LR-N05-0380, Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage Salem Generating Station Unit 2

From kanterella
Jump to navigation Jump to search
Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage Salem Generating Station Unit 2
ML052350482
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/11/2005
From: Benyak D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0380
Download: ML052350482 (90)


Text

PSEG Nuclear LLC i I P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 AUG 1 1 2005 o PSEG ATa clearILC LR-N05-0380 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-001 INSERVICE INSPECTION ACTIVITIES - 90 DAY REPORT FOURTEENTH REFUELING OUTAGE SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 FACILITY OPERATING LICENSE NO. DPR-75 This letter submits the ninety (90) day report for Inservice Inspection (ISI) activities conducted at the Salem Generating Station Unit 2 during the fourteenth refueling outage. This report is submitted in accordance Article IWA-6000 of Section Xl of the ASME Boiler and Pressure Vessel Code, 1998 Edition, 2000 Addenda.

The enclosures to this letter are as follows:

Enclosure 1 Salem Unit 2 (RFO#14) ISI Summary Enclosure 2 S2 RFO#14, Form OAR-1 Owners Activity Report Enclosure 3 Form OAR-1, Table 1 Salem Nuclear Generating Station Unit 2 ISI Program Long Term Plan RFO #14 ISI Examination Results Enclosure 4 Form OAR-1, Table 1 Salem Nuclear Generating Station, Unit 2 ISI Program Long Term Plan RFO #14 IWE Examination Results Enclosure 5 Form OAR-i, Table 1 Salem Nuclear Generating Station Unit 2 ISI Long Term Plan RFO #14 Flywheel Examination Results Enclosure 6 Form OAR-I, Table 1 Salem Nuclear Generating Station Unit 2 ISI Long Term Plan Inservice Inspection Summary for the Third Interval Enclosure 7 Form OAR-I, Table 1 Salem Nuclear Generating Station Unit 2 ISI Long Term Plan IWE/IWL Examination Summary for the First Interval Enclosure 8 Form OAR-1, Table 2 - Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service.

Enclosure 9 Form OAR-I, Table 3 - Abstract of Repairs, Replacements or

_ Corrective Measures Required for Continued Service.

95-2168 REV. 7199

i T AUG I 1 2005] I LR-N05-0380 2 Document Control Desk Should you have any questions regarding this request, please contact E. H. Villar at 856-339-5456.

Sincerely, 3I Darin M. Benyak Director - Regulatory Assurance Enclosures (9)

LR-N05-0380 3 Document Control Desk C Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. S. Bailey, Project Manager -Salem & Hope Creek U.S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555-0001 USNRC Senior Resident Inspector - Salem (X24)

Mr. K. Tosch Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ 08625 Mr. Milton Washington Chief Inspector NJ Department of Labor Division of Public Safety, Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance P. 0. Box 396 101 South Broad Street Trenton, NJ 08625-0392

T LR-N05-0380 Document Control Desk ENCLOSURE I SALEM UNIT 2 (RFO#14) ISI

SUMMARY

,-1.,

fl,.-Z 4-777.1 1, 7', 11:'-7,-'

- .",I1-11-1.1. .- "I", i7.

_,;,--DUT ., ' '. e`, , :,;- ';, ' -' I.,-" -I" . 1, 4 -". ... ".,. I'. --. I Z.-, - 11, I -, - I I 11 - I ,-I, - ,- , . -- e*... I -- 11., --- - I - -

-,-'-, e. - - ,- " 1. : le; .- -'.r'-.-! I t;.-e`--_-,-- ... ..----,

--  ;"-  %- ,,I .,!

,.,11 .." ." -,--,--,:r-,:-.;i'--P

,--,,--'-, .Ii 1. i I,.,7 -'%,-, i 5-i - 1, ,,, .". - , , :"r:.

-; "P,

, . 1,,,,,.r , -!::;Zl-_;.,-,

-,,.-,,,i,,,-,,.',-,,..-.::z.;,,

-, ." - ",.., -.IJ."1. - ., ..-. I, T n.,-. .3rdINTERVALJUt'

1. a, --, ;Z , , ..". .., , , . ,,. . "?.I-I ,EMOD.11tt ," .AGE`

V A!' -;,- . .,, -,.-.,;-".".-"j,;e. -!,.,L' 4", j." .,-, -. r - " ,,..", .. .". .'.' ,-,.,j;e O . , ,. , , 1:

le,:,, . i I. ,,.-,-" , _!",---;; ,,..",",'......";,.,"., ', ,I.".- 511 , :-, 11,.`-. : i-, . ., !.,-?-f . ", . .-", - ,-.,.-. ..,1-" ,.,.-". ' 1 'P-` 4,;,.;_ ', , t1 ,-r,i , .1-,-1 .- "I:'..I, ",1Z;Iz,- '! ;:,,:.::-, .: . z '. .,--. I,-, ,, , t -, " , ", . ,%, LO, "i:.-.- - ,,,_,.

).- . .. ,,, ,,.-,.., ; :

-- Z,-:,- liz,,5 , i .,... . - ,-.. I . -,-. - ,

.,,-,'i",-.r-4.,,,,..jl-i, if . -.-t,,.

.: .- , z - - - ,-., 1, ,- ,I "I I , , '. , . ...;:. , - :.Lr- -'r,-:.  : "n ,, -I '.) -".Q.

"... ,, " ,-, ,, . -, ".I I... .1
--,,-
-i A , ,, ,14 Z- , _, li, ;I -',.  ; ,.,.- .,-, ,:.

...., , ; -,:, ; . -,-,,'.,'I,m-. , -, 11.;`-- - - -,;- 1-1 ".." .,...lj ., - , i., - .;,,,,, , , ,-,..,-" ,  % 7 , x-.I . - .1 -, .-, . ., :,;. .. ,I - .I

-5  !-.-.4-11,. .,-:.. .1,..t I - ,-,., . .. .,.,,,-',--r:

1. "'.1,iA.'.'..- '. -.',:.,:,I,::., .,,,,. '. ,,.., .'r, 11- ,,,-."f " .- "', , I--.

,--.. ., , i, I I I- 11 I 11 I "J. ", ,- ",.,  ! ",Z.11 , .7:m ,, ,- ,,-1 1. .I , "." .I -,'. ".- -1 ':.,... j....,"II1, I ,L i ,--;".

,-..;--;;, .1

-r- :. -,, ":,,,'-,,,,.-....,-,!:.-,,.',-,.,,,;.,'.,,,--,,:-, '.,e..'I,-::" ..-,-.,. . " - - "'. " V..." ..., ,.,_ -- ,i:',?!REFU '-"...- -w?, ftIIJN'b!'AO .- U 1-.. T-A G E-4, ,,-:,,,-,!,--- '--, ,

' ' --' , -,:;--,-'J'- , -., e , (,-,,,,".,I.,.

, -, .'.'- , -_ f .;- -..-,:.:,;, --- . .;"

,?,-;,;:,,

,,-' ,." ---.,--,,::, -..-i.1,,,

-1";Z. -'. ,'-,i,'I.

j j ,-,:- ,..,:

-, ,. ..,,"".,.t

,,!', " - . , - I I .

., , .I I , , - , , , ". I!,. , , - , - j I - - -i'.

- - - - -,r.

1;j-,I-

. "1. .,- , I, -'", ' - ."!.,., - , I,,".-,..! , i , , , ,, . r - , ..

V'.:i, Z'_--l'.-_--,-.,-...,-;-,,'. ,.:

'il".7 'l!,

-: , ,, A,: -., ,., , , .-,' ; I; I ,." I..", 4 " ! , "", 1 , _t ,F- .,'-,,.,%t, , -, """ "'T", ,,J-:,-, '., "..j I_ e;, .`V!,,-Ae !.-,, o, I , _.. I , 1, -. , - -- - , - z:,-7 Z 11,-,-

,,, f ,., .-!- I".":.?.,,,

t: w - "";i', 1, , , , ,k- .`/, - ".f", ,,., z, 1'7, -',-, II I I.. .:A.,,-

?. .,1'-..-.

. 'O.,...,

-,;1'0410512005'.THPOUGH't05I.Ilt2O'65,---'izk',.4"1:--,,

, . ,,- ".. ,-,! '.4 1'..-..<,, " ;".-.%, -.

't,--.

., , . -, 1 - .,-,:"'L,,',,I,

.. , .. -. 1- "."-

- e , ill-, ,1,

., - 4 , - .;,.u - .. "--,_',

lj- -, ,l, -. ',P:I-"',

t,--.

"f - .,

ZZ'_

II-Y".1"'t -1iZ'--:ii,', ,6 1 4 . -:e`::-,'.',:-.:t,, L-,r ,.i ". ',,. -.

!,.'; 1:-, ,',.,-- '.. -j ..,-z--,11"",,I, 2""'. -t ,t-;,Jr .-. ;',' tj,-.- -.- ".......... ,,,.<-,- ti,,.- .,;- I - .1

-1 'j,--::;,:C - .. i--- ,- .,.,:.., -,,,nA 1-,,',",,,',,'-,-',-,',"- ' , , ',- , ',','.',11".".,J;C,  :-.- .: .. -;:.:k. , , -,-` " -,-, -- I,,, --. -., , , v .4 -"!'.,-;I, --- Z,, .: .,,,

11!-11 -','--I'nI',.f,-,i.,I;- , -. :,-.-..

'. . - ,.- ., .", , - -;.-c,, - 't,' ,` ."i,,:,.-,;,-o,,,.,'cr

-, 1"w ,.,..e -.- "..-

.,',.`_-

- - ,,--- - - .", , ";,.1'. . ,."-".,.-,'.'.I---.','.-,",,

. ,,,,I.;:;-w_

a%

-, ..3 .. . - ,-
1. .1, --j "'.- ,,. - - !,-- ;-, ! - 1

--- a II -%j,'-'--l

-, ," ,.-, '-, I -,,C. I-.

1 ,-- ;- -,-. ,z-.-

k,'?, ', ,viI.11

J1.,., .. ,,I'-", .

Y--.." ': -,. -- ...

- - ."4.........L , .. ;el.

. '.-. I".,.:." -e ,, ,, ;, - ,

., , e:-,;, -l, , .,,--,.,.1-,;

, , r.. - ',--- -- ,c,:-,

r-.--' ,-Y,:Z`j,`, ,-

- ..", -. , 1, , I. , i ;,-,L: !."

., O"",n

,; ".r'.:"'."'.-I, -,, ,,"I- -,,. ,;!'-,-O,'.I-.q, - j:, -. - .I ,,,-.-,' 4. , - --  %

, ,4

.1 11 -,. .: i  :, %-:,. , - 1.'..,",.;_Ij,Z.'

,!,-.,,,-.i.!:-,t'-,'-,I' -- -,,

", me '! , i.:".- .",,,,.%y4k,, , ". ..- t.  ;, ---,---' -,;- 11 .,.,..,- --,',! . a -,'.I .-x 3 -, - - ; ,'.','- -, ,:. ,--. t-.. , '! , . . - 1.

.- v ,, ,,

,:,,,,k- j ;. "', -. ,.;- " , .....- I -" , ,. , ",-- . ;, ',,-, , -1 ,.. , ,I- "w.  ;.r.. r., .,--!-

.. - -;, 1, -

--,;,F,.-"-,-",- I ij, , 1-

-,,, - . 'I".. , y -,.,

'-,--.:7., -. . I -'I',.- I' 1.

.-,. t .7-.,:

,,jk,.--

1 ,-.

.', -.--.'. I.,

.. N.,,.,.-,;,

-,-,z---,-.wj,'i.

c P

-,t .

'ZfZ--,?,1

.;I I" 1.

'.jy.:,1- j.,'f.-

' - ,-.. ,., ,, - . , --...' ,',-.,--.11 .-.

- ,z-l"11

-- ,-7,',:,-':-v.':,'-.-,(.'I"eN,-.`.-14E-.-J'-,, ,._,C.-,

I

',I..-,-",L-L.

.11.! 1, i '5-

-;, I:;:-.-Is--,'eV'

.i,:-.-J.,

'.;";`,Ji.;,-

'I'l--,.

r.,,-

.,,j

%, z 1,,;, . --VOL ,-',.'-',--;,;!.

UME;,I,,OF.B ,.-,,,.;-:,t--,, i,- .- - -5e, I - .. Ii...

