ML031410032

From kanterella
Jump to navigation Jump to search
April 2003 Monthly Operating Report for Virgil C. Summer Nuclear Station, Unit 1
ML031410032
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/08/2003
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031410032 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY May 8, 2003 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 APRIL MONTHLY OPERATING REPORT Enclosed is the April 2003 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment C:

G. H. Halnon T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR4100)

DMS (RC-03-0103)

SCE&G I Virgil C Summer Nuclear Station

  • P. O. Box 88. Jenkinsville, South Carolina 29065.T (803) 345.5209.ww.sanaiom

Subject:

'k

'Prr -

-J6.

/

I Director, Office of Resource Management April Monthly Operating Report RC-03-01 03 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE April 2003 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 982 17 983 18 982 19 983 20 981 21 980 22 980 23 981 24 981 25 981 26 981 27 982 28 982 29 982 30 982 981 50/395 V. C. SUMMER I May 1,2003 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (Mwe-Net) 981 981 981 981 983 983 982 983 982 982 982 982 982 982 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16

Director, Office of Resource Management April Monthly Operating Report RC-03-01 03 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I May 1, 2003 W. H. BELL (803) 345-4389 OPERATING STATUS I1 Reporting Period:

April 2003 Gross Hours in Reporting Period:

719 2

Currently Authorized Power Level (MWt):

2900 Max. Depend. Capacity (MWe-Net):

966 Design Electrical Rating (MWe-Net):

972.7 3

Power Level to Which Restricted (if Any) (MWe-Net):

N/A 4

Reasons for Restrictions:

N/A THIS MONTH YR TO DATE CUMULATIVE 5

Number of Hours Reactor Critical 6

Reactor Reserve Shutdown Hours 7

Hours Generator On Line 8

Unit Reserve Shutdown Hours 9

Gross Thermal Energy Generated (MWH) 10 Gross Electrical Energy (MWH) 11 Net Electrical Energy Generated (MWH) 12 Reactor Service Factor 13 Reactor Availability Factor 14 Unit Service Factor 15 Unit Availability Factor 16 Unit Capacity Factor (Using MDC) 17 Unit Capacity Factor (Using Design) 18 Unit Forced Outage Rate 719.0 0.0 719.0 0.0 2082935 733670 705811 100.0 100.0 100.0 100.0 101.6 100.9 0.0 2879.0 0.0 2879.0 0.0 8339614 2940470 2826960 100.0 100.0 100.0 100.0 101.6 100.9 0.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refueling Outage, October 18, 2003, 36 Days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

NIA 142028.3 0.0 140149.4 0.0 379169395 128166359 122477659 83.8 83.8 82.7 82.7 79.5 78.5 3.1

N Director, Office of Resource Management April Monthly Operating Report RC-03-01 03 Page 3 of 4 ATTACHMENT IlIl UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE May 1, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 April 2003 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A I

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

d 1;

Director, Office of Resource Management April Monthly Operating Report RC-03-01 03 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 501395 V. C. SUMMER I May 1, 2003 W. H. BELL (803) 345-4389 April 2003 V. C. Summer Station operated at 100% power for the entire month of April, 2003.