|
---|
Category:Letter
MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20240032024-11-0606 November 2024 – Integrated Inspection Report 05000395/2024003 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0620000282006-07-13013 July 2006 June 2006 Operating Report for Virgil C. Summer RC-06-0094, April 2006 Monthly Operating Report for Virgil C. Summer Nuclear Station2006-05-0909 May 2006 April 2006 Monthly Operating Report for Virgil C. Summer Nuclear Station RC-06-0073, March 2006 Monthly Operating Report for V.C. Summer Nuclear Station2006-04-0606 April 2006 March 2006 Monthly Operating Report for V.C. Summer Nuclear Station ML0607505692006-03-13013 March 2006 February 2006 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0601703262006-01-11011 January 2006 December 2005 Monthly Operating Report for V C Summer Unit 1 ML0534703312005-12-0606 December 2005 November 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0532101872005-11-14014 November 2005 October 2005 Monthly Operating Report for Virgil C. Summer RC-05-0163, September 2005 Monthly Operating Report for Virgil C Summer Nuclear Station2005-10-0707 October 2005 September 2005 Monthly Operating Report for Virgil C Summer Nuclear Station RC-05-0145, August 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station2005-09-12012 September 2005 August 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0522902682005-08-10010 August 2005 July 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0519903442005-07-13013 July 2005 June 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station RC-05-0056, March 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station2005-04-0606 April 2005 March 2005 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0507001212005-03-0909 March 2005 February 2005 Monthly Operating Report for the Virgil C Nuclear Station Unit 1 RC-05-0022, January 2005 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit 12005-02-0404 February 2005 January 2005 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit 1 ML0501201382005-01-0707 January 2005 December 2004 Monthly Operating Report, Virgil C. Summer Nuclear Station ML0434100782004-12-0202 December 2004 November 2004 Monthly Operating Report for Virgil C Summer Nuclear Station Unit 1 ML0431402432004-11-0505 November 2004 October 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1 ML0428800242004-10-0707 October 2004 September 2004 Monthly Operating Report for Virgil C Summer Nuclear Station ML0426003382004-09-0909 September 2004 August 2004 Monthly Operating Report for Virgil C Summer Nuclear Station RC-04-0125, July 2004 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 12004-08-0909 August 2004 July 2004 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1 ML0420302872004-07-15015 July 2004 June 2004 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0416705222004-06-0808 June 2004 May 2004 Monthly Operating Report for Virgil C Summer RC-04-0084, April 2004 Monthly Operating Report for Virgil C. Summer Unit 12004-05-12012 May 2004 April 2004 Monthly Operating Report for Virgil C. Summer Unit 1 ML0411108772004-04-13013 April 2004 March 2004 Monthly Operating Report for Virgil C. Summer ML0407103052004-03-0404 March 2004 February 2004 Monthly Operating Report for Virgil C. Summer Nuclear Station RC-04-0029, January 2004 Monthly Operating Report for Virgil C. Summer Unit 12004-02-0606 February 2004 January 2004 Monthly Operating Report for Virgil C. Summer Unit 1 ML0401602802004-01-13013 January 2004 December 2003 Monthly Operating Report for Virgil C. Summer, Unit 1 RC-03-0245, November 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station Unit 12003-12-0808 December 2003 November 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station Unit 1 RC-03-0230, October 2003 Monthly Operating Report for Virgil C. Summer2003-11-0606 November 2003 October 2003 Monthly Operating Report for Virgil C. Summer ML0331701822003-11-0303 November 2003 October 2003 Monthly Operating Report for Virgil C. Summer, Unit 1 ML0329405832003-10-13013 October 2003 September 2003 Monthly Operating Report for Virgil C. Summer, Unit 1 ML0326009132003-09-0909 September 2003 August 2003 Monthly Operating Report for Virgil C. Summer ML0322503472003-08-0505 August 2003 July 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0320604752003-07-0707 July 2003 June 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0316814012003-06-0909 June 2003 May 2003 Monthly Operating Report for Virgil C. Summer ML0314100322003-05-0808 May 2003 April 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1 RC-03-0080, March 2003 Monthly Operating Report for Virgil