NL-15-169, Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate

From kanterella
Jump to navigation Jump to search
Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate
ML15282A152
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/21/2015
From: Shea J W
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15282A154 List: ... further results
References
CNL-15-169
Download: ML15282A152 (20)


Text

Proprietary Information and Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Attachments 6, 8 10, 12, 14, 16 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43*Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-169 September 21, 2015 10 CFR 50.90 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Proposed Technical Specifications Change TS-505 -Request for License Amendments

-Extended Power Uprate

Reference:

Letter from TVA to NRC, "Technical Specifications Changes TS-431 and TS-41 8 -Extended Power Uprate (EPU) -Withdrawal of Requests and Update to EPU Plans and Schedules," dated September 18, 2014 (ADAMS Accession No. MLI14265A487)

In accordance with the provisions of 10 Code of Federal Regulations (10 CFR) 50.90,"Application for amendment of license, construction permit, or early site permit," Tennessee Valley Authority (TVA) is submitting a request for a Technical Specification (TS)amendment (TS-505) to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, respectively.

The proposed amendment will increase the authorized maximum steady-state reactor core power level for each unit from 3458 MWt to 3952 MWt. This license amendment request (LAR) represents an increase of approximately 20 percent above the original licensed thermal power (OLTP)level of 3293 MWt, and an increase of approximately 14.3 percent above the current licensed thermal power (CLTP) level of 3458 MWt.The information provided in the attachments to this letter represents a consolidation of plant-specific safety analyses as well as plant-specific confirmation of generic evaluations applicable to a boiling water reactor (BWR) constant pressure power uprate for the three BEN units.On September 8, 1998, the Nuclear Regulatory Commission (NRC) approved a stretch power uprate for BFN Units 2 and 3 to increase the authorized maximum thermal power level to 3458 MWt. By letter dated March 6, 2007, the NRC issued an amendment to the BFN Unit 1 operating license to also increase the authorized maximum thermal power level to 3458 MWt.

Proprietary Information and Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Attachments 6, 8 10, 12, 14, 16 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43 In the referenced letter dated September 18, 2014, TVA withdrew previous BFN EPU LARs and provided its revised plans and schedule for the BEN EPU project. In the interim months, TVA has held several meetings with the NRC staff to provide pre-application discussions on key aspects of the EPU project, including fuel considerations, startup test plans, replacement steam dryers, flow-induced vibration, and the elimination of credit for containment accident pressure in net positive suction head (NPSH) evaluations for emergency core cooling system (EGOS) pumps. This [AR submittal is consistent with TVA's letter of September 18, 2014, which stated that a new, consolidated BEN EPU [AR would be submitted by October 2015.The enclosure to this letter provides a summary of the proposed changes to the BEN operating licenses and Technical Specifications due to EPU operation, the no significant hazards considerations, and environmental considerations.

Attachments 1 through 52 include a description of the proposed changes to the licensing basis and provide supporting documentation.

This [AR is subdivided as follows: Attachment 1 List of Regulatory Commitments There are no commitments associated with this [AR. Those actions associated with the amendment approval will be complete prior to implementation of EPU, except where those actions require an increase in power above the currently licensed power level. In those instances, defined actions will be completed during power ascension and will be incorporated into license conditions (see Attachments 2 and 3).Attachment 2 Proposed Technical Specification Changes (Markups)Attachment 2 provides a markup of the affected operating license and Technical Specifications pages indicating the proposed changes for EPU.Attachment 3 Retyped Proposed Technical Specification Changes Attachment 3 provides a camera-ready retype of the affected Technical Specification pages with changes incorporated.

Attachment 4 Proposed Technical Specification Bases Changes (Markups)Attachment 4 provides a markup of the affected Technical Specification Bases pages indicating the proposed changes for EPU.Attachment 5 Retyped Proposed Technical Specification Bases Changes Attachment 5 provides a camera-ready retype of the affected Technical Specification Bases pages with changes incorporated.

U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 3 September 21, 2015 Attachment 6 NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (proprietary)

Attachment 6 provides a proprietary version of the GE-Hitachi Nuclear Energy Americas LLC (GEH) Power Uprate Safety Analysis Report (PUSAR), NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate. This report summarizes the results of safety analyses and evaluations performed that support the proposed increase in the authorized maximum steady-state reactor core power level.The PUSAR technical evaluations supporting the proposed EPU are based on NRC-approved licensing topical report, NEDC-33304P-A, Constant Pressure Power Uprate, Revision 4 (referred to as the Constant Pressure Power Uprate Licensing Topical Report (CLTR)). For topics outside the CLTR approved applicability (e.g., use of AREVA ATRIUM 10XM fuel), the technical evaluations are based on a series of NRC-approved AREVA methods. The content of the technical evaluations is consistent with the guidance provided in NRC Review Standard RS-001, Review Standard for Extended Power Uprates, Revision 0, dated December 2003, as it applies to the licensing basis of BFN Units 1, 2, and 3.Certain information provided in Attachment 6 is considered proprietary information by the Electric Power Research Institute (EPRI). EPRI and GEH separately consider portions of the information provided in Attachment 6 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. Affidavits for withholding information, executed by GEH and EPRI, are provided in Attachment 50 and Attachment 52, respectively.

A non-proprietary version of the document is provided in Attachment

7. Therefore, on behalf of GEH and EPRI, TVA requests that Attachment 6 be withheld from public disclosure in accordance with the GEH and EPRI affidavits and the provisions of 10 CFR 2.390.Attachment 7 NEDO-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (non-proprietary)

Attachment 8 ANP-3403P, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (proprietary)

Attachment 8 provides a proprietary version of the AREVA Inc.(AREVA) Fuel Uprate Safety Analysis Report (FUSAR), ANP-'3403P, 'Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3." This report supplements the PUSAR and summarizes the results of fuel-related safety analyses and evaluations performed that support the proposed increase in the authorized maximum steady-state reactor core power level.

U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 4 September 21, 2015 The FUSAR technical evaluations supporting the proposed EPU are based on a series of NRC-approved AREVA methods that are summarized in LAR Attachment

36. The safety evaluations documented in Attachment 8 are based on the continued use of AREVA's ATRIUM 10XM fuel design. Where appropriate, evaluations for the existing ATRIUM-10 fuel design have also been included because the potential exists that some fuel of this type may still be resident in a BFN reactor core upon implementation of EPU..The general format of the technical evaluations in Attachment 8 is consistent with the guidance provided in NRC Review Standard RS-001, as it applies to the licensing basis of BFN Units 1, 2, and 3. However, because only selected portions of RS-001 are addressed, the numbering of individual sections is discontinuous.

AREVA considers portions of the information provided in Attachment 8 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
9. Therefore, on behalf of AREVA, TVA requests that Attachment 8 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 9 ANP-3403NP, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (non-proprietary)

Attachment 10 ANP-3377P, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel (EPU) (proprietary)

Attachment 10 provides the results of a loss-of-coolant accident (LOCA) break spectrum analysis for BFN Units 1, 2, and 3. The break spectrum analysis is used to identify the parameters that result in the highest calculated peak Cladding temperature (POT)during a postulated LOCA.AREVA considers portions of the info~rmation provided in Attachment 10 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
11. Therefore, on behalf of AREVA, TVA requests that Attachment 10 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 5 September 21, 2015 Attachment 11 ANP-3377NP, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel (EPU) (non-proprietary)

Attachment 12 ANP-3378P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10OXM Fuel (EPU) (proprietary)

Attachment 12 provides the results of the LOCA-ECCS analyses for BFN Units 1, 2 and 3. The LOCA-ECCS analysis specifies the maximum average planar linear heat generation rate (MAPLHGR)limit versus exposure for ATRIUM 10OXM fuel and demonstrates that the MAPLHGR limit is adequate to ensure that the LOCA-ECCS criteria in 10 CER 50.46 are satisfied for operation at or below the limit. Attachment 12 also documents the licensing basis PCT and corresponding local cladding oxidation from the metal water reaction (MWR) for ATRIUM 10XM fuel used at BFN Units 1, 2, and 3.AREVA considers portions of the information provided in Attachment 12 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
13. Therefore, on behalf of AREVA, TVA requests that Attachment 12 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 13 ANP-3378NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU)(non-ProPrietary)

Attachment 14 *ANP-3384P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS.Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU) (proprietary)

Attachment 14 provides the results of the LOCA-ECCS analyses for BEN Units 1, 2 and 3. The LOCA-ECCS analysis specifies the MAPLHGR limit versus exposure for ATRIUM-l0 fuel and demonstrates that the MAPLHGR limit is adequate to ensure that the LOCA-ECCS criteria in 10 CFR 50.46 are satisfied for operation at or below the limit. Attachment 14 also documents the licensing basis PCT and corresponding local cladding oxidation from the MWR for ATRIUM-I10 fuel used at BFN Units 1, 2, and 3.AREVA considers portions of the information provided in Attachment 14 of this [AR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, exe'cuted by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
15. Therefore, on behalf of AREVA, TVA U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 6 September 21, 2015 requests that Attachment 14 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 15 ANP-3384NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU)(non-proprietary)

Attachment 16 ANP-3342P, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (proprietary)

Attachment 16 provides the design results for the equilibrium cycle reactor core loading, including projected co~ntrol rod patterns and evaluations of thermal and reactivity margins. The equilibrium cycle results are summarized for operation of BFN Units 1, 2, and 3 with ATRIUM 10XM fuel at EPU conditions.

