrate that the increase is within the design margin of qualification of the electrical equipment.
TVA Reply to EEEB.10 The safety-related electrical equipment was reviewed for EPU to ensure that the existing environmental qualification (EQ) for the normal and accident conditions, expected in the area where the devices are located, remains adequate. PUSAR Section 10.3.1.1, "Inside Containment," reflects the evaluation of EQ-related equipment inside the containment building under EPU conditions.
Further discussion of the information provided in PUSAR Section 10.3.1.1 is provided below. BFN Unit 1 has been in an extended shutdown, and-the EQ program will be re-established to meet the current EQ program for BFN Units 2 and 3. As such, the effects of EPU on the EQ program are provided by comparison between the current licensed thermal power (CLTP) and EPU conditions for BFN Units 2 and 3.
EPU EQ analyses for equipment located inside containment:
- 1) NEDC-33101P states that normal temperatures are expected to increase slightly, but remain bounded by the normal temperatures used in the EQ analyses. The maximum normal temperatures for the-drywell and wetwell used in the'EQ analyses are 147*F and 95 0 F, respectively. These values actually remain the same for CLTP and EPU conditions; therefore, there is no effect on equipment qualification.
E1-3
- 2) NEDC-33101P states that the post-accident peak temperature and pressure do not significantly increase for EPU. For BFN EQ analyses, the EQ evaluations are performed using bounding peak values for temperature and pressure based on main steam line break (MSLB) and/or DBA-LOCA conditions. The CLTP bounding EQ peak temperatures and pressures for the drywell and wetwell are 336*F/65 psia and 177'F/50.7 psia, respectively.
For EPU conditions, the calculated peak temperatures and pressures for the drywell and wetwell are 335.4 0 F/62.9 psia and 193 0 F/44.9 psia, respectively..
The higher values (CLTP or EPU) were used for the EQ.
analyses. Thus, the only value that had the potential to change any EQ evaluations is the increased wetwell peak temperature. However, there is no safety-related electrical equipment located in the wetwell; therefore, EPU has no effect on equipment qualification.
- 3) NEDC-33101P states that the long-term post-accident temperatures inside containment increase. However, the increase in long-term post-accident temperatures was determined not to adversely affect the qualification of safety-related electrical equipment. For BFN EQ analyses, the EQ evaluations consider the temperature versus time profiles based on MSLB and/or DBA-LOCA conditions. For EPU conditions the post-accident temperature profiles are greater than the CLTP temperature profiles. Figures EEEB.10-1 and EEEB.10-2 are provided to show the comparison of drywell and wetwell temperature profiles for CLTP and EPU conditions.
For the EQ of equipment located inside containment, the EPU long-term temperature profiles based on MSLB/DBA-LOCA conditions were compared to the EQ test profiles for the specific equipment to ensure that the EPU conditions are enveloped by the test conditions. In cases where the test conditions do not completely envelop the EPU conditions, the long-term temperatures were further evaluated using the RCM Technologies System 1000 computer program (Arrhenius calculation) to demonstrate that the EPU conditions were within the qualification requirements for the affected equipment.
E1-4
Figure EEEB.10-1: Drywell Temperature Profiles 350 300 L.i 250 w
U 200 150 100 1 Osec 8sec lOsec 15sec 20sec 25sec 30sec 1rmin 10min 20rmin 30rmin 40rmin 50rmin 60min 1 day 2day 5day lOday 40day 60day lOOday TIME E1-5
Figure EEEB.10-2: Wetwell Temperature Profiles 200 . .................................... *......
190- o EPU LOCA.
EPU MSLB 180 " CLTP LOCA x .----
-... ----+.... CLTP MSLB o_170 -
ILi i-150 - -"_ __"" ___
0-. 4 IIO _'7 _ _
0.- /- ---
110 - - - - - - - " -
100' - --- "--
0m 1imin 2min 3min 4min 6min 8min 10min 20min 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 4 hour 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hour IS hour 1 day 2day 5 day 10 day 40 day 60 day 100 day TIME E1-6
NRC Request EEEB.11 In Section 6.2 of NEDC-33101P regarding dc power, it is stated that the load addition for control logic relay associated with on-site power system changes are with existing margins. Please specify the amount of additional load on the dc system as a result of EPU and demonstrate that the additional load is within the existing design margin.
