ML070320392
Letter Sequence Request | |
---|---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) | |
Initiation
Administration
Questions
Answers Results Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results | |
MONTHYEARML0607202531975-05-23023 May 1975
[Table View]May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28 |
ML070320392 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 01/29/2007 |
From: | Crouch W Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML070320392 (4) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Fuel Cycle Reload Report
MONTHYEARML23138A0522023-05-18018 May 2023
[Table view]Cycle 22 Mellla+ Eigenvalue Tracking Data ML23096A3202023-04-0606 April 2023 Core Operating Limits Report for Cycle 23 Operation, Revision 1 ML23067A0922023-03-0808 March 2023 Core Operating Limits Report for Cycle 23 Operation, Revision 0 ML22363A3922022-12-28028 December 2022 Cycle 14 Mellla+ Eigenvalue Tracking Data ML22290A2102022-10-17017 October 2022 Cycle 15, Core Operating Limits Report, (120% OLTP, Mellla+), TVA-COLR-BF1C15, Revision 0 ML22070A1402022-03-11011 March 2022 Core Operating Limits Report for Cycle 21 Operation, Revision 0 ML22035A1182022-02-0404 February 2022 Core Operating Limits Report for Unit 1 Cycle 14 Operation, Revision 1; Unit 2 Cycle 22 Operation, Revision 1; and Unit 3 Cycle 20 Operation, Revision 2 ML21062A2572021-03-0303 March 2021 Core Operating Limits Report for Cycle 22 Operation, Revision 0 ML20304A1182020-10-30030 October 2020 Unit 3 Core Operating Limits Report for Cycle 20 Operation, Revision 1 ML20293A2542020-10-19019 October 2020 Core Operating Limits Report for Cycle 14 Operation, Revision 0 ML20129J9802020-05-0808 May 2020 Core Operating Limits Report for Cycle 21 Operation, Revision 1 ML20073H3842020-03-13013 March 2020 Core Operating Limits Report for Cycle 20 Operation, Revision 0 ML20031D1892020-01-31031 January 2020 Core Operating Limits Report for Cycle 13 Operation, Revision 1 ML19064B3042019-03-0505 March 2019 Core Operating Limits Report for Cycle 21 Operation, Revision O ML18297A0892018-10-24024 October 2018 Core Operating Limits Report for Cycle 13 Operation, Revision 0 ML18051A0192018-02-20020 February 2018 Core Operating Limits Report for Cycle 19 Operation, Revision 0 ML17058A2252017-02-27027 February 2017 Core Operating Limits Report for Cycle 20 Operation, Revision 0 ML16277A1092016-10-0303 October 2016 Core Operating Limits Report for Cycle 12 Operation, Revision 0 ML16258A0952016-09-14014 September 2016 Core Operating Limits Report for Cycle 19 Operations, Revision 5 ML16190A2832016-07-0808 July 2016 Core Operating Limits Report for Cycle 18 Operation, Revision 2 ML16078A1392016-03-18018 March 2016 Core Operating Limits Report for Cycle 18 Operation, Revision 1 ML16068A4402016-03-0808 March 2016 Core Operating Limits Report for Cycle 18 Operation, Revision 0 ML16029A4862016-01-29029 January 2016 Submittal of Core Operating Report for Cycle 17 Operation, Revision 2 ML16029A4842016-01-29029 January 2016 Core Operating Limits Report for Cycle 19 Operation, Revision 4 NL-15-169, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology2015-09-21021 September 2015 Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology NL-15-169, Browns Ferry, Units 1, 2 and 3, RHR Heat Exchange K-values Utilities in EPU Containment Analyses2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3, RHR Heat Exchange K-values Utilities in EPU Containment Analyses NL-15-169, ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate2015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate NL-15-169, ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design.2015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design. NL-15-169, ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate.2015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate. NL-15-169, ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design.2015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design. NL-15-169, ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues.2015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues. ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design. NL-15-169, ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu).2015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu). ML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design. ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate. ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues. ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu). ML15236A1612015-08-24024 August 2015 Core Operating Limits Report for Cycle 11 Operation, Revision 2 ML15205A0222015-07-24024 July 2015 Core Operating Limits Report for Cycle 19 Operations Revision 3 ML15112B1702015-04-21021 April 2015 Core Operating Limits Report for Cycle 19 Operations Revision 2 ML15282A2212015-03-31031 March 2015 ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU NL-15-169, Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU2015-03-31031 March 2015 Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU ML15075A1952015-03-16016 March 2015 Core Operating Limits Report for Cycle 19 Operations ML15054A3242015-02-19019 February 2015 Core Operating Limits Report for Cycle 11 Operation, Revision 1 NL-15-169, ANP-2637, Revision 6, Boiling Water Reactor Licensing Methodology Compendium.2014-10-31031 October 2014 ANP-2637, Revision 6, Boiling Water Reactor Licensing Methodology Compendium. ML15282A1912014-10-31031 October 2014 ANP-3343NP, Revision 0, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle Atrium 10XM Fuel. NL-15-169, ANP-3343NP, Revision 0, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle Atrium 10XM Fuel.2014-10-31031 October 2014 ANP-3343NP, Revision 0, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle Atrium 10XM Fuel. 2023-05-18 Category:Letter MONTHYEARML24032A4762024-02-0101 February 2024
[Table view]Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01 |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Aabama 35609-2000 January 29, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket No. 50-259 Tennessee-Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 1 - SUPPLEMENTAL RELOAD LICENSING REPORT (SRLR) - CYCLE 7 - 105% POWER OPERATION By letter dated September 22, 2006 (ADAMS Accession No. ML062680459), TVA submitted a supplement to the original June 28, 2004 (ML041840109) extended power uprate (EPU) license application for BFN Unit 1. The original EPU license application is for operation at 120% of original licensed thermal power (OLTP). The September 22, 2006, amendment supplement provides for interim Unit 1 operation at 105% of OLTP until such time as certain steam dryer analyses and other remaining licensing activities associated with EPU (120%) operation can be completed and approved by NRC.
In support of the September 22, 2006, supplement, TVA stated that a SRLR would be generated to reflect the interim (105%) power level as delineated in NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel."
The Enclosure to this letter provides the SRLR for BFN Unit 1 Cycle 7 operation at 105% operation and presents the results of the cycle-specific core analyses, including the transient and accident analyses. This SRLR was prepared by Global Nuclear Fuel for TVA, and has been reviewed and
U.S. Nuclear Regulatory Commission Page 2 January 29, 2006 accepted by TVA. An SRLR for EPU (120%) operation was previously submitted on May 15, 2006 (ML061450390).
There are no new regulatory commitments associated with this submittal. If you have any questions about this submittal, please contact me at (256) 729-2636.
Sincerely, William D. Crouch Manager of Licensing and Industry Affairs
Enclosure:
0000-0044-1520-SRLR, Revision 0, Supplemental Reload Licensing Report for Browns Ferry 1, Reload 6 Cycle 7, January 2007 cc: See page 3
U.S. Nuclear Regulatory Commission Page 3 January 29, 2006 Enclosure cc: (Enclosure)
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
Enclosure Browns Ferry Nuclear Plant (BFN)
Supplemental Reload Licensing Report for Browns Ferry 1 Reload 6 Cycle 7 January 2007 0000-0044-1520-SRLR Revision 0