(BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Request for Schedule Regarding Analysis for Steam Dryers
ML070310569
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/31/2007
From: Crouch W
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MC3743, TAC MC3744, TAC MC3812
Download: ML070310569 (4)


Text

January 31, 2007 TVA-BFN-TS-431 TVA-BFN-TS-418 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D. C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260

) 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -

TECHNICAL SPECIFICATIONS (TS) CHANGES TS-431 AND TS-418 -

EXTENDED POWER UPRATE (EPU) - RESPONSE TO REQUEST FOR SCHEDULE REGARDING ANALYSIS FOR STEAM DRYERS (TAC NOS. MC3812, MC3743, AND MC3744)

By letters dated June 28, 2004 (ADAMS Accession No. ML041840109) and June 25, 2004 (ML041840301), TVA submitted applications to the NRC for EPU of BFN Unit 1 and BFN Units 2 and 3, respectively. The NRCs January 25, 2007, letter to Karl W. Singer (TVA) requested that TVA provide a schedule for the submittal of the steam dryer analysis and an outline of the revised steam dryer approach which establishes a success path for EPU operation. The letter further stated that the outline should include plans to address the justification of the similarity between the units, the analysis assumptions, and the plans for the development of limiting curves for the startup power ascension.

TVA will provide a submittal with the steam dryer analysis by April 2, 2007. The requested outline will be provided with the analysis.

U.S. Nuclear Regulatory Commission Page 2 January 31, 2007 If you have any questions regarding this letter, please contact me at (256)729-2636.

Sincerely, Original signed by:

William D. Crouch Manager of Licensing and Industry Affairs

U.S. Nuclear Regulatory Commission Page 3 January 31, 2007 cc: State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Malcolm T. Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 4 January 31, 2007 JEM:TLE:BAB cc: B. M. Aukland, POB 2C-BFN M. Bajestani, NAB 1A-BFN A. S. Bhatnagar, LP 6A-C R. H. Bryan, BR 4X-C R. G. Jones, POB 2C-BFN G. V. Little, NAB 1D-BFN R. A. DeLong, SAB 1A-BFN B. J. O'Grady, PAB 1E-BFN K. W. Singer, LP 6A-C P. D. Swafford, LP 6A-C E. J. Vigluicci, WT 6A-K NSRB Support, LP 5M-C EDMS WT CA - K s:lic/submit/EPU/TS 418 and 431 - response to request regarding steam dryers analysis.doc