Letter Sequence Meeting |
---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) TAC:MC3812, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results
|
MONTHYEARML0607202531975-05-23023 May 1975 May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28
[Table View] |
|
---|
Category:Meeting Notice
MONTHYEARPMNS20240078, Meeting with Tennessee Valley Authority to Discuss a Future License Amendment Request to Revise the Final Safety Analysis Report Regarding the Hydrologic Analysis for the Browns Ferry Nuclear Plant2024-01-24024 January 2024 Meeting with Tennessee Valley Authority to Discuss a Future License Amendment Request to Revise the Final Safety Analysis Report Regarding the Hydrologic Analysis for the Browns Ferry Nuclear Plant PMNS20240028, Meeting with Tennessee Valley Authority to Discuss Proposed Use of the Risk-Informed Process for Evaluations (RIPE) for an Upcoming License Amendment Request for the Browns Ferry Nuclear Plant2024-01-12012 January 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Use of the Risk-Informed Process for Evaluations (RIPE) for an Upcoming License Amendment Request for the Browns Ferry Nuclear Plant PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230966, Pre-Application SLRA Meeting with TVA for Browns Ferry Cathodic Protection2023-09-11011 September 2023 Pre-Application SLRA Meeting with TVA for Browns Ferry Cathodic Protection PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230570, Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Environmental2023-05-10010 May 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Environmental PMNS20230568, Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Bfnp) - Safety2023-05-10010 May 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Bfnp) - Safety PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting PMNS20230053, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 32023-01-18018 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20221018, Meeting with the Tennessee Valley Authority to Discuss Proposed Alternative Requests for the Browns Ferry Nuclear Plant2022-10-12012 October 2022 Meeting with the Tennessee Valley Authority to Discuss Proposed Alternative Requests for the Browns Ferry Nuclear Plant PMNS20220991, Meeting with Tennessee Valley Authority to Discuss Severe Accident Mitigation Alternatives Analysis for the Browns Ferry Nuclear Plant, Subsequent License Renewal Application2022-10-0606 October 2022 Meeting with Tennessee Valley Authority to Discuss Severe Accident Mitigation Alternatives Analysis for the Browns Ferry Nuclear Plant, Subsequent License Renewal Application PMNS20220953, Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant2022-09-21021 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed Alternative Request for Browns Ferry Nuclear Plant PMNS20220312, Meeting with Tennessee Valley Authority to Discuss the Criticality Analysis License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 32022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss the Criticality Analysis License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20220206, Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request2022-03-0707 March 2022 Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request ML21270A0492021-09-27027 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request to ASME Code Case N-526 for Browns Ferry Nuclear Plant, Unit 2 ML21265A1322021-09-22022 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20211154, Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request2021-09-21021 September 2021 Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request ML21256A1962021-09-13013 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request to ASME Code Case N-526 for Browns Ferry Nuclear Plant, Unit 2 ML21252A5352021-09-0909 September 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML21242A0582021-08-30030 August 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20210702, Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption2021-05-25025 May 2021 Closed Meeting with Representatives from the Tennessee Valley Authority to Discuss a Planned Request for Exemption ML21141A1152021-05-21021 May 2021 Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 PMNS20210392, Annual Assessment Meeting2021-04-12012 April 2021 Annual Assessment Meeting ML20167A1202020-06-30030 June 2020 Public Meeting Notice - Notice of Predecisional Enforcement Conference (Pec) Between U.S. Nuclear Regulatory Commission (NRC) and Tennessee Valley Authority (TVA) (EA-20-006, EA-20-007) ML19067A0262019-03-0707 March 2019 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) and General Electric-Hitachi (Geh), Regarding Maximum Extended Load Line Limit Analysis Plus (Mella+) License Amendment Request (LAR) for Browns Ferry Nuclear Plant, ML16260A3552016-09-16016 September 2016 Notice of Closed Pre-decisional Enforcement Conference to Discuss Two Apparent Willful Violations Involving Failure to Conduct Roving Fire Watches and Inaccurate/Incomplete Hourly Fire Watch Records at Browns Ferry ML16161A0642016-06-15015 June 2016 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority and Its Consultant, GEH, Regarding Steam Dryers Structural Adequacy for Browns Ferry Units 1, 2 & 3 Extended Power Uprate (EPU) License Amendment Request (LAR) ML15062A5402015-03-0303 March 2015 March 8, 2015, Rescheduled Forthcoming Closed Meeting with Tennessee Valley Authority Browns Ferry Nuclear Plant Main Steam Isolation Valve Leakage Rate License Amendment Request ML14076A0692014-03-17017 March 2014 Notice of Public Meeting with the TVA to Discuss TVA 2013 Synergy Safety Culture ML14065A4952014-03-0606 March 2014 March 26, 2014 Notice of Category 3 Meeting with TVA to Present the 2013 Synergy Safety Culture Survey Results ML14014A2402014-01-14014 January 2014 Meeting Notice with Public to Discuss the Results of the Follow-up Inspection of the Items Identified in Confirmatory Action Letter of August 22, 2013 (ML13232A105) and the Status of the Nrc'S Performance Assessment of Browns Ferry Unit 1 ML14014A1572014-01-14014 January 2014 Meeting Announcement - Category One - Browns Ferry Nuclear Plant ML13191A1722013-07-10010 July 2013 Notice of Category 1 Meeting - Regulatory Conference Browns Ferry ML13178A3532013-06-27027 June 2013 Notice of Meeting with Tennessee Valley Authority to Discuss the Annual Assessment & Inspection Procedure 95003 Supplemental Inspection for Browns Ferry Nuclear Plant ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13078A4212013-03-19019 March 2013 Public Meeting Notice Tennessee Valley Authority, Browns Ferry, Sequoyah, Watts Bar for Commercial Grade Dedication Program ML12321A2522012-11-16016 November 2012 12/5/2012 - Meeting Announcement - Category One - Browns Ferry Nuclear Plant ML12306A4092012-11-0202 November 2012 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Areva Xm Fuel Transition Request ML12272A0612012-09-28028 September 2012 11/8/12 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Voluntary Fire Protection Risk Initiative for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML12240A0802012-09-10010 September 2012 10/3/2012 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Voluntary Fire Protection Risk Initiative ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12212A3332012-07-30030 July 2012 Meeting Notice with Browns Ferry to Discuss the Status of Tva'S Preparations for NRC Supplemental Inspection in Accordance with Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded.. ML12192A1712012-07-10010 July 2012 7/25/2012 Browns Ferry 2012 Regulatory Conference for SSIs Public Meeting Notice ML12160A3722012-06-0808 June 2012 6/21/2012 Announcement for Public Meeting Regarding Browns Ferry Nuclear Plant Annual Assessment ML12150A1202012-05-29029 May 2012 6/18/12 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Areva Xm Fuel Transition Request ML1213001942012-05-0909 May 2012 May 9, 2012 Letter to Preston D. Swafford of the Tennessee Valley Authority Re Participation in the Commission Briefing on Results of the Agency Action Review Meeting on June 1, 2012 ML12122A1902012-05-0101 May 2012 Notice of Public Meeting to Discuss the Status of Tva'S Preparations for NRC Supplemental Inspection in Accordance with Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones ML12055A0632012-02-24024 February 2012 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) Regarding Fire Protection 2024-01-24
[Table view] |
Text
February 8, 2006 MEMORANDUM TO: Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: DyLanne D. Duvigneaud, Project Engineer /RA/
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH THE TENNESSEE VALLEY AUTHORITY (TVA)
DATE & TIME: Monday, February 13, 2006 11:00 AM - 1:00 PM LOCATION: U.S. Nuclear Regulatory Commission (NRC)
One White Flint North 11555 Rockville Pike, Room O14B8 Rockville, Maryland PURPOSE: To discuss various topics regarding TVAs extended power uprate amendment requests for the Browns Ferry Nuclear Plant, Units 1, 2 and 3.
CATEGORY 1:
- This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Proprietary information will be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
CONTACTS: D. Duvigneaud, NRR M. Chernoff, NRR 301-415-4010 301-415-4041 Ddd@nrc.gov Mhc@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.
M. Marshall PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC/NRR TVA C. Haney M. Bajestani E. Hackett W. Crouch C. Holden B. Marks M. Marshall J. Wolcott et. al. et al.
