August 2002 Monthly Operating Report for Virgil C. Summer Unit 1
ML022630533
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/10/2002
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022630533 (5)


Text

Senior Vice President, September 10, 2002 ASCN COA A $CANA COMPANY Stephen A. Byrne Nuclear Operations 803 345.4622 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Ladies and Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 AUGUST MONTHLY OPERATING REPORT Enclosed is the August 2002 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c:

G. H. Halnon T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-02-0157)

/

SCE&G I Virgil C. Summer Nuclear Station - P. 0. Box 88

  • T (803) 345 5209
  • wwwscana.com

Director, Office of Resource Management August Monthly Operating Report RC-02-0157 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE August 2002 AVERAGE DAILY POWER LEVEL (Mwe-Net) 966 967 966 967 964 963 962 966 967 968 968 965 967 969 967 968 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 50/395 V. C. SUMMER I September 5, 2002 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (Mwe-Net) 969 968 967 967 966 966 965 966 967 965 968 967 967 969 969 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16

Director, Office of Resource Management August Monthly Operating Report RC-02-0157 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I September 5, 2002 W. H. BELL (803) 345-4389 OPERATING STATUS 1

Reporting Period:

August 2002 Gross Hours in Reporting Period.

744 2

Currently Authorized Power Level (MWt):

2900 Max. Depend. Capacity (MWe-Net):

966 Design Electrical Rating (MWe-Net):

972.7 3

Power Level to Which Restricted (If Any) (MWe-Net):

N/A 4

Reasons for Restrictions:

N/A THIS MONTH YR TO DATE CUMULATIVE Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Using Design)

Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155413 748430 719185 100.0 100.0 100.0 100.0 100.1 99.4 0.0 4771.0 0.0 4717.0 0.0 13460585 4703550 4521588 81.8 81.8 80.9 80.9 80.3 79.7 0.8 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A 5

6 7

8 9

10 11 12 13 14 15 16 17 18 136220.3 0.0 134341.4 0.0 362346993 122252299 116792769 83.2 83.2 82.1 82.1 78.7 77.6 3.2

Director, Office of Resource Management August Monthly Operating Report RC-02-0157 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE September 5, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 August 2002 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A 1

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management August Monthly Operating Report RC-02-0157 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE September 5, 2002 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 August 2002 On August 6th at 22:15 reactor power was reduced by approximately 1% due to high circulating water discharge temperature.

Circulating water discharge temperature became stable and reactor power was restored to 100% on August 7 th at 07:05. V. C. Summer Station operated at 100% power for all other times during the month.