December 2005 Monthly Operating Report for V C Summer Unit 1
ML060170326
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/11/2006
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060170326 (5)


Text

'.

Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 A SCANA COMPANY January 11, 2006 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 DECEMBER MONTHLY OPERATING REPORT Enclosed is the December 2005 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call Mr. Robert G. Sweet, (803) 345-4080, at your convenience.

Very trig yours, I J y B Archie JBA/mbb Attachment c: S. A. Byrne (email) W. R. Higgins (email)

T. D. Gatlin (email) INPO Records Center T. G. Eppink (email) J&H Marsh & McLennan R. J. White (email) William G. Wendland (ANI)

W. D. Travers Pat Haught (Westinghouse)

R. E. Martin C. W. Adams (email)

G. A. Lippard (email) NSRC (email)

NRC Resident Inspector (email) CER (L-99-0350-1)

K. M. Sutton File (818.03-1, RR 4100)

Paulette Ledbetter (email) DMS (RC-06-0004)

SCE&G I Virgil C.Summer Nuclear Station

  • P.0.Box 88
  • T(803) 345.5209 . www.scana.com

Director, Office of Resource Management December Monthly Operating Report RC-06-0004 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE January 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 December 2005 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net)

I 988 17 987 2 987 18 988 3 987 19 987 4 987 20 986 5 989 21 987 6 987 22 987 7 988 23 987 8 987 24 987 9 987 25 987 10 987 26 987 11 988 27 987 12 988 28 987 13 987 29 988 14 986 30 987 15 986 31 987 16 987

Director, Office of Resource Management December Monthly Operating Report RC-06-0004 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE January 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 3454812 OPERATING STATUS I Reporting Period: December 2005 Gross Hours in Reporting Period: 744 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 744.0 7787.8 163098.4 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 744.0 7746.9 160996.7 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 2155400 22028476 438966641 10 Gross Electrical Energy (MWH) 764020 7774380 149227569 11 Net Electrical Energy Generated (MWH) 734480 7469400 142715529 12 Reactor Service Factor 100.0 88.9 84.6 13 Reactor Availability Factor 100.0 88.9 84.6 14 Unit Service Factor 100.0 88.4 83.5 15 Unit Availability Factor 100.0 88.4 83.5 16 Unit Capacity Factor (Using MDC) 102.2 88.3 80.8 17 Unit Capacity Factor (Using Design) 101.5 87.7 79.8 18 Unit Forced Outage Rate 0.0 0.7 3.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

N/A 20 If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 21 Units in Test Status (Prior to Commercial Operation): N/A

Director, Office of Resource Management December Monthly Operating Report RC-06-0004 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 501395 UNIT V. C. SUMMER I DATE January 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 December 2005 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None 1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management December Monthly Operating Report RC-06-0004 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE January 3, 2006 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 December 2005 V. C. Summer Station operated at full power for the entire month of December.