ML070320392
Letter Sequence Request | |
---|---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) | |
Initiation
Administration
Questions
Answers Results Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results | |
MONTHYEARML0607202531975-05-23023 May 1975
[Table View]May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28 |
ML070320392 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 01/29/2007 |
From: | Crouch W Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML070320392 (4) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Fuel Cycle Reload Report
MONTHYEARCNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024
[Table view]Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 CNL-24-013, Cycle 22 Reload Analysis Report2024-03-14014 March 2024 Cycle 22 Reload Analysis Report ML24072A5682024-03-0707 March 2024 Core Operating Limits Report for Cycle 22 Operation, Revision 0 ML23138A0522023-05-18018 May 2023 Cycle 22 Mellla+ Eigenvalue Tracking Data ML23096A3202023-04-0606 April 2023 Core Operating Limits Report for Cycle 23 Operation, Revision 1 ML23067A0922023-03-0808 March 2023 Core Operating Limits Report for Cycle 23 Operation, Revision 0 ML22363A3922022-12-28028 December 2022 Cycle 14 Mellla+ Eigenvalue Tracking Data ML22290A2102022-10-17017 October 2022 Cycle 15, Core Operating Limits Report, (120% OLTP, Mellla+), TVA-COLR-BF1C15, Revision 0 ML22070A1402022-03-11011 March 2022 Core Operating Limits Report for Cycle 21 Operation, Revision 0 ML22035A1182022-02-0404 February 2022 Core Operating Limits Report for Unit 1 Cycle 14 Operation, Revision 1; Unit 2 Cycle 22 Operation, Revision 1; and Unit 3 Cycle 20 Operation, Revision 2 ML21062A2572021-03-0303 March 2021 Core Operating Limits Report for Cycle 22 Operation, Revision 0 ML20304A1182020-10-30030 October 2020 Unit 3 Core Operating Limits Report for Cycle 20 Operation, Revision 1 ML20293A2542020-10-19019 October 2020 Core Operating Limits Report for Cycle 14 Operation, Revision 0 ML20129J9802020-05-0808 May 2020 Core Operating Limits Report for Cycle 21 Operation, Revision 1 ML20073H3842020-03-13013 March 2020 Core Operating Limits Report for Cycle 20 Operation, Revision 0 ML20031D1892020-01-31031 January 2020 Core Operating Limits Report for Cycle 13 Operation, Revision 1 ML19064B3042019-03-0505 March 2019 Core Operating Limits Report for Cycle 21 Operation, Revision O ML18297A0892018-10-24024 October 2018 Core Operating Limits Report for Cycle 13 Operation, Revision 0 ML18051A0192018-02-20020 February 2018 Core Operating Limits Report for Cycle 19 Operation, Revision 0 ML17058A2252017-02-27027 February 2017 Core Operating Limits Report for Cycle 20 Operation, Revision 0 ML16277A1092016-10-0303 October 2016 Core Operating Limits Report for Cycle 12 Operation, Revision 0 ML16258A0952016-09-14014 September 2016 Core Operating Limits Report for Cycle 19 Operations, Revision 5 ML16190A2832016-07-0808 July 2016 Core Operating Limits Report for Cycle 18 Operation, Revision 2 ML16078A1392016-03-18018 March 2016 Core Operating Limits Report for Cycle 18 Operation, Revision 1 ML16068A4402016-03-0808 March 2016 Core Operating Limits Report for Cycle 18 Operation, Revision 0 ML16029A4862016-01-29029 January 2016 Submittal of Core Operating Report for Cycle 17 Operation, Revision 2 ML16029A4842016-01-29029 January 2016 Core Operating Limits Report for Cycle 19 Operation, Revision 4 ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses NL-15-169, Browns Ferry, Units 1, 2 and 3, RHR Heat Exchange K-values Utilities in EPU Containment Analyses2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3, RHR Heat Exchange K-values Utilities in EPU Containment Analyses ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology NL-15-169, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology2015-09-21021 September 2015 Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology ML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design. NL-15-169, ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu).2015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu). NL-15-169, ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design.2015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design. NL-15-169, ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design.2015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design. NL-15-169, ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate2015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate. NL-15-169, ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate.2015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate. ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate NL-15-169, ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues.2015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues. ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design. ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues. ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu). ML15236A1612015-08-24024 August 2015 Core Operating Limits Report for Cycle 11 Operation, Revision 2 ML15205A0222015-07-24024 July 2015 Core Operating Limits Report for Cycle 19 Operations Revision 3 ML15112B1702015-04-21021 April 2015 Core Operating Limits Report for Cycle 19 Operations Revision 2 NL-15-169, Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU2015-03-31031 March 2015 Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU ML15282A2212015-03-31031 March 2015 ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU ML15075A1952015-03-16016 March 2015 Core Operating Limits Report for Cycle 19 Operations 2024-09-16 Category:Letter MONTHYEARIR 05000259/20240032024-11-0404 November 2024
[Table view]Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03 |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Aabama 35609-2000 January 29, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket No. 50-259 Tennessee-Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 1 - SUPPLEMENTAL RELOAD LICENSING REPORT (SRLR) - CYCLE 7 - 105% POWER OPERATION By letter dated September 22, 2006 (ADAMS Accession No. ML062680459), TVA submitted a supplement to the original June 28, 2004 (ML041840109) extended power uprate (EPU) license application for BFN Unit 1. The original EPU license application is for operation at 120% of original licensed thermal power (OLTP). The September 22, 2006, amendment supplement provides for interim Unit 1 operation at 105% of OLTP until such time as certain steam dryer analyses and other remaining licensing activities associated with EPU (120%) operation can be completed and approved by NRC.
In support of the September 22, 2006, supplement, TVA stated that a SRLR would be generated to reflect the interim (105%) power level as delineated in NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel."
The Enclosure to this letter provides the SRLR for BFN Unit 1 Cycle 7 operation at 105% operation and presents the results of the cycle-specific core analyses, including the transient and accident analyses. This SRLR was prepared by Global Nuclear Fuel for TVA, and has been reviewed and
U.S. Nuclear Regulatory Commission Page 2 January 29, 2006 accepted by TVA. An SRLR for EPU (120%) operation was previously submitted on May 15, 2006 (ML061450390).
There are no new regulatory commitments associated with this submittal. If you have any questions about this submittal, please contact me at (256) 729-2636.
Sincerely, William D. Crouch Manager of Licensing and Industry Affairs
Enclosure:
0000-0044-1520-SRLR, Revision 0, Supplemental Reload Licensing Report for Browns Ferry 1, Reload 6 Cycle 7, January 2007 cc: See page 3
U.S. Nuclear Regulatory Commission Page 3 January 29, 2006 Enclosure cc: (Enclosure)
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
Enclosure Browns Ferry Nuclear Plant (BFN)
Supplemental Reload Licensing Report for Browns Ferry 1 Reload 6 Cycle 7 January 2007 0000-0044-1520-SRLR Revision 0