Text

August 10, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 2 AND 3 REQUEST FOR ADDITIONAL INFORMATION FOR EXTENDED POWER UPRATE - ROUND 8 TECHNICAL SPECIFICATION (TS-431) (TAC NOS. MC3743 AND MC3744)

Dear Mr. Singer:

By letter dated June 28, 2004, as supplemented by letters dated August 23, 2004, February 23, April 25, June 6, and December 19, 2005, February 1 and 28, March 7, 9, 23, and 31, April 13, May 5 and 11, June 12, 15, 23 and 27, and July 21, 2006, Tennessee Valley Authority (TVA, the licensee) submitted an amendment request for Browns Ferry Nuclear Plant, Units 2 and 3. The proposed amendments would change the Units 2 and 3 operating licenses to increase the maximum authorized power level from 3458 to 3952 megawatts thermal. This change represents an increase of approximately 15 percent above the current maximum authorized power level. The proposed amendments would also change the Units 2 and 3 licensing bases to revise the credit for overpressure from 3 pounds for short term and 1 pound for long term, to 3 pounds for the duration of a loss-of-coolant accident, and revise the maximum ultimate heat sink temperature.

A response to the enclosed request for additional information is needed before the Nuclear Regulatory Commission (NRC) staff can complete the review. The steam dryer questions (EEMB) in this request were provided on July 12, 2006, while the remaining questions (SBWB) provided July 20, 2006, are in support of an audit planned for August 8, 2006, at the site.

These requests were discussed with your staff on August 2, 2006, and it was agreed that a response would be provided by August 18, 2006.

K. Singer As stated in a letter dated August 8, 2006, some of the steam dryer questions contain information from Continuum Dynamics Incorporated Report No.05-28P, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Revision 1 (05-28P),

which was requested withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390. However, information needed to complete the NRC staffs withholding review for this information has not been provided. Therefore, the NRC staff will release the information sought to be withheld after 30 days of this letter unless the information is withdrawn or amended consistent with the requirements of 10 CFR 2.390(b).

If you have any questions, please contact me at (301) 415-2315.

Sincerely,

/RA/

Eva A. Brown, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-260 and 50-296

Enclosures:

1. Non-proprietary Request for Additional Information
2. Proprietary Request for Additional Information cc w/Enclosure 1 Only: See next page

K. Singer As stated in a letter dated August 8, 2006, some of the steam dryer questions contain information from Continuum Dynamics Incorporated Report No.05-28P, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Revision 1 (05-28P),

which was requested withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390. However, information needed to complete the NRC staffs withholding review for this information has not been provided. Therefore, the NRC staff will release the information sought to be withheld after 30 days of this letter unless the information is withdrawn or amended consistent with the requirements of 10 CFR 2.390(b).

If you have any questions, please contact me at (301) 415-2315.

Sincerely,

/RA/

Eva A. Brown, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-260 and 50-296

Enclosures:

1. Non-proprietary Request for Additional Information
2. Proprietary Request for Additional Information cc w/Enclosure 1 Only: See next page DISTRIBUTION:

PUBLIC RidsNrrDorl (CHolden) RidsNrrLACGoldstein LPL2-2 R/F RidsNrrDorlDpr RidsNrrDorlLpl2-2 RidsNrrDeEemb RidsNrrDssScvb RidsNrrLABClayton TAlexion RidsNrrPMMChernoff CWu RidsNrrPMEBrown TScarbrough RidsAcrsAcnwMailCenter RidsNrrDssSbwb RidsRgn2MailCenter THuang MZobler, OGC LWard Package: ML062190265 Encl2: ML062140663 ADAMS ACCESSION NO.: ML062140657 NRR-088 OFFICE LPL2-2/PM LPL2-2/PM LPL2-2/LA SBWB/BC NAME EBrown EBrown for CGoldstein GCranston by memo MChernoff DATE 8/9/06 8/9/06 8/9/06 7/26/06 OFFICE EEMB/BC SCVB/BC LPL2-2/BC NAME KManoly by memo RDennig by memo LRaghavan DATE 7/27/06 7/26/2006 8/10/06 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION EXTENDED POWER UPRATE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 2 AND 3 DOCKET NOS. 50-260 AND 50-296 EEMB

46. [

]

47. [

]

48. [ ]
49. [

]

50. [

]

51. [

]

52. [

]

53. [

]

Enclosure 1

54. [

]

55. [

]

56. [

]

57. [

]

58. [

]

59. [

]

60. [

]

61. [

]

62. [

]

63. [

]

64. [ ]
65. [ ]
66. [

]

67. [

]