. .I .. ,.-

',J- ,.

-S.--"

", -. , --.;.I

)t., - -. 1

,J]",-,

'-L

"'j,-;. 1 , , .',',:;

' ,Zv:;. ,-

,.,7, ,, ,-, , -...--

4 ": : ', I " i , .1-".-, , ',,,--. ,,I I-.-' ..,-.,.- , -4, ,- ,."

-,- .. .I., -.

-- ,,.. ': - I ,. - 4 ,.; Ij

, _,,,.,, - .,,I 1, "

,:. ,,-:,;,-.,J; ,I I.i, ., ,.,. ., ".:.P C.'. " L..,' 7, . , , , .,. 1% " ..... ,- " ",,- -, 1 v %,; ; , -I-', - - ,-,-, .",-I -4,,,-.,'-,. 7

-,-I I- '. .. I..,.

-'e-.,jc , -.; Ii.- , "-,-;tl::,

,, , -t j--.---f :,,,,

I,.1:-,..1-'i,.,,.-!-

, ,,"I,-

f 7-','-

11":. ..;" I,,

.-I'- - -,-.

, .',:- -. ,-."4,,,

. .1 ,
'.' ,.,., 4I,:-.1,..-,'-:'. - . "j.., '7 L,, -."-;jI.i-,-"IF.INAL'REF,"I"

,..I.I-"'.

' , ""-,"I, 4";

,,.,,I.I-i--,--j--,.j'.,

--`.'z"-"N',"

, .t',

,,..,z..,

j k-I.- ..

-- -e ,-

" '.- . .-, 1,-,

Ij;.,;

. v

, -,-J.

-,-J'

-V..-.,-- .., rl-,-

.,.k.,:- ,-,e pp,  ;, '...,,A

, - - - -be-"!- ...-- .- I.I..';"i",

..... - .: - :.,I ,,.,-  ;:,

,,5-- I " ,; -r I""';,,,- --' 'oe" .. , ,

.- .V.

. -, '-." ,.-, , , -..-,.,II,-,-,, I'4r . -

--. 'l,..,.

,...5 -. ,- .- .-. "..-
,,. -`s

!: -,,, .,, , " 1,

-j-4 , -',,.., ..  ; - I.' -. 11.1 .-II.

o--,-f,-.-:I-,.- -',.' -1, ,jz.

I-.- "li, IIII.-  :".I:".,. -,., --- j,,lLl:. ,,.-!,;:-, .. C.",4I.. I I .I --, ". i" 11.,"

...... ,. J 'I .Z .., ,,,

,. , ;-.; 4 ,;. '... --,,- - ;: 7

.-- :;-i'11. - I11 -1 .. !:. . , .,-? t,-:,:--;"' -,I --,-, ., .. - ,-,i,-.',.",-"ii-"".""-

I ,,', .1.11 .,'.,11 ,: 4 - , ." ."A., -. i-','.,---;_ -. 4. :-1-11., -.. 1:

I 3. - - ..- . . -,; ,:, , j 1 e, !, , ,

"1, W -.1 -P-14:";. -,

, i-,.,;-:.X-I",".., -,r

-". , -, -:,,,,,."I".%,,

j ;.

ill, ", I-il -, " -.- -:

i'z-II,;

4. ,X ,.: , :-,,.-.',o ". ..""

_.,.z I;-'

-:.71 '.';."",-  ;,

i -- ,.2.,

-""T'3, - -,

- ,,t-'!,VVITH,,PENDICES"%,!",-"'-,"

7.!., , '-.,..p,.

- --. I,:, - ., '.'.--". - ',' . I -.t-

-'"-'-' .1 "..

. , I ., - .. ,.-.

i-;-!, ,.,-. ..,. .21,1

, -e '. .:,;, , ,,, :,.,-' ., ,%. -',' ,1,4

, I` --111-

.'t -,%.."...,A,, -- - .- , , !_'.'.',I.,, 4 I ;,k

-t . I -I -,- . - -

1, -: ,,.,-, ,)I"-,",;Ii;, ,- ,--,  ;,, -171,; .'*. 'I., "..."--,::,',,' -,; ,-,';-4:e., , 1',,,f ."'.'t : -i,.1E.li,... ,.,,;-;--.-,

I.,.',vr'I.---,7  ;, -. , .,. 4 11

-'7._; .- '. I ": , -.,,-'.:., ", `-, , ? . ':, k,`,. Z, Z,i ., ;.-,-.',

i I-.tl,,.,,  ; -. . ,,-, ,---vIi-,'7 I-T.,."",

- , -'.'. ', , ,, - ,. .- .,.,:-" ,. - -,-'. ., j i--<;".,:I.

'-VL'

,,.Yankee .. !I:'-'., '.tt--;', - . I " , ., . 4 ..; ,"-.- I-,

,.j,".1-." . !%,',,'4 -, i, ' ;; ",.,:-'A o---.,' z". -- .l.- , - I - - . ,Ji--- '11-11-,"." , , " '. ,.. - , , .., .. I j ;-,e  : . . ,,,,,I -- ', -,,!,- ,,.. . . i 4, 1

'I -,,';',,

- . ., -. I--,-',.,:- ...

1.f-'.,,I.

, 1%-.--. -..

.---. ... :,; -'J'Ii-,'I. j..; ..-... ,..".%,, .'r .. :w :.,-,, -. -',2,;--'..;. :, P.., ,;- .- ., , I " "Ii riI "i , , I , i -I -I I I I I.-, .,,- ,,I,.,,.::,

-.11-111I, -. , . . ,.. .. ; -"- ,`,t,,t,lz; ,I,". k... :,-., , F , ., -1 ,_,,, :.'Z_,%-, , lr., :2;,-;-,',.', :,';,',',',:%-'4 ', ;' "- -.... --, -,--,- , -,,%, z, , ;,' ,,-I, .,L,, " '.., .,',-., ., , I e ".. ' 4,'- il. , -- ,; ;, ',!,-`, :- j

, , ,l t:, -,i.-:.il "( Z ,""', .. !,,:-,

, ,.V. '! :,;- , -, .. j, _',.4 . .. . ,.14 .. ... . , i, ;: - : :,.% , ,.--. 2,, ,.-' - - ,; -,-, - i,-- j 111".-'.- , ; ,- . ,-,,,,.-"-,i

. Z- '. '. ,., , ,, ,,', -, - ---,;, ,-1.- , ...-,e,;

";"'Iz:. - - - ,, t_- -. I.,".

.,".: - ".., ........ 1,;. .I- , , - .J,--

, - , ,4.. ",' . -:, 'rZ--'..'--ff

, . .. ,11 t: - ", '. ""', <.,.

.,,2:.", -,2-,..--._i. ,...... , -,.-,-, , ,' ,`, - ,, -, - 1' . . ! -, .. , -, , '. -r ;r', 1'. i.., , , .

, I..1', N.., ,,., ,-.,: r,-. ",,,..I.. I , 4, -.,.", -y',": ':"-,i . .;,-I,.;C,'-.,; ,w, I. . , ,11. ., -, . .--,-,, -,,-!I.,,-

-1 ;I.,- -,,.

.:., I, -,Ct, ":"i.,..-N--. , v.--

-. :". 1,%i!,: I .2 -",,j,"l;,,,:.IL, ,... , , --

.-. .,,t'l;., , ,,,,,.!,'-I;I --l','- i :,:,! .'I , - -- -0. -, ,--'F.

", ,--_! 'I -i Z.: :1.  ;,.;,,I

";,--.,__,"I.,-,',..-

- el.,,, .,.e- r'.:j. -',,."-

" "'. , ,,- I -,- . --.,,-:,,-,,.- .- :-'Ii

-,.-.`.:,

_,:-"7, 1-;', -- .- .-

.--,.---  ;,, ,-..-S - At .. pflI200 ,-,`-,'-

I ':: .,--;.-,

,- ;-'.;-e- ". ,.,-
- - - --

-I_ , !-, ; ,,,,I-o -,-, , ; I, ""',..",

-'.'%','- -, -.'.- z,,-.',,-,;.,-

, , I..-,- , ,". , , , ,z,--.:I,. ..tle ?- - i..1-lr---..,.

,.1--.-.1-.'.':.-, , 4'. .-- -.,!-'I'e..'-t,.-"--,-,II--

'.,v -- I ,-- ,-' , -." ?r-

- ..,,11, -, "II , I-,'-;v

.. I I I4, 111'1:,",;:,. - .,

.. ", I .:'..-.-'111, ". I q "?, - "-,: .- ,. , . .",--

1. :I-, -,t .,q ., -

, .-- ; 1-..,,.;,.,-:j,.-."_.,.,."-

, .-, ; -i,Z- ' , ". t";!<.' r ' . .-..--I -4.

,--, .." ,:..., .. .-ij- -11 , ".,.,-11 ;,I :,.,.- . 111;

. ,,.-,-,.: I'....,. i-,, - I . .- - ,- f., r. ' l:,--

,i,:;,.'.,:,:,,,,1,1I.:.,;,;,-.1,IIli ,-- ,,--,:,; ,.i .). ;,:.',.,. ,il , -,!-.,.;- , 1;. , , .. --..- ..." , , 'I,-,-,..;-.' ,: -, ." , , . .-.': , ,F--a , -,,""'.

- ". ..- , I ; , .., ,- ,, - . . .. -.

,- -, - - --I 1 ,,i,,,;. -,. , " '.. --, "L'I ", .,.. ,.-.-','.--', .,

' I , , %, .- ,-, ',......

1, -t ,. Z14 . , - -..

e' 4 -..,,;- -, -

. - 7. - ,,, , ". .", -:. ,;-;)f, --, :, I,- ,-..-..::n 1- -'1.1 ,,-.. 1;I i1-' 1,J, 4.,- '.'-p"':  ; .I - ,-Z.t ..1,, ,,.:I,vl'., . ,%':, "t-..1-, -t i - i"I -; ,:.

-:I -z::,lf,

. f-,-,,'-,,

,,"I,,- 1. .1 1 -J +:. , --. el:d'4I.e.- I , :,,.i;.-- , .,-,.. . . ..,.:. -. '.-, , -;4

," " f I , 1, - '., :.., -.1 "I ..... ..," . :.II ,--::,-,,.  ; -.. ... ."... - ..',-P, I. V -, iI 1- i .-': -:'- ,-- ,":"-,,'I, ; ,- - "-;.".Ie .1 - %:

,.-e,', J. . , i " :1; '--- ,,, I- .?; , .",.,i , ;.,; II

,--lz,'

.. -- , " - :-p- r Q.' 17 . :--, . ..... ,, ,: ,':Ij 1-r..Ix .1

-,,Z" -,,I; ,.'.I : " -- ,-..:., .,,!; , . ,.-; z-... , " ,..,,,I. '--, ,..:,., .j!`-`-.- i.- r!' -,,,,;,,.;;,, i-, "  ; ,-,  ! 1 rI -,"I,;-

, ,cl -,,%,.11 i.,ji - ;w- -,.j -"..-I .-1,11.. -'111: '... -'e, , ,- -

--J,',-.Ie.--I.-i

'redlby '

-.. P t ,,-'

IIL .1. s- -

--:7::,-.

T

I--,.I%

--- --. - I 11- ;,,:. I - , --

- "'N - .- , ,-.

, -,'. - -,?-.. , o .,,-t' -,, ,  ;,. ,,;,

, -'. , t I-

,:t?4::-

"I - -

","-q'

,, - ,"t-ri--

.11,I-

-"I'i nl ,,, 1. 11

".-m

..li F i , 1 1:,Ik

, 1:.i.,n ..

:. fv:; :.".4"1,,;tA,;,-,!-,;,-",.t',-;,-"t."-,'I.',

1.

1, 1;

4

,1 I-1,

-,,.-,'I,

.e 1 -, ' . , .,,-, ; ,:.,-,; ': ".'..,!'.

, -,-". , ;ei, Z, retb.f,-.'-,",y,',, II-,

... -, 4-..:-

.. .,,L" ."",!! t , ; .--.V'Im- C.-:.;:.,. 1 --: .. 1 , ,!,,--il  !,'r; C-.!-5`_

.11.-- . :,-I,-',

.14 w'. 4 ,.. -- -, --

-,-,- 11-lwl'-..-"I: --., -,,--..- i 11-4-, -. 1, - I,-, , . , , , , -, 1.1,-".. x =.i ..- ; _,-,-I. .,- I--,,; --, , .. - .. , ,- -

V-'.I: .,,,--.l -,.

