April 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1
ML021430326
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/07/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021430326 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 May 7, 2002 A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 APRIL MONTHLY OPERATING REPORT Enclosed is the April 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment C:

G. H. Halnon T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes G. E. Edison T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-02-0084)

SCE&G I Virgil C. Summer Nuclear Station

  • P. 0. Box 88. Jenkinsville, South Carolina 29065 -T (803) 345.5209 *www.scana.com

Director, Office of Resource Management April Monthly Operating Report RC-02-0084 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE APRIL 2002 DAY AVERAGE DAILY POWER LEVEL DAY (MWe-Net) 1 979 16 2

980 17 3

979 18 4

978 19 5

978 20 6

978 21 7

978 22 8

980 23 9

979 24 10 978 25 11 978 26 12 978 27 13 978 28 14 979 29 15 979 30 50/395 V. C. SUMMER I 05/01/2002 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (MWe-Net) 978 974 829 783 1

0 0

0 0

0 0

0 0

0 0

Director, Office of Resource Management April Monthly Operating Report RC-02-0084 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I 05/01/2002 W. H. BELL (803) 345-4389 OPERATING STATUS

1.

Reporting Period:

Gross Hours in Reporting Period:

2.

Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3.

Power Level to Which Restricted (If Any) (MWe-Net):

4. Reasons for Restrictions:

THIS MONTH Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Design MWe)

Unit Forced Outage Rate 458.6 0.0 456.2 0.0 1297113 453830 436848 63.8 63.8 63.4 63.4 62.9 62.5 0.0

19. Shutdowns Scheduled Over Next 6 Months (Type, Date &

13th Refueling Outage - April 20, 2002 - 33 Day Duration YR TO DATE CUMULATIVE 2618.6 0.0 2616.2 0.0 7553032 2650890 2552613 91.0 91.0 90.9 90.9 91.8 91.2 0.0 134067.9 0.0 132240.6 0.0 356439441 120199639 114823794 83.4 83.4 82.3 82.3 78.9 77.8 3.2 Duration of Each):

20. If Shut Down at End of Report Period, Estimated Date of Startup:
21.

Units in Test Status (Prior to Commercial Operation):

May 22, 2002 N/A April 2002 719 2900 966 972.7 N/A N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

Director, Office of Resource Management April Monthly Operating Report RC-02-0084 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I 05/01/2002 W. H. BELL (803) 345-4389 APRIL 2002 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 04/20/2002 S

262.8 C

1 Complete Refueling 1.0 REASON A:

Equipment Failure B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error H:

Other (Explain) 2.0 METHOD 1 :

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Continuation (Use initial Date) 5:

Power Reduction (Duration 0.0) 9:

Other (Explain)

SUMMARY

Director, Office of Resource Management April Monthly Operating Report RC-02-0084 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I 05/01/2002 W. H. BELL (803) 345-4389 At the beginning of the month the plant was operating at 100% power. Power was reduced to 85% on April 17 th @ 23:55 to support main steam safety valve testing. On April 2 0 th @ 00:12 the 1 3th refueling outage began with the opening of the main generator breaker. Reactor shut down was completed and mode 3 entered at 02:33 on the 2 0th. The plant remained shut down for the remainder of the month.