TVA Reply to EEEB.11 Subsequent to the preparation of NEDC-33101P, it has been determined that the modification associated with the load addition for control logic relays is no longer required. A review of the EPU modifications was performed to determine the impact to the DC system. The EPU modification (listed in of the March 7, 2006 submittals) that adds load to the DC system is:
Main Bank Transformers The existing transformer differential rel ays are replaced, resulting in approximately a 0.6 Amps DC total increase (0.2 Amp per Unit) to Non-Safety Related Battery #4 for the replacement of transformer differential relays on Units 1, 2, and 3.
Operation at EPU conditions does not increase any existing loads beyond their analyzed nameplate rating or revise any component operating duty cycle. There is no impact from EPU on the plant safety-related batteries. BFN calculations for the DC power systems contain built-in margin to account for minor load additions without re-performing the entire DC analyses. Load changes are evaluated in plant calculations as part of the design process. EPU changes are within existing battery system design margin. Therefore, the DC power distribution system remains adequate.
E1-7
NRC Request CVIB.6 In the response to Nuclear Regulatory Commission (NRC) Request EMCB-A.3, it was stated that.
the BWRVIP [Boiling Water Reactor Vessel and Internal Project]-25 report requires an EVT-l examination from below the core plate, or UT
[ultrasonic testing] from above the core plate, of 50% of the holddown bolts. If cracking is detected, the remaining 50% of the bolts will be inspected. Inspections for Unit 2 and Unit 3 have been extremely difficult to perform because of poor accessibility and high radiation conditions with fuel in an operating reactor pressure vessel.
Presently, a VT-3 examination of accessible holddown bolts has been the best possible examination that can be performed for an operating RPV [reactor pressure vessel] to verify that the bolt is still' performing its design function.
Unit 1 performed an EVT-1 examination from below the core plate of 50% of the rim holddown bolts prior to restart since access below the core plate was available.
Based on the response to NRC Request EMCB-A.3, provide a discussion regarding the intention to either inspect the core plate holddown bolts in accordance with the BWRVIP inspection guidelines, install the core plate wedges, or develop an alternative to the inspections identified in BWRVIP-25 and submit it to the staff for review and approval prior to the period of extended operation.
TVA Reply to CVIB.6 TVA intends to develop an alternative to the inspections identified in BWRVIP-25 and submit it to the NRC staff for review and approval.. The information will be submitted prior to the period of extended operation.
As. stated in the Reply to NRC-Request EMCB-A.3 in the EPU submittals dated March 7, 2006, TVA has previously committed (as part of the license renewal for BFN Units 1, 2, and 3) to perform a plant-specific analysis consistent with BWRVIP-25. In addition, in TVA's November 16, 2005, supplement to the license renewal application, it was stated that appropriate corrective action will be taken if the plant-specific analysis does not satisfy the applicable criteria. The installation of core plate wedges to eliminate the'need for enhanced inspections of the core El-8
plate hold-down bolts as recommended by BWRVIP-25 is considered an acceptable corrective action. The plant-specific analysis, or the corrective action taken to resolve the issue, will be submitted for the NRC staff review and approval. The information will be submitted two years prior to the period of extended operation.
NRC Request CVIB.7 In the response to NRC Request EMCB-A.4, it was stated that there is no inspection currently required for the grid beam and beam-to-beam crevice slot. However, the NRC staff's Safety Evaluation for BWRVIP-26 dated December 7, 2000, states that the threshold fluence level for irradiation-assisted stress-corrosion cracking is 5 x 1020 n/cm2 .
Address the inspection activities that will be performed on the critical top guide components in the refueling outage following power uprate. This discussion should address enhanced visual testing of the top guide grid beams and the conformance of these tests in accordance with Service Information Letter (SIL) 554 following the sample selection and inspection frequency of BWRVIP-47 for the control rod drive guide tubes. Additionally the discussion should address the inspection percentage and time frame for the total population of cells. Selection of the cells should be discussed including intentions to bias the cell selection to the highest fluence areas in the top guide.
TVA Reply to CVIB.7 TVA will commence inspections of critical top guide components during the refueling outages following EPU operation for each of the three BFN units. Enhanced visual testing (EVT-1) of top guide grid beams will be performed in accordance with GE SIL 554 following the sample selection and inspection frequency of BWRVIP-47 for CRD guide tubes* That is, TVA will perform inspections of 10% of the tothl population of cells within twelve years, with one-half (i.e., 5%) to be completed within six years.
The six-year intervals will be defined to be the same as those for the CRD guide tubes. Selection of the top guide cells will be biased to the highest fluence areas of the top guide. 'If cracking is found, the inspection sample size would be expanded.
