ML060750569

From kanterella
Jump to navigation Jump to search
February 2006 Monthly Operating Report for Virgil C. Summer Nuclear Station
ML060750569
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/13/2006
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060750569 (5)


Text

I Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214

_SCE"&Ge A SCANA COMPANY' March 13, 2006 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 FEBRUARY MONTHLY OPERATING REPORT Enclosed is the February 2006 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call Mr. Robert G. Sweet, (803) 345-4080, at your convenience.

Very truly ours, e dy B. ,Archie JBA/mbb Attachment c: S. A. Byrne (email) W. R. Higgins (email)

T. D. Gatlin (email) INPO Records Center J. H. Hamilton (email) J&H Marsh & McLennan R. J. White (email) William G. Wendland (ANI)

W. D. Travers Pat Haught (Westinghouse)

R. E. Martin C. W. Adams (email)

G. A. Lippard (email) NSRC (email)

NRC Resident Inspector (email) CER (L-99-0350-1)

K. M. Sutton File (818.03-1, RR4100)

Paulette Ledbetter (email) DMS (RC-06-0050)

SCEUG I Virgil C.Summer Nuclear Station

  • T(803) 345.5209 . www.scona.com

-7:17EDq

Director, Office of Resource Management February Monthly Operating Report RC-06-0050 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE March 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 February 2006 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mxve-Net) (Mwe-Net) 1 988 17 987 2 987 18 988 3 988 19 988 4 988 20 988 5 987 21 989 6 987 22 990 7 987 23 989 8 987 24 989 9 987 25 980 10 987 26 990 11 987 27 989 12 987 28 989 13 986 14 986 15 987 16 986

Director, Office of Resource Management February Monthly Operating Report RC-06-0050 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE March 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 OPERATING STATUS I Reporting Period: February 2006 Gross Hours in Reporting Period: 672 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 672.0 1416.0 164514.4 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 672.0 1416.0 162412.7 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 1946142 4101692 443068333 10 Gross Electrical Energy (MWH) 689770 1453840 150681409 11 Net Electrical Energy Generated (MWH) 663603 1398155 144113684 12 Reactor Service Factor 100.0 100.0 84.7 13 Reactor Availability Factor 100.0 100.0 84.7 14 Unit Service Factor 100.0 100.0 83.6 15 Unit Availability Factor 100.0 100.0 83.6 16 Unit Capacity Factor (Using MDC) 102.2 102.2 81.0 17 Unit Capacity Factor (Using Design) 101.5 101.5 79.9 18 Unit Forced Outage Rate 0.0 0.0 2.9 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

N/A 20 If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 21 Units in Test Status (Prior to Commercial Operation): N/A

Director, Office of Resource Management February Monthly Operating Report RC-06-0050 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE March 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 February 2006 NO. DATE T(PE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None 1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management February Monthly Operating Report RC-06-0050 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE March 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 February 2006 V. C. Summer Station operated at full power for the entire month of February.