1,::I: 'I-'.. . . ;,. 4 ..-,,%:;j,-_,%. Z: ", - I.-,f " I.-,'; , -- ,.";.;,:.

!.-,..;,.,-`e'.'.."';.: ,--

., , -. 1"'V". ,"

,,"', ,--I .1, -,,' .. ,.,- ,' , ,1-1",.. i --. , ", -

,.f , -,,; , 4 ,-.. V, " , - 'i -. 1--....., ..-- k. -,.,, -- : j; : .-. ..  ;'I.e- iI 11 1.Z , - ".I-'.-

,1,-I. .. -%,,; .. .. -zN le"!-.-r - ,v.- -".. ;--_ 1,;z -I;,,4- ,-- -I' j, , ,' -',-- ,, 'i... - i ,- vI . .. I. I,j

,x ,i

,I.....,; i .. , .t -..- -i,,,,,--.--. hl-I......1:1.", C:,."-..., 1'.,. .,.

, .. -.1-- III , - - ... ;,- :," . , -Z, ,, .. . .. ....

-;,-Ij a,.- ,. .,.. ,. !4-:1 .; ""! m., .",..-, i!- ,-,!--- ,-- .,--,, , % "-x'3,,,,Ii,, I,

,I ,.

I,'11,,-,,-.-

"I . - ,ia1 - -,-?i;ll ---;,I'-.-,'-I.' I." ,-`,!-,.,-.,L ..1"I., , .---- --..'."Z441-,.Z.,

-'.-::; -I--.-,- ,'-,,,;

I -,,,,... . ,..:!.-.":.,.",-,.,,'..-,.'--

, .. ,%..-,-,:"; ,,Z- ,.--!l%,,,_-!,--"4; -- ..-- , -. ", N--.14' ,:;

, 4,.:.

1.--%

.t-,j-

,7-` '. ii I II..ic

. llf

-1I - t 11, ,', -I I jI . ;V,.Q i :,-.-,.

-`t.;X--Irz;,t "T, I,- 3-4.-,ar, I..I.-.I.-.1I.:Z:I,- -.-

I Z,,...e.-...., ... ... ... .---

. .. , ..:,t

. .I ,za;,!.'Z-,..",.."'.., --

.r, z,

-, -- I .- 1-' ...

.e.7 -..

":,-,;:, . III

!" -... 7:!. :-n--, -

-_-;,,i,.

5,- - -4 --,s ..'-7".,i I.% 4,:]:.

- ,-1

, -. 11-.11

,.j ,- ,-,t:f,- . , ". '!: " , ,,`,

-,Z,

`Ile47-7 ".,

.I:I-,j.a'-I I1. I-, --- i , 1, , ,:;;-.I . . .-%-I -.I i.,,',',' , -'.,.- -,...: ," : rf.- ,., 7 ..-. . " 1j:  :

... ! ... , ., -I.-, k - . :e - -,, "": .1. . . 1, - 1  : ,- -,-. .. -... 1. . ., ., --,%.,-, :t,; A,  : Z'; . F,4 i !.; -. 11-

.,.:-'. -r- C, -.,, I Z" " .r...- , . -",-'. ... jl.t -- ;4"':'",.:-_-, 1".. :'4---"--;.:',-+:. ;',f%% -Z 1,

': r!".

,-,-11. _, ,!:, Tita rD IDurat ---- --z, .--!Z`" .- '- - - - , 1-. ,-:,, :,,

",- . I.

- 4.. ---..

- , -. 4 --. , ,2,';p, ;-,,;et,.----..L.]; ., ..' ;-,--;-', ,------. ,.,.!
11-...'--,,r fj

'! ,....",% Z!", ':t I, -:',-.,',:,;--.""i,.!.-..,il.',

"Ir"".'-ft , :t ,,,,.,--,.,A.,,,-

,.,-,'z'.:,Ij,-1-.-s

,,-. - . . :.,,, -I;:---.`:

i-,". .,:,--7',-,%I-.

- -,--- , - Z 7.-iI L

14

. .i

.1. - 1, I.2'i. i, ,- . .. .., . ,:,.,-- ..  :', ,Ll'ir .,Zi . z . --. . - . r!:.!.- tt- ,-, " ..". -,", I 11 '-:-_,F:,-.",:,  :;1'- .. , :,.-' 4 .,.,. ."i..A:,

i-

'I.;.:v,1,,,

,--."."".--!."E'ngineenng 1.7:,---Z, Progranisi-,,.-,-.-.-!,-,-, --" : , ---;"',--'-: -"--"

" -",; : , " ..., , : '!;,. -., I - , - 1;1, v .... "-;J..,..,.

..-- -r. I I .-- :-,,,. - ;.',.,j " - .,- ,,., Z-,----,k.,.,-:-

-  :,-j;-:,,;,-  : j.:",--.

.,..4:`--- `,, .-I' , .'::- .. - J' k .,...... ,,

4.`-'.t.' , -,,-.'_,;,--,'.

4,.'., ":,:`-,  !-;..:-:4" --'.5.- ,:-",:-

".,. L I %I- ,-'

, `, -', .,. .. ;, -.-. , .. ., I-. ..:.I.r . ",,- . ,.- - ,,, . I1.-.

.. - . lw..;-,"-::-.--;-.._. -'.:-, - ,,'. -.."..,..--._

, ;... ,, i.., "I -I .,

I1. ,-" . '.'"--,-," ': ,.;., -j": . :I : -

, iI., w.i; "`,--4 ,V"', "  !,;nX,'t -- " .1 ,-, Z. .'....

..:- , :; --y. i ;I- "Z: ,., .:,,.,; .";'.

.. ,.,"..,-.,.,-.ISID&Oattn)edt-,-,!-,"-.'---.,-',:...:...

-,, .4.r. -,. i,-ti. w. -,- , ,, Z,,, , ;- e: :;: ":"',-...Z

',-,v -Jl I i  : ., fl t - L, ,, - - .:, "I t"'.. - ', , , '

-.  ;,:,-. , - - I ,  ; , - , -:,, 1,

--c -"'

i

., ,,-.,r '., , , . ---"", ...... ;I

't'. ,,',-.

eo,'.'

I.'- .. , ", '.

1 '4

.- .. .,,c - ..---,....l;--%_m , 'Iw :-..!';,

-. Ii -

'--'- ;: -,' -, -','. . , , .I

.i kp,.:".."

'. --.-: ,.' '4 i% 1, '. .,---; - 'r, . . ,."":. , ::-.'-'-' $ 'X. .V .-C, ..., .:., . -:,-4. .1; --,;,,I.,-,

?, 4, r I11. ,,;.,t;l . . "`--r!--- ---.

, :I -. -.

I-`i'7.,---: ,-.r,.;.:,

,;,61 ., .,-N,

.!,:. ...;$-.,-:. ,--- :- ;P, k-- ,,,.',.; - ... .,. ,-.. .- -!,- , ;t. -", ,..,,.il':';.

., - .,-, ,- I -. ,,,.,!;-

,,.".;".--'..Z*X'r---,-, ,: -ReVieW 5;1"A, .; , - -,

,... , ".-T: ,  ;,  ; - , I -k " . .. .-a, M., .... ;,,

-,,,,'- .. .:, . .- ,-, - -- I.,.. .".;  ? - .:, '-.'.,- k-,,,-.

, ,'-Jl I`, :",I11111.-. I'.

L, - : i , - i,-e',,'.-,!..

-. , :,- - '.,' -` ..

4'." , .- j ; - , -

.. -- .".,- .i - , ,.;,-..

. - .1- .---

4- - . ... .... r.%e- : .. -I-.1.. :. .-::. II

-- , I - I - "" , " ,

, I. - -,.

,.z.:"-,;,

- LI .

.. .: , .1 t.- - lde- ;.4'1w"-.,

" -n,.- - !., -.. '.., i,.!,' "., , -it ,.I-I :I,,,- :,-, -.- ,,-,. ." . - ..--....-.- .111;1.1.- , -,,,,! . Z'. " I 1. - -II .-

r-, 'i,,,-.f."?,:.-z,,,,-,il."..'I . ,.. -,. : -; ..

.;...C;',,,.,,'..'..":::""..--

I.--..-L,,,:.-,,,f

%t i

, f,'-. .1,1: "II ,.: ':

I..-

-eWbdl:'i,'

..,O, :,,-,,: ; ,,7:,-,,"-,

.. 1. ....,_-_R I.,

,. -.1.-,I.

-..-,,.,:!,il,--'..- - , ,

r r e.. .-

II ':, ,,,, ,.:-'4--Y.,: ....: -, '. I....!:,'$;-'-.

-,-:,','-;.:.... ' . A "", :,-. :' 71 -A,,-,: .,--."

11.1.'...

. . -_ '..., ;:.; ,7-::X"', - i,. .:; -r:! .-.: IZ- ,-.::-, .- ,. 1.

- -..1

- , 11 -I1.'.-;-` ,;%;;;- ..! -- , -.- .

"'.-r, '.,, ': ,7,1. 4'. 1:L. , ,. ..-- 1 ., -.... -"..,--," 1; -.1

. ... %C":"'tz:,  ! _-:. 1 '.I...-! ....... -'-As ,:t,-,': ., f, :. ,"':;; '.I 4.',;,,, I , .- 'r11" . ..

....... %1- zz.:I:":I,.

,.. -:._._IiF-:-.'- -, -; -. ,; . .;; wL 'l- ..!.-4-.-5'I--. ... . ,I.-.- ". 4,;, I -,-

', L. -.- ' "f'..,

"'..,I'..-, -,%;Z,,- I -... ...-;.,

,. .. X ;. - -.i, .,.-,--

,- r -, ,....-- , -i ". 1. ,I:.,--,-. .- I,.m .-, ,. .--_- ,.,,..',"VS-'.;: .'- -;:,.: ee. " -. -,7'.!'-;.' ,-1--

.-. '.,-.; i . ". -,..-:-,g%. - -I. .7,;..- ..".

... ...711- 1111,

,.:xi--,-,: ......

_. ; , -, -,! -.." _,,;--I:",

X .,I 7-e.,- , I'--r, - --,-',;

. "I' %_-  :'. .,-I,..,.,

-,.: 't .111, 1.

1-1 I '. ..- ., ,e,,,]-':- -zL-":-'-.,,-,.,.,,.,,  :.I;',,, i! ,.

--,!,- ',' : ".-1 , ;,!"-7L...-w..I...... - .--11,;-'17.,:1-2" I-,-, I , - 4 4 -.. ,I. -,.. " .".

,,: - "!?'..-, . _ ,

r..-",'i-,-',,,,-':'-,'.,';-,4-.--,f t'.. ,':-',':-,,-.-.

1.ZY

-,-;, .-;'-;-Z-"%, -,,. ,4

.;7L- - I "f .." -lw -'l--z-I I -%

17)

'O ,.-I.;t...--

v J !:77f, . ,e- ": -.....

-e-.4 r,.I

-.. .  ;' -- I:-

- II..

.'- 'i ; I,-...-- , .--. ., . 1..

.21... - , . ,,;-I`;-,,

. / ;2 A

.n, - -.

i-.:

.l.'al"I-Y .I.-.-.I--I I II.: 4 -:

1'..,

"I.1 I .----,-. .- E, >:; ,-. .- ".;

.: 1I-

-7 -,-,. .. - .I I ,-

.V::i,,-.---

, - -: , , -I- ... -- -w .- :;/.,. .- , -"-, - -,...

.--..r:.I,-I

.., .: -, :- I. . -,-,;, - -, ," -:'",-:. I..,.:: - ".. ., :4 -' 7,-,

-- -,.'. bij,.,----.,..-., ,_,.. -,- .- -- ,-:!v- . ?,  : , .f. II-- . .:._: v '%,

14.I'.!

1.Z.,... --

v---,--! ,,

1.1-1.-- , ,-, :4 -..I..,,,"

.-- -.:-1---- .,,,

i,;,,-- ,...-.