In this regard, TVA intends to follow the guidelines of BWRVIP-
- 26. The inspection protocol and sample size are subject to modification if BWRVIP-26 is revised.
El-9
NRC Request CPTB.1 Additional information is required to clarify the evaluation of EPU physical modifications and conditions on the renewed operating license. It is understood that the License Renewal Application (LRA) was decoupled from the EPU application, but the effects of the planned power uprate on the LRA were evaluated and the results were presented in the enclosure to TVA letter dated August 3, 2004. In this document, the operating characteristics that potentially affect the identified aging mechanisms were identified to verify the LRA remained valid. It is known that the configuration considered in the.LRA scope and aging management review (AMR) table is the configuration that will exist at restart for BFN Unit 1. It is also recognized that the configuration identified in the LRA includes the physical changes that are identified in Appendix F of the LRA to be completed prior to restart for BFN Unit 1. The currently planned configuration changes that will exist as a result of the proposed EPU are identified in the EPU applications submitted by letters dated June 25 and June 28, 2004, as supplemented, and it is understood that the EPU is expected-to coincide with restart.
Since the EPU is decoupled from the LRA, it is not clear to the staff if these planned physical changes and conditions identified in the EPU application are still bounded by the LRA scope, AMR tables and AMP scope or if these EPU changes have been or will be evaluated separately for license renewal aging management as part of either the EPU application or in a 10 CFR 50.59 evaluation reflected in the annual update.
Provide a discussion on how the structures, systems and components that were included within the scope of the LRA are going to be impacted by the EPU modifications and conditions.
Specifically, provide the following information:
a) Confirm the timing of the planned EPU physical changes to components within scope of license renewal and clarify how and where these physical'changes have been or will be evaluated forlicense renewal aging management. If all planned EPU physical changes will be in place at restart and, thus, are bounded by the aging management review in the LRA, identify these specific physical changes and clarify how and where-they are evaluated in the LRA. If certain planned EPU physical changes have not been evaluated for aging management in the LRA, clarify how and where they are or will be evaluated.
b) Considering that the LRA and EPU applications were decoupled, clarify how and where the operating conditions that will exist as a result of EPU have been, or will be, El-10
evaluated for license renewal aging management. If these new operating conditions are bounded by the aging management review in the LRA, identify these specific operating conditions and clarify how and where they are evaluated in either the LRA or EPU. If certain planned EPU conditions have not been evaluated for aging management in the LRA, clarify how and where they are or will be evaluated. For example, clarify if the conclusions on operational characteristics reached in TVA letters dated January 28, August 3, and August 5, 2004, concerning effects of the EPU on the LRA still remain valid or clarify if these changes are to be addressed as part of the EPU evaluation.
c) Where additional components, materials, environments and aging effects/mechanisms are identified as a result of the EPU applications that were not included in the LRA, identify those specific components for each system and clarify how the aging management review was or will be performed and how the aging management program scope was or will be expanded.
If the existing LRA AMR tables or AMP scope do not bound the new EPU components, materials, environments and aging effects/mechanisms, submit new AMR tables and programs as appropriate.
TVA Reply to CPTB.1 The License Renewal Application (LRA) for BFN Units 1, 2, and 3 was developed in parallel with the Extended Power Uprate (EPU) license amendment requests for BFN Units 1, 2, and 3. The conditions resulting from EPU implementation were reviewed during the license renewal process to determine any impact on the LRA.
As would be expected, changes in operating conditions associated with EPU implementation were identified as having potential impacts on the LRA. Accordingly, EPU conditions were evaluated and incorporated into the LRA as appropriate (see item (b) below). Additionally, physical modifications associated with EPU would be expected to have no impact on the scope of the LRA as these modifications consist of modifying existing systems with new replacement components and equipment. EPU modifications have been preliminarily-reviewed and are not anticipated to change the LRA scope (see item (a) below).
a) The majority of the EPU modifications have not yet been implemented, and'the final review of the modifications is not complete. A small number of Unit 1 EPU modification reviews had been completed at the time of the LRA (included in the annual updates) and were included in the LRA scope.
Based on final reviews to date and preliminary reviews of EPU physical design changes, no impact to the aging El-il
management in the LRA is anticipated. The EPU modifications.
involve installation of.new components and equipment which
.would have a positive impact on aging management.
Components and equipment utilized for EPU modifications are of similar materials and design as the original equipment and, to date, have not involved any new aging management issues, nor are they likely to.
