ML040160280

From kanterella
Jump to navigation Jump to search
December 2003 Monthly Operating Report for Virgil C. Summer, Unit 1
ML040160280
Person / Time
Site: Summer 
Issue date: 01/13/2004
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040160280 (5)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 vK, SCAS&AC A SCANA COMPA~iJy January 13, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 DECEMBER MONTHLY OPERATING REPORT Enclosed is the December 2003 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, Stephen A. Byrne SAB/mbb Attachment c:

J. B. Archie T. G. Eppink (w/o Attachment)

R. J. White L. A. Reyes K. R. Cotton T. D. Gatlin NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams NSRC RTS (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-04-001 0)

,:C. C-; ' q SCENG I Virgil (. Summer NuKeW r Station

  • P. 0. Box 88. Jenkinsmille, South Carohna 29065.T (803) 345.5209
  • wwwscanc.com

Director, Office of Resource Management December Monthly Operating Report RC-04-0010 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE December 2003 AVERAGE DAILY POWER LEVEL DAY DAY I

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 (Mwe-Net) 983 982 982 973 981 982 982 983 982 983 983 983 985 984 984 983 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 50/395 V. C. SUMMER I January 12, 2004 W. H. BELL (803) 345-4389 AVERAGE DAILY POWER LEVEL (Mwe-Net) 983 983 983 986 984 985 985 985 985 985 987 983 983 986 987

1.

Director, Office of Resource Management December Monthly Operating Report RC-04-001 0 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I January 12, 2004 W. H. BELL (803) 345-4389 OPERATING STATUS I

Reporting Period:

December 2003 Gross Hours in Reporting Period:

744 2

Currently Authorized Power Level (MWt):

2900 Max. Depend. Capacity (MWe-Net):

966 Design Electrical Rating (MWe-Net):

972.7 3

Power Level to Which Restricted (If Any) (MWe-Net):

NIA 4

Reasons for Restrictions:

N/A THIS MONTH YR TO DATE CUMULATIVE 5

6 7

8 9

10 11 12 13 14 15 16 17 18 Number of Hours Reactor Critical Reactor Reserve Shutdown Hours Hours Generator On Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC)

Unit Capacity Factor (Using Design)

Unit Forced Outage Rate 744.0 0.0 744.0 0.0 2155182 761350 731637 100.0 100.0 100.0 100.0 101.8 101.1 0.0 7655.2 0.0 7565.0 0.0 21786274 7650970 7352094 87.4 87.4 86.4 86.4 86.9 86.3 1.0 146804.5 0.0 144835.4 0.0 392616055 132876859 127002793 83.7 83.7 82.6 82.6 79.6 78.5 3.0 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

None 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management December Monthly Operating Report RC-04-001 0 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE January 12, 2004 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 December 2003 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS N/A I

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management December Monthly Operating Report RC-04-0010 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I January 12, 2004 W. H. BELL (803) 345-4389 December 2003 V. C. Summer Station operated at 100% power for the entire month of December, 2003.