Letter Sequence Other | |
|---|---|
TAC:MC1330, (Open) TAC:MC1427, (Approved, Closed) TAC:MC2305, (Approved, Closed) TAC:MC3812, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3813, (Approved, Closed) TAC:MC3822, (Open) TAC:MC3960, (Open) TAC:MC4070, (Open) TAC:MC4161, (Open) TAC:MC4659, (Approved, Closed) TAC:MC4797, (Approved, Closed) TAC:MC5254, (Withdrawn, Closed) TAC:MC5373, (Open) | |
Initiation
Results
Other: ML050380283, ML050590036, ML050900421, ML051150191, ML051430036, ML052290397, ML062170007, ML062750565 | |
MONTHYEARML0607202531975-05-23023 May 1975
[Table View]May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 A Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other L-80-017, (Bfn), Unit 1 - Technical Specifications (TS) Change 437 - Scram Discharge Volume Water Level Setpoint2003-11-0303 November 2003 (Bfn), Unit 1 - Technical Specifications (TS) Change 437 - Scram Discharge Volume Water Level Setpoint Project stage: Request ML0527100312004-01-31031 January 2004 Pressure-Temperature Curves for TVA, Browns Ferry, Unit 1 Project stage: Other ML0411106652004-04-16016 April 2004 Brown Ferry, Unit 1, Request for Additional Information, Scram Discharge Volume Water Level Setpoint Project stage: RAI ML0412803272004-05-0606 May 2004 Technical Specifications (TS) Change 437 - Response to Request for Additional Information Regarding Scram Discharge Volume Water Level Setpoint Project stage: Response to RAI ML0420204152004-07-0808 July 2004 (BFN) - Unit 1 - Technical Specifications (TS) Change 427 - Deletion of the Low Pressure Coolant Injection Motor-Generator Sets Project stage: Request ML0423707612004-08-16016 August 2004 Technical Specifications Change TS-447 - Extension of Channel Calibration Surveillance Requirement Performance Frequency and Allowable Value Revision Project stage: Other ML0423701002004-08-23023 August 2004 Ltr, Framatome Proprietary Review Project stage: Other ML0425702122004-09-13013 September 2004 RAI, Allowable Value for Reactor Vessel Water Level Project stage: RAI ML0429403302004-10-19019 October 2004 RAI, Power Range Neutron Monitor Upgrade Project stage: RAI ML0431303662004-11-0808 November 2004 Technical Specifications (TS) Change 430 - Response to Request for Additional Information Regarding Power Range Neutron Monitor Upgrade with Implementation of Average Power Range Monitor and Rod Block Monitor Project stage: Response to RAI ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0434301202004-12-0606 December 2004 Technical Specification Change TS 426, Revision to Diesel Generators Allowed Outage Time Project stage: Other ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0501001802005-01-0707 January 2005 December 02, 2004 Browns Ferry Nuclear Plant, Units 1, 2, and 3, Summary of NRC Site Visit and Meeting Regarding Extended Power Uprate and License Renewal Applications Project stage: Meeting ML0436405562005-01-10010 January 2005 Ltr, Acceptance Review to Extend Technical Specification (TAC No. MC4070, MC4071, MC4072) (TS-447) Project stage: Acceptance Review ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0503802832005-02-16016 February 2005 Summary of Conference Call with TVA Status of Amendments Using Method 3 Project stage: Other ML0505603372005-02-23023 February 2005 (BFN) - Response to NRCs Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0507703702005-03-11011 March 2005 Technical Specifications (TS) Change TS-447, Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency and Allowable Value Revision Project stage: Request ML0508305292005-03-28028 March 2005 RAI, TS Change on Deletion of LPCI Motor-Generator Sets (Tac No. MC3822) Project stage: RAI ML0508801572005-04-0101 April 2005 Summary of February 2005 Conference Calls Regarding Extended Power Uprate Acceptance Review Reply Project stage: Acceptance Review ML0508305192005-04-0808 April 2005 Request for Additional Information, EFCV Surveillance Testing Frequency Revision (TS-438) (Tac No. MC4659) Project stage: RAI ML0510505802005-04-15015 April 2005 Technical Specifications Change 427, Response to Request for Additional Information Regarding Deletion of the Low Pressure Coolant Injection Motor-Generator Sets Project stage: Response to RAI ML0509004212005-04-19019 April 2005 Ltr, Licensing Action, Dependencies Requests Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to NRCs Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to NRCs Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0513004622005-04-27027 April 2005 Technical Specifications Change 438- Response to Request for Additional Information Regarding Excess Flow Check Valve Surveillance Test Frequency Project stage: Response to RAI ML0514300362005-05-20020 May 2005 Response to NRCs Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201022005-05-27027 May 2005 Ltr., Extended Power Uprate Acceptance Review Results (Tac No. MC3812) (TS-431) Project stage: Acceptance Review ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to NRCs Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0515800472005-06-20020 June 2005 Amd No. 254, Deletion of Low Pressure Coolant Injection Motor-Generator Sets (Tac No. MC3822) Project stage: Other ML0517304532005-06-20020 June 2005 Enclosure, Amd No. 254 on Deletion of Low Pressure Coolant Injection Motor-Generator Sets (Tac No. MC3822) Project stage: Other ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other 2004-09-13 |
| ML051150191 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/19/2005 |
| From: | Hackett E NRC/NRR/DLPM/LPD2 |
| To: | Singer K Tennessee Valley Authority |
| Brown Eva, NRR/DLPM, 415-2315 | |
| Shared Package | |
| ML050950256 | List: |
| References | |
| TAC MC1330, TAC MC1427, TAC MC2305, TAC MC3812, TAC MC3813, TAC MC3822, TAC MC3960, TAC MC4070, TAC MC4161, TAC MC4659, TAC MC4797, TAC MC5254, TAC MC5373 | |
| Download: ML051150191 (1) | |
Similar Documents at Browns Ferry | |
|---|---|
Text
Licensing Actions Interdependencies for Selected Submittals l
l Low Water Trip Setpoint Power Range Neutron Monitor Upgrade
>1J 24-Month Fuel Cycle
-I V
y v
Extended Power UpratE Excess Flow Check Valves MSIV Leakage
> Alternate Source Term Completion of License Condition 2.C(4)
Completion of License Condition 2.C(15)