March 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1
ML021130340
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/09/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021130340 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 April 9, 2002 A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 MARCH MONTHLY OPERATING REPORT Enclosed is the March 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/nkk Attachment c:

G. H. Halnon T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes G. E. Edison T. D. Gatlin NRC Resident Inspector K. M. Sutton W. R. Higgins Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-02-0058)

SCE&G I Virgil C. Summer Nuclear Station

  • www.scana.om i

Director, Office of Resource Management March Monthly Operating Report RC-02-0058 Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MARCH 2002 DAY AVERAGE DAILY POWER LEVEL DAY (MWe-Net) 1 980 17 2

981 18 3

980 19 4

980 20 5

979 21 6

980 22 7

980 23 8

980 24 9

982 25 10 981 26 11 978 27 980 980 980 979 980 28 29 30 31 50/395 V. C. SUMMER I 04/02/2002 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (MWe-Net) 979 978 979 980 979 977 976 977 982 980 979 979 979 980 980 12 13 14 15 16

Director, Office of Resource Management March Monthly Operating Report RC-02-0058 Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I 04/02/2002 W. H. BELL (803) 345-4389 OPERATING STATUS

1.

Reporting Period:

Gross Hours in Reporting Period:

2.

Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3.

Power Level to Which Restricted (If Any) (MWe-Net):

4.

Reasons for Restrictions:

THIS MONTH March 2002 744 2900 966 972.7 N/A N/A YR TO DATE CUMULATIVE Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Design MWe)

Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155451 756660 728693 100.0 100.0 100.0 100.0 101.4 100.7 0.0 2160.0 0.0 2160.0 0.0 6255919 2197060 2115765 100.0 100.0 100.0 100.0 101.4 100.7 0.0

19.

Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

13th Refueling Outage - April 20, 2002 - 33 Day Duration

20.

If Shut Down at End of Report Period, Estimated Date of Startup:

21.

Units in Test Status (Prior to Commercial Operation):

133609.3 0.0 131784.4 0.0 355142327 119745809 114386946 83.5 83.5 82.4 82.4 79.0 77.9 3.2 N/A N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

Director, Office of Resource Management March Monthly Operating Report RC-02-0058 Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 04/02/2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 MARCH 2002 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1.0 REASON A:

Equipment Failure B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error H:

Other (Explain) 2.0 METHOD 1 :

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Continuation (Use initial Date) 5:

Power Reduction (Duration 0.0) 9:

Other (Explain)

Director, Office of Resource Management March Monthly Operating Report RC-02-0058 Page 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I 04/02/2002 W. H. BELL (803) 345-4389 MARCH 2002 V. C. Summer Station operated at 100% power for the entire month of March, 2002.