In accordance with the provisions of 10 CFR 54.37(b), newly identified systems, structures, and components that would have been subjected to an aging management review or evaluation of time-limited aging analyses will be included inFSAR updates required by 10 CFR 50.71(e). The next FSAR update is scheduled to occur 6 months following the Unit 2 Spring.2007 refueling outage.
b) The review of EPU conditions was performed as part of the LRA. The conclusions on operational characteristics reached in TVA letters dated February 19, 2004 (January 28, 2004, Meeting Follow-up), May 28, 2004 (as updated by letter dated August 5, 2004)., and August 3, 2004, concerning effects of the EPU on the LRA still remain valid for license renewal.
As previously discussed in theAugust 3, 2004, submittal, the Browns Ferry LRA was developed in parallel with the EPU submittal. The February 19, 2004, letter provided additional information discussing the effects of EPU on the LRA. That letter concluded that all evaluations in support of the LRA were valid at the EPU power level, except those associated with Section 4.3, Metal Fatigue. LRA Sections 4.2 and 4.3 were later updated by the letters dated May 28, 2004, and August 5, 2004, to reflect EPU conditions.
Attachment 1 of the August 3, 2004, letter identified the changing operational characteristics that potentially affected the identified aging mechanisms following EPU.
These operational characteristics were reviewed for the systems affected, as delineated in Attachment 2 of that letter, to.verify the license renewal application remains valid.
c) 0Noadditional components, materials, environments and aging effects/mechanisms have been identified as a result of the EPU application that were not included in the LRA. As stated in item (a) above, the physical modifications associated with EPU are not anticipated to impact the aging management based on preliminary reviews. Final reviews will be completed post-implementation in accordance with TVA design processes and the-aging management program. Also, as stated in item (b) above, the review of EPU operating El-12
conditions was previously performed and appropriately incorporated into the LRA.
NRC Request IOLB.1 During a conference call on April 25, 2006, TVA stated that the change in plant parameter values associated with EPU conditions could affect the timing of actions provided in the Emergency Operating Instructions (EOIs) and Abnormal Office Instructions (AOIs). Describe any changes resulting from the EPU on the available time and the actual time it takes for these operator actions. Provide the times for both current conditions-and proposed EPU conditions. The scope of action times to be addressed should be those credited in the safety analyses in the Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis.
TVA Reply to IOLB.1 See TVA Reply to question IOLB.2, below.
NRC Request IOLB.2 Discuss how TVA will validate that times available for the proposed EPU,.will be adequate for operators to reliably perform the timing of actions provided in the EOIs and AOIs.
TVA Reply to IOLB.2 TVA previously provided a discussion of BFN operator actions and the effect on Emergency Operating Instructions (EOIs) and Abnormal Operating Instructions (AOIs) in the reply to NRC requests IROB.B-1 and IROB.B-2 in the letter dated December 19, 2005. The previous TVA reply and the above additional questions were further discussed with the NRC staff during a conference call on APril 25, 2006. During. this call, the additional request
.was clarified. TVA and NRC agreed that operator action times for operator actions credited in the safety analyses in the Updated Final Safety Analysis Report (UFSAR) Chapter 14, "Plant Safety Analysis," would provide the additional information needed.
This response supplements the information previously provided in the reply to NRC requests IROB.B-I and IROB.B-2.in the letter
As discussed in the April 25, 2006 conference call with the.NRC staff, Table IOLB.2-1 is provided to further clarify the EPU effect on operator-actions credited in safety analyses that support the design basis accidents of UFSAR Chapter 14. This table provides the available time (time assumed in the'analysis El-13
from beginning of accident to completion of action) and actual time (time it takes the operator to perform the action from initiation of the action to completion of action) for both current licensed thermal power (CLTP) and EPU conditions.
BFN was designed to mitigate the consequences of design basis accidents automatically with a minimum of manual operator actions. Most safety systems were designed to rely on automatic system actuation to ensure that the safety system were capable of carrying out their intended functions. In a few cases, limited operator actions are employed. As indicated in Table IOLB.2-1, only a small number of the manual operator actions are credited in these analyses. Two of these actions are credited within the first 60 minutes of the accident, and these manual operator action times were unchanged for EPU. Only one of the operator action times (CAD required start time) was revised for EPU and the time frame for this action is so great as to not affect the ability of the operator to perform this action in a timely manner. The CAD required start time is further discussed in PUSAR Section 4.7, "Post-LOCA Combustible Gas Control."