Docket Nos. 50-259, 50-260, and 50-261
Enclosure:
Agenda cc w/encl: See next page
ML060390135 NRC-001 OFFICE LPL2-2/PE LPL2-2/PM LPL2-2/LA LPL2-2/BC DORL/DD NAME MChernoff for MChernoff BClayton MMarshall EHackett DDuvigneaud DATE 2/8/06 2/8/06 2/8/06 2/8/06 2/8/06
SUBJECT:
FORTHCOMING MEETING WITH THE TENNESSEE VALLEY AUTHORITY (TVA) FOR FEBRUARY 13, 2006 Date: February 8, 2006 DISTRIBUTION:
PUBLIC AHowe LPLII-2 R/F DThatcher BClayton SWeerakkody BWetzel PQualls PMNS DFrumkin RidsNrrAdro (BBoger) HLi RidsNrrDorl (CHaney) RPettis RidsNrrDorlLpld (MMarshall) RGallucci RidsNrrPMEBrown RJenkins RidsNrrPMMChernoff TFrye RidsOpaMail SKlementowiz RidsRgn2MailCenter (MWidman, KClark MRubin and LMellen) NTrehan RJasinski CHinson RidsOgcMailCenter (AHodgdon) RPederson RidsAcrsAcnwMailCenter MStutzke TChan SLaur DTrimble MMitchell HHamzehee MKhanna MKotzalas GCheruvenki AHiser JNakoski DFischer AAttard MYoder RLobel GGeorgiev KKavanagh RPelton AStubbs KMartin Receptionist (OWFN and TWFN)
EForrest RDennig RGoel MHart FAkstulewicz RFranovich MMasnik HNash GThomas MRazzaque THuang ZAbdullahi KManoly SJones CWu JTatum DReddy
AGENDA NUCLEAR REGULATORY COMMISSION MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)
EXTENDED POWER UPRATE February 13, 2006 11:00 AM Welcome/Introduction 11:15 AM TVA Extended Power Uprate Status Updates
- Schedule
- Steam Dryers
- Fuel Methodology
- Core Reload Analyses
- Containment Overpressure Analysis
- Testing of Browns Ferry Unit 1 12:30 PM Wrap-up 1:00 PM Adjourn for the Day Enclosure
Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:
Mr. Karl W. Singer Mr. Masoud Bajestani, Vice President Chief Nuclear Officer and Browns Ferry Unit 1 Restart Executive Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Decatur, AL 35609 Chattanooga, Tennessee 37402-2801 Mr. Robert G. Jones, General Manager Mr. Ashok S. Bhatnagar, Senior Vice President Browns Ferry Site Operations Nuclear Operations Browns Ferry Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Decatur, AL 35609 Chattanooga, TN 37402-2801 Mr. Scott M. Shaeffer Mr. Larry S. Bryant, Vice President Browns Ferry Unit 1 Project Engineer Nuclear Engineering & Technical Services Division of Reactor Projects, Branch 6 Tennessee Valley Authority U.S. Nuclear Regulatory Commission 6A Lookout Place 61 Forsyth Street, SW.
1101 Market Street Suite 23T85 Chattanooga, TN 37402-2801 Atlanta, GA 30303-8931 Brian OGrady, Site Vice President Mr. Glenn W. Morris, Manager Browns Ferry Nuclear Plant Corporate Nuclear Licensing Tennessee Valley Authority and Industry Affairs P.O. Box 2000 Tennessee Valley Authority Decatur, AL 35609 4X Blue Ridge 1101 Market Street Mr. Robert J. Beecken, Vice President Chattanooga, TN 37402-2801 Nuclear Support Tennessee Valley Authority Mr. William D. Crouch, Manager 6A Lookout Place Licensing and Industry Affairs 1101 Market Street Browns Ferry Nuclear Plant Chattanooga, TN 37402-2801 Tennessee Valley Authority P.O. Box 2000 General Counsel Decatur, AL 35609 Tennessee Valley Authority ET 11A Senior Resident Inspector 400 West Summit Hill Drive U.S. Nuclear Regulatory Commission Knoxville, TN 37902 Browns Ferry Nuclear Plant 10833 Shaw Road Mr. John C. Fornicola, Manager Athens, AL 35611-6970 Nuclear Assurance and Licensing Tennessee Valley Authority State Health Officer 6A Lookout Place Alabama Dept. of Public Health 1101 Market Street RSA Tower - Administration Chattanooga, TN 37402-2801 Suite 1552 P.O. Box 303017 Mr. Bruce Aukland, Plant Manager Montgomery, AL 36130-3017 Browns Ferry Nuclear Plant Tennessee Valley Authority Chairman P.O. Box 2000 Limestone County Commission Decatur, AL 35609 310 West Washington Street Athens, AL 35611