,(jKh`.R:iO'X - -,,,.-,-,:t -. I:I.-, '..- -,....,--.",i-

. .L;j.i. : I.' .--,.. -..-

.. ...-...-. ,I ...-.

....I I,:,

.I 1I.

.- :7

.,,- -.,:,I.,- , I, 1-1,,,`',. " ,- :,

, ,'-.-;.,1'.'; -,'-:, - - --.-. -itrator

,"na..:.,.

Wrb'Orbth

, ; ,,v-,;-,..-

. -,;;. ', . -; ->7;; - - - ..'I,-,,--,q-.-"-......,

.; -,.;,! -. Z: - ,,.:I

.:r ;;I.-.

I I--;:,L-f-.. -, 7I. i".-" .. 1:------ -.--,-

.1. ,

-I" .. ,;I " ,;.. ,. -- , - ".:- ---i,, ,;: "',,-;, " - ,- . -. i -.-.....- .:.11--.:.--..I -, w, -,s"  :-, : !-F '-Z,,'. :I -. , I-. . '. , ;:"e.

-.-- ,--;,---,,:-- - , '., , ."....,.1 , ---. ",:.f  : ..-.,..i. -. 1 ... .:.-:..-- i.-. . .--- :: :.-.! .,. ,-:

.- ,,c,.-'

-. . I::..ji% ,.... .

,:-I',',,;-

.- -- .. a....-:..:..I. b .I -1. i.

,-- .-I,, 2 -.,-:,..-.:--; .--- -, r "'. .- I; ..T--- -- !!,-, .- ..- ". ...-,J -. -.. .--- -, -.-.-----'

...-c.- , , . ;:,.....:.w; .., : .:- .. .. ,-I.n

, .".. -,. :-- I ,.I.
... --! ,--, _.!
.-, ;"..-1: i -, --.,. : ! .-. i, ". --. ,--  : .. i .. : . . F.

-, zI.--.. ..--,-..... w --r.-....:...:a-..I1. -...

-,,,--- -,I "-. I, 7.', -, ;..

..1,:..T ... I .. ` -- : I-', 1 ;Z; ..z-.-..-... :I..-I--...

, -, ',tI-.-..:..-.;'.:,..;

w,--.:-:--a.:

-....-II-..., .,:;

--.- ,!,  : : - .- II

-,'.. .IiI. ........

. I:.,,:"-.,.I..---.  :...-...- I-I.,

....:---...---......--- ,--I.....-;I. _

.-.i- ------ Ijil::.;416vibMbv....

-.!-  ;-.:..'.....:-;-. .. ....... .bII- . App ...,Gaved---:,--...i;.,.,'I-I,.,,;--: ..., y,.--.,;:I_.:....

I 111_I;i..,, ,;- '.. , ,.  ?-,

-'.1..-"--: : ,-I.1,.......I. ...- . .:.,.... .; -.i,...' , .-, ,-,;" -'--',I  :,', -, '... 7'k , .;.

.-..': . I. ., .. .. -L, .I...-:. . . ........ ..... p--......., -.t ., , ,-I, -,I, -': ,`,,'.;iJ ,

.. -..- ;-.,-,.- :,.. .. :.- -.. ......... .-- --..... . ... :....,- , ,. . .I,, ,-",- -.-. .- -... .i .'., 1,,-' 4

, : -,: -, . :, z J... ,

-% ... ,,) . .:I,I 11 -

..... .-..  :..-4.  :..m...,,,I....... ..... .  :::::::......: ,-.1,; - ,.. III 1.. -

.. ..--;. ,-:,.-1-7....... I 1:II--..

,,-- .:-. -.. ..-:.....:i- r .- 7. . %. .- -- ,-.

_i ,-.:  :.- -i z,:;- .... :, .. aide.....,.Z,:: .-- ...--  :-..1 .. - 7. ., -,  !.-'-. ,,., ""-, 7,.,e, :`-,,,".., I : .

- .. 111\,r ;.1,,..e74c:... .- , ee"' ;' :,, ,

, ,1-'---

..... ,-1I.......:,::

,.--.,., .j .:.. _;.  ?,',, ..  ;%,-,- , , ,,--I L" I;

. .
-:...- ..- . "::.,, - "....--. -. --- ,-.-.V fe;;, I-i Z:,-- ,-, ,-.-..,-q-:" 't`,--

,O?-. --,.. .-:..-..., -- --- , ` "'.,,

v
!; -,l: ., , --..... ,.:;,-...:... '.....:. .: -.- tz'_', ;. . -:::",%'. .

., ,-...In7 I-..-,.--. .....-- :'- .:

.... '----, '.... .. .... .. v, Ib`-'I..- - - ,. .!!,;- .... --"A

.....-.. I-,....'. .....- . . 1. ::,... -. .-,I,.--

"ILuettgbflANII)'.' ..., ' --- ;-f-

.......... .. .:.. :.....,.... . -. I: -.--- ,..-; ,., -.-

,or. '....- '. I:.....

sv..

.- i -:,-:-

,11.

I!,

- -!,,,-' --- H B;CT.. ' '.-

r,-: -'..1 ,, .:---,..,--.11 . .,............:.,I-.i.I,.'I. . . .... .........--w.I--z,:.

, ."..-L......:1.
: ;,-,--;,r..-

............  ;.-..-----..... ...... . : .... I..: I

- . 7., ,,,.......

.,; ., ;...: .... ...:. ..  :....,:.........-X .- -- !- ,.. --,

'C ". .11 -- -.. .-..................-_

-J; . --;--.::  :....-:..:!.:-.:1

,- ,-............  : ... ..-.......: .. w.. . ..... . .. :,,-.-,..:..-..........

....... a....:..,-.-.... .,.I:. -:1,: ,.

4. -- ,I -- ,....,Z,........ I .-.... .. .....  : :;., - ,j- , -.. 1:.

, -- , "'e,.,, ......-.  :..-,....  : 1.:-I.... 4, -,.,

I -. te,, .- Z,;'.., r.If ,, ---,.1'. ,--.,..... .  :....: ...... .,,, ,"'.  :.:-..:: ..  %.: .:..:... .. .. ,I.:..:.-.....

-. . ..-. .. :: . :':,-- !, ,...1 ;. ... ....-- . .-.... .: .1. ";

...... - -..--.. ...  :. .-; - 1.-. ...!_., ... -. ,-$

...I. I-"-. --,

I---w --1, -, "i-.,

,: wI...I-:,...- .......

. !, .: series ,:,,,,-,,,,,,

-.. to:.- :..2med' -'RMS :-'- '(1,COPYIrnsmuer

,:;., (1 COPY,.Odginal

.:.:.. d ').:; ,-W.O.#

,:-::. 50071724

,.....:.-11.:
.I i -... .. er"-- - -

I. : I t

.
. i.,:...,.I.-)-- --.m-. -,,--.JsI

,.I:...-:-.:..-.:

I'.,.....I-,i  :,,;, 't. IL -.  %..., ";

y SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT ABSTRACT This report represents an accumulation of information pertaining to the ISI activities conducted during Salem Unit 2 Refueling Outage 14 (RFO-14). ISI/NDE exams were conducted in accordance with the Salem Unit 2 Inservice Inspection Program Long Term Plan.

Inservice Inspection (ISI) nondestructive examinations were completed of selected Salem Generating Station, Unit 2 (Salem 2) Class 1, Class 2, Class 3, and Class MC, and Class CC components. These examinations were performed by PSEG, Framatome-ANP, Magnaflux Quality Services (MQS) and Wesdyne personal during April, 5 2005 thru May, 11 2005 (35 days).

These examinations constituted the fourteenth (14th) outage overall and the first outage of the first period of the third interval (3rd Interval 1 st Period, 1 st Outage 3-1-1) at Salem Unit 2 marking the start of the Third 10- year Inspection Interval of operation. This Final Report covers the time period (approximately 18 months) between breaker closure after RFO#1 3 (11/27/2003 until breaker closure after RFO#14 (05/11/2005).

ISI/NDE exams were completed in accordance with ASME Section Xl 1998 up through and including Edition 2000 Addenda. Ultrasonic testing requirements were completed in accordance with ASME XI Appendix Vil as amended by 10CFR50.55a Final Rulemaking.

Other ISI/NDE examinations were also conducted using Visual (VT), Magnetic Particle (MT),

Liquid Penetrant (PT), Manual Ultrasonic (UT), and Radiography (RT) nondestructive examination techniques.

Containment Inservice Inspection examinations were conducted in accordance with ASME Section XI IWE/IWL 1998 Edition up through and including 1998 Addenda as amended by the NRC's Safety Evaluation Report (SER).These examinations constituted the second (2nd) outage of the first interval (1st Interval 2nd Period, 2nd Outage 1-2-2) at Salem Unit 2 marking the end of the second period of scheduled exams of the First 10- year Inspection Interval.

This Final Report covers the time period (approximately 18 months) between breaker closure after RFO#13 (11/27/2003 until breaker closure after RFO#14 (05/11/2005).

This report also contains augmented examinations required by Salem Unit 2 Technical Specifications and commitments made in response to United States Nuclear Regulatory Commission Regulatory Guides, Circulars and Bulletins and selective preventive maintenance examinations.

Page: ii

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT TABLE OF CONTENTS PAGE FINAL

SUMMARY

REPORT WITH APPENDICES ABSTRACT........................................................................................................... ii TABLE OF CONTENTS .. iii APPENDICES ................ iv, v, vi I.

SUMMARY

REPORT A. Applicable documents .2 B. ISI Section Xl (Vol. & Surface.) Examinations Performed .2 C. ISI Section XI RPV IWI Visual Exams. 3 D. ISI Section Xl Visual Examinations on Valves and Bolting . 4 E. ISI Section XI Visual Examination of Component Supports . 5 F. ISI Section Xl Visual Examination of Containment Integrity. 5 G. ISI Section XI System Leakage Examinations .5 H. RCP Flywheel Examination per USNRC Regulatoryl.14. 6 I. Risk Informed Break Exclusion Region RI-BER .6 J. Augmented Bolted Connection exams per ISI Code Case N533-1 . 6 K. Augmented System Leakage Test per NUREG - 0578 .7 L. Additional Augmented Examinations Performed. 7 M. Preservice Examinations on Various Bolting Materials .8 N. Preservice Examinations on Various Piping Welds .8

0. Preservice Examinations on Various Component Supports . 9 P. Erosion / Corrosion UT Thickness Program .10,11 Q. Reactor Pressure Vessel Head Replacement .12 R. Functional Testing of Snubbers per T.S. 4.7.9(C) ........................ ....12 S. Explanation of the Outage ISI Examination Plan Format 13,14 T. List of Acronym's .15 - 18 Page: iii

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT II. APPENDICES VOLUME 1 A ISI Exam Plan (S2RFO#14, Rev. 1, 06/15/2005) Pages 1 Thru 113 B ISI Exam Results (S2RFO#14, Rev. 1, 06/15/2005) Pages 1 Thru 33 C ISI Flywheel Exam Plan (S2RFO#14, Rev. 0, 06/15/2005) Page 1 D ISI Flywheel Exam Results (S2RFO#14, Rev. 0, 06/15/2005) Page 1 E ISI IWE/IWL Exam Plan (S2RFO# 14, REV. 1 06/15/2005) Pages 1 Thru 64 F ISI IWE/IWL Exam Results (S2RFO# 14, REV. 1 06/15/2005) Pages 1 Thru 15 G Examination Allocation Percentage Review (01/07/2004)

H Class 1, 2 & 3 Exam Limitations Greater Than 10% for the 3rd Interval, 1st Period, 1st Outage (S2RFO#14),

I Revision Data Report for the Second Ten Year Inspection Interval (S2RFO#14,)

J PSEG Notifications, Listed by Summary Number (S2RFO#14)

K S2RFO#14 OAR Report (Code Case N-532)

L PSEG / Vendor Correspondence (S2RFO#14)

M PSEG / VENDOR NDE Procedure Listing N Certificates of Vendor Personnel Qualifications O Consumables Material Certifications P Equipment Certifications Page: iv

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT II. APPENDICES (CONT'D VOLUME 2 Q PSEG Visual Examination Field Data Records Visual Data Records Numerically Assembled By Summary Number.

R PSEG Visual IWE Examination Field Data Records VT-G Visual Data Records Numerically Assembled By Summary Number.

