June 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station
ML032060475
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/07/2003
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032060475 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY July 7, 2003 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 JUNE MONTHLY OPERATING REPORT Enclosed is the June 2003 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byme SAB/mbb Attachment C:

G. H. Halnon T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-03-0136)

SCE&G I Virgil C. Summer Nuclear Station

  • T (803) 345.5209
  • wwc.sana.crom

Director, Office of Resource Management June Monthly Operating Report RC-03-01 36 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I July 2, 2003 W. H. BELL (803) 345-4389 June 2003 AVERAGE DAILY POWER LEVEL DAY DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)

(Mwe-Net) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 980 979 980 980 980 979 980 979 978 979 956 966 978 977 977 977 17 18 19 20 21 22 23 24 25 26

  • 27 28 29 30 976 976 976 976 962 977 976 976 973 977 976 975 976 976

Director, Office of Resource Management June Monthly Operating Report RC-03-01 36 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I July 2, 2003 W. H. BELL (803) 345-4389 OPERATING STATUS I

Reporting Period:

Gross Hours in Reporting Period:

2 Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3 Power Level to Which Restricted (If Any) (MWe-Net):

4 Reasons for Restrictions:

June 2003 720 2900 966 972.7 N/A N/A THIS MONTH YR TO DATE CUMULATIVE 5

6 7

8

.9 10 11 12 13 14 15 16 17 18 Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Using Design)

Unit Forced Outage Rate 720.0 0.0 720.0 0.0 2082613 730790 702520 100.0 100.0 100.0*

100.0 101.0 100.3 0.0 4274.7 0.0 4268.5 0.0 12337946 4344600 4175841 98.4 98.4 98.3 98.3 99.5 98.8 1.7 143424.0 0.0 141538.9 0.0 383167727 129570489 123826540 83.9 83.9 82.8 82.8 79.7 78.6 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refueling Outage, October 18, 2003, 36 Days 20 If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management June Monthly Operating Report RC-03-01 36 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE July 2, 2003 COMPLETED BY

-W. H. BELL TELEPHONE (803) 345-4389 June 2003 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management June Monthly Operating Report RC-03-01 36 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I July 2, 2003 W. H. BELL (803) 345-4389 June 2003 At 17:40 on 06/11/03 the B Reheater Drain Tank level transmitter (ILT0371 5A) failed high causing the tank to isolate and the 1 B feedwater heater to trip. Reactor power was reduced in accordance with AOP-204.1 and stabilized at 92%. The level transmitter was repaired and full power was restored at 15:05 on 06/12/03. On 06/21/03 at 00:44 power was reduced to 98% to perform torquing of the connectors on similar transmitters in the secondary plant. This maintenance was completed and full power restored at 16:21 on 06/21/03. V. C.

Summer Station operated at 100% power at all other times during the month of June.