ML043410078

From kanterella
Jump to navigation Jump to search
November 2004 Monthly Operating Report for Virgil C Summer Nuclear Station Unit 1
ML043410078
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/02/2004
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043410078 (5)


Text

A SCANA COMPANY Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 December 2, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 NOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, AZF4 Jeffrey B. Archie JBA/mbb Attachment c:

T. D. Gatlin T. G. Eppink (w/o Attachment)

R. J. White W. D. Travers K. R. Cotton G. A. Lippard NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams*

NSRC CER (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-04-0194)

SCE&G I Virgil (. Summer NuclearStoaion

  • P.0. Box 88.Jenkinsville, South Carolina 29065-T1(803) 345.5209.www.scona.com 62§f

4.

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 1 of 4 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE November 2004 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 985 17 985 18 984 19 985 20 986 21 986 22 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 AVERAGE DAILY POWER LEVEL (Mwe-Net) 986 987 987 987 987 988 987 987 987 987 987 987 987 987 986 987 986 986 986 987 987 986 986 986 23 24 25 26 27 28 29 30

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 OPERATING STATUS I

Reporting Period:

November 2004 Gross Hours in Reporting Period:

720 2

Currently Authorized Power Level (MWt):

2900 Max. Depend. Capacity (MWe-Net):

966 Design Electrical Rating (MWe-Net):

972.7 3

Power Level to Which Restricted (If Any) (MWe-Net):

N/A 4

Reasons for Restrictions:

N/A THIS MONTH YR TO DATE 5

Number of Hours Reactor Critical 6

Reactor Reserve Shutdown Hours 7

Hours Generator On Line 8

Unit Reserve Shutdown Hours 9

Gross Thermal Energy Generated (MWH) 10 Gross Electrical Energy (MWH) 11 Net Electrical Energy Generated (MWH) 12 Reactor Service Factor 13 Reactor Availability Factor 14 Unit Service Factor 15 Unit Availability Factor 16 Unit Capacity Factor (Using MDC) 17 Unit Capacity Factor (Using Design) 18 Unit Forced Outage Rate 720.0 0.0 720.0 0.0 2085933 738560 710207 100.0 100.0 100.0 100.0 102.1 101.4 0.0 7762.2 0.0 7747.3 0.0 22412852 7903080 7596594 96.5 96.5 96.4 96.4 97.8 97.1 3.5 CUMULATIVE 154566.7 0.0 152582.7 0.0 415028907 140779939 134599387 84.3 84.3 83.2 83.2 80.4 79.3 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refuel 15 is scheduled to start on 04/22/05 for a duration of 35 days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

501395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 November 2004 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None I

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 November 2004 V. C. Summer Station operated at full power for the entire month of November.