S PSEG System Pressure Test Field Data Records System Pressure test Data records Numerically Assembled By Summary Number T PSEG #22 Cross Leg White Residue Augmented Exams Surface and Visual Data records Numerically Assembled By Summary Number.

U MQS Field NDE Examinations Field Data Records performed by MQS Numerically Assembled By Summary Number V WESDYNE #24 RCP Shaft Ultrasonic Examination Final Report for #24 RCP Shaft Examination performed by Wesdyne VOLUME 3 PSEG Reactor Pressure Vessel Lower Head Exams 2005 Reactor Pressure Vessel Lower Head Visual Examinations PSE&G Salem Unit 2 Nuclear Generating Station, RFO# 14 VOLUME 4 Manual Examinations 2005 Section Xl Inservice Inspection Final Report Revision 00. For PSE&G Salem Unit 2 Nuclear Generating Station, RFO# 14 (Framatome)

Page: v

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT II. APPENDICES (CONT'D VOLUME 5 Flywheel Examinations Section Xl Inservice Inspection Ten Year Examination Performed By Framatome.

VOLUME 6 & 7 Reactor Pressure Vessel Head Replacement Reactor Vessel Head Penetration Baseline NDE Inspection Final Report 51-5061492-00 Performed By Framatome.

VOLUME 8 Boric Acid Corrosion 2005 Boric Acid Corrosion Inspection Final Report Revision 0. For PSE&G Salem Unit 2 Nuclear Generating Station, RFO# 14 Page: vi

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT I.

SUMMARY

REPORT During the refueling outage (RFO14), PSEG, MQS, FRA-ANP, and Wesdyne personnel performed inservice inspection nondestructive examinations (NDE) of selected Salem Generating Station, Unit 2 Class 1, Class 2, Class 3, Class MC, and Class CC components. These examinations constituted the fourteenth (14th) outage overall and the first outage of the first period of the third interval (3d Interval 1st Period, 1 st Outage 3-1-1) at Salem Unit 2 marking the start of the Third 10- year Inspection Interval of operation.

This Final Report covers the time period (approximately 18 months) between breaker closure after RFO#13 (11/27/2003 until breaker closure after RFO#14 (05/11/2005)).

Containment Inservice Inspection examinations were conducted in accordance with ASME Section Xl IWE/IWL 1998 Edition up through and including 1998 Addenda as amended by the NRC's Safety Evaluation Report (SER).These examinations constituted the second (2nd) outage overall of the first interval (1 st Interval 2nd Period, 2nd Outage 1 2) at Salem Unit 2 marking the end of the second period of scheduled exams of the First 10- year Inspection Interval. This Final Report covers the time period (approximately 18 months) between breaker closure after RFO#13 (11/27/2003 until breaker closure after RFO#14 (05/11/2005)).

This report also contains augmented examinations required by Salem Unit 2 Technical Specifications and commitments made in response to United States Nuclear Regulatory Commission Regulatory Guides, Circulars and Bulletins and selective preventive maintenance examinations.

Allocation tables are contained in Appendix "G" of this report.

This report is presented in 8 volumes as follows:

Volume 1 - ISI Salem 2 RFO# 14 Summary Report with Appendices A through P Volume 2 - ISI Salem 2 RFO# 14 Appendixes Q thru V Field Data Repo rts Volume 3 - ISI Salem 2 RFO# 14 RPV Lower Head Examinations.

Volume 4 - ISI Salem 2 RFO# 14 Manual ISI Exams Final Report (Fram atome).

Volume 5 - ISI Salem 2 RFO# 14 RCP Flywheel Ten Year Exam Report (Framatome).

Volume 6 & 7 - ISI Salem 2 RFO# 14 RPV Replacement Head Final Report (Framatome).

Volume 8 - ISI Salem 2 RFO# 14 Boric Acid Corrosion Final Report These Volumes are available at the ISI's office for review.

Page: 1

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT A. Applicable Documents ISI/NDE exams were conducted in accordance with the following documents:

  • Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, "Rules for Inservice Inspection of Nuclear Power Plant Components", 1998 Edition 2000 Addenda.
  • Ultrasonic testing requirements were completed in accordance with ASME Xl 1998 Edition 2000 Addenda Appendix VIII as amended by the 10CFR50.55a Final Rulemaking.
  • Containment Inservice Inspection examinations were conducted in accordance with ASME Section Xl IWE/IWL 1998 Edition up through and including 1998 Addenda as amended by the NRC's Safety Evaluation Report (SER).
  • Salem Generating Station Unit 2 Inservice Inspection Program Long Term Plan, Third Interval, Revision 0.
  • PSEG's Salem Nuclear Generating Station Unit 2, ISI RFO EXAM PLAN (S2RFO#14, REV. 1), Third Interval, First Period, First Outage.

B. ISI Section XI Volumetric & Surface Examinations Performed.

Framatome-ANP, Cooperheat / MQS and Wesdyne under the direction of the PSEG ISI Group, conducted Twenty-Six (26) manual ultrasonic (UT), eleven (11) liquid penetrant (PT), Four (4) Magnetic Particle (MT) Examinations, five (5)

Radiography (RT) examination and one (1) RCP Shaft ultrasonic exam.

PSEG Nuclear applies Risk Informed Inservice Inspection (RI-ISI) of Nuclear Class 1 and 2 Piping Welds, formerly known as ASME Section Xl Exam Category B-F, B-J, C-F-1 and C-F-2. The bases of the Salem Unit 2 RI-ISI Program are documented in the Salem Nuclear Generating Station - Final Report - Risk Informed Inservice Inspection Application (VTD-326046).

During 2R14 ISI NDE examinations were conducted of the following Class 1 and 2 systems and components:

Examination Results Were Satisfactory.

Page: 2

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT B. ISI Section Xl Volumetric & Surface Examinations Performed. (cont.)

Class 1 Vessels

- Rx Vessel Upper and Lower Head Penetrations

- Pressurizer

- Steam Generators Piping

- Reactor Coolant

- Safety Injection

- Residual Heat Removal

- Chemical and Volume Control Class 2 Vessels

- Steam Generator

- Residual Heat Removal Heat Exchanger

- Boron Injection Tank

- CVC Tank (VCT)

Piping

- Feed Water

- Main Steam

- Residual Heat Removal

- Chemical and Volume Control

- Safety Injection

- Containment Spray C. ISI Section Xl Reactor Vessel Visual (IVVI) Examinations Performed.

There were no IWI Examinations performed this outage.

Page: 3

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT D. ISI Section Xi Visual Examinations of Valves and Bolting PSEG's ISI Group conducted Twenty-Eight (28) Class 1 bolting exams and One (1) Class 1 valve internal exam.

The following components were examined:

Su4mmary~oi'Copnn!;- i'- -I-ommet 051100 l 6-PR-1205-10FB 1 VT-1 Exam of Bolting 063760 1 4-PS-1231-1 OFB VT-1 Exam of Bolting 255050 ~ 2CV2 BOLTING VT-I Exam of Bolting 255100 1 2CV277 BOLTING VT-1 Exam of Bolting 255150 .. 2CV79 BOLTING . VT-I Exam of Bolting 255200 2CV275 BOLTING l VT-1 Exam of Bolting 255550 2PR5 BOLTING VT-1 Exam of Bolting 255675 12PR7 BOLTING VT-I Exam of Bolting 255700 f 2PR2 BOLTING J VT-1 Exam of Bolting 255800 2PS28 BOLTING VT-I Exam of Bolting 255850 l 2P53 BOLTING l VT-1 Exam of Bolting 255900 l 2PS29 BOLTING l VT-1 Exam of Bolting 255950 2PS24 BOLTING l VT-1 Exam of Bolting 255975 2PS1 BOLTING 0 VT-1 Exam of Bolting 256000 2P. 25 BOLTING . VT-I Exam of Bolting 258200 23SJ55 BOLTING ( VT-1 Exam of Bolting 258350 22SJ55 BOLTING f VT-1 Exam of Bolting 258400 22SJ56 BOLTING j VT-1 Exam of Bolting 258450 21SJ54 BOLTING f VT-1 Exam of Bolting 258700 24RH27 BOLTING 1 VT-i Exam of Bolting 258850 BOLTING

_24J156 VT-I Exam of Bolting 259000 22SJ43 BOLTING VT-1 Exam of Bolting 259150 j215J15-6-BOLTING VT-I Exam of Bolting 259200 J2J513 BOLTING VT-1 Exam of Bolting 259250 2SJ135 BOLTING VT-1 Exam of Bolting 259300 f 2SJ12 BOLTING VT-1 Exam of Bolting 259400 21SJ40 BOLTING VT-I Exam of Bolting 259450 2SJ150 BOLTING VT-1 Exam of Bolting 175575 21 SJ 43 VT-3 Exam of Valve Internals Page: 4

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT D. ISI Section Xl Visual examinations on valves and bolting (cont.)

ISI Section Xl examinations were conducted on the following systems:

- Safety Injection

- Reactor Coolant

- Chemical and Volume Control There were no unacceptable exam results identified.

E. ISI Section Xl Visual Examination of Components Supports PSEG Nuclear's ISI Group conducted 11 scheduled VT-1 and 98 VT-3 visual examinations.

There were no unacceptable indications identified F. ISI section Xl Visual Examination of Containment Integrity.

PSEG's Nuclear ISI Group conducted 6 VT-G IWE and 186 IWL Visual Examinations There were no unacceptable exam results identified.

G. ISI Section Xl System Leakage Examinations PSEG Nuclear's ISI Group conducted thirty seven 37 System Pressure Tests of System Functional or Inservice Test, on Nuclear Class 1, 2, and 3, in accordance with ASME Section Xl.

A system leakage exam was performed in accordance with ASME Section Xl on all Class 1 Systems. The system leakage test was performed with the Reactor Coolant System in Mode 3 (normal operating pressure) with the insulation installed. No pressure boundary leakage was detected.

Work requests were initiated to correct minor mechanical leakage that was not corrected during the system walk downs.

Page: 5

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT G. ISI Section Xl System Leakage Examinations (cont.)

Class 2 and 3 System Pressure Tests were conducted of the following systems:

- Auxiliary Feed Water - Station Air

- Component Cooling - Spent Fuel Pool Cooling

- Containment Spray - Safety Injection

- Control Air - Sampling

- Fire Protection - Service Water

- Residual Heat Removal - Ventilation Control

- Reactor Coolant - Waste Liquid There were no unacceptable results Identified H. RCP Flywheel Examination - USNRC Regulatory Guide 1.14 Framatome-ANP completed required ultrasonic and surface examinations on #24 reactor coolant pump flywheel Serial # 1S76P917 in accordance with station technical specification requirements.

There were no unacceptable exam results identified.

I. Augmented High Energy Piping Welds Risk Informed Break Exclusion Region (RI-BER) (Branch Technical Position MEB 3-1)

PSEG Nuclear applied Risk Informed Break Exclusion Region (RI- BER) of Nuclear Class 1 and 2 Piping Welds, formerly known as MEB-3-1 Program. The bases of the Salem Unit 2 RI-BER Program are documented in the Salem Nuclear Generating Station - Final Report - Risk Informed Inservice Inspection Application (VTD-326046).

There were no welds examined, during RFO-14 to comply with the Risk Informed Break Exclusion Region (RI-BER).

J. Augmented Bolted Connection Exams- Code Case N 533-1 PSEG's ISI Group conducted eighty two (82) Class 1 bolted connection VT-2's in accordance with the ISI Long Term Plan Program and Code Case N 533-1 There were no other unacceptable exam results identified Page: 6

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT K. Augmented System Leakage Tests per NUREG 0578 "TMI Lessons Learned" PSEG's ISI Group conducted twenty-seven (27) System Leakage Tests in accordance with NUREG 0578 on the following systems:

- Safety Injection - Residual Heat Removal

- Chemical and Volume Control - Containment Spray

- Sampling - Boron Recovery

- Waste Gas - Waste Liquid There were no unacceptable exam results identified.

