ML23331A253 | 27 November 2023 | Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions | |
CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 | 10 March 2023 | Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 | Surveillance Frequency Control Program |
CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) | 31 January 2023 | Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) | Surveillance Frequency Control Program |
CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) | 20 December 2022 | License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) | Incorporated by reference Surveillance Frequency Control Program |
CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) | 13 June 2022 | and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) | Time of Discovery Incorporated by reference Missed surveillance |
ML21335A067 | 26 November 2021 | Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions | |
ML24019A119 | 8 April 2021 | Technical Specification 3.1.6, Rod Pattern Control | |
CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) | 27 March 2020 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) | |
CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) | 25 January 2019 | Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) | Water Inventory Control |
CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays | 19 November 2018 | Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
CNL-18-062, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 | 19 April 2018 | Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 | |
CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 | 16 March 2018 | Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 | |
CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 | 7 March 2018 | Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 | Anticipated operational occurrence Minimum Critical Power Ratio |
ML18079B140 | 23 February 2018 | Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus | |
ML18066A120 | 20 February 2018 | Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions - Updated | |
CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change | 31 October 2016 | Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment Incorporated by reference Fire Protection Program Power Uprate |
NL-16-165, Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificat | 31 October 2016 | Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificati | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment Incorporated by reference Fire Protection Program Power Uprate Measurement Uncertainty Recapture |
CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision | 28 October 2016 | Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision | |
CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates | 13 July 2016 | Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates | Safe Shutdown Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment Power-Operated Valves Fuel cladding Flow Induced Vibration |
CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information | 27 April 2016 | for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information | Probabilistic Risk Assessment Large early release frequency Fuel cladding |
CNL-16-073, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information | 22 April 2016 | Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information | Safe Shutdown Probabilistic Risk Assessment Job Performance Measure Power-Operated Valves Fire Protection Program |
CNL-15-240, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information | 13 November 2015 | Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information | |
CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. | 25 September 2015 | Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. | Reactor Vessel Water Level |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate | Safety Limit Minimum Critical Power Ratio Probabilistic Risk Assessment Large early release frequency Flow Induced Vibration |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 2 | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 2 | Shutdown Margin Reactor Vessel Water Level Incorporated by reference Scram Discharge Volume |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 2 | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 2 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Cyber Security Incorporated by reference Scram Discharge Volume Fire Protection Program |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 3 | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 3 | |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 4 | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 4 | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Squib Feedwater Controller Failure Fuel cladding Power change |
ML15282A169 | 21 September 2015 | Proposed Technical Specification Markups, Part 2 of 2 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Cyber Security Incorporated by reference Scram Discharge Volume Fire Protection Program |
ML15282A152 | 21 September 2015 | Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate | Probabilistic Risk Assessment Minimum Critical Power Ratio Large early release frequency Flow Induced Vibration |
NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 5 | 21 September 2015 | Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 5 | |
ML15282A180 | 21 September 2015 | Retyped Technical Specifications Bases Changes, Attachment 5 | |
ML15282A178 | 21 September 2015 | Retyped Proposed Technical Specifications Changes, Attachment 3 | |
ML15282A167 | 21 September 2015 | License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment |
ML15282A179 | 21 September 2015 | Proposed Technical Specification Bases Markups, Attachment 4 | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Squib Feedwater Controller Failure Fuel cladding Power change |
ML15282A166 | 21 September 2015 | Proposed Technical Specification Markups, Part 1 of 2 | Shutdown Margin Reactor Vessel Water Level Incorporated by reference Scram Discharge Volume |
CNL-15-002, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499) | 6 March 2015 | Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499) | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence MELLLA |
CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) | 17 February 2015 | Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) | Reactor Vessel Water Level |
CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) | 29 January 2015 | (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) | |
ML12242A477 | 28 August 2012 | License Amendment Request to Change Technical Specifications to Delete References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25 Percent Extension of Surveillance Intervals to Accel | Stroke time Incorporated by reference |
ML110600408 | 25 February 2011 | Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets | Safe Shutdown Abnormal operational transient |
ML103210334 | 12 November 2010 | Revised Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, & 3D | Safe Shutdown Fire Barrier Maintenance Rule Program Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML102430528 | 27 August 2010 | Technical Specifications Change TS-474 - Request to Add TS 3.7.3, Control Room Emergency Ventilation (Crev) System, Action to Address Two Crev Subsystems Inoperable Due to Inoperable Crev System High Efficiency Particulate | Safe Shutdown Probabilistic Risk Assessment Abnormal operational transient Large early release frequency |
ML100550700 | 18 February 2010 | Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, and 3D | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Design basis earthquake Large early release frequency Earthquake Maintenance Rule Program Fuel cladding Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML093350655 | 17 November 2009 | Technical Specification Change TS-467-S - Utilization of Areva Fuel & Associated Analysis Methodologies - Non EPU Supplement | Shutdown Margin Safety Limit Minimum Critical Power Ratio Abnormal operational transient |
ML093080158 | 23 October 2009 | Technical Specification Change TS-467 - Utilization of Areva Fuel and Associated Analysis Methodologies | Shutdown Margin Reactor Vessel Water Level Abnormal operational transient Minimum Critical Power Ratio Fuel cladding Power change Coast down |
ML092950340 | 20 October 2009 | License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 | Safe Shutdown |
ML092290471 | 11 August 2009 | Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 25 - Request for Additional Information - SCVB-82 Through SCVB-86 and Replacement Documentation | |
ML092110119 | 27 July 2009 | Technical Specifications Change 465 - Revision of Technical Specifications to Eliminate Unnecessary Water Local Leak Rate Tests | Squib |