Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23331A25327 November 2023Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions
CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 410 March 2023Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4Surveillance Frequency Control Program
CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)20 December 2022License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)Incorporated by reference
Surveillance Frequency Control Program
ML21335A06726 November 2021Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions
CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)27 March 2020Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)
CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)25 January 2019Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)Water Inventory Control
CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays19 November 2018Revised Application to Modify the Technical Specifications for Unbalanced Voltage RelaysSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)316 March 2018Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3
CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 17 March 2018Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1Anticipated operational occurrence
Minimum Critical Power Ratio
ML18066A12020 February 2018Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions - Updated
CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change31 October 2016Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification ChangeSafety Limit Minimum Critical Power Ratio
Ultimate heat sink
Probabilistic Risk Assessment
Incorporated by reference
Fire Protection Program
Power Uprate
NL-16-165, Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificat31 October 2016Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical SpecificatiSafety Limit Minimum Critical Power Ratio
Ultimate heat sink
Probabilistic Risk Assessment
Incorporated by reference
Fire Protection Program
Power Uprate
Measurement Uncertainty Recapture
CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates13 July 2016Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous UpdatesSafe Shutdown
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Probabilistic Risk Assessment
Power-Operated Valves
Fuel cladding
Flow Induced Vibration
CNL-16-073, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information22 April 2016Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional InformationSafe Shutdown
Probabilistic Risk Assessment
Job Performance Measure
Power-Operated Valves
Fire Protection Program
CNL-15-240, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information13 November 2015Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information
CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In..25 September 2015Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In..Reactor Vessel Water Level
CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)29 January 2015(Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)
ML11060040825 February 2011Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator SetsSafe Shutdown
Abnormal operational transient
ML10321033412 November 2010Revised Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, & 3DSafe Shutdown
Fire Barrier
Maintenance Rule Program
Offsite Circuit
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML10243052827 August 2010Technical Specifications Change TS-474 - Request to Add TS 3.7.3, Control Room Emergency Ventilation (Crev) System, Action to Address Two Crev Subsystems Inoperable Due to Inoperable Crev System High Efficiency ParticulateSafe Shutdown
Probabilistic Risk Assessment
Abnormal operational transient
Large early release frequency
ML10055070018 February 2010Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, and 3DSafe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Design basis earthquake
Large early release frequency
Earthquake
Maintenance Rule Program
Fuel cladding
Offsite Circuit
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML09229047111 August 2009Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 25 - Request for Additional Information - SCVB-82 Through SCVB-86 and Replacement Documentation
ML09211011927 July 2009Technical Specifications Change 465 - Revision of Technical Specifications to Eliminate Unnecessary Water Local Leak Rate TestsSquib
ML09154001529 May 2009Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 24 Request for Additional Information (RAI) EMCB.209 Regarding Steam Dryer AnalysesFlow Induced Vibration
ML09120006424 April 2009Technical Specifications Change 464 - Application for Technical Specification Improvement to Adopt Technical Specification Task Force TSTF-476, Rev. 1, Improved BPWS Control Rod Insertion ProcessIncorporated by reference
ML0904402069 February 2009Response for Additional Information Regarding - Technical Specifications (TS) Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force (Tstf).
ML08365010922 December 2008Technical Specifications Change 463-T, One-time Extension of Surveillance Requirements (Srs)Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Incorporated by reference
Scram Discharge Volume
Feedwater Controller Failure
Fuel cladding
ML08353061915 December 2008Technical Specifications Change TS-431 - Extended Power Uprate - Response to Round 22 Request for Additional Information - Unit 1 Large Transient Testing (Ltt) -
ML08296022717 October 2008Technical Specifications Change TS-418 - Extended Power Uprate - Response to Round 21 Request for Additional Information on Channel BowSafety Limit Minimum Critical Power Ratio
High Residence Time
ML07236026331 August 200707-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0Finite Element Analysis
ML07236026231 August 200707-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0Finite Element Analysis
ML07213037531 July 2007CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038231 July 2007CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038631 July 2007CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution
ML07213041531 July 2007CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components
ML07213042931 July 2007C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings
ML07213040131 July 2007CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz
ML0710100926 April 2007(BFN) - Unit 3 - Technical Specifications (TS) Change TS-460-T - Request for One-Time Extension of Allowed Outage Time (AOT) - Emergency Diesel Generator (EDG) 3DSafe Shutdown
Probabilistic Risk Assessment
Large early release frequency
ML07060033926 February 2007Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) - Response to Round 12 Request for Additional Information (RAI)Shutdown Margin
Stroke time
Operating Basis Earthquake
ML0628602675 October 2006Technical Specification Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 10 Request for Additional InformationShutdown Margin
Reactor Vessel Water Level
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Scram Discharge Volume
Large early release frequency
ML0627902303 October 2006Technical Specifications Changes TS-431 and TS 418 - Extended Power Uprate - Steam Dryer Stress Report, Revision 4
ML0627901402 October 2006Technical Specifications Change TS-443 - Request for Additional Information (RAI) Regarding Oscillation Power Range MonitorReactor Vessel Water Level
Minimum Critical Power Ratio
Scram Discharge Volume
MELLLA
Fuel cladding
Power change
ML06292015613 September 2006Rev 1 to Technical Specification, NPSH Transient Study RHR and Core Spray Pumps, E12.5.1296
ML06178030815 June 2006Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 5 Request for Additional InformationAging Management
EVT-1
ML06251038531 May 2006Enclosure 3, Browns Ferry, Units 1, 2 & 3 - CDI Report No. 05-28P, Rev 1, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements.
ML06130044331 May 2006GE-NE-0000-0053-7413-R0-NP, Browns Ferry, Units 1, 2 & 3 Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions.Finite Element Analysis
Earthquake
Flow Induced Vibration
ML06130044131 May 2006C.D.I. Report 06-11, Rev 1, Hydrodynamic Loads on Browns Ferry, Unit 1 Steam Dryer to 200 Hz.
ML06136014811 May 2006Supplemental Response to NRC Round 3 Request for Additional Information Related to Technical Specifications Change No. TS-418 - Extended Power Uprate Operation
ML0613004365 May 2006Transmittal of Browns Ferry, Units 1, 2 & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Steam Dryer Stress Report
ML06062032828 February 2006Technical Specifications (TS) Change TS-431 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head