August 2004 Monthly Operating Report for Virgil C Summer Nuclear Station
ML042600338
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/09/2004
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042600338 (5)


Text

A SCA O

A SCANA COMPANY Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 September 9, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 AUGUST MONTHLY OPERATING REPORT Enclosed is the August 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

y yours, ey B. A JBA/mbb Attachment c:

T. D. Gatlin T. G. Eppink (w/o Attachment)

R. J. White W. D. Travers K. R. Cotton G. A. Lippard NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-04-0149)

I q L

SCE&G I Virgil C Summer Nuclear Station

  • P.O. Box 88. Jenkinsville, South Corolina 29065. T(803) 345.5209 *wwwscano.com

Director, Office of Resource Management August Monthly Operating Report RC-04-0149 Page 1 of 4 DAY I

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE August 2004 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 972 17 971 18 972 19 972 20 972 21 973 22 974 23 974 24 975 25 975 26 975 27 975 28 975 29 974 30 975 31 975 50/395 V. C. SUMMER I September 2, 2004 T. V. Dao (803) 345-4812 AVERAGE DAILY POWER LEVEL (Mwe-Net) 976 976 975 976 976 976 975 976 975 975 974 975 975 975 976

Director, Office of Resource Management August Monthly Operating Report RC-04-01 49 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I September 2, 2004 T. V. Dao (803) 345-4812 OPERATING STATUS 1

Reporting Period:

Gross Hours in Reporting Period:

2 Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3 Power Level to Which Restricted (If Any) (MWe-Net):

4 Reasons for Restrictions:

August 2004 744 2900 966 972.7 N/A N/A THIS MONTH YR TO DATE CUMULATIVE 5

Number of Hours Reactor Critical 6

Reactor Reserve Shutdown Hours 7

Hours Generator On Line 8

Unit Reserve Shutdown Hours 9

Gross Thermal Energy Generated (MWH) 10 Gross Electrical Energy (MWH) 11 Net Electrical Energy Generated (MWH) 12 Reactor Service Factor 13 Reactor Availability Factor 14 Unit Service Factor 15 Unit Availability Factor 16 Unit Capacity Factor (Using MDC) 17 Unit Capacity Factor (Using Design) 18 Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155727 754350 724970 100.0 100.0 100.0 100.0 100.9 100.2 0.0 5577.2 0.0 5562.3 0.0 16084172 5668640 5447900 95.3 95.3 95.0 95.0 96.3 95.7 4.8 152381.7 0.0 150397.7 0.0 408700227 138545499 132450693 84.1 84.1 83.0 83.0 80.1 79.1 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management August Monthly Operating Report RC-04-0149 Page 3 of 4 ATTACHMENT IlIl UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE September 2, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 August 2004 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None I

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management August Monthly Operating Report RC-04-0149 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I September 2, 2004 T. V. Dao (803) 345-4812 August 2004 V. C. Summer Station operated at full power for the entire month of August.