October 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station
ML023250143
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/12/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023250143 (5)


Text

Stephen A. Byrne Senior Vice President,Nuclear Operations 803.345 4622 A SCANA COMPANY November 12, 2002 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 OCTOBER MONTHLY OPERATING REPORT Enclosed is the October 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c: G. H. Halnon Paulette Ledbetter T. G. Eppink (w/o Attachment) INPO Records Center R. J. White J&H Marsh & McLennan L. A. Reyes William G. Wendland (ANI)

K. R. Cotton Pat Haught (Westinghouse)

T. D. Gatlin RTS (0-L-99-0350-1)

NRC Resident Inspector File (818.03-1, RR 4100)

K. M. Sutton DMS (RC-02-0199)

SCE&G I Virgil C.Summer Nuclear Station

  • P.O. Box 88 *Jenkinsville, South Carolina 29065T1(803)345.5209 °www.scana cam

Director, Office of Resource Management October Monthly Operating Report RC-02-0199 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 6, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 October 2002 AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL DAY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 972 17 977 2 973 18 976 7-3 974 19 977 4 973 20 977 5 974 21 977 6 973 22 977 7 973 23 977 8 974 24 977 9 974 25 978 10 975 26 979 11 974 27 979 12 974 28 978 13 975 29 978 14 975 30 977 15 976 31 976 16 976

Director, Office of Resource Management October Monthly Operating Report RC-02-0199 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 6, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS 1 Reporting Period: October 2002 Gross Hours in Reporting Period: 745 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE Number of Hours Reactor Critical 745.0 6236.0 137685.3 5

6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 745.0 6182.0 135806.4 Unit Reserve Shutdown Hours 0.0 0.0 0.0 8

9 Gross Thermal Energy Generated (MWH) 2158447 17703553 366589961 10 Gross Electrical Energy (MWH) 756150 6185130 123733879 11 Net Electrical Energy Generated (MWH) 726870 5945688 118216869 12 Reactor Service Factor 100.0 85.5 83.4 100.0 85.5 83.4 13 Reactor Availability Factor 100.0 84.7 82.3 14 Unit Service Factor Unit Availability Factor 100.0 84.7 82.3 15 16 Unit Capacity Factor (Using MDC) 101.0 84.4 78.9 17 Unit Capacity Factor (Using Design) 100.3 83.8 77.8 18 Unit Forced Outage Rate 00 0.6 3.2 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

'None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation): N/A

I,;,- *-?'*

Director, Office of Resource Management October Monthly Operating Report RC-02-0199 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 6, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 October 2002 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain) j

SUMMARY

Director, Office of Resource Management October Monthly Operating Report RC-02-0199 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 6, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 October 2002 V. C. Summer Station operated at 100% power for the entire month of October, 2002.