ML030430374
| ML030430374 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 02/06/2003 |
| From: | Byrne S South Carolina Electric & Gas Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030430374 (5) | |
Text
Stephen A. Byrne Senior Vice President, Nuclear Operations 803 345 4622 February 6, 2003 A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 JANUARY MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
Very truly yours, Stephen A. Byrne SAB/mbb Attachment c:
G. H. Halnon T. G. Eppink (w/o Attachment)
R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)
Pat Haught (Westinghouse)
C. W. Adams RTS (0-L-99-0350-1)
File (818.03-1, RR 4100)
DMS (RC-03-0033)
SCE&G I Virgil C. Summer Nuclear Station - P.O. Box 88. Jenkinsville, South Carolna 29065.T(803)345.5209 *ww.scana com
Director, Office of Resource Management January Monthly Operating Report RC-03-0033 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE January 2003 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 984 983 983 982 983 982 982 982 982 983 982 982 982 982 983 982 17 18 19 20 21 22 23 24 25 26 27 28 29 "30 31 50/395 V. C. SUMMER I February 4, 2003 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (Mwe-Net) 977 981 982 983 983 983 982 981 982 983 982 982 983 982 982 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16
Director, Office of Resource Management January Monthly Operating Report RC-03-0033 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I February 4, 2003 W. H. BELL (803) 345-4389 OPERATING STATUS 1
Reporting Period:
January 2003 Gross Hours in Reporting Period:
744 2
Currently Authorized Power Level (MWt):
2900 Max. Depend. Capacity (MWe-Net):
966 Design Electrical Rating (MWe-Net):
972.7 3
Power Level to Which Restricted (If Any) (MWe-Net):
N/A 4
Reasons for Restrictions:
N/A THIS MONTH YR TO DATE CUMULATIVE Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)
Unit Capacity Factor (Using Design)
Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155113 760490 730770 100.0 100.0 100.0 100.0 101.7 101.0 0.0 744.0 0.0 744.0 0.0 2155113 760490 730770 100.0 100.0 100.0 100.0 101.7 101.0 0.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):
None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):
N/A 5
6 7
8 9
10 11 12 13 14 15 16 17 18 139893.3 0.0 138014.4 0.0 372984894 125986379 120381469 83.6 83.6 82.5 82.5 79.2 78.2 3.1
Director, Office of Resource Management January Monthly Operating Report RC-03-0033 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE February 4, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 January 2003 NO.
DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1
REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)
SUMMARY
Director, Office of Resource Management January Monthly Operating Report RC-03-0033 Page 4 of 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE February 4, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 January 2003 On 01/09/03 at 02:10 the calorimetric computer program used to calculate the feedwater flow rate based value of reactor thermal power (Fivcals) locked up and began returning exactly the same value of core thermal power.
This condition continued until 04:42 at which time the Plant Computer group corrected the problem. As a result of this problem with the calorimetric, reactor thermal power was reduced to approximately 99% at 03:35. After the calorimetric was restarted power escalation began at 05:35 and 100% power was restored at 06:50 on the 9th.
On 01/17/03 at 14:43 a reactor shutdown began due to the "B" reactor trip breaker being declared inoperable.
However, by 15:10 the breaker was repaired and declared operable and the shutdown was terminated. Power escalation began at 15:55 and was restored to 100% at 16:25.
The plant operated at 100% power at all other times during the month.