March 2004 Monthly Operating Report for Virgil C. Summer
ML041110877
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/13/2004
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041110877 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY April 13, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 MARCH MONTHLY OPERATING REPORT Enclosed is the March 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Ve, yours or fA `t/ 4 phnA. B mre SAB/mbb Attachment c: J. B. Archie INPO Records Center T. G. Eppink (w/o Attachment) J&H Marsh & McLennan R. J. White William G. Wendland (ANI)

L. A. Reyes Pat Haught (Westinghouse)

K. R. Cotton C. W. Adams T. D. Gatlin NSRC NRC Resident Inspector RTS (0-L-99-0350-1)

K. M. Sutton File (818.03-1, RR 4100)

Paulette Ledbetter DMS (RC-04-0065)

W. R. Higgins SCE&G I Virgil C.Summer Nuudear Station

  • T(803) 345.5209 *www.scana.com

Director, Office of Resource Management March Monthly Operating Report RC-04-0065 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE April 5, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 March 2004 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 987 17 987 2 986 18 985 3 986 19 987 4 986 20 987 5 985 21 987 6 987 22 986 7 987 23 987 8 987 24 987 9 988 25 987 10 986 26 986 11 986 27 988 12 982 28 987 13 982 29 987 14 986 30 602 15 986 31 0 16 988

Director, Office of Resource Management March Monthly Operating Report RC-04-0065 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE April 5, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS 1 Reporting Period: March 2004 Gross Hours in Reporting Period: 744 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 711.7 2151.7 148956.2 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 711.7 2151.7 146987.1 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 2062025 6234091 398850146 10 Gross Electrical Energy (MWH) 729270 2205970 135082829 11 Net Electrical Energy Generated (MWH) 700919 2120177 129122970 12 Reactor Service Factor 95.7 98.5 83.9 13 Reactor Availability Factor 95.7 98.5 83.9 14 Unit Service Factor 95.7 98.5 82.8 15 Unit Availability Factor 95.7 98.5 82.8 16 Unit Capacity Factor (Using MDC) 97.5 100.5 79.8 17 Unit Capacity Factor (Using Design) 96.9 99.8 78.8 18 Unit Forced Outage Rate 4.3 1.5 3.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup: 04/13/04 21 Units in Test Status (Prior to Commercial Operation): N/A

Director, Office of Resource Management March Monthly Operating Report RC-04-0065 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE April 5, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 March 2004 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS 1 03/30/2004 F 32.3 A 3 Repair C Reactor Coolant Pump seal injection line.

1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management March Monthly Operating Report RC-04-0065 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE April 5, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 March 2004 V. C. Summer Station began the month at 100% power and operated there until 03/30/04. At 14:10 on the 3 0 th a plant shutdown began to support repairs to the C Reactor Coolant Pump seal injection line. This seal injection line was identified as the source of pressure boundary leakage, which required a plant shutdown in accordance with Tech Spec 3.4.6.2. During this shutdown at 15:16 the main turbine was manually tripped due to high bearing vibration. At 15:21 the reactor automatically tripped due to lo-lo level in the C steam generator. The plant remained shutdown for the remainder of the month.