ML022310260

From kanterella
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1
ML022310260
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/12/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022310260 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY August 12, 2002 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 JULY MONTHLY OPERATING REPORT Enclosed is the July 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c:

G. H. Halnon T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-02-0137)

SCE&G I Virgil C. Summer Nuclear Station - P. 0. Box 88. Jenkinsville, South Carolina 29065 *T (803) 345.5209

  • www.scana.com
-:, jrý -

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE July 2002 AVERAGE DAILY POWER LEVEL (Mwe-Net) 976 974 973 973 974 971 972 972 970 969 968 969 970 969 970 970 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 50/395 V. C. SUMMER I August 2,2002 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (Mwe-Net) 968 970 971 971 971 973 974 975 975 974 970 968 968 966 967 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I August 2,2002 W. H. BELL (803) 345-4389 OPERATING STATUS 1

Reporting Period:

July 2002 Gross Hours in Reporting Period:

2 Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3 Power Level to Which Restricted (If Any) (MWe-Net):

4 Reasons for Restrictions:

THIS MONTH YR TO DATE Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Using Design)

Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155930 751740 722433 100.0 100.0 100.0 100.0 100.5 99.8 0.0 4027.0 0.0 3973.0 0.0 11305172 3955120 3802403 79.2 79.2 78.1 78.1 77.4 76.8 1.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A CUMULATIVE 135476.3 0.0 133597.4 0.0 360191580 121503869 116073584 83.2 83.2 82.0 82.0 78.6 77.5 3.2 744 2900 966 972.7 N/A N/A 5

6 7

8 9

10 11 12 13 14 15 16 17 18

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE August 2,2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 July 2002 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I August 2,2002 W. H. BELL (803) 345-4389 July 2002 V. C. Summer Station operated at 100% power for the entire month of July 2002.