AREVA considers portions of the information provided in Attachment 16 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
17. Therefore, on behalf of AREVA, TVA requests that Attachment 16 be withheld from public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.Attachment 17 ANP-3342NP, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (non-proprietary)

Attachment 18 ANP-3372P, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design (proprietary)

Attachment 18 provides the design results for the BFN Unit 3 Cycle 19 reactor core loading, including projected control rod patterns and evaluations of thermal and reactivity margins. The Cycle 19 results are summarized for operation of BFN Unit 3 with ATRIUM 1OXM fuel at EPU conditions based on projected Cycle 18 core operation.

AREVA considers portions of the information provided in Attachment 18 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
19. Therefore, on behalf of AREVA, TVA requests that Attachment 18 be withheld from public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.Attachment 19 Attahmen 19ANP-3372NP, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP)

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 7 September 21, 2015 LAR Reference Fuel Cycle Design (non-proprietary)

Attachment 20 ANP-3404P, Browns Fer'ry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (proprietary)

Attachment 20 provides reload licensing analyses results in.support of an EPU operation at BEN. The analyses reported in Attachment 20 were performed uSing NRC-approved methodologies for generic application to boiling water reactors.Reload licensing analyses were performed for potentially limiting events. The results are used to establish the Technical Specifications/Core Operating Limits Report limits and ensure design and licensing criteria are met. The results of the representative reload licensing analysis for BEN Unit 3 Cycle 19 operation are presented and support operation with equipment out-of-service.

ARE VA considers portions of the information p~rovided in Attachment 20 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
21. Therefore, on behalf of AREVA, TVA requests that Attachment 20 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 21 ANP-3404NP, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (non-proprietary)

Attachment 22 ANP-3343P, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM I0XM Fuel (proprietary)

Attachment 22 provides the results of the neutronic design analyses performed for EPU operation at BEN with equilibrium cycle ATRIUM 10XM fuel assemblies.

The mechanical design parameters for the ATRIUM 10OXM fuel assemblies are summarized.

ARE VA considers portions of the information provided in Attachment 22 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
23.

on behalf of AREVA, TVA requests that Attachment 22 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.

U. S. Nuclear Regulatory Commission CNL-l15-169 Page 8 September 21, 2015 Attachment 23 Attachment 24 ANP-3343NP, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel (non-proprietary)

ANP-3386P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM I0XM Fuel Assemblies (proprietary)

Attachment 24 provides the results of the structural evaluation of the ATRIUM 10XM fuel assembly and fuel channel for operation of BEN at EPU conditions.

This report provides a design description, the mechanical design criteria, fuel structural analysis results, and test results for the ATRIUM 10XM fuel assembly and Advanced.Fuel Channel (AFC).AREVA considers portions of the information provided in Attachment 24 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
25. Therefore, on behalf of AREVA, TVA requests that Attachment 24 be withheld from' public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.ANP-3386NP, Mechanical Design Report for Browns Ferry Units 1,2 and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies (non-proprietary)

ANP-3385P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies (proprietary)

Attachment 26 provides the results of the structural evaluation of the ATRIUM-10 fuel assembly and fuel channel for operation of BEN at EPU conditions.

This report provides a design description, the mechanical design criteria, fuel structural analysis results, and test results for the ATRIUM-i10 fuel assembly and AFC.AREVA considers portions of the information provided in Attachment 26 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
27. Therefore, on behalf of AREVA, TVA requests that Attachment 26 be withheld from public disclosure in accordance with the AIREVA affidavit and the provisions of 10 CFR 2.390.Attachment 25 Attachment 26 U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 9 September 21, 2015 Attachment 27 Attachment 28 Attachment 29 Attachment 30 ANP-3385NP, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-i0 Fuel Assemblies (non-proprietary)

ANP-3388P, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (proprietary)

Attachment 28 provides the results of fuel rod thermal-mechanical analyses to demonstrate that the applicable design criteria are satisfied.

The analyses are for ATRIUM I0XM fuel. These evaluations assess fuel rod performance at EPU conditions based on NRC-approved methodologies and design criteria.AREVA considers portions of the information provided in Attachment 28 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is.provided in Attachment
29. Therefore, on behalf of AREVA, TVA requests that Attachment 28 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.ANP-3388NP, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (non-proprietary)

ANP-3327P, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (proprietary)

Attachment 30 provides the results of thermal-hydraulic analyses that demonstrate that ATRIUM 10OXM fuel is hydraulically compatible with ATRIUM-10 fuel for BFN at EPU conditions.

This report also provides the hydraulic characterization of the BEN ATRIUM 10XM and ATRIUM-10 fuel designs.AREVA considers portions of the information provided in Attachment 30 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
31. Therefore, on behalf of AREVA, TVA requests that Attachment 30 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.ANP-3327NP, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (non-proprietary)

Attachment 31 U. S. Nuclear Regulatory Commission CNL-15-169 Page 10 September 21, 2015 Attachment 32 FSI-001 9629, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (proprietary)

Attachment 32 provides the Safety Limit Minimum Critical Power Ratio (MCPR) results for BFN Unit 3 Cycle 19 using the methodology in AREVA's licensing topical report, ANP-10307PA, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, dated June 2011, to support two-loop operation and single-loop operation of BEN at EPU conditions.

AREVA considers portions of the information provided in Attachment 32 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
33. Therefore, on behalf of AREVA, TVA requests that Attachment 32 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 33 FS1-0019630, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (non-proprietary)

Attachment 34 ANP-2860P Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate (proprietary)

Attachment 34 provides a review of certain NRC-approved licensing methodologies to demonstrate their applicability to the operation of BEN with AREVA's ATRIUM 10XM fuel in the EPU operating domain. General applicability of AREVA's licensing methods to BEN in the EPU operating domain is provided in AREVA technical report, ANP-2680P, Revision 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information.

Applicability of these methods to the ATRIUM I10XM fuel design in the current operating domain is provided in ANP-2680P Revision 2, Supplement 1P.AREVA considers portions of the information provided in Attachment 34 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
35. Therefore, on behalf of AREVA, TVA requests that Attachment 34 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.

U. S. Nuclear Regulatory Commission CNL-15-1 69 Page 11 September 21, 2015 Attachment 35 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 1OXM Fuel for Extended Power Uprate (non-proprietary)

Attachment 36 ANP-2637, Boiling Water Reactor Licensing Methodology Compendium (non-proprietary)

Attachment 36 is a compendium of AREVA fuel-related methodologies and design criteria that are described in licensing topical reports that the NRC has found acceptable for referencing in boiling water reactor (BWR) licensing applications.

This compendium provides a concise, organized source for NRC-approved, AREVA topical reports for BWR fuel-related applications.

Attachment 37 ANP-3409P, Fuel-Related Emergent Regulatory Issues (proprietary)

Attachment 37 addresses two emergent regulatory issues: 1) Proposed new criteria for the postulated LOCA in 10 CFR 50.46c; and 2) Proposed changes to the acceptance criteria for the reactivity initiated accident in NUREG-0800, U.S. Nuclear Regulatory Commission, Standard Review Plan, Section 4.2, Fuel System Design.At present these items are not regulatory requirements and therefore are not included in the current licensing basis for BFN.However, because both issues represent potential changes to regulatory requirements that may become effective during the NRC staff's review of this LAR, the potential effect of their adoption on the BFN EPU into regulatory requirements is being addressed.