L. Additional Augmented Examinations Performed.

-Si#K - .Copoie~nt ID - Descripton t - - .. NDE :

007115 RPV LOWER HEAD PENETRATION WELDS ON LOWER HEAD VT-2 Flux Thimble Tubing Dissimilar 007116 Metal weld FLUX THIMBLE WELDS ON LOWER HEAD VT-2 012520 PZR Inst. Penetrations Instrument Nozzles (4) Top- (4) Bottom VT-2 080010 24 HOT LEG Thermal Welds 24 HOT LEG Thermal Welds VT-2 081210 23 HOT LEG Thermal Welds 3 HOT LEG Thermal Welds VT-2 082210 22 HOT LEG Thermal Welds 22 HOT LEG Thermal Welds VT-2 083310 21 HOT LEG Thermal Welds 21 HOT LEG Thermal Welds VT-2 083410 24 COLD LEG Thermal Welds 24 COLD LEG Thermal Welds VT-2 083420 24-STG Channel Head Steam Generator #24 Hot/cold Channel Head VT-2 084410 23 COLD LEG Thermal Welds #23 COLD LEG Thermal Welds VT-2 084420 23-STG Channel Head Steam Generator #23 Hot/Cold Channel Head VT-2 085610 22 COLD LEG Thermal Welds #22 COLD LEG Thermal Welds VT-2 085620 22-STG Channel Head Steam Generator #22 Hot/Cold Channel Head VT-2 086510 21 COLD LEG Thermal Welds #21 COLD LEG Thermal Welds VT-2 086520 21-STG Channel Head Steam Generator #21 Hot/Cold Channel Head VT-2 251555 #24 RCP SHAFT #24 Reactor Coolant Pump Shaft V-2 NO.21 Accumulator Instrumentation Nozzles 734262 2SJE6 Penetrations -2 NO.22 Accumulator Instrumentation Nozzles 734263 2SJE7 Penetrations -2 NO.23 Accumulator Instrumentation Nozzles 734264 2SJE8 Penetrations -2 NO.24 Accumulator Instrumentation Nozzles 734265 2SJE9 Penetrations -2 There were no unacceptable exam results identified Page: 7

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT M. Preservice Examinations of Various Bolting Material Replacements One bolted connection was installed as new and is identified below.

Preservice Examinations of Various Bolting Material Replacements ITEM PSEG PSEG PSEG NO. Sum# COMPONENT DCP # CJP # Order #

1. 063760 4-PS-1231-1OFB 80050214 60042309 60042309 The applicable (PSI) examinations were performed with no unacceptable exam results identified.

N. Preservice Examinations of Various Piping Welds Due To Repair!

Replacement I Modifications Sum # ISI Component ISO Component NDE Order #

ID ID Method 063710 4-PS-1231-27A FW-2-RC-81-3 RT, 60042309 063720 4-PS-1231-27B FW-2-RC-81-4 RT, 60042309 063730 4-PS-1231-27C FW-2-RC-81-5 RT, UT, 60042309 063740 4-PS-1231-27D FW-2-RC-81-6 RT- UT, 60042309 063750 4-PS-1231-27E FW-2-RC-P-98-1 RT, 60042309 330760 14-BF-2221--9 S2-2-SGF-34D RT, 60054088 330770 14-BF-2221 -10 IS2-2-SGF-34J IRT, 60054088 The applicable (PSI) examinations were performed with no unacceptable indications identified.

Page: 8

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT

0. Preservice Examinations on Various Component Supports and their Associated Integral Attachments Due to Repair/ Replacement / Modifications Twelve (12) component supports or their associated integral attachments were repaired / replaced or modified as identified below:

Preservice Examinations Of Various Component Supports And Their Associated Integral Attachments Due To Repair/ Replacement / Modifications ITEM COMPONENT PSEG PSEG PSEG NO. Sum# SUPPORT DCP CJP Order #

IDENTIFICATION

1. 008050 2-RPV-21-TIE-ROD 80057548 80057548 80057548
2. 008150 2-RPV-22-TIE-ROD 80057548 80057548 80057548
3. 008250 2-RPV-23-TIE-ROD 80057548 80057548 80057548
4. 008250 2-RPV-24-TIE-ROD 80057548 80057548 80057548
5. 039160 2C-PRA-235 80050214 60042309 60042309
6. 063350 2C-PHR-222 80050214 60042309 60042309
7. 063975 2C-PHR-220 80050214 60042309 60042309
8. 066850 2C-PGR-228 80050214 60042309 60042309
9. 067450 2C-PRH-221 80050214 60042309 60042309
10. 330740 2-FWH-22-19 N/A 50071724
11. 722590 SWPG-20 50071724
12. 722620 SWPG-21 50071724 The applicable (PSI) examinations were performed with no unacceptable indications identified.

Page: 9

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT P. Erosion / Corrosion UT Thickness Program In response to NRC Bulletin 87-01 and Generic Letter 89-08, Two hundred and one (201) components were scheduled for UT thickness examinations. All calculations and evaluations can be obtained by contacting the FAC program engineer.

The following component was replaced, due to the results of the erosion/corrosion UT examinations performed.

Erosion I Corrosion UT Thickness Program ITEM SYSTEM COMPONENT ID COMPONENT NO. DESCRIPTION

1. Feed Water 2-SGF-34-Ll 14" Elbow The following components examined are linked to the ISI Section Xl Program.

Cmp t scription - ' SICornpoient,11 N-22 2-SGF-34-Ll 14" Elbow 14-BF-2221 Welds 9 &10 The following is a break down of these examinations.

a. One (1) component was replaced.
b. Two hundred (200) were acceptable for continued service, based on minimum wall design requirements.
c. No components required a weld build-up.

Page: 10

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT P. Erosion / Corrosion UT Thickness Program (Cont.)

The following components were replaced as a result of low readings obtained during Salem 2 RFO-13 outage.

FACV# .Component D --

Description:

' A System D-81 2S-BS-326-RI 10" X 8" Bleed Steam Reducer J-36 2S-RS-1095-Cl 1.5" Coupling Cold Reheat M-109 2S-C-1 7-L2 24" Elbow Condensate N06 2-SGF-37-Rl 14"x12" Reducer Steam Generator l_ Feed N07 2-SGF-52-El 12"x14" Steam Generator Expander Feed N-22 2-SGF-34-Ll 14" Elbow Steam Generator Feed N-30 2-SGF-6-Vl 12"x14" Steam Generator Expander Feed FAC # Component IDO; Description System N-49 2-SGF-1 13-T4 18"x14" Tee Steam Generator Feed N-52 2-SGF-1 13-T3 14"x8" Tee Steam Generator Feed N-64 2-SGF-38-El 12"x14" Steam Generator Expander Feed N-65 2-SGF-23-Rl 14"x12" Reducer Steam Generator

._ Feed N-66 2-SGF-24-El 12"x14" Steam Generator Expander Feed N-67 2-SGF-51-Rl 14"x12" Reducer Steam Generator Feed N-68 2-SGF-6-Rl 14"x12" Reducer Steam Generator Feed N-70 2-SGF-51-Ll 14" Elbow Steam Generator

__ Feed N-73 2-SGF-30-Ll 14" Elbow Steam Generator N_74_____Elbow _ Feed N-74 2-SGF-13-LI 14" Elbow Steam Generator Feed There were no other unacceptable exam results identified.

Page: 11

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT Q. Salem Unit 2 Reactor Pressure Vessel Head Replacement.

Salem Unit 2 Reactor Pressure Vessels head was replaced by Framatome-ANP during the RFO-14 Re-Fueling Outage. All CRDM Penetrations were inspected by Framatome and results can be found in the Reactor Vessel Head Penetration NDE Inspection Final Report # 51-50611492-00 which can be found in Volume 6 of this final report.

R. Functional Testing Of Selected Snubbers- Technical Specification 4.7.9 (C)

LARGE BORE REXNORD HYDRAULIC SNUBBERS Hydraulic snubbers were tested using the Technical Specification 4.7.9(c), 10%

sample plan by Wyle Laboratories using the API in-place snubber test machine and the Wyle Laboratories Model 150 snubber test machine as follows:

- Two (2) S/G 1,000 Kip -Rexnord There were no degraded and or failed snubbers identified during testing.

LISEGA HYDRAULIC SNUBBERS)

Lisega snubbers were tested using the Technical Specification 4.7.9(c), 10%

sample plan using the Wyle Laboratories Model 150 snubber test machine as follows:

- Twelve (12) Lisega small snubber There were no degraded and or failed snubbers identified during testing.

A Feed Water System medium mechanical snubber found damaged and replaced in kind during RFO# 12 was visually re-examined before and after shutdown with the examination results found satisfactory.

All accessible Unit 2 Snubbers were visually examined per Salem Unit 2 Technical Specification Section. 4.7.9 Examination results were found satisfactory.

Page: 12

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT Section S Date: Salem Unit 2 Nuclear Generating Station Page ISI Program Long Term Plan Third Interval Class I Components Revisi on:

Sumrma 'Com onent]D Des'riptionw - ' l Grou .  :.Ifo l.

a171 ()l(2) s 2s ....... (3) 3j~AM-tmJSV

' ............... 4a .l . (5) 5....... l(4)

- Plant ISO# ISIIS #'. ASM Ct. AS Class S stem . ExamiationMethod ;."'.'"t" (6) (7) (8) (9) (10) (11) (12) (12) (12)

Comments, (13)

(14) 1st Interval 2nd Interval 3rd Interval 4th Interval SCOPE 1St Period 2nd Period 3rd Period 1st Period 2nd Period 3rd Period 1st Period 2nd Period 3rd Period 1st Period 2nd Period 3rd Period ISI AUG OWN PRE - - -- - - -I

1) Unique Reference Number. 8) ASME Section XI Examination Category Designation
2) ISI Program Component Identification Number 9) ASME Section XI Examination Item Number
3) Component Description/ Configuration 10) ASME Classification
4) Component Group Designation 11) System Designation
5) Miscellaneous Information- Hanger Detail No., Calibration Block No. 12) NDE Exam Method
6) Construction Isometric No. 13) Comments- Exam Limitation/Coverage, Additional Instructions
7) ISI Sketch No. 14) Examination History (Interval/Period/Outage)

Page: 13

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT IDDEAL Concepts ISI Program Scheduling Identifiers Scheduled "S" To schedule a component, place the identifier "s" in the required period/outage.

Completed "COO Upon exam completion for a scheduled component and by uploading the outage scope from IDDEAL back to Schedule Works, an "s" will be updated to completed "c".

Re-scheduled K er. Once a component has been scheduled, and you wish to reschedule to another outage, replace the scheduled "s" with a rescheduled "r" and enter an "s" in the new outage schedule.

Expanded Ole" To increase a work scope without taking code credit in the percentage calculations, enter an expanded "e".

"E" Upon exam completion of an expanded scope and by either uploading the outage scope from IDDEAL or manually changing the letter to an upper case "E" the exam scope is completed.

Additional ",a. After an initial expanded work scope has been identified and you wish to add an increased Expanded Scope expanded work scope, enter an additional expanded scope "a".

"Azi Upon exam completion of an additional expanded scope and by either uploading the outage scope fro IDDEAL or manually changing the letter to an upper case "A"the exam scope is completed.

Partial "p" To track partially completed component examination requirements enter a partial "p".

Deferred "d" Once a component has been scheduled, and you wish to defer the inspection to another Outage, or Period, replace the scheduled "s" with a deferred "d" and enter an "s" in the new Outage.

Limited "i" To track limited component examinations or limited completions of requirements enter "I".

Multiple "b" For multiple scheduling of the same component in successive Outages or Periods within an Interval enter "b".

"B" Upon exam completion of a multiple scope in the same Interval and by either uploading the outage scope from IDDEAL or manually changing the letter to an upper case "B" the exam scope is completed. This multiple scheduling scope will not count as complete Tickler Ot" To track exam scopes or use as reminder or identifier to confirm scheduling enter "t".

Successive "h" Successive examinations. (Code Required Re-Exams)

"H" Upon exam completion of a successive scope and by either uploading the outage scope from IDDEAL or manually changing the letter to an upper case "H" the exam scope is completed.

