ML022310260

From kanterella
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1
ML022310260
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/12/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022310260 (5)


Text

Stephen A. Byrne Senior Vice President,Nuclear Operations 803.345.4622 A SCANA COMPANY August 12, 2002 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 JULY MONTHLY OPERATING REPORT Enclosed is the July 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c: G. H. Halnon Paulette Ledbetter T. G. Eppink (w/o Attachment) INPO Records Center R. J. White J&H Marsh & McLennan L. A. Reyes William G. Wendland (ANI)

K. R. Cotton Pat Haught (Westinghouse)

T. D. Gatlin RTS (0-L-99-0350-1)

NRC Resident Inspector File (818.03-1, RR 4100)

K. M. Sutton DMS (RC-02-0137)

-:,jrý-

SCE&G I Virgil C.Summer Nuclear Station - P.0. Box 88 . Jenkinsville, South Carolina 29065 *T (803) 345.5209

  • www.scana.com

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE August 2,2002 COMPLETED W. H. BELL BY TELEPHONE (803) 345-4389 July 2002 AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL DAY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 976 17 968 2 974 18 970 3 973 19 971 4 973 20 971 5 974 21 971 6 971 22 973 7 972 23 974 8 972 24 975 9 970 25 975 10 969 26 974 11 968 27 970 12 969 28 968 13 970 29 968 14 969 30 966 15 970 31 967 16 970

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE August 2,2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS 1 Reporting Period: July 2002 Gross Hours in Reporting Period: 744 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 744.0 4027.0 135476.3 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 744.0 3973.0 133597.4 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 2155930 11305172 360191580 10 Gross Electrical Energy (MWH) 751740 3955120 121503869 11 Net Electrical Energy Generated (MWH) 722433 3802403 116073584 12 Reactor Service Factor 100.0 79.2 83.2 13 Reactor Availability Factor 100.0 79.2 83.2 14 Unit Service Factor 100.0 78.1 82.0 15 Unit Availability Factor 100.0 78.1 82.0 16 Unit Capacity Factor (Using MDC) 100.5 77.4 78.6 17 Unit Capacity Factor (Using Design) 99.8 76.8 77.5 18 Unit Forced Outage Rate 0.0 1.0 3.2 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation): N/A

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE August 2,2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 July 2002 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management July Monthly Operating Report RC-02-0137 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE August 2,2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 July 2002 V. C. Summer Station operated at 100% power for the entire month of July 2002.