AREVA considers portions of the information provided in Attachment 37 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
38. Therefore, on behalf of AREVA, TVA requests that Attachment 37 be withheld from public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.Attachment 38 ANP-3409NP, Fuel-Related Emergent Regulatory Issues (non-proprietary)

U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 12 September 21, 2015 Attachment 39 RHR Heat Exchanger K-values Utilized in EPU Containment Analyses Attachment 39 provides a review of Residual Heat Removal (RHR)heat exchanger K-values used in the containment analyses for postulated events under EPU conditions.

Because K-values may differ for design basis and special events based on certain assumptions and initial conditions, Attachment 39 provides the basis for these determinations.

RHR heat exchanger K-values used in the containment analyses are identified for each event described in the applicable PUSAR section.Attachment 40 Steam Dryer Analysis Report (proprietary)

Attachment 40 is GEH engineering report, NEDC-33824P, Browns Ferry Replacement Steam Dryer Stress Analysis, which documents the stress analyses for the replacement steam dryer (RSD) for each of the three BEN units. The analyses demonstrate that the RSDs will maintain structural integrity during normal plant operation and under transient and accident conditions.

A power ascension test plan for the initial cycle of EPU operation at all three BFN units is presented.

The structural analyses and power ascension monitoring program provide assurance that the BEN RSDs will maintain structural integrity during normal operation and under transient and accident conditions for the design life of each RSD.GEH considers portions of the information provided in Attachment 40 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by GEH, is provided in Attachment

50. A non-proprietary version of the document is provided in Attachment
41. Therefore, on behalf of GEH, TVA requests that Attachment 40 be withheld from public disclosure in accordance with the GEH affidavit and the provisions of 10 CFR 2.390.Attachment 41 Steam Dryer Analysis Report (non-proprietary)

Attachment 42 Supplemental Environmental Report Attachment 42 is the Supplemental Environmental Report (ER) for the EPU of BFN Units 1, 2, and 3. The ER provides an assessment of the environmental impacts of the proposed increase in power output and supports a conclusion that EPU will not result in any significant additional impacts.

U. S. Nuciear Regulatory Commission CNL-1 5-169 Page 13 September 21, 2015 Attachment 43 Transmission System Stability Evaluation Attachment 43 provides the results of the BFN transmission system stability evaluation.

This study evaluated the impact of BEN operation at EPU conditions with respect to continued compliance with 10 CFR Part 50, Appendix A, General Design Criterion (GDC)-17, Electric Power Systems. The study assumed three unit operation at a maximum power output of 1,318 MWe (each unit)based on a heat balance calculation (optimum main condenser vacuum).Attachment 43 documents load flow analysis of the offsite power supply considering various pre-event outages and a subsequent plant design basis event LOCA. The analysis demonstrates that BEN will continue to meet GDC-17 requirements while operating'at EPU conditions, and the offsite power system has the capacity and capability to supply power to safety loads and required equipment.

Because Attachment 43 contains critical energy infrastructure information that is considered sensitive, unclassified (non-safeguard) information, TVA requests that it be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390(d)(1).

Attachment 44 Probabilistic Risk Assessment Attachment 44 provides the results of the assessment of the effect of EPU on risk as characterized as a change in the core damage frequency (CDF) and large early release frequency (LERF). In assessing these changes, TVA followed the guidelines of Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, to determine the resultant risk acceptance region.Attachment 45 Flow Induced Vibration Analysis and Monitoring Program Attachment 44 provides a detailed discussion of the analyses and testing program undertaken to provide assurance that unacceptable flow induced vibration issues are not experienced at BEN due to EPU implementation for affected piping systems.Attachment 46 Startup Test Plan Attachment 46 describes the testing TVA will perform following the EPU implementation outages at BFN Units 1, 2, and 3 (i.e., refueling outages scheduled for Spring 2018, Fall 2018, and Spring 2019 for Units 3, 1, and 2, respectively).

Following each of these outages, TVA will conduct a comprehensive EPU startup test program to ensure the safe operation of each plant. Attachment 46 describes the test program.

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 14 September 21, 2015 Attachment 47 List and Status of Plant Modifications Attachment 47 provides a list, description, and implementation schedule of plant modifications completed or planned to support EPU for BEN Units 1, 2 and 3.Attachment 48 NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (with redline/strike out)Attachment 48 provides a redline/strikeout version of the RS-001 safety evaluation template consistent with the BEN Units 1, 2, and 3 design basis.Attachment 49 NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (retyped)Attachment 49 provides a clean version of the RS-001 safety evaluation template, incorporating all the redline/strikeout changes.Attachment 50 Affidavits

-GE-Hitachi Nuclear Energy Americas LLC Attachment 51 Affidavits -AREVA Inc. \Attachment 52 Affidavit

-Electric Power Research Institute TVA has determined that there are no significant hazards considerations associated with the proposed changes and that the TS changes qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51 .22(c)(9).

Additionally, in accordance with 10 CFR 50.91 (b)(1), TVA is sending a copy of this letter and the enclosure to the Alabama State Department of Public Health.The BFN Plant Operations Review Committee and the TVA Nuclear Safety Review Board have reviewed this proposed change and determined that operation of BFN in accordance with the proposed change will not endanger the health and safety of the public.TVA requests approval of these proposed TS changes within 24 months of the date of this letter. The requested review period is consistent with NRC guidance and supports plans for implementation coincident with refueling outages. Once approved, the amendments will be fully implemented within 90 days of completion of refueling outages scheduled for Spring 2018, Fall 2018, and Spring 2019 for Units 3, 1, and 2, respectively.

These implementation periods will provide adequate time for the installation of required modifications supporting power uprate and revision of the affected station documentation in accordance with the appropriate change control mechanisms.

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 15 September 21, 2015 There are no new regulatory commitments associated with this submittal.

If there are any questions or if additional information is needed, please contact Mr. Edward D.Schrull at (423) 751-3850.I declare under penalty of perjury that the foregoing is true and correct. Executed on the 21st day of September 2015.RespectfulIly, J. W. Se V~ce Presid ent, Nuclear Licensing

Enclosure:

Discussion of Changes, No Significant Hazards Considerations, and Environmental Considerations Attachments:

1. List of Regulatory Commitments
2. Proposed Technical Specification Changes (Markups)3. Retyped Proposed Technical Specification Changes 4. Proposed Technical Specification Bases Changes (Markups)5. Retyped Proposed Technical Specification Bases Changes 6. NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (proprietary)
7. NEDO-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (non-proprietary)
8. ANP-3403P, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (proprietary)
9. ANP-3403NP, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (non-proprietary)
10. ANP-3377P, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 1 0XM Fuel (EPU) (proprietary) i1. ANP-3377NP, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 10OXM Fuel (EPU) (non-proprietary)
12. ANP-3378P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU) (proprietary)
13. ANP-3378NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU) (non-proprietary)
14. ANP-3384P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-i10 Fuel (EPU) (proprietary)

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page. 16 September 21, 2015 15. ANP-3384NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU) (non-proprietary)

16. ANP-3342P, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (proprietary)
17. ANP-3342NP, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (non-proprietary)
18. ANP-3372P, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design (proprietary)
19. ANP-3372NP, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design (non-proprietary)
20. ANP-3404P, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (proprietary)
21. ANP-3404NP, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (non-proprietary)
22. ANP-3343P, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel (proprietary)
23. ANP-3343NP, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel (non-proprietary)
24. ANP-3386P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies (proprietary)
25. ANP-3386NP, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies (non-proprietary)
26. ANP-3385P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-l0 Fuel Assemblies (proprietary)
27. ANP-3385NP, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies (non-proprietary)
28. ANP-3388P, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (proprietary)
29. ANP-3388NP, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (non-proprietary)
30. ANP-3327P, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (proprietary)
31. ANP-3327NP, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (non-proprietary)
32. FS1-001 9629, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (proprietary)
33. FS1-0019630, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (non-proprietary)

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 17 September 21, 2015 34. ANP-2860P Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate (proprietary)

35. ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate (non-proprietary)
36. ANP-2637, Boiling Water Reactor Licensing Methodology Compendium (non-proprietary)
37. ANP-3409P, Fuel-Related Emergent Regulatory Issues (proprietary)
38. ANP-3409NP, Fuel-Related Emergent Regulatory Issues (non-proprietary)
39. RHR Heat Exchanger K-values Utilized in EPU Containment Analyses 40. Steam Dryer Analysis Report (proprietary)
41. Steam Dryer Analysis Report (non-proprietary)
42. Supplemental Environmental Report 43. Transmission System Stability Evaluation
44. Probabilistic Risk Assessment
45. Flow Induced Vibration Analysis and Monitoring Program 46. Startup Test Plan 47. List and Status of Plant Modifications
48. RS-001 SE Template GDC Markup (with redline/strike out)49. RS-001 SE Template GDC Markup (retyped)50. Affidavits

