ML051150191
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
TAC:MC1330, (Open) TAC:MC1427, (Approved, Closed) TAC:MC2305, (Approved, Closed) TAC:MC3812, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3813, (Approved, Closed) TAC:MC3822, (Open) TAC:MC3960, (Open) TAC:MC4070, (Open) TAC:MC4161, (Open) TAC:MC4659, (Approved, Closed) TAC:MC4797, (Approved, Closed) TAC:MC5254, (Withdrawn, Closed) TAC:MC5373, (Open) | |
Initiation | |
MONTHYEARML0606805861975-05-23023 May 1975
[Table View]May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202531975-05-23023 May 1975 May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0411106652004-04-16016 April 2004 Brown Ferry, Unit 1, Request for Additional Information, Scram Discharge Volume Water Level Setpoint Project stage: RAI ML0412803272004-05-0606 May 2004 Technical Specifications (TS) Change 437 - Response to Request for Additional Information Regarding Scram Discharge Volume Water Level Setpoint Project stage: Response to RAI ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0425702122004-09-13013 September 2004 RAI, Allowable Value for Reactor Vessel Water Level Project stage: RAI ML0429403302004-10-19019 October 2004 RAI, Power Range Neutron Monitor Upgrade Project stage: RAI ML0431303662004-11-0808 November 2004 Technical Specifications (TS) Change 430 - Response to Request for Additional Information Regarding Power Range Neutron Monitor Upgrade with Implementation of Average Power Range Monitor and Rod Block Monitor.. Project stage: Response to RAI ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0436405562005-01-10010 January 2005 Ltr, Acceptance Review to Extend Technical Specification (TAC No. MC4070, MC4071, MC4072) (TS-447) Project stage: Acceptance Review ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0507703702005-03-11011 March 2005 Technical Specifications (TS) Change TS-447, Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency and Allowable Value Revision Project stage: Request ML0510505802005-04-15015 April 2005 Technical Specifications Change 427, Response to Request for Additional Information Regarding Deletion of the Low Pressure Coolant Injection Motor-Generator Sets Project stage: Response to RAI ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0513004622005-04-27027 April 2005 Technical Specifications Change 438- Response to Request for Additional Information Regarding Excess Flow Check Valve Surveillance Test Frequency Project stage: Response to RAI ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520201822005-07-18018 July 2005 Brown'S Ferry, Unit 1, Tech Spec Pages for Amendment 255, Regarding Completion Time for Containment Atmosphere Dilution Subsystem Inoperability Project stage: Other ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0521301352005-08-15015 August 2005 RAI, Regarding Channel Calibration Test Interval (TS-447) (Tac Nos. MC4070, MC4071, MC4072) Project stage: RAI ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522005532005-08-30030 August 2005 Request for Additional Information Regarding Extended Allowable Outage Time for Inoperable Diesel Generator Project stage: RAI ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting 2005-02-23 |
ML051150191 | |
Person / Time | |
---|---|
Site: | Browns Ferry ![]() |
Issue date: | 04/19/2005 |
From: | Hackett E NRC/NRR/DLPM/LPD2 |
To: | Singer K Tennessee Valley Authority |
Brown Eva, NRR/DLPM, 415-2315 | |
Shared Package | |
ML050950256 | List: |
References | |
TAC MC1330, TAC MC1427, TAC MC2305, TAC MC3812, TAC MC3813, TAC MC3822, TAC MC3960, TAC MC4070, TAC MC4161, TAC MC4659, TAC MC4797, TAC MC5254, TAC MC5373 | |
Download: ML051150191 (1) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML21286A5422021-10-0404 October 2021
[Table view]Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A3972021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.12, Process Radiation Monitoring Systems Characteristics ML21286A3422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.9, Reactor Water Cleanup System Equipment Design Data ML21286A3592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.4, (Deleted by Amendment 13) ML21286A3762021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.1, Systems (or Portions of Systems) Required to Mitigate LOCA And/Or HELB ML21286A3732021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.2, Reactor Protection System Instrumentation Specifications ML21286A3682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.3, Primary Containment Isolation ML21286A3892021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.7, Reactor Manual Control System Instrumentation ML21286A3952021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.6, Refueling Interlocks Effectiveness ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A4042021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.13, Area Radiation Monitoring ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis ML21286A5162021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.17, Process Sampling Systems ML21286A4942021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.11, Power Block Structures ML21286A4602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.4, Tools and Servicing Equipment ML21286A4572021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.2, Reactor Building Concrete Structure Base Slab Design Data ML21286A4522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.3, Plant Radiation Zone Classification ML21286A4272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.4, Normal Auxiliary Power ML21286A4242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.6, 250-V DC Power Supply ML21286A4232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.20, Design Output Documents ML21286A4142021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.5, Standby AC Power Supply ML21286A4092021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.16, Process Computer System ML21286A2772021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.3, Meteorology ML21286A2232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State B ML21286A2222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G - BWR Operating States ML21286A2262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State D ML21286A2272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State a ML21286A2622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.11, Id Resolution of Construction Permit Concern - Summary ML21286A2522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.4-1, Class of BWR Systems Criteria Requirements for Safety Evaluation ML21286A2662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.5, Sheets 1-3, Historical Earthquake Listing 200 Mile Radius Around 87.11 W Lon 34/71 N Lat ML21286A3172021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.3, Reactor Recirculation System ML21286A2002021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix a, AEC General Design Criteria - Group 1 (Overall Plant Requirements) ML21286A2722021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.7, Comparison of Nuclear System Design Characteristics ML21286A3482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.5, Plant Parameters Used Locaa Analysis ML21286A3542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3, Emergency Core Cooling Systems Equipment Design Data Summary ML21286A3672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.5, Neutron Monitoring System, SRM Trips ML21286A3962021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.8, Reactor Vessel Instrumentation ML21286A3122021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.2-1, Deleted by Amendment No. 16 ML21286A3132021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3, Reactor Vessel Internals, Mechanical Design Data ML21286A2962021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.2, Reactor Pressure Vessel Materials ML21286A2822021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.4A, Maximum Possible Flood ML21286A2842021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table, 2.4, Deleted ML21286A3112021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.4, Nuclear Steam Pressure Relief System ML21286A3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.6, Definition of Fuel Design Limits ML21286A3432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.8, Residual Heat Removal System Equipment Design Data 2021-10-04 |
Text
Licensing Actions Interdependencies for Selected Submittals
>1J l l Low Water Trip Setpoint Power Range Neutron Monitor Upgrade 24-Month Fuel Cycle
-I V y v Extended Power UpratE Excess Flow Check Valves MSIV Leakage > Alternate Source Term Completion of License Condition 2.C(4)
Completion of License Condition 2.C(15)
Enclosure 3
Retrieved from "https://kanterella.com/w/index.php?title=ML051150191&oldid=2288144"