September 2003 Monthly Operating Report for Virgil C. Summer, Unit 1
ML032940583
Person / Time
Site: Summer 
(NPF-012)
Issue date: 10/13/2003
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032940583 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY OCT 1 3 M0 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 SEPTEMBER MONTHLY OPERATING REPORT Enclosed is the September 2003 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c:

J. B. Archie T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-03-0213)

SCE&G I Virgil C. Summer Nuclear Station

  • P. O. Box 88. Jenkinsville, South Carolina 29065.T (803) 345.5209.www.scana.com

'-e-ZA

Director, Office of Resource Management September Monthly Operating Report RC-03-021 3 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE October 2, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 September 2003 AVERAGE DAILY POWER LEVEL DAY DAY I

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 (Mwe-Net) 970 970 971 972 970 972 972 972 973 973 972 973 973 975 975 974 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL (Mwe-Net) 975 975 976 976 977 976 977 975 976 976 975 975 977 977

Director, Office of Resource Management September Monthly Operating Report RC-03-021 3 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE October 2, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS I

Reporting Period:

September 2003 Gross Hours in Reporting Period:

720 2

Currently Authorized Power Level (MWt):

2900 Max. Depend. Capacity (MWe-Net):

966 Design Electrical Rating (MWe-Net):

972.7 3

Power Level to Which Restricted (If Any) (MWe-Net):

N/A 4

Reasons for Restrictions:

N/A THIS MONTH YR TO DATE CUMULATIVE 5

6 7

8 9

10 11 12 13 14 15 16 17 18 Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Using Design)

Unit Forced Outage Rate 720.0 0.0 720.0 0.0 2085783 729550 701307 100.0 100.0 100.0 100.0 100.8 100.1 0.0 6482.7 0.0 6476.5 0.0 18734818 6580600 6324819 99.0 99.0 98.9 98.9 99.9 99.3 1.1 145632.0 0.0 143746.9 0.0 389564599 131806489 125975518 84.1 84.1 83.0 83.0 80.0 78.9 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refueling Outage, October 11, 2003, 36 Days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management September Monthly Operating Report RC-03-021 3 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE October 2, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 September 2003 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management September Monthly Operating Report RC-03-021 3 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE October 2, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 September 2003 V. C. Summer Station operated at 100% power for the entire month of Septembert, 2003.