-GE-Hitachi Nuclear Energy Americas LLC 51. Affidavits

-ARE VA Inc.52. Affidavit

-Electric Power Research Institute cc (Enclosure):

NRC Regional Administrator

-Region II NRC Senior Resident Inspector

-Browns Ferry Nuclear Plant State Health Officer, Alabama State Department of Public Health (w/o Attachments 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43)

The enclosed cover letter is for reference only. The disc includes the pdf.version of the signed letter.The files listed below are contained on the enclosed disc. The files highlighted in yellow and containing NPUB following the file number, (e.g., 009 NPUB BFN EPU...)are considered to be proprietary and should be withheld from public disclosure under 10 CFR 2.390.For convenience from the cover letter: Proprietary Information and Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Attachments 6, 8 10, 12, 14, 16 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43 Thanks Carla Edmondson Executive Management Assistant to J. W. Shea, VP Nuclear Licensing cedmondson~tva.gov 423-751-2638 PUB C~NL-l5-16g BFN [PU LAR Co,'er Letter002 PUB BFN EPU LAR Enclosure~A003 PUB BEN EPU LARAtti1-List of Reg Commitments004 PUB BFN E PU [AR Aft 2-TS Markups Part io d2005 PUB BEN [PU LAR Att 2-TS Mabrkup~s Part2 of 2006 PUB BFN [PU LAR AII3-Retyped TS Changes S007 PUB BEN [PU LAR Af't 4-Proposedl TS Bases Mark~ups S008 PUB BEN EPU LAR Aft 5-etyped IS Bases ChangesNPUB BEN, [PU LAB Att 6-N[D033860P-PUSAR,010 PUB BFN [PU LAR Alt 7-NEDO-3386]0011 NPUB BEN [PU LAPB At8-.NP-3403P-FUSAR012 PUB BFN [PU [AR Alt 9-ANP-3'403NP-FUSAR013 NPUB BEN EPU [AR Alt 10-ANP-33T7P S014 PUB BFN [PU [AR Alt li-ANP-337NP S015 NPUB BFN [PU LAB At 2-ANP-3378P S016 PUB BEN [PU LAB Alt 13-ANP-3378NP017 NPUB BFN [PU [AR Al 14AP-3~4018 PUB BFN [PU LAR Alt 1.-ANP-3384NP S019 r, PUB BFN [PU [AR Attl6-A NP-33,42P020 PUB BEFN EPU [AR, Alt 17-ANP-3342NP021! NPUB BEN E PU [AP, Aft 18-ANP-3372P022 PUB BEN [PU [AR Aft lg-ANP-3372NP023 NPUB BFN [PU [AR Alt 20-ANP-3404P S024 PUB BEN [PU [AR` Aft 1.-ANP-3404NP S025 NPUB BEN [PU [AR Alt 22-ANP-3343P026 PUB BEN EPU [AR Aft 23-,A, P-3343NP~~027 NPUB BFN [PU [AR Aft 24-ANP-3386P028 PUB BFN EPU [AR Alt 25-ANP-3386NP02.9 NPUB BEN [PU LAB, Alt 26-ANP-3385P S030 PUB BEN [PU [AP, Aft 27-ANP -3385 NP S031 NPUB BEN [PU [AR, Af 2-ANP-3388P S032 PUB BFN [PU [AR` -ANP-3383NP

~4033 NPUB BEN [PU [ARAft ANP-3327P034 PUB BEN E PU [AR Alt 31-ANP-332?NP S035 NPUB BEN [PU [ARft32-ES1-001g629 1 :O5 P.A~7:45 AI~tANIuils 7'465 AlM Sb % '1_S 7:'4' AK;I 0i4221201.5 7:46 AMA 9,"22i20L1 7:8i g~2'O! 7:r l, '0!22!2C'i5 7:43 41,4 2'"22!2015 7:49,AM:7:4Sq A 1 ,4 0,22.201.5 9.,"22/201.5 7:40 AlA,'2.u2,.20:i.5 7:55 ,AlA 5bi'22/201.5 7:50 AlAt o,"22;i017:50 AMb'0u/22/015 7:50 AMA 072.20153 7:50 AMk'09/2/015?

4:1,[,4 Sb22 2015 7:51 AlA,;Ad oble Acob at D,,, A,.ob,..,Aroblt O,..AdiobeAciobat U,,, Adobe Ac'o~bat D,,, Adobe Acrobt U.,, Adobe. Acrobt.a U,,.,doi:e krba t Adobe Acrobat Ox,,, Adobe &,robat O,,..dobe.Acrobat x,., A~do~be .A~cobat D,,, Adobe Acrobat D,..Adobe A.,:robat RI,,, Adobe. Acrobat Ox,,, AdobeAczrobat O ....Adobee Acrobat U',,, Ad obte Acro bat U,,, Adobe icrobat O,,,

U,,, Adobe Acrobt;at U,,, Ado~be Acroboat U.., Adobe Acrobat U,,..Adobe Acrof~t U,,, A#dobe Acrobat D,,, Adobe Acrobat U,., Adobe Acrobat D,,, Adco be Acrobat O,,, Ad~o be Ac:robat U,,, AdobLe Acrobat D,,, Adobe Acro~bat U.,,, Adobe:crobat D,,, Ad:obe Acrobat .,,, 446 KB 132 KB 53 KB, 31,757 KB 440'KB.623 KB Ky38 KB, 5:i254 KB LWA. KB: 2,508 KB 2.071 KB: 2.066S KB 2,1330 KB.,KB.2 ,46 KB 1,770 KB 1,367 KB!l4SS KB 1,422 KB 1,.470 KB.2,070 KB 2,153 KB 5,,2i56 KB 7 33 OKB 3,57.5 K.B 330, KB, 1,023 KB 673 KB 610 KB 607 KB 0,67 KBKB_5.061 KB 036 PUB BFNl EPU LARI Att 33-FS1-001963,0 037 N4PUB BFN', EPU LAR Att 34-ANP-2860P

~J038 PUB BFN', EPU LAR~gtt35-ANP-2860NP 039 PUB BFII4 EPU LAR Att 3-ANP-2637040 l[1PUB BFN, EPU LAR, tt37-4NP-3'409P041 PUB BFN EPU LAB Aft

~i042 PUB BFN EPU L.B Att 39-RHR H-X 043 NPUB BFIN, FPU LAB ktt 4J-NIEDC33B24P-Part1 Gf 6~2044 NPUB EPU Lb1,, kit 4J-tEDC33824P-ApA Part 2,,,..045 N',PUB EPUJ LA Aft 1-EDC33824P-ApB Part 3..,046 NPUB EPUt LAPA~tti:-NEDC3J824P-ApC Part 4.,.47 NJPUB BFNI EPU' LAB Aft 40-NEO(C33824P-A.pD Part5..,, S0'48 NIPUE. BFIi EPU LA. Aft 40-NIEBC33,824P-ApE Part 6,,049 PUB BFNl EPU LAP..Att 41-NEDO-33824 L0.50 PUB BFN EPU LAB Att 42-Supp Env Report051 NPUB BFN EPU LAB Aft 43-Trans Stabilt? Stud 1 ,052 PUB BFN EPU LABRAtt. 4'4-PRA~J053 PUB BFN EPU LAB tt 4.5-FI2I Analysi Monitor Prg05,4 PUB BFN EPU LP,. Ait Teft Plan 2055 PUB BFN EPU LAR Aft 47-List of Plant Mods0.56 PUB BFN FPU LAR Aft 48-SE Termplate ODC M,,arkup057 PUB BFNI EPU LAB At 49-SE Template GDC Markup ,~J058 PUB BFN EPU LAB.Aft.50-GEH Affidavits059 PUB BFN EPU LAB Af 51-kreva 060 PUB BFN EPU LAB Aft 52-EPRI Affidavit.... .... I,., .. .. .. -...-..-.."h~ j,1 "L -.7 /-- ',..l ."t '!-,' "!: ? i.. I.,-, LJIL-.(V *-. .I.1-i-..-i4mI~ F.I CI~. I;~~~I C ~ s~~:IcIC~t

~ArC -..~4 I ' ..4F.qL '....L . I:'.k.,..