El-14
Table IOLB.2-1 Compilation of Manual Operator Actions in Design Basis Accident Analyses Manual Operator Action 1) Available Time 2) Actual Time Comments Credited in Safety Analysis CLTP EPU - CLTP EPU Initiate suppression 10 minutes 10 minutes 5 minutes 5 minutes 1) The available time for this action is pool cooling (DBA-LOCA based upon the assumed time utilized in Containment Analysis) the containment analysis. Although EPU conditions affect the suppression pool heatup rate in the containment analysis, the assumed time for initiating suppression pool cooling was not changed for the EPU analysis and the resulting peak pool temperature was allowed to increase for EPU conditions. The containment analysis was performed for EPU conditions and the results of the analysis (as compared to CLTP conditions) are reflected in PUSAR Section 4.1, "Containment System Performance."
- 2) The actual time for the performance of this action is based upon conservatively bounding operator experience. EPU does not affect the steps that are required for the operator to align the RHR system to suppression pool cooling.
El-15
Table IOLB.2-1 Compilation of, Manual Operator Actions in Design Basis Accident Analyses Manual Operator Action 1) Available Time 2) Actual Time Comments Credited in Safety Analysis CLTP EPU CLTP EPU Initiate drywell spray 11 minutes 11 minutes 2 minutes 2 minutes 1) The available time for this action is (Steam Line Break based upon the assumed time utilized in Containment Analysis) the containment analysis. Dryweil spray is assumed to be initiated when the drywell temperature exceeds 280°F plus 60 seconds. If 280°F was reached prior to 10 minutes, the minimum allowed response time was 11 minutes. This assumed time was not changed for the EPU analysis.
For the limiting larger steam line breaks, the drywell temperature exceeds 280*F prior to ten minutes both in the pre-EPU and EPU cases; therefore, the minimum allowed response time of 11 minutes is not affected. For smaller steam line breaks, the time to reach 280*F could be longer than ten minutes which would provide adequate time for operator action in both pre-EPU and EPU conditions.
- 2) The actual time for the performance of this action is based upon conservatively bounding operator experience. EPU does not affect the steps that are required for the operator to align the RHR system to drywell spray.
El-16
Table IOLB.2-1 Compilation of Manual Operator Actions in Design Basis Accident Analyses Manual Operator Action 1) Available Time 2) Actual Time Conments Credited in Safety .......
Analysis CLTP EPU CLTP EPU SLC system injection ýInjection Injection 2 minutes 2 minutes 1) The available time for this action is (DBA-LOCA Radiological initiation initiation based upon the assumed time utilized in Consequences) within 2 within 2 the Alternate Source Term (AST) hours hours radiological analyses. The current AST analyses were performed conservatively to envelope EPU conditions. Therefore, there are no changes associated with EPU implementation.
- 2) The actual time for the performance of this action is based upon conservatively bounding operator experience. For this event, SLC is initiated after receiving the alarm for high drywell radiation.
More than adequate time is available for operator action compared to the time needed for actual actuation. EPU does not affect the steps that are required for the operator to initiate the SLC system.
El-17
Table IOLB.2-1 Compilation of Manual Operator Actions in Design Basis Accident Analyses Manual Operator Action 1) Available Time 2) Actual Time Comments Credited in Safety Analysis CLTP EPU CLTP EPU Required start time 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> 5 minutes 5 minutes 1) The available time for this action is for CAD system based upon the calculation of post-LOCA initiation (DBA-LOCA production of hydrogen and oxygen by Combustible Gas radiolysis. This. production is directly Control) affected by EPU and the results of the analysis are reflected in PUSAR Section 4.7, "Post-LOCA Combustible Gas Control."
- 2) The actual time for the performance of this action is based upon conservatively bounding operator experience. Post-LOCA Hydrogen/oxygen levels in the drywell are monitored during the accident and will provide adequate warning of the need for CAD system operation. EPU does not affect the steps that are required for the operator to initiate the CAD system.
El-18
NRC Request SBPB.14 The response provided in the March 7, 2006 submittals to RAI SPLB-A.5 stated that:
the turbine and turbine control system design changes for EPU are in progress and the specific control setpoints have not been established. The setpoints will be adjusted to ensure that the turbine will not exceed 120% of rated speed due to overshoot.
Provide a discussion addressing to what extent the proposed EPU will affect the existing turbine overspeed protection capability, including a discussion of turbine overshoot during a loss of electrical load and supporting analyses that are credited, the effects of turbine modifications that will be completed, and post-modification testing that will be completed to confirm that the analytical results are correct.
