Issue date | Title | Topic | |
---|---|---|---|
ML23331A253 | 27 November 2023 | Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions | |
CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 | 10 March 2023 | Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 | Surveillance Frequency Control Program |
CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) | 20 December 2022 | License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) | Incorporated by reference Surveillance Frequency Control Program |
ML21335A067 | 26 November 2021 | Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions | |
CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) | 27 March 2020 | Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) | |
CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) | 25 January 2019 | Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) | Water Inventory Control |
CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays | 19 November 2018 | Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 | 16 March 2018 | Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 | |
CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 | 7 March 2018 | Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 | Anticipated operational occurrence Minimum Critical Power Ratio |
ML18066A120 | 20 February 2018 | Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions - Updated | |
CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change | 31 October 2016 | Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment Incorporated by reference Fire Protection Program Power Uprate |
NL-16-165, Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificat | 31 October 2016 | Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificati | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment Incorporated by reference Fire Protection Program Power Uprate Measurement Uncertainty Recapture |
CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates | 13 July 2016 | Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates | Safe Shutdown Safety Limit Minimum Critical Power Ratio Ultimate heat sink Probabilistic Risk Assessment Power-Operated Valves Fuel cladding Flow Induced Vibration |
CNL-16-073, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information | 22 April 2016 | Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information | Safe Shutdown Probabilistic Risk Assessment Job Performance Measure Power-Operated Valves Fire Protection Program |
CNL-15-240, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information | 13 November 2015 | Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information | |
CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. | 25 September 2015 | Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. | Reactor Vessel Water Level |
CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) | 29 January 2015 | (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) | |
ML110600408 | 25 February 2011 | Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets | Safe Shutdown Abnormal operational transient |
ML103210334 | 12 November 2010 | Revised Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, & 3D | Safe Shutdown Fire Barrier Maintenance Rule Program Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML102430528 | 27 August 2010 | Technical Specifications Change TS-474 - Request to Add TS 3.7.3, Control Room Emergency Ventilation (Crev) System, Action to Address Two Crev Subsystems Inoperable Due to Inoperable Crev System High Efficiency Particulate | Safe Shutdown Probabilistic Risk Assessment Abnormal operational transient Large early release frequency |
ML100550700 | 18 February 2010 | Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, and 3D | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Design basis earthquake Large early release frequency Earthquake Maintenance Rule Program Fuel cladding Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML092290471 | 11 August 2009 | Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 25 - Request for Additional Information - SCVB-82 Through SCVB-86 and Replacement Documentation | |
ML092110119 | 27 July 2009 | Technical Specifications Change 465 - Revision of Technical Specifications to Eliminate Unnecessary Water Local Leak Rate Tests | Squib |
ML091540015 | 29 May 2009 | Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.209 Regarding Steam Dryer Analyses | Flow Induced Vibration |
ML091200064 | 24 April 2009 | Technical Specifications Change 464 - Application for Technical Specification Improvement to Adopt Technical Specification Task Force TSTF-476, Rev. 1, Improved BPWS Control Rod Insertion Process | Incorporated by reference |
ML090440206 | 9 February 2009 | Response for Additional Information Regarding - Technical Specifications (TS) Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force (Tstf). | |
ML083650109 | 22 December 2008 | Technical Specifications Change 463-T, One-time Extension of Surveillance Requirements (Srs) | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Hydrostatic Incorporated by reference Scram Discharge Volume Feedwater Controller Failure Fuel cladding |
ML083530619 | 15 December 2008 | Technical Specifications Change TS-431 - Extended Power Uprate - Response to Round 22 Request for Additional Information - Unit 1 Large Transient Testing (Ltt) - | |
ML082960227 | 17 October 2008 | Technical Specifications Change TS-418 - Extended Power Uprate - Response to Round 21 Request for Additional Information on Channel Bow | Safety Limit Minimum Critical Power Ratio High Residence Time |
ML072360263 | 31 August 2007 | 07-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0 | Finite Element Analysis |
ML072360262 | 31 August 2007 | 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0 | Finite Element Analysis |
ML072130375 | 31 July 2007 | CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz | Finite Element Analysis Liquid penetrant |
ML072130382 | 31 July 2007 | CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 Hz | Finite Element Analysis Liquid penetrant |
ML072130386 | 31 July 2007 | CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution | |
ML072130415 | 31 July 2007 | CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components | |
ML072130429 | 31 July 2007 | C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings | |
ML072130401 | 31 July 2007 | CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz | |
ML071010092 | 6 April 2007 | (BFN) - Unit 3 - Technical Specifications (TS) Change TS-460-T - Request for One-Time Extension of Allowed Outage Time (AOT) - Emergency Diesel Generator (EDG) 3D | Safe Shutdown Probabilistic Risk Assessment Large early release frequency |
ML070600339 | 26 February 2007 | Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) - Response to Round 12 Request for Additional Information (RAI) | Shutdown Margin Stroke time Operating Basis Earthquake |
ML062860267 | 5 October 2006 | Technical Specification Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 10 Request for Additional Information | Shutdown Margin Reactor Vessel Water Level Probabilistic Risk Assessment VT-2 Incorporated by reference Scram Discharge Volume Large early release frequency |
ML062790230 | 3 October 2006 | Technical Specifications Changes TS-431 and TS 418 - Extended Power Uprate - Steam Dryer Stress Report, Revision 4 | |
ML062790140 | 2 October 2006 | Technical Specifications Change TS-443 - Request for Additional Information (RAI) Regarding Oscillation Power Range Monitor | Reactor Vessel Water Level Minimum Critical Power Ratio Scram Discharge Volume MELLLA Fuel cladding Power change |
ML062920156 | 13 September 2006 | Rev 1 to Technical Specification, NPSH Transient Study RHR and Core Spray Pumps, E12.5.1296 | |
ML061780308 | 15 June 2006 | Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 5 Request for Additional Information | Aging Management EVT-1 |
ML062510385 | 31 May 2006 | Enclosure 3, Browns Ferry, Units 1, 2 & 3 - CDI Report No. 05-28P, Rev 1, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements. | |
ML061300443 | 31 May 2006 | GE-NE-0000-0053-7413-R0-NP, Browns Ferry, Units 1, 2 & 3 Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions. | Finite Element Analysis Earthquake Flow Induced Vibration |
ML061300441 | 31 May 2006 | C.D.I. Report 06-11, Rev 1, Hydrodynamic Loads on Browns Ferry, Unit 1 Steam Dryer to 200 Hz. | |
ML061360148 | 11 May 2006 | Supplemental Response to NRC Round 3 Request for Additional Information Related to Technical Specifications Change No. TS-418 - Extended Power Uprate Operation | |
ML061300436 | 5 May 2006 | Transmittal of Browns Ferry, Units 1, 2 & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Steam Dryer Stress Report | |
ML060620328 | 28 February 2006 | Technical Specifications (TS) Change TS-431 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head |