Proprietary Information and Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Attachments 6, 8 10, 12, 14, 16 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43*Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-169 September 21, 2015 10 CFR 50.90 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Proposed Technical Specifications Change TS-505 -Request for License Amendments

-Extended Power Uprate

Reference:

Letter from TVA to NRC, "Technical Specifications Changes TS-431 and TS-41 8 -Extended Power Uprate (EPU) -Withdrawal of Requests and Update to EPU Plans and Schedules," dated September 18, 2014 (ADAMS Accession No. MLI14265A487)

In accordance with the provisions of 10 Code of Federal Regulations (10 CFR) 50.90,"Application for amendment of license, construction permit, or early site permit," Tennessee Valley Authority (TVA) is submitting a request for a Technical Specification (TS)amendment (TS-505) to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, respectively.

The proposed amendment will increase the authorized maximum steady-state reactor core power level for each unit from 3458 MWt to 3952 MWt. This license amendment request (LAR) represents an increase of approximately 20 percent above the original licensed thermal power (OLTP)level of 3293 MWt, and an increase of approximately 14.3 percent above the current licensed thermal power (CLTP) level of 3458 MWt.The information provided in the attachments to this letter represents a consolidation of plant-specific safety analyses as well as plant-specific confirmation of generic evaluations applicable to a boiling water reactor (BWR) constant pressure power uprate for the three BEN units.On September 8, 1998, the Nuclear Regulatory Commission (NRC) approved a stretch power uprate for BFN Units 2 and 3 to increase the authorized maximum thermal power level to 3458 MWt. By letter dated March 6, 2007, the NRC issued an amendment to the BFN Unit 1 operating license to also increase the authorized maximum thermal power level to 3458 MWt.

Proprietary Information and Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Attachments 6, 8 10, 12, 14, 16 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43 In the referenced letter dated September 18, 2014, TVA withdrew previous BFN EPU LARs and provided its revised plans and schedule for the BEN EPU project. In the interim months, TVA has held several meetings with the NRC staff to provide pre-application discussions on key aspects of the EPU project, including fuel considerations, startup test plans, replacement steam dryers, flow-induced vibration, and the elimination of credit for containment accident pressure in net positive suction head (NPSH) evaluations for emergency core cooling system (EGOS) pumps. This [AR submittal is consistent with TVA's letter of September 18, 2014, which stated that a new, consolidated BEN EPU [AR would be submitted by October 2015.The enclosure to this letter provides a summary of the proposed changes to the BEN operating licenses and Technical Specifications due to EPU operation, the no significant hazards considerations, and environmental considerations.

Attachments 1 through 52 include a description of the proposed changes to the licensing basis and provide supporting documentation.

This [AR is subdivided as follows: Attachment 1 List of Regulatory Commitments There are no commitments associated with this [AR. Those actions associated with the amendment approval will be complete prior to implementation of EPU, except where those actions require an increase in power above the currently licensed power level. In those instances, defined actions will be completed during power ascension and will be incorporated into license conditions (see Attachments 2 and 3).Attachment 2 Proposed Technical Specification Changes (Markups)Attachment 2 provides a markup of the affected operating license and Technical Specifications pages indicating the proposed changes for EPU.Attachment 3 Retyped Proposed Technical Specification Changes Attachment 3 provides a camera-ready retype of the affected Technical Specification pages with changes incorporated.

Attachment 4 Proposed Technical Specification Bases Changes (Markups)Attachment 4 provides a markup of the affected Technical Specification Bases pages indicating the proposed changes for EPU.Attachment 5 Retyped Proposed Technical Specification Bases Changes Attachment 5 provides a camera-ready retype of the affected Technical Specification Bases pages with changes incorporated.

U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 3 September 21, 2015 Attachment 6 NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (proprietary)

Attachment 6 provides a proprietary version of the GE-Hitachi Nuclear Energy Americas LLC (GEH) Power Uprate Safety Analysis Report (PUSAR), NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate. This report summarizes the results of safety analyses and evaluations performed that support the proposed increase in the authorized maximum steady-state reactor core power level.The PUSAR technical evaluations supporting the proposed EPU are based on NRC-approved licensing topical report, NEDC-33304P-A, Constant Pressure Power Uprate, Revision 4 (referred to as the Constant Pressure Power Uprate Licensing Topical Report (CLTR)). For topics outside the CLTR approved applicability (e.g., use of AREVA ATRIUM 10XM fuel), the technical evaluations are based on a series of NRC-approved AREVA methods. The content of the technical evaluations is consistent with the guidance provided in NRC Review Standard RS-001, Review Standard for Extended Power Uprates, Revision 0, dated December 2003, as it applies to the licensing basis of BFN Units 1, 2, and 3.Certain information provided in Attachment 6 is considered proprietary information by the Electric Power Research Institute (EPRI). EPRI and GEH separately consider portions of the information provided in Attachment 6 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. Affidavits for withholding information, executed by GEH and EPRI, are provided in Attachment 50 and Attachment 52, respectively.

A non-proprietary version of the document is provided in Attachment

7. Therefore, on behalf of GEH and EPRI, TVA requests that Attachment 6 be withheld from public disclosure in accordance with the GEH and EPRI affidavits and the provisions of 10 CFR 2.390.Attachment 7 NEDO-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (non-proprietary)

Attachment 8 ANP-3403P, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (proprietary)

Attachment 8 provides a proprietary version of the AREVA Inc.(AREVA) Fuel Uprate Safety Analysis Report (FUSAR), ANP-'3403P, 'Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3." This report supplements the PUSAR and summarizes the results of fuel-related safety analyses and evaluations performed that support the proposed increase in the authorized maximum steady-state reactor core power level.

U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 4 September 21, 2015 The FUSAR technical evaluations supporting the proposed EPU are based on a series of NRC-approved AREVA methods that are summarized in LAR Attachment

36. The safety evaluations documented in Attachment 8 are based on the continued use of AREVA's ATRIUM 10XM fuel design. Where appropriate, evaluations for the existing ATRIUM-10 fuel design have also been included because the potential exists that some fuel of this type may still be resident in a BFN reactor core upon implementation of EPU..The general format of the technical evaluations in Attachment 8 is consistent with the guidance provided in NRC Review Standard RS-001, as it applies to the licensing basis of BFN Units 1, 2, and 3. However, because only selected portions of RS-001 are addressed, the numbering of individual sections is discontinuous.

AREVA considers portions of the information provided in Attachment 8 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
9. Therefore, on behalf of AREVA, TVA requests that Attachment 8 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 9 ANP-3403NP, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (non-proprietary)

Attachment 10 ANP-3377P, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel (EPU) (proprietary)

Attachment 10 provides the results of a loss-of-coolant accident (LOCA) break spectrum analysis for BFN Units 1, 2, and 3. The break spectrum analysis is used to identify the parameters that result in the highest calculated peak Cladding temperature (POT)during a postulated LOCA.AREVA considers portions of the info~rmation provided in Attachment 10 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
11. Therefore, on behalf of AREVA, TVA requests that Attachment 10 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 5 September 21, 2015 Attachment 11 ANP-3377NP, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel (EPU) (non-proprietary)

Attachment 12 ANP-3378P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10OXM Fuel (EPU) (proprietary)

Attachment 12 provides the results of the LOCA-ECCS analyses for BFN Units 1, 2 and 3. The LOCA-ECCS analysis specifies the maximum average planar linear heat generation rate (MAPLHGR)limit versus exposure for ATRIUM 10OXM fuel and demonstrates that the MAPLHGR limit is adequate to ensure that the LOCA-ECCS criteria in 10 CER 50.46 are satisfied for operation at or below the limit. Attachment 12 also documents the licensing basis PCT and corresponding local cladding oxidation from the metal water reaction (MWR) for ATRIUM 10XM fuel used at BFN Units 1, 2, and 3.AREVA considers portions of the information provided in Attachment 12 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
13. Therefore, on behalf of AREVA, TVA requests that Attachment 12 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 13 ANP-3378NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU)(non-ProPrietary)

Attachment 14 *ANP-3384P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS.Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU) (proprietary)

Attachment 14 provides the results of the LOCA-ECCS analyses for BEN Units 1, 2 and 3. The LOCA-ECCS analysis specifies the MAPLHGR limit versus exposure for ATRIUM-l0 fuel and demonstrates that the MAPLHGR limit is adequate to ensure that the LOCA-ECCS criteria in 10 CFR 50.46 are satisfied for operation at or below the limit. Attachment 14 also documents the licensing basis PCT and corresponding local cladding oxidation from the MWR for ATRIUM-I10 fuel used at BFN Units 1, 2, and 3.AREVA considers portions of the information provided in Attachment 14 of this [AR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, exe'cuted by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
15. Therefore, on behalf of AREVA, TVA U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 6 September 21, 2015 requests that Attachment 14 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 15 ANP-3384NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU)(non-proprietary)

Attachment 16 ANP-3342P, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (proprietary)

Attachment 16 provides the design results for the equilibrium cycle reactor core loading, including projected co~ntrol rod patterns and evaluations of thermal and reactivity margins. The equilibrium cycle results are summarized for operation of BFN Units 1, 2, and 3 with ATRIUM 10XM fuel at EPU conditions.