TVA Reply to SBPB.14 EPU modifications for the main turbine include new rotors for Unit 1 (monoblock design) and new buckets (heavier design) and diaphragms for all three units to increase flow capacity for the proposed EPU operations. The new buckets for all three units as well as the monoblock design for Unit 1 increase the rotor inertia which slows the acceleration rate of the machine should a load rejection event occur. However, the entrapped steam energy contained within the turbine and the associated piping after the valves close also increases slightly for EPU which increases the acceleration rate of the machine should a load rejection event occur. As stated in PUSAR Section 7.1, the overspeed calculation compares the entrapped steam energy contained within the turbine and the associated piping, after the stop valves trip, and the sensitivity of the rotor train for the capability of overspeeding.'
The scenario considered is the emergency case where the EHC controls and the Control and Intercept Valves fail to respond to the initial speed increase due to a load rejection event. For this scenario, the unit rapidly accelerates to the overspeed trip setpoint, thereby trip closing the main and intermediate stop valves. The operating condition analyzed was the maximum power, Valves Wide Open case, with low backpressure. This approach accounts for the two basic contributors to peak overspeed due to a load rejection event: 1) the energy due to entrapped (or entrained) steam within the steam path and inlet piping downstream of the main and intermediate steam valves; and 2) what is termed "valve lag overspeed," which takes into account the El-19
- energy contributed'by new steam entering the machine during response time of :the control and'trip systems, and during the actual closing time of these valves. The overspeed trip setpoint is established such that the resulting peak speed will not exceed the 120% emergency overspeed limit .due to overshoot. This ensures that the turbine is protected in an overspeed event.
The BFN main turbines are provided with overspeed protection to ensure that the turbines do not exceed 120% of rated speed for any condition. The emergency overspeed protection is an independent two out of three electronic trip device with independent speed sensors that detect turbine speed and sends a signal to the master trip solenoid valve (MTSV) on a detected overspeed condition. The current BFN Units 2 and 3 emergency overspeed setpoint is 109%. Electronic overspeed protection is also part of the digital EHC system. The digital EHC.system will also send a trip signal to the MTSV on a detected overspeed condition from. independent speed sensors. The digital EHC overspeed setpoint is set less than or equal to the emergency overspeed protection setpoint.
With the modifications to the main turbine for EPU conditions, the turbine overspeed calculation has determined that a setpoint of 109.5% will provide emergency.overspeed protection. This setpoint will result in an emergency overspeed peak at 118.99% on Unit 1 and 119.04%.on Units 2 and 3 following a full load rejection event,.concurrent with the unlikely assumption that the EHC controls and/or the control and intercept valves have failed to respond to the initial speed increase. These are below GE's emergency overspeed peak speed limit requirement of 120%.
Therefore the existing emergency overspeed trip setpoint of 109%
for Unit 2 and Unit 3 remains conservative and a setpoint change will not be required. The. 109% emergency setpoint will also be utilized for Unit 1.
Post-modification testing to confirm the analytical results is not practical as this would require disabling turbine-protective features and rapidly increasing turbine speed to the overspeed
.. trip setpoint. However, post-modification testing of.the overspeed function will be performed as part of the EPU.startup testing. For Unit 1, overspeed functional testing will be conducted at no load as part of post-modification testing for the digital EHC upgrade modification on Unit 1. This test will bring the turbine up to the overspeed'setpoint and confirm proper overspeed trip function with the generatoroffline and the reactor power-within the bypass-valve capacity. -For BFN Units 2 and 3, overspeed functional testing will be conducted via signal simulation. An emergency overspeed trip logic function test will be conducted by inserting simulated speed signals to validate the overspeed trip signal to the MTSV is received at the El-20
emergency overspeed setpoint. The turbine trip output from the EHC digital control system will also be tested for proper trip signal initiation to the MTSV. The MTSV is functionally tested weekly.
El-21
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 -
EXTENDED POWER UPRATE (EPU).- RESPONSE TO ROUND 5 REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC3812, MC3743, AND MC3744)
COMMITMENT
SUMMARY
TVA will commence inspections of critical top guide components during the refueling outages following EPU operation for each of the three BFN units. Enhanced visual testing (EVT-l) of top guide grid beams will be performed in accordance with GE SIL 554 following the sample selection and inspection frequency of BWRVIP-47 for CRD guide tubes.