68. [ ]
69. [

]

70. [

]

71. [

]

72. [

]

73. [

]

74. [

]

75. [

]

76. [

]

77. [

]

78. [

]

79. [

]

80. [

]

81. [

]

82. [

]

83. [

]

84. [

]

ACVB

57. Discuss which break flow model (Moody, HEM) is used for containment peak pressure at uprated conditions.
58. Address whether the only difference between the values of Updated Final Safety Analysis Report (UFSAR) peak drywell pressure of 50.6 pounds per square inch gage (psig) and the current method of 47.7 psig is due to the difference in LAMB models discussed in note (3) of Table 4-1 of Enclosure 4 of the June 25, 2004, submittal, NEDC-33047P, DRF 0000-0011-1328, Revision 2, Browns Ferry Units 2 and 3 Safety Analysis Report for Extended Power Uprate (EPU). Discuss whether the use of LAMB model output for the current method at uprated conditions is the same as that used for the Vermont Yankee EPU.
59. a. Provide a technical manual or a description of the MULTIFLOW program for calculating pressure losses in piping systems which is used for the EPU Net Positive Suction Head (NPSH) calculations.
b. Discuss what, if any, conservatism is included in the MULTIFLOW calculations.
c. Enclosure 6 of the March 23, 2006, submittal contains MD-Q0999-970046, NPSH Evaluation of Browns Ferry residual heat removal and core spray pumps. Page 12, states that a piping roughness value of 1.5E-4 ft was selected, which corresponds to condensate quality water. Justify why this is acceptable for suppression pool water, and address whether this a significant assumption.

SBWB

58. Describe the process followed by Tennessee Valley Authority to implement Long Term (L/T) Solutions including approved methodologies used, hardware modifications, and any interface between fuel vendors.
59. Address where Browns Ferry Nuclear Plant (BFN) is today in the implementation schedule and what is its implementation status. Address the affect, if any, of multiple fuel vendors.
60. Describe the BFN Technical Specifications affected by the L/T Solution implementation.

Identify the related tech spec operability requirements.

61. Discuss the BFN experience with the period-based detection algorithm (PBDA) in response to noise and Solution III setpoint adjustment. Describe what actions are taken during cycle reload confirmations if the calculated setpoints are lower than expected.

Describe the acceptance testing process used during the Solution III testing process.

Include a description of PBDA results where false alarms were detected.

62. Describe any changes for the backup stability implementation (e.g. interim collective actions) associated with different fuel vendors calculating method. Discuss whether BFN uses cycle-specific calculations for backup stability or generic regions. Describe any Solution-III hardware implementation issues such as: location of the new hardware, periodic testing procedures, and signal response quality.
63. Describe the implications for operator training with respect to handling false alarms.
64. Describe what is the effect, if any, of the EPU upgrade on anticipated transient without scram and Emergency Operating Instructions.

Mr. Karl W. Singer BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:

Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Robert G. Jones, General Manager Nuclear Operations Browns Ferry Site Operations Tennessee Valley Authority Browns Ferry Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Decatur, AL 35609 Mr. Larry S. Bryant, Vice President Mr. Glenn W. Morris, Manager Nuclear Engineering & Technical Services Corporate Nuclear Licensing Tennessee Valley Authority and Industry Affairs 6A Lookout Place Tennessee Valley Authority 1101 Market Street 4X Blue Ridge Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Brian OGrady, Site Vice President Browns Ferry Nuclear Plant Mr. William D. Crouch, Manager Tennessee Valley Authority Licensing and Industry Affairs P.O. Box 2000 Browns Ferry Nuclear Plant Decatur, AL 35609 Tennessee Valley Authority P.O. Box 2000 Mr. Robert J. Beecken, Vice President Decatur, AL 35609 Nuclear Support Tennessee Valley Authority Senior Resident Inspector 6A Lookout Place U.S. Nuclear Regulatory Commission 1101 Market Street Browns Ferry Nuclear Plant Chattanooga, TN 37402-2801 10833 Shaw Road Athens, AL 35611-6970 General Counsel Tennessee Valley Authority State Health Officer ET 11A Alabama Dept. of Public Health 400 West Summit Hill Drive RSA Tower - Administration Knoxville, TN 37902 Suite 1552 P.O. Box 303017 Mr. John C. Fornicola, Manager Montgomery, AL 36130-3017 Nuclear Assurance and Licensing Tennessee Valley Authority Chairman 6A Lookout Place Limestone County Commission 1101 Market Street 310 West Washington Street Chattanooga, TN 37402-2801 Athens, AL 35611 Mr. Bruce Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609