AREVA considers portions of the information provided in Attachment 16 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
17. Therefore, on behalf of AREVA, TVA requests that Attachment 16 be withheld from public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.Attachment 17 ANP-3342NP, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (non-proprietary)

Attachment 18 ANP-3372P, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design (proprietary)

Attachment 18 provides the design results for the BFN Unit 3 Cycle 19 reactor core loading, including projected control rod patterns and evaluations of thermal and reactivity margins. The Cycle 19 results are summarized for operation of BFN Unit 3 with ATRIUM 1OXM fuel at EPU conditions based on projected Cycle 18 core operation.

AREVA considers portions of the information provided in Attachment 18 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
19. Therefore, on behalf of AREVA, TVA requests that Attachment 18 be withheld from public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.Attachment 19 Attahmen 19ANP-3372NP, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP)

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 7 September 21, 2015 LAR Reference Fuel Cycle Design (non-proprietary)

Attachment 20 ANP-3404P, Browns Fer'ry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (proprietary)

Attachment 20 provides reload licensing analyses results in.support of an EPU operation at BEN. The analyses reported in Attachment 20 were performed uSing NRC-approved methodologies for generic application to boiling water reactors.Reload licensing analyses were performed for potentially limiting events. The results are used to establish the Technical Specifications/Core Operating Limits Report limits and ensure design and licensing criteria are met. The results of the representative reload licensing analysis for BEN Unit 3 Cycle 19 operation are presented and support operation with equipment out-of-service.

ARE VA considers portions of the information p~rovided in Attachment 20 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
21. Therefore, on behalf of AREVA, TVA requests that Attachment 20 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 21 ANP-3404NP, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (non-proprietary)

Attachment 22 ANP-3343P, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM I0XM Fuel (proprietary)

Attachment 22 provides the results of the neutronic design analyses performed for EPU operation at BEN with equilibrium cycle ATRIUM 10XM fuel assemblies.

The mechanical design parameters for the ATRIUM 10OXM fuel assemblies are summarized.

ARE VA considers portions of the information provided in Attachment 22 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
23.

on behalf of AREVA, TVA requests that Attachment 22 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.

U. S. Nuclear Regulatory Commission CNL-l15-169 Page 8 September 21, 2015 Attachment 23 Attachment 24 ANP-3343NP, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel (non-proprietary)

ANP-3386P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM I0XM Fuel Assemblies (proprietary)

Attachment 24 provides the results of the structural evaluation of the ATRIUM 10XM fuel assembly and fuel channel for operation of BEN at EPU conditions.

This report provides a design description, the mechanical design criteria, fuel structural analysis results, and test results for the ATRIUM 10XM fuel assembly and Advanced.Fuel Channel (AFC).AREVA considers portions of the information provided in Attachment 24 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
25. Therefore, on behalf of AREVA, TVA requests that Attachment 24 be withheld from' public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.ANP-3386NP, Mechanical Design Report for Browns Ferry Units 1,2 and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies (non-proprietary)

ANP-3385P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies (proprietary)

Attachment 26 provides the results of the structural evaluation of the ATRIUM-10 fuel assembly and fuel channel for operation of BEN at EPU conditions.

This report provides a design description, the mechanical design criteria, fuel structural analysis results, and test results for the ATRIUM-i10 fuel assembly and AFC.AREVA considers portions of the information provided in Attachment 26 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
27. Therefore, on behalf of AREVA, TVA requests that Attachment 26 be withheld from public disclosure in accordance with the AIREVA affidavit and the provisions of 10 CFR 2.390.Attachment 25 Attachment 26 U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 9 September 21, 2015 Attachment 27 Attachment 28 Attachment 29 Attachment 30 ANP-3385NP, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-i0 Fuel Assemblies (non-proprietary)

ANP-3388P, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (proprietary)

Attachment 28 provides the results of fuel rod thermal-mechanical analyses to demonstrate that the applicable design criteria are satisfied.

The analyses are for ATRIUM I0XM fuel. These evaluations assess fuel rod performance at EPU conditions based on NRC-approved methodologies and design criteria.AREVA considers portions of the information provided in Attachment 28 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is.provided in Attachment
29. Therefore, on behalf of AREVA, TVA requests that Attachment 28 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.ANP-3388NP, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (non-proprietary)

ANP-3327P, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (proprietary)

Attachment 30 provides the results of thermal-hydraulic analyses that demonstrate that ATRIUM 10OXM fuel is hydraulically compatible with ATRIUM-10 fuel for BFN at EPU conditions.

This report also provides the hydraulic characterization of the BEN ATRIUM 10XM and ATRIUM-10 fuel designs.AREVA considers portions of the information provided in Attachment 30 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
31. Therefore, on behalf of AREVA, TVA requests that Attachment 30 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.ANP-3327NP, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (non-proprietary)

Attachment 31 U. S. Nuclear Regulatory Commission CNL-15-169 Page 10 September 21, 2015 Attachment 32 FSI-001 9629, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (proprietary)

Attachment 32 provides the Safety Limit Minimum Critical Power Ratio (MCPR) results for BFN Unit 3 Cycle 19 using the methodology in AREVA's licensing topical report, ANP-10307PA, AREVA MCPR Safety Limit Methodology for Boiling Water Reactors, dated June 2011, to support two-loop operation and single-loop operation of BEN at EPU conditions.

AREVA considers portions of the information provided in Attachment 32 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
33. Therefore, on behalf of AREVA, TVA requests that Attachment 32 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.Attachment 33 FS1-0019630, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (non-proprietary)

Attachment 34 ANP-2860P Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate (proprietary)

Attachment 34 provides a review of certain NRC-approved licensing methodologies to demonstrate their applicability to the operation of BEN with AREVA's ATRIUM 10XM fuel in the EPU operating domain. General applicability of AREVA's licensing methods to BEN in the EPU operating domain is provided in AREVA technical report, ANP-2680P, Revision 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information.

Applicability of these methods to the ATRIUM I10XM fuel design in the current operating domain is provided in ANP-2680P Revision 2, Supplement 1P.AREVA considers portions of the information provided in Attachment 34 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
35. Therefore, on behalf of AREVA, TVA requests that Attachment 34 be withheld from public disclosure in accordance with the AREVA affidavit and the provisions of 10 CFR 2.390.

U. S. Nuclear Regulatory Commission CNL-15-1 69 Page 11 September 21, 2015 Attachment 35 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 1OXM Fuel for Extended Power Uprate (non-proprietary)

Attachment 36 ANP-2637, Boiling Water Reactor Licensing Methodology Compendium (non-proprietary)

Attachment 36 is a compendium of AREVA fuel-related methodologies and design criteria that are described in licensing topical reports that the NRC has found acceptable for referencing in boiling water reactor (BWR) licensing applications.

This compendium provides a concise, organized source for NRC-approved, AREVA topical reports for BWR fuel-related applications.

Attachment 37 ANP-3409P, Fuel-Related Emergent Regulatory Issues (proprietary)

Attachment 37 addresses two emergent regulatory issues: 1) Proposed new criteria for the postulated LOCA in 10 CFR 50.46c; and 2) Proposed changes to the acceptance criteria for the reactivity initiated accident in NUREG-0800, U.S. Nuclear Regulatory Commission, Standard Review Plan, Section 4.2, Fuel System Design.At present these items are not regulatory requirements and therefore are not included in the current licensing basis for BFN.However, because both issues represent potential changes to regulatory requirements that may become effective during the NRC staff's review of this LAR, the potential effect of their adoption on the BFN EPU into regulatory requirements is being addressed.

AREVA considers portions of the information provided in Attachment 37 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by AREVA, is provided in Attachment

51. A non-proprietary version of the document is provided in Attachment
38. Therefore, on behalf of AREVA, TVA requests that Attachment 37 be withheld from public disclosure in accordance with the ARE VA affidavit and the provisions of 10 CFR 2.390.Attachment 38 ANP-3409NP, Fuel-Related Emergent Regulatory Issues (non-proprietary)

U. S. Nuclear Regulatory Commission CNL-1 5-1 69 Page 12 September 21, 2015 Attachment 39 RHR Heat Exchanger K-values Utilized in EPU Containment Analyses Attachment 39 provides a review of Residual Heat Removal (RHR)heat exchanger K-values used in the containment analyses for postulated events under EPU conditions.