Page: 14

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT T. List of Acronym's ABBREVIATION DESCRIPTION A-E AUGMENTED EXAM AF AUXILIARY FEEDWATER SYSTEM ASME AMERICAN SOCIETY OR MECHANICAL ENGINEERS BF STEAM GENERATOR MAIN FEEDWATER SYSTEM BIT BORIC ACID INJECTION TANK BR BORIC ACID RECOVERY SYSTEM CA CONTROL AIR SYSTEM CC COMPONENT COOLING SYSTEM CCW COUNTER CLOCK WISE CHR CONTAINMENT HEAT REMOVAL SYSTEM CRC CORROSION RESISTANT CLAD CRD CONTROL ROD DRIVE CS CONTAINMENT SPRAY SYSTEM CW CLOCK WISE CV CHEMICAL VOLUME AND CONTROL SYSTEM DG DIESEL GENERATORS AND AUXILIARIES DR DEMINERALIZED WATER - RESTRICTED ECCS EMERGENCY CORE COOLING SYSTEM EXAM EXAMINATION FO DIESEL GENERATOR FUEL OIL SYSTEM Page: 15

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT T. List of Acronym's (Cont'd)

ABBREVIATION DESCRIPTION FB FLANGE BOLTING FLG FLANGE FP FIRE PROTECTION SYSTEM FW MAIN FEED WATER PUMP & PIPING GB STEAM GENERATOR BLOWDOWN SYSTEM HT HEAD TANK IA INTEGRAL ATTACHMENT INSIG INSIGNIFICANT ISI INSERVICE INSPECTION LD LONGITUDINAL SEAM WELD EXTENDING DOWNSTREAM LDI LONGITUDINAL SEAM WELD EXTENDING DOWNSTREAM ON THE INSIDE RADIUS OF AN ELBO LDO LONGITUDINAL SEAM WELD EXTENDING DOWNSTREAM ON THE OUTSIDE RADIUS OF AN ELBOW LGS LUGS LO ZERO REFERENCE LOCATION LTP LONG TERM PLAN LU LONGITUDINAL SEAM WELD EXTENDING UPSTREAM LUI LONGITUDINAL SEAM WELD EXTENDING UPSTREAM ON THE INSIDE RADIUS OF AN ELBOW LUO LONGITUDINAL SEAM WELD EXTENDING UPSTREAM ON THE OUTSIDE RADIUS OF AN ELBOW Page: 16

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT T. List of Acronym's (Cont'd)

ABBREVIATION DESCRIPTION MS MAIN STEAM SYSTEM M-UT MECHANIZED ULTRASONIC EXAMINATION MT MAGNETIC PARTICLE EXAMINATION NDE NONDESTRUCTIVE EXAMINATION NDT NONDESTRUCTIVE TESTING NPS NOMINAL PIPE SIZE NRC NUCLEAR REGULATORY COMMISSION PR PRESSURIZER RELIEF SYSTEM PS PRESSURIZER SPRAY SYSTEM PSAR PRELIMINARY SAFETY ANALYSIS REPORT PSEG PSEG NUCLEAR LLC PSI PRESERVICE INSPECTION PT LIQUID PENETRANT EXAMINATON PZR PRESSURIZER RC REACTOR COOLANT SYSTEM RCP REACTOR COOLANT PUMP REV REVISION RHR RESIDUAL HEAT REMOVAL SYSTEM RPV REACTOR PRESSURE VESSEL RPVCH REACTOR PRESSURE VESSEL CLOSURE HEAD Page: 17

SALEM UNIT 2 (RFO#14) ISI FINAL

SUMMARY

REPORT T. List of Acronym's (Cont'd)

ABBREVIATION DESCRIPTION RX REACTOR SCAN PLAN MECHANIZED EXAMINATION PLAN SA STATION AIR SYSTEM SF SPENT FUEL POOL COOLING & FILTERING REFUELING CANAL

& FUEL TRANSFER TUBE SPENT FUEL POOL SJ SAFETY INJECTION SYSTEM SW SERVICE WATER SYSTEM UFSAR UPDATED FINAL SAFETY ANALYSIS REPORT UT MANUAL ULTRASONIC EXAMINATION VT VISUAL EXAMINATION WL WASTE LIQUID SYSTEM Page: 18

LR-N05-0380 Document Control Desk ENCLOSURE 2 S2 RFO#14 FORM OAR-1 OWNERS ACTIVITY REPORT

Salem Nuclear Generating Station Unit 2 RFO-14 OAR Report FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: S2RFO#14 Owner: Public Service Electric & Gas Companv Plant: Salem Nuclear Generating Station Unit No: 2 Commercial Service Date: 10/31/81 Refueling Outage No.: RFO #14 Current inspection interval: Third Current inspection period: First Edition and Addenda of Section Xi applicable to the inspection plan: 1998 Edition 2000 Addenda.-

Appendix Vil exams were performed to the 1995 Edition 1996 Addenda as amended by Final Rule - and IWE/IWL was performed to the1998 Edition. 1998 Addenda Date and revision of inspection plan: 11/2003 Rev. 0 Edition and Addenda of Section Xi applicable repairs and replacements, if different than the inspection plan: Class 1. 2, & 3 - 1998 Edition, 2000 Addenda Class MC - 1992 / 92 Addenda (Unless Specifically identified in the individual repair Ilan)

CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authoriza7 Expiration Date: N/A Signed:__________ _VC__ E

/ Owner or Owner's Designee, Title

_ Date ?AAC<

CERTIFICATE OF INSERVICE INSPECTION I the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or providence of New Jersey and employed by Hartford Steam Boiler Inspection &

Insurance Companv of Connecticut have inspected the items described in this Owner's Activity Report, during the period 11/27/2003 to 05/11/2005, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal ipruyor-pripertydamage or a loss of any kind arising from or connected with this inspection.

(l M M , Commissions XV9 ?g<

Iiispector's Signature National Board, State, Province, and Endorsements Date Page 1 of 10

LR-N05-0380 Document Control Desk ENCLOSURE 3 Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION UNIT 2 RFO #14 ISI EXAMINATION RESULTS

Salem Nuclear Generating Station, Unit 2 Page 1 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results Exam performed by Framatome under W/O# Examined Studs 1 thru 18 No Recordable 2-RPVCH-STUDS 1-54 CLOSURE STUDS UT-0L ISI Accept 50071724 Indications.

004800 (REMOVED)

Pre-Service PT examination performed by Framatome personnel during head construction In France Data report located in section E3 of Reactor Vessel Head CRD HOUSINGS SURFACE Penetration NDE Inspection Final Report 51-5061492-EXAM PT PRE Accept 00 No Recordable Indications 006950 CRD HOUSINGS SURFACE

- 5:  :.. :..:.:.S. :

......... ...5.:.. . .>.;. ...... ......... . s ...

A Augmented Eddy Current examination performed by No eddy current responses Indicative of such CRD HOUSINGS Framatome certified personnel during head planar degradation were found in the Salem Unit 2 VOLUMETRIC EXAM ET OWN Accept construction In France.. ECT examinations.

CRD HOUSING VOL No degradation or crack-like indications were Identified in the perpheral 24 DM welds, 57 006975 CRDM penetrations or in the RVLIS and vent line penetrations. There were numerous minor weld fabrication indications detected near the J- Groove fusion line on the CRDM penetrations with the A Remote Augmented UT Examination performed by ultrasonic method. Most of the indications CRD HOUSINGS the following Framatome personnel. Hrvole Bezlaj, recorded lie In the weld material and not base CRD HOUSING VOL. VOLUMETRIC EXAM UT OWN Accept Level II - Pierre Wanders Level IlL, metal New head Inastalled during RFO-14 A code required Pre-Service PT examinations was performed under Sum# 006950 A Augmented UT and ET examination were performed under Sum# 006975 and a Augmented 007111 RPV NEW UPPER HEAD RPV NEW UPPER HEAD OWN Accept VT-2 examination was performed under Sum# 007112

. .. ... g ... .... Ss s....::sp:. S:.... .

s...s...s. :s: ..... . 5....... 5 .... . 5. ... . . .... .. 5 ...... .... . .. . . .... ... . . . . . ... .

. . ..... 5.. . 5. . . . ..... . . . .. . 5 PENETRATION WELDS ON Augmented Visual examination performed by certified UPPER HEAD VT-2 OWN Accept PSEG personnel. No recordable indications 007112 RPV UPPER HEAD 5is.. . . . . . ... .

. .5 .5.5 SS.SSs.5 . . . . . ...... . 5 . . .:.. . ..

These components were examined and found to PENETRATION WELDS ON Visual Examination performed under order# 50071724 be acceptable and did not exhibit any evidence of LOWER HEAD VT-2 OWN Accept by certified PSEG personnel component degradation or leakage.

007115 RPV LOWER HEAD Flux Thimble Tubing Dissimilar FLUX THIMBLE WELDS ON Visual Examination performed under order# 50071724 No residue observed or evidence of component LOWER HEAD VT-2 OWN Accept by certified PSEG personnel degradation.

007116 Metal weld

Salem Nuclear Generating Station, Unit 2 ISI Program Long Term Plan Page 2 of 33 06/15/2005 Revision 01 P;rF-IA1-0 ISI Exmination ResultsQ visual Examination performed under order# "I 724 008050 2-RPV-21-TIE ROD ISUPPORTAT 325' V17-3 PRE Accept by certified PSEG personnel No conditions noted Exam acceptable a sBX g-,>S, ............ s ,'...........

'>'>B'':..........

'1....

a.. .;f 'gs;,;;,""'..........

71724; SEISMI ROD .I ....efre Vlsual io unde

.50071724order#

Xvir .

SEISMIC TIE ROD Vlsual Examination perfommned under order# 50071724 008350 2-RPV-22-TIE ROB SUPPORT AT 2145 VT7-3 PRE Accept by certified PSEG personnel No conditions noted Exam acceptable

... . ....s ..... . .s -* .a...aaB

... aS'*S

  • .*&Saa SIMCTERDVisual Examination performed under order# 50071724 N eiu bevdo vdneo opnn 0018250 2-RPV-12341TZE RBSPOTO SAFE-END VT-2 PRE Accept by certified PSEG personnel Noegraditions.oe xmacpal
  • B
  • s& * * .. .. .. .. .. ... . .. .. .... ... . .... .... .... . ..... kB

..... .... .efme Visual nth 5012 N ei bere

.ne.... reieceo opnn 011820~~~~... R10- TO SAE-N IS.cet b.etiidPE esnnldgaaln

.- .OL ....

SIMCTERDVisual Examination performed under order# 50071724 N eiu bevdo vdneo opnn 0083500 2-RPZR-24-TI16DSPPR MN AT BOLTS VT7-2 PRE Accept by certified PSEG personnel Nconditions notedExmacpbl Isrmn ols()Tp-Visual Examination performed under order# 50071724 No residue observed or evidence of component 012520 -PZR10- NOZZLE TOeraln SAFE-ENDo VT-2 isN Accept by certified PSEG personnel degradation.

Visal pexaominaio peramaormed under WOre#50774Nreiuobrvdreienefcmpet 018 -PRG-1204-1 NOUTETNZLE SAEEN IRS UT-28 ISI Accept by712cetNo S esne decoradation di.ton a&?~~.  : S...:.;N * ,aS fS . .. . . ...... ...... .... .... ............ ....

Salem Nuclear Generating Station, Unit 2 Page 3 of 33 ISI Program Long Term Plan 06/15S/2005 Revision 01 RFO-14 ISI Examination Results MM:

r-xaml Fuenonmc WY rr1amlaluome ulnoe 29-STG-1 2201IRS INLET NOZZLE IRS UT-28 lISI Accept 50071724 No Recordable Indications D21200 b . b l l l l l Ss l Exam performed by Frarnatome under W/O# 29-STG-1 220-IRS INLET NOZZLE IRS UT-38 llSI Accept 50071724 No Recordable Indications AddN Vlsual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 022800 24-STG-OMB OUTLET MANWAY BOLTING lVT-2 AUG Accept by certified PSEG personnel conditions noted Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 022900 123-STG-OMB OUTLET MANWAY BOLTING VT1-2 JAUG Accept by certified PSEG personnel conditions noted Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 023000 1212-STG-OMB OUTLET MANWAY BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted Visual Examination performed under order# 50071724 Visual Exam performed on boited connection. No 023100 214STG-OMB OUTLET MANWAY BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted

.. a ai $.; .. ~

.B...............

iBB~

gsB Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 023200 24-STG-IMB INLET MANWAY BOLTING VT-2 AUG Accept by certified PS EG personnel conditions noted B. ~

~ ~ ~ B ~ B ~ .. S.S. i f Bl ... ...i .....

