October 2003 Monthly Operating Report for Virgil C. Summer
ML033180427
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/06/2003
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RC-03-0230
Download: ML033180427 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY

4ovember 6, 2003 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 CORRECTED OCTOBER MONTHLY OPERATING REPORT

Reference:

Mr. Stephen A. Byrne Letter (RC-03-0228) to the Document Control Desk dated November 3, 2003, "October Monthly Operating Report" In the referenced letter, SCE&G submitted the October Monthly Operating Report. The attachments incorrectly identified the month as September. Enclosed is the corrected report.

If there are any questions, please call me at your convenience.

phenly yours Aen.

Bne PeA. jAee--,-w-d 0F S, 117.4.,VE IXce 6

/

.3 SAB/mbb Attachment c:

J. B. Archie T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-03-0230)

-- I tl 1

"i -- C SCE&G I Virgi C. Summer Nuclear Station

  • P. 0. Box 88 -lenkinsville, South Carolina 29065.T (803) 345.5209.www.scano.com

Director, Office of Resource Management October Monthly Operating Report RC-03-0230 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 1, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 October 2003 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)

(Mwe-Net) 1 977 17 0

2 978 18 0

3 977 19 0

4 978 20 0

5 979 21 0

6 981 22 0

7 974 23 0

8 855 24 0

9 824 25 0

10 766 26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

ATTACHMENT II

Director, Office of Resource Management October Monthly Operating Report RC-03-0230 Page 2 of 4 OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 1, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS 1

Reporting Period:

Gross Hours in Reporting Period:

2 Currently Authorized Power Level (MWt):

Max. Depend. Capacity (MWe-Net):

Design Electrical Rating (MWe-Net):

3 Power Level to Which Restricted (If Any) (MWe-Net):

4 Reasons for Restrictions:

October 2003 744 2900 966 972.7 N/A N/A THIS MONTH YR TO DATE S

6 7

8 9

10 11 12 13 14 15 16 17 18 Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Using Design)

Unit Forced Outage Rate 242.7 0.0 240.2 0.0 664724 232330 222954 32.6 32.6 32.3 32.3 31.0 30.8 0.0 6725.4 0.0 6716.7 0.0 19399542 6812930 6547773 92.2 92.2 92.1 92.1 92.9 92.3 1.1 CUMULATIVE 145874.7 0.0 143987.1 0.0 390229323 132038819 126198472 83.9 83.9 82.8 82.8 79.8 78.7 3.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refueling Outage, October 11, 2003, 37 Days 20 If Shutdown at End of Report Period, Estimated Date of Startup: 11/17/03 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management October Monthly Operating Report RC-03-0230 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 1, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 October 2003 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS 2

10/11/2003 S

503.8 C

1 Complete Refueling 1

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management October Monthly Operating Report RC-03-0230 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE November 1, 2003 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 October 2003 At the beginning of the month the plant was operating at 100% power. Power was reduced to 85% on October 8 @ 06:44 to support main steam safety valve testing. On October 1 1h @ 00:10 the 14th refueling outage began with the opening of the main generator breaker. Reactor shut down was completed and mode 3 entered at 02:43 on the 11th. The plant remained shut down for the remainder of the month.