ML043140243

From kanterella
Jump to navigation Jump to search
October 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1
ML043140243
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/05/2004
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043140243 (5)


Text

A SCANA COMPANY Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 November 5, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir/ Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 OCTOBER MONTHLY OPERATING REPORT Enclosed is the October 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

V Ty yours, B. Arch JBA/mbb Attachment c:

T. D. Gatlin T. G. Eppink (w/o Attachment)

R. J. White W. D. Travers K. R. Cotton G. A. Lippard NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-04-0182)

SCEUG I Virgil C Summer Nuclear Station

  • P. o. Box 88. Jenkinsville, South Carolina 29065 1T (803) 345.5209.www.scana.com Iraq

Director, Office of Resource Management October Monthly Operating Report RC-04-01 82 Page 1 of 4 DAY ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE October 2004 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 983 17 983 18 983 19 984 20 980 21 984 22 1

2 3

4 5

6 7

8 9

10 11 12 13 14 50/395 V. C. SUMMER I November 2, 2004 T. V. Dao (803) 345-4812 AVERAGE DAILY POWER LEVEL (Mwe-Net) 987 986 986 986 986 981 979 986 985 986 985 987 986 986 985 985 985 984 985 984 988 983 986 986 986 23 24 25 26 27 28 29 30 31 15 16

Director, Office of Resource Management October Monthly Operating Report RC-04-01 82 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I November 2, 2004 T. V. Dao (803) 345-4812 OPERATING STATUS I

Reporting Period:

Gross Hours in Reporting Period:

2 Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3 Power Level to Which Restricted (If Any) (MWe-Net):

4 Reasons for Restrictions:

October 2004 745 2900 966 972.7 N/A N/A THIS MONTH YR TO DATE CUMULATIVE 5

Number of Hours Reactor Critical 6

Reactor Reserve Shutdown Hours 7

Hours Generator On Line 8

Unit Reserve Shutdown Hours 9

Gross Thermal Energy Generated (MWH) 10 Gross Electrical Energy (MWH) 11 Net Electrical Energy Generated (MWH) 12 Reactor Service Factor 13 Reactor Availability Factor 14 Unit Service Factor 15 Unit Availability Factor 16 Unit Capacity Factor (Using MDC) 17 Unit Capacity Factor (Using Design) 18 Unit Forced Outage Rate 745.0 0.0 745.0 0.0 2157203 762660 733542 100.0 100.0 100.0 100.0 101.9 101.2 0.0 7042.2 0.0 7027.3 0.0 20326919 7164520 6909815 96.2 96.2 96.0 96.0 97.7 97.0 3.8 153846.7 0.0 151862.7 0.0 412942974 140041379 133912608 84.2 84.2 83.1 83.1 80.3 79.3 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refuel 15 is scheduled to start on 04/22/2005 for a duration of 35 days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

I.

Director, Office of Resource Management October Monthly Operating Report RC-04-01 82 Page 3 of 4 ATTACHMENT IlIl UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE November 2, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 October 2004 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS 2

10/22/2004 S

0 B

5 Reactor Power was reduced to 91% to perform quarterly testing of Main Turbine and Main Feedwater Pump Turbines 1

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

I Director, Office of Resource Management October Monthly Operating Report RC-04-01 82 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I November 2, 2004 T. V. Dao (803) 345-4812 October 2004 V. C. Summer Station operated at full power for the entire month of October with the following exception:

Reactor power was reduced to 91% for 5.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> (10/22104 at 22:05 to 10/23/04 at 04:00) to perform quarterly testing of Main Turbine and Main Feedwater Pump Turbines.