Stephen A. Byme Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY September 9. 2003 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 AUGUST MONTHLY OPERATING REPORT Enclosed is the August 2003 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
Very truly yours, Stephen A. Byrne SAB/mbb Attachment C:
J. B. Archie T. G. Eppink (w/o Attachment)
R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)
Pat Haught (Westinghouse)
C. W. Adams NSRC RTS (0-L-99-0350-1)
File (818.03-1, RR 4100)
DMS (RC-03-0189)
J-1-Ii1
104 SCELG I Virgil C Summer Nudeor Station
- P. o. Box 88 - Jeinlmvile, South (croena 29065 eT (803) 345.5209.*wwscono.com
Director, Office of Resource Management August Monthly Operating Report RC-03-0189 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE September 3, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 August 2003 AVERAGE DAILY POWER LEVEL DAY DAY I
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 (Mwe-Net) 972 973 973 972 973 971 972 972 972 973 974 973 973 972 971 972 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (Mwe-Net) 973 971 972 973 972 970 971 971
- 971 970 970 970 970 970 970
Director, Office of Resource Management August Monthly Operating Report RC-03-0189 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I
-DATE September 3, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS I
Reporting Period:
Gross Hours In Reporting Period:
2 Currently Authorized Power Level (MWt):
Max. Depend. Capacity (MWe-Net):
Design Electrical Rating (MWe-Net):
3 Power Level to Which Restricted (If Any) (MWe-Net):
4 Reasons for Restrictions:
August 2003 744 2900 966 972.7 N/A N/A THIS MONTH YRTO DATE 5
6 7
8 9
10 11 12 13 14 15 16 17 18 Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy (MWH) a Net Electrical Energy Generated (MWH)
Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)
Unit Capacity Factor (Using Design)
Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155488 752460 722976 100.0 100.0 100.0 100.0 100.6 99.9 0.0 5762.7 0.0 5756.5 0.0 16649035 5851050 5623512 98.8 98.8 98.7 98.7 99.8 99.1 1.3 CUMULATIVE 144912.0 0.0 143026.9 0.0 387478816 131076939 125274211 84.1 84.1 83.0 83.0 79.9 78.8 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):
Refueling Outage, October 11, 2003, 36 Days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):
N/A
Director, Office of Resource Management August Monthly Operating Report RC-03-0189 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE September 3, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 August 2003 NO.
DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS NIA I
REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)
SUMMARY
Director, Office of Resource Management August Monthly Operating Report RC-03-0189 Page 4 of 4 ATTACHMENT IV NARRATIVE
SUMMARY
-OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE September 3, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 August 2003 V. C. Summer Station operated at I 00% power for the entire month of August, 2003.