Because K-values may differ for design basis and special events based on certain assumptions and initial conditions, Attachment 39 provides the basis for these determinations.

RHR heat exchanger K-values used in the containment analyses are identified for each event described in the applicable PUSAR section.Attachment 40 Steam Dryer Analysis Report (proprietary)

Attachment 40 is GEH engineering report, NEDC-33824P, Browns Ferry Replacement Steam Dryer Stress Analysis, which documents the stress analyses for the replacement steam dryer (RSD) for each of the three BEN units. The analyses demonstrate that the RSDs will maintain structural integrity during normal plant operation and under transient and accident conditions.

A power ascension test plan for the initial cycle of EPU operation at all three BFN units is presented.

The structural analyses and power ascension monitoring program provide assurance that the BEN RSDs will maintain structural integrity during normal operation and under transient and accident conditions for the design life of each RSD.GEH considers portions of the information provided in Attachment 40 of this LAR to be proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. An affidavit for withholding information, executed by GEH, is provided in Attachment

50. A non-proprietary version of the document is provided in Attachment
41. Therefore, on behalf of GEH, TVA requests that Attachment 40 be withheld from public disclosure in accordance with the GEH affidavit and the provisions of 10 CFR 2.390.Attachment 41 Steam Dryer Analysis Report (non-proprietary)

Attachment 42 Supplemental Environmental Report Attachment 42 is the Supplemental Environmental Report (ER) for the EPU of BFN Units 1, 2, and 3. The ER provides an assessment of the environmental impacts of the proposed increase in power output and supports a conclusion that EPU will not result in any significant additional impacts.

U. S. Nuciear Regulatory Commission CNL-1 5-169 Page 13 September 21, 2015 Attachment 43 Transmission System Stability Evaluation Attachment 43 provides the results of the BFN transmission system stability evaluation.

This study evaluated the impact of BEN operation at EPU conditions with respect to continued compliance with 10 CFR Part 50, Appendix A, General Design Criterion (GDC)-17, Electric Power Systems. The study assumed three unit operation at a maximum power output of 1,318 MWe (each unit)based on a heat balance calculation (optimum main condenser vacuum).Attachment 43 documents load flow analysis of the offsite power supply considering various pre-event outages and a subsequent plant design basis event LOCA. The analysis demonstrates that BEN will continue to meet GDC-17 requirements while operating'at EPU conditions, and the offsite power system has the capacity and capability to supply power to safety loads and required equipment.

Because Attachment 43 contains critical energy infrastructure information that is considered sensitive, unclassified (non-safeguard) information, TVA requests that it be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390(d)(1).

Attachment 44 Probabilistic Risk Assessment Attachment 44 provides the results of the assessment of the effect of EPU on risk as characterized as a change in the core damage frequency (CDF) and large early release frequency (LERF). In assessing these changes, TVA followed the guidelines of Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, to determine the resultant risk acceptance region.Attachment 45 Flow Induced Vibration Analysis and Monitoring Program Attachment 44 provides a detailed discussion of the analyses and testing program undertaken to provide assurance that unacceptable flow induced vibration issues are not experienced at BEN due to EPU implementation for affected piping systems.Attachment 46 Startup Test Plan Attachment 46 describes the testing TVA will perform following the EPU implementation outages at BFN Units 1, 2, and 3 (i.e., refueling outages scheduled for Spring 2018, Fall 2018, and Spring 2019 for Units 3, 1, and 2, respectively).

Following each of these outages, TVA will conduct a comprehensive EPU startup test program to ensure the safe operation of each plant. Attachment 46 describes the test program.

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 14 September 21, 2015 Attachment 47 List and Status of Plant Modifications Attachment 47 provides a list, description, and implementation schedule of plant modifications completed or planned to support EPU for BEN Units 1, 2 and 3.Attachment 48 NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (with redline/strike out)Attachment 48 provides a redline/strikeout version of the RS-001 safety evaluation template consistent with the BEN Units 1, 2, and 3 design basis.Attachment 49 NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (retyped)Attachment 49 provides a clean version of the RS-001 safety evaluation template, incorporating all the redline/strikeout changes.Attachment 50 Affidavits

-GE-Hitachi Nuclear Energy Americas LLC Attachment 51 Affidavits -AREVA Inc. \Attachment 52 Affidavit

-Electric Power Research Institute TVA has determined that there are no significant hazards considerations associated with the proposed changes and that the TS changes qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51 .22(c)(9).

Additionally, in accordance with 10 CFR 50.91 (b)(1), TVA is sending a copy of this letter and the enclosure to the Alabama State Department of Public Health.The BFN Plant Operations Review Committee and the TVA Nuclear Safety Review Board have reviewed this proposed change and determined that operation of BFN in accordance with the proposed change will not endanger the health and safety of the public.TVA requests approval of these proposed TS changes within 24 months of the date of this letter. The requested review period is consistent with NRC guidance and supports plans for implementation coincident with refueling outages. Once approved, the amendments will be fully implemented within 90 days of completion of refueling outages scheduled for Spring 2018, Fall 2018, and Spring 2019 for Units 3, 1, and 2, respectively.

These implementation periods will provide adequate time for the installation of required modifications supporting power uprate and revision of the affected station documentation in accordance with the appropriate change control mechanisms.

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 15 September 21, 2015 There are no new regulatory commitments associated with this submittal.

If there are any questions or if additional information is needed, please contact Mr. Edward D.Schrull at (423) 751-3850.I declare under penalty of perjury that the foregoing is true and correct. Executed on the 21st day of September 2015.RespectfulIly, J. W. Se V~ce Presid ent, Nuclear Licensing

Enclosure:

Discussion of Changes, No Significant Hazards Considerations, and Environmental Considerations Attachments:

1. List of Regulatory Commitments
2. Proposed Technical Specification Changes (Markups)3. Retyped Proposed Technical Specification Changes 4. Proposed Technical Specification Bases Changes (Markups)5. Retyped Proposed Technical Specification Bases Changes 6. NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (proprietary)
7. NEDO-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate (non-proprietary)
8. ANP-3403P, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (proprietary)
9. ANP-3403NP, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3 (non-proprietary)
10. ANP-3377P, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 1 0XM Fuel (EPU) (proprietary) i1. ANP-3377NP, Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM 10OXM Fuel (EPU) (non-proprietary)
12. ANP-3378P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU) (proprietary)
13. ANP-3378NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU) (non-proprietary)
14. ANP-3384P, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-i10 Fuel (EPU) (proprietary)

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page. 16 September 21, 2015 15. ANP-3384NP, Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU) (non-proprietary)

16. ANP-3342P, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (proprietary)
17. ANP-3342NP, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design (non-proprietary)
18. ANP-3372P, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design (proprietary)
19. ANP-3372NP, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design (non-proprietary)
20. ANP-3404P, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (proprietary)
21. ANP-3404NP, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate (non-proprietary)
22. ANP-3343P, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel (proprietary)
23. ANP-3343NP, Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel (non-proprietary)
24. ANP-3386P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies (proprietary)
25. ANP-3386NP, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies (non-proprietary)
26. ANP-3385P, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-l0 Fuel Assemblies (proprietary)
27. ANP-3385NP, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies (non-proprietary)
28. ANP-3388P, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (proprietary)
29. ANP-3388NP, Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate (non-proprietary)
30. ANP-3327P, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (proprietary)
31. ANP-3327NP, Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU (non-proprietary)
32. FS1-001 9629, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (proprietary)
33. FS1-0019630, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology (non-proprietary)

U. S. Nuclear Regulatory Commission CNL-1 5-169 Page 17 September 21, 2015 34. ANP-2860P Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate (proprietary)

35. ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 -Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate (non-proprietary)
36. ANP-2637, Boiling Water Reactor Licensing Methodology Compendium (non-proprietary)
37. ANP-3409P, Fuel-Related Emergent Regulatory Issues (proprietary)
38. ANP-3409NP, Fuel-Related Emergent Regulatory Issues (non-proprietary)
39. RHR Heat Exchanger K-values Utilized in EPU Containment Analyses 40. Steam Dryer Analysis Report (proprietary)
41. Steam Dryer Analysis Report (non-proprietary)
42. Supplemental Environmental Report 43. Transmission System Stability Evaluation
44. Probabilistic Risk Assessment
45. Flow Induced Vibration Analysis and Monitoring Program 46. Startup Test Plan 47. List and Status of Plant Modifications
48. RS-001 SE Template GDC Markup (with redline/strike out)49. RS-001 SE Template GDC Markup (retyped)50. Affidavits