C. Summer, Unit 12003-04-0303 April 2003 March 2003 Monthly Operating Report for Virgil C. Summer, Unit 1 RC-03-0055, February 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station2003-03-0707 March 2003 February 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0304303742003-02-0606 February 2003 January 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0301501162003-01-0606 January 2003 December 2002 Monthly Operating Report for Virgil C. Summer Unit 1 ML0235201562002-12-0606 December 2002 November 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0232501432002-11-12012 November 2002 October 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station RC-02-0173, September 2002 Monthly Operating Report for South Carolina Electric & Gas Co2002-10-14014 October 2002 September 2002 Monthly Operating Report for South Carolina Electric & Gas Co ML0226305332002-09-10010 September 2002 August 2002 Monthly Operating Report for Virgil C. Summer Unit 1 ML0223102602002-08-12012 August 2002 July 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1 ML0220003402002-07-11011 July 2002 June 2002 Monthly Operating Report for Virgil C Summer Nuclear Station ML0217700422002-06-13013 June 2002 May 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station ML0214303262002-05-0707 May 2002 April 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1 ML0211303402002-04-0909 April 2002 March 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1 ML0208405812002-03-13013 March 2002 February 2002 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1 2006-07-13
[Table view] |
Text
Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY July 15, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 JUNE MONTHLY OPERATING REPORT Enclosed is the June 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
Very truly yours, COG &e Stephen A. Byrne SAB/mbb Attachment c: J. B. Archie INPO Records Center T. G. Eppink (w/o Attachment) J&H Marsh & McLennan R. J. White William G. Wendland (ANI)
W. D. Travers Pat Haught (Westinghouse)
K. R. Cotton C. W. Adams T. D. Gatlin NSRC NRC Resident Inspector RTS (0-L-99-0350-1)
K. M. Sutton File (818.03-1, RR 4100)
Paulette Ledbetter DMS (RC-04-0112) s ,
W. R. Higgins
.',-; ;a
- \ J8 SCE&G I Virgil C.Summer Nuclear Station
Director, Office of Resource Management June Monthly Operating Report RC-04-01 12 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE July 6, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 June 2004 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net) 1 982 17 977 2 982 18 979 3 983 19 975 4 981 20 975 5 981 21 977 6 981 22 977 7 980 23 978 8 981 24 976 9 981 25 977 10 981 26 977 11 980 27 978 12 981 28 976 13 979 29 977 14 981 30 977 15 979 16 979
Director, Office of Resource Management June Monthly Operating Report RC-04-0112 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE July 6, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS 1 Reporting Period: June 2004 Gross Hours in Reporting Period: 720 2 Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MWe-Net): 966 Design Electrical Rating (MWe-Net): 972.7 3 Power Level to Which Restricted (If Any) (MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5 Number of Hours Reactor Critical 720.0 4089.2 150893.7 6 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator On Line 720.0 4074.3 148909.7 8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 2086116 11772978 404389033 10 Gross Electrical Energy (MWH) 733210 4159940 137036799 11 Net Electrical Energy Generated (MWH) 704770 3998005 131000798 12 Reactor Service Factor 100.0 93.6 84.0 13 Reactor Availability Factor 100.0 93.6 84.0 14 Unit Service Factor 100.0 93.3 82.9 15 Unit Availability Factor 100.0 93.3 82.9 16 Unit Capacity Factor (Using MDC) 101.3 94.8 79.9 17 Unit Capacity Factor (Using Design) 100.6 94.1 78.9 18 Unit Forced Outage Rate 0.0 6.4 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):
None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation): N/A
Director, Office of Resource Management June Monthly Operating Report RC-04-01 12 Page 3 of 4 ATTACHMENT Ill UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE July 6, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 June 2004 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None 1 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)
SUMMARY
- r z :
Director, Office of Resource Management June Monthly Operating Report RC-04-01 12 Page 4 of 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE July 6, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 June 2004 V. C. Summer Station operated 100% power for entire month of June, 2004.