-GE-Hitachi Nuclear Energy Americas LLC 51. Affidavits

-ARE VA Inc.52. Affidavit

-Electric Power Research Institute cc (Enclosure):

NRC Regional Administrator

-Region II NRC Senior Resident Inspector

-Browns Ferry Nuclear Plant State Health Officer, Alabama State Department of Public Health (w/o Attachments 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43)

The enclosed cover letter is for reference only. The disc includes the pdf.version of the signed letter.The files listed below are contained on the enclosed disc. The files highlighted in yellow and containing NPUB following the file number, (e.g., 009 NPUB BFN EPU...)are considered to be proprietary and should be withheld from public disclosure under 10 CFR 2.390.For convenience from the cover letter: Proprietary Information and Critical Energy Infrastructure Information Withhold from Public Disclosure Under 10 CFR 2.390 This letter is decontrolled when separated from Attachments 6, 8 10, 12, 14, 16 18, 20, 22, 24, 26, 28, 30, 32, 34, 37, 40, and 43 Thanks Carla Edmondson Executive Management Assistant to J. W. Shea, VP Nuclear Licensing cedmondson~tva.gov 423-751-2638 PUB C~NL-l5-16g BFN [PU LAR Co,'er Letter002 PUB BFN EPU LAR Enclosure~A003 PUB BEN EPU LARAtti1-List of Reg Commitments004 PUB BFN E PU [AR Aft 2-TS Markups Part io d2005 PUB BEN [PU LAR Att 2-TS Mabrkup~s Part2 of 2006 PUB BFN [PU LAR AII3-Retyped TS Changes S007 PUB BEN [PU LAR Af't 4-Proposedl TS Bases Mark~ups S008 PUB BEN EPU LAR Aft 5-etyped IS Bases ChangesNPUB BEN, [PU LAB Att 6-N[D033860P-PUSAR,010 PUB BFN [PU LAR Alt 7-NEDO-3386]0011 NPUB BEN [PU LAPB At8-.NP-3403P-FUSAR012 PUB BFN [PU [AR Alt 9-ANP-3'403NP-FUSAR013 NPUB BEN EPU [AR Alt 10-ANP-33T7P S014 PUB BFN [PU [AR Alt li-ANP-337NP S015 NPUB BFN [PU LAB At 2-ANP-3378P S016 PUB BEN [PU LAB Alt 13-ANP-3378NP017 NPUB BFN [PU [AR Al 14AP-3~4018 PUB BFN [PU LAR Alt 1.-ANP-3384NP S019 r, PUB BFN [PU [AR Attl6-A NP-33,42P020 PUB BEFN EPU [AR, Alt 17-ANP-3342NP021! NPUB BEN E PU [AP, Aft 18-ANP-3372P022 PUB BEN [PU [AR Aft lg-ANP-3372NP023 NPUB BFN [PU [AR Alt 20-ANP-3404P S024 PUB BEN [PU [AR` Aft 1.-ANP-3404NP S025 NPUB BEN [PU [AR Alt 22-ANP-3343P026 PUB BEN EPU [AR Aft 23-,A, P-3343NP~~027 NPUB BFN [PU [AR Aft 24-ANP-3386P028 PUB BFN EPU [AR Alt 25-ANP-3386NP02.9 NPUB BEN [PU LAB, Alt 26-ANP-3385P S030 PUB BEN [PU [AP, Aft 27-ANP -3385 NP S031 NPUB BEN [PU [AR, Af 2-ANP-3388P S032 PUB BFN [PU [AR` -ANP-3383NP

~4033 NPUB BEN [PU [ARAft ANP-3327P034 PUB BEN E PU [AR Alt 31-ANP-332?NP S035 NPUB BEN [PU [ARft32-ES1-001g629 1 :O5 P.A~7:45 AI~tANIuils 7'465 AlM Sb % '1_S 7:'4' AK;I 0i4221201.5 7:46 AMA 9,"22i20L1 7:8i g~2'O! 7:r l, '0!22!2C'i5 7:43 41,4 2'"22!2015 7:49,AM:7:4Sq A 1 ,4 0,22.201.5 9.,"22/201.5 7:40 AlA,'2.u2,.20:i.5 7:55 ,AlA 5bi'22/201.5 7:50 AlAt o,"22;i017:50 AMb'0u/22/015 7:50 AMA 072.20153 7:50 AMk'09/2/015?

4:1,[,4 Sb22 2015 7:51 AlA,;Ad oble Acob at D,,, A,.ob,..,Aroblt O,..AdiobeAciobat U,,, Adobe Ac'o~bat D,,, Adobe Acrobt U.,, Adobe. Acrobt.a U,,.,doi:e krba t Adobe Acrobat Ox,,, Adobe &,robat O,,..dobe.Acrobat x,., A~do~be .A~cobat D,,, Adobe Acrobat D,..Adobe A.,:robat RI,,, Adobe. Acrobat Ox,,, AdobeAczrobat O ....Adobee Acrobat U',,, Ad obte Acro bat U,,, Adobe icrobat O,,,

U,,, Adobe Acrobt;at U,,, Ado~be Acroboat U.., Adobe Acrobat U,,..Adobe Acrof~t U,,, A#dobe Acrobat D,,, Adobe Acrobat U,., Adobe Acrobat D,,, Adco be Acrobat O,,, Ad~o be Ac:robat U,,, AdobLe Acrobat D,,, Adobe Acro~bat U.,,, Adobe:crobat D,,, Ad:obe Acrobat .,,, 446 KB 132 KB 53 KB, 31,757 KB 440'KB.623 KB Ky38 KB, 5:i254 KB LWA. KB: 2,508 KB 2.071 KB: 2.066S KB 2,1330 KB.,KB.2 ,46 KB 1,770 KB 1,367 KB!l4SS KB 1,422 KB 1,.470 KB.2,070 KB 2,153 KB 5,,2i56 KB 7 33 OKB 3,57.5 K.B 330, KB, 1,023 KB 673 KB 610 KB 607 KB 0,67 KBKB_5.061 KB 036 PUB BFNl EPU LARI Att 33-FS1-001963,0 037 N4PUB BFN', EPU LAR Att 34-ANP-2860P

~J038 PUB BFN', EPU LAR~gtt35-ANP-2860NP 039 PUB BFII4 EPU LAR Att 3-ANP-2637040 l[1PUB BFN, EPU LAR, tt37-4NP-3'409P041 PUB BFN EPU LAB Aft

~i042 PUB BFN EPU L.B Att 39-RHR H-X 043 NPUB BFIN, FPU LAB ktt 4J-NIEDC33B24P-Part1 Gf 6~2044 NPUB EPU Lb1,, kit 4J-tEDC33824P-ApA Part 2,,,..045 N',PUB EPUJ LA Aft 1-EDC33824P-ApB Part 3..,046 NPUB EPUt LAPA~tti:-NEDC3J824P-ApC Part 4.,.47 NJPUB BFNI EPU' LAB Aft 40-NEO(C33824P-A.pD Part5..,, S0'48 NIPUE. BFIi EPU LA. Aft 40-NIEBC33,824P-ApE Part 6,,049 PUB BFNl EPU LAP..Att 41-NEDO-33824 L0.50 PUB BFN EPU LAB Att 42-Supp Env Report051 NPUB BFN EPU LAB Aft 43-Trans Stabilt? Stud 1 ,052 PUB BFN EPU LABRAtt. 4'4-PRA~J053 PUB BFN EPU LAB tt 4.5-FI2I Analysi Monitor Prg05,4 PUB BFN EPU LP,. Ait Teft Plan 2055 PUB BFN EPU LAR Aft 47-List of Plant Mods0.56 PUB BFN FPU LAR Aft 48-SE Termplate ODC M,,arkup057 PUB BFNI EPU LAB At 49-SE Template GDC Markup ,~J058 PUB BFN EPU LAB.Aft.50-GEH Affidavits059 PUB BFN EPU LAB Af 51-kreva 060 PUB BFN EPU LAB Aft 52-EPRI Affidavit.... .... I,., .. .. .. -...-..-.."h~ j,1 "L -.7 /-- ',..l ."t '!-,' "!: ? i.. I.,-, LJIL-.(V *-. .I.1-i-..-i4mI~ F.I CI~. I;~~~I C ~ s~~:IcIC~t

~ArC -..~4 I ' ..4F.qL '....L . I:'.k.,..