BB .. B zBB S S BSBBsSSf B S ~ z 'BB B Visual Examination performed under order# 50071724 Visual Exam performred on bolted connection. No 023300 23-STG-IMB INLET MANWAY BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted

.. . .. . . f i S ~

B.........

....; B i.{ gif..... B .S BgBsBB.

BBSgBBzZg~..;

S B

Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 023400 21-STG-IMB INLET MANWAY BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted Vsual Examination performed under order# 50071724 Vsa xmpromdo otdcneto.N 0235000 21-CVCG-IMB GINETMNABO IG VT-3 AUG Accept by certified PSEG personnel Nconditions notedExmacpbl

.Visual Examination performed under order# 50071724 030080 2C-CVCG-5139 GUIDER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 033150 2C-CVCS-5135 SUPPORT VT-3 PRE Accept by certified PSEG personnel No conditlons noted Exam acceptable

............... S.

i;.,,ejsSBB SB .B BS SBBS~iB gBs f~8,,S

S SBsB iSS~2BsfSS

Salem Nuclear Generating Station, Unit 2 Page 4 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 PrF)_4A IM~ 1Fnminnfinn Pac~idfc

.~ . ...

Visual Examination performed under order 050950 2C-PRA-1 50A IANCHOR 'SI Accept by certified PSEG personnel INo conditions noted Exam acceptable Visual Examination performed under order# 50071724 051100 6-PR-1205-1OFB FLANGE BOLTING (2PR5) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 6-PR-1205-10FB FLANGE BOLTING (2PRS) VT-2 AUG Accept by certified PSEG personnel conditions noted

.. '.'sX;'N M o-.'g

.... ............. Bg:....'

.:g.........

,: .... -... --  ::ff5g Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 052300 6-PR-1204-IOFB FLANGE BOLTING (2PR4) VT-2 AUG Accept by certified PSEG personnel conditions noted Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 053700 6-PR-1203-1OFB FLANGE BOLTING (2PR3) VT-2 AUG Accept by certified PSEG personnel conditions noted VAR.SUPPORTTYP.C,SZ Visual Examination performed under order# 50071724 054975 2C-PRH-204 5,CL- 360,HL- 296 VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

. . . . . . . . . .. . . . ,..,~

Exam performed by Framatome under W/O# 055850 3-PR-1207-13 REDUCER TO VALVE 2PR2 PT ISI Accept 50071724 No Recordable Indications.

Actual Linear indication measured 0.078" Code Exam performed by Framatome under W/O# Allowable 0.20" Acceptance Based on 1998 057000 3-PR-1206-13 REDUCER TO VALVE 2PRI PT ISI Accept 50071724 Edition 2000 Addenda Table IWB-3514-2 B o;tax... . . >s.;..B .... .s>

gaa Exam performed by Framatome under W/O#

14-PS-i1231-1 NOZZLE TO SAFE-END UT-45 ISI Accept 50071724 No Recordable Indication 0Exam performed by Framatome under W/O#

060014-PS-i1231-i NOZZLE TO SAFE-END UT-35 ISI Accept 50071724 No Recordable Indication Exam performed by Framatome under W/O#

14-PS-1231-1 NOZZLE TO SAFE-END UT-GO ISI Accept 50071724 No Recordable Indication Visual Examination performed underorder# 50071724 No residue observed or evidence of component 060001 14-PS-1231-1 NOZZLE TO SAFE-END VT-2 ISI Accept by certfied PSEG personnel degradation VAR.SUPPORT,TYP.A Vsua Examination performed under order# 50071724 060350 2-PSH-3 1Z13ZCL- 2895,HL- 3212 VT-3 ISI Accept by certified PSEG personnel No condiions noted Exam acceptable 060350 2C-PSH-37 ,L 91,HL-289 20321 VT1-3 [SI Accept by certified PSEG personnel No conditlons noted Exam acceptable VARSUPPORT,TYP.G,SZ ....

Visual Examination performed under order# 50071724 s s .. .. ........ B......~s

....... &sBBB8¢~a SS ss~gs g s

Salem Nuclear Generating Station, Unit 2 Page 5 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 Visual Examination performed under order#

062050 2C-PRG-227 GUIDE VT-3 'SI Accept by certified PSEG personnel No conditions noted Exam acceptable

.'aaaaas,<ga.

a$sI...... mo m .. a..a......'.;a.'aa CONSTANT LOAD Visual Examination performed under order# 50071724 062425 2C-PRH-223 SUPPORT HANGER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

.. . . .... .... . B .'

VAR.SUPPORT,TYP.C,SZ1 0, Visual Examination performed under order# 50071724 063350 2C-PRH-222 CL- 1294,HL- 1066 VT-3 PRE Accept by certified PSEG personnel No conditions noted Exam acceptable x ........ ..... .. . . . .. . .. .. . .. . ..  :... ..... . .....

a a .9

.. .sg..... . .a;-..:g

.:,E;:,S,,>

Radiography examination performed by MQS 063710 4-PS-1231 -27A PIPE TO TEE RT PRE Accept personnel under order# 60042309 No rejectable indications noted.

063720 4-PS-i 231.-276 TEE TO PIPE RT PRE Accept personnel under order# 60042309 No rejectable indications noted.

Radiography examination performed by MQS 063730 4-PS-1 231-27C TEE TO PIPE RT PRE Accept personnel under order# 60042309 No rejectable indications noted.

Exam performed by Framatome under WIO#

063730 4-PS-1231-27C TEE TO PIPE UT-60 PRE Accept 50071724 Pre-Servlce Exam No recordable indications Exam performed by Framatome under W/O# 063730 4-PS-1231-27C TEE TO PIPE UT-45 PRE Accept 50071724 Pre-Service Exam No rejectable indications noted.

Exam performed by Framatome under WIO#

063730 4-PS-1231-27C TEE TO PIPE UT-70 PRE Accept 50071724 Pre-Service Exam No reJectable indications noted.

_ ._._._....._...... . ...... :.. . . .agog.. s8a ...

  • a..

BP . ,*'..... ..

Radiography examination performed by MQS 4-PS-1231-27D PIPE TO VALVE RT PRE Accept personnel under order# 60042309 No rejectable indications noted.

Pre-Service Exam Indication noted 3/8 to 4.5 COW from radiography 0 marking at a depth of

.32" on valve side of weld centerline. Indication Exam performed by Framatome under W/O#was confirmed with radiogrphy and was 4-PS-1231-27D PIPE TO VALVE UT-60 PRE Accept 50071724 acceptable.

Pre-Service Exam Indication noted 3/8" to 4.5" 063740 CCW from radiography 0 marking at a depth of

.32" on valve side of weld centerline. indication Exam performed by Framatome under W/O#was confirmed with radiogrphy and was 4-PS-1231-27D PIPE TO VALVE UT-70 PRE Accept 50071724 acceptable.

~~~~~~Preo8B Pre-Service Exam Iniato noted Indication

  • a8-ServiceS

,~x*aExam -n;tgd38 to 459 3/8" to 4.5" CCW from radiography 0 marking at a depth of

                                                                                                                                                                              .32" on valve side of weld centerline. Indication Exam performed by Framatome under W/O#                        was confirmed with radiogrphy and was 4-PS-1231-27D                PIPE TO VALVE               UT-45                PRE      Accept   50071724                                                      acceptable.

Salem Nuclear Generating Station, Unit 2 Page 6 of33 06/15/2005 ISI Program Long Term Plan Revision 01 Radiography examination performe 063750 4-PS-1 231 -27E VALVE TO FLANGE RT PRE Accept personnel under order# 60042309 No rejectable Indications noted. Visual Examination performed under order# 50071724 063680 4C-PRS-1231IF GUIDGE BLIGVT-3 PRE Accept by certified PSEG personnel No conditions noteExmacpbl VAR.SUPPORT,TYP.C,SZ1 0Visual Examination performed under order# 50071724 0637450 2C-PRH-220 5CL- 1380,HL- 3106 VT-3 PRE Accept by certified PSEG personnel No conditions noteExmacpbl ViulExam performed in tob m t munder Wrde # weenoe0a dap ere1o7ege mt4 n 070400 2C-PR G-2 028 ELBOW T PIEVT-2 PRE Accept by certified PSEG personnel degrandationsafte claig 070500TY.CS10 isa Exam into performed b rmtm under Wrde# 5012 0645 12-PRH-21C1289H410601-3 PIPROEBWET4 S Accept 50071724.PEGpesone No RcordabeIdctionsno

                                                                                                                                                                         ....                                                                                                                    t o we d,bse.ed.o.pip aWhit.resdue dj acent..        d es no pp arwel        t o banl ak g Vati isunl Epaemf~or ed nde ord r # 007 724 n oire osdu obs r v1e2                                              eorev d enc o f crvomponenta 07 4031-RC-1240-2                                 ELBOW TO PIPE                                                        UT-45                    OWN        Accept           bycetiie                P EGpesone                                                                      degradation aifter e aig

Salem Nuclear Generating Station, Unit 2 Page 7of33 ISI Program Long Term Plan Revision 01 06/15/2005 PlrF.1A VIS~ 1Examinnfinn Raczidtc; Visual examination noted white substance in small amounts 360 around pipe outside weld area. Visual Examination performed under order# 50071724 Recommend sample taken and analyzed plus 074600 31 -RC-1220-1 NOZZLE TO ELBOW VT-2 IOWN Accept by certified PSEG personnel supplemental NDE be performed. iVisual Examination performed under order# 50071724 No residue observed or evidence of component 31 RC-i220-1 NOZLE TO ELBOW VT-2 owN Accept by certified PSEG personnel Idegradation after cleaning. Examination performed under order# 50071724 by 31 -RC-1 220-1 NOZZLE TO ELBOW PT OWN Accept MQS personnel. No recordable Indications

                       -i.

White residue observed on pipe weld and adjacent to weld. does not appear to be leakage Visual Examination performed under order# 50071724 from RCS. Clean residue from pipe surface and 075000 31-RC-1220-2 ELBOW TO PIPE VT-2 OWN Accept by certified PSEG personnel obtain CH-AP-21 swipes. Visual Examination performed under order# 50071724 No residue observed or evidence of component 31 -RC-1 220-2 ELBOW TO PIPE VT-2 OWN Accept by certified PSEG personnel degradation after cleaning. Examination performed under order# 50071724 by 31-RC-1220-2 ELBOW TO PIPE PT OWN Accept MQS personnel. No recordable indications

                                     ........            . .. :.,.:.:......:.:..:....~:                   ..........--.......

Examined component weld during 2R14 to confirm condition observed accumulation of deposits observed running down. Notification# Visual Examination performed under order# 50071724 20233744 was generated to perform supplemental 075100 31-RC-1220-3 PIPE TO ELBOW VT-2 OWN Accept by certified PSEG personnel NDE. Re-examined component weld aRer cleaning to Visual Examination performed under order# 50071724 confirm condition observed accumulation of 31 -RC-1220-3 PIPE TO ELBOW VT-2 OWN Accept by certified PSEG personnel deposits observed running down were removed. Examination performed under order# 50071724 by 075100 31-RC-1220-3 PIPE TO ELBOW PT OWN Accept MQS personnel. No recordable Indicatons White residue observed on pipe weld and adjacent to weld, does not appear to be leakage Visual Examination performed under order# 50071724 from RCS. Clean residue from pipe surface and 076000 31 -RC-1220-4 ELBOW TO PIPE VT-2 OWN Accept by certified PSEG personnel obtain CH-AP-21 swipes. Visual Examination performed under order# 50071724 No residue observed or evidence of component 076000 31-RC-1220.4 ELBOW TO PIPE VT-2 OWN Accept by certified Visal PSEG personnel Examinatio perfre une8odr 50712 degradation after cleaning. No: reidue:observed 88:evidenc ofcmpnn

Salem Nuclear Generating Station, Unit 2 Page 8 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results

                                                                                                                                                                                .;M               .

White residue observed on pipe weld and adjacent to weld. does not appear to be leakage Visual Examination performed under order# 50071724 from RCS. Clean residue from pipe surface and 077200 31-RC-1210-2 ELBOW TO PIPE VT-2 OWN Accept by certified PSEG personnel obtain CH-AP-21 swipes.

4. 1 Visual Examination performed under order# 50071724 No residue observed or evidence of component 31-RC-1210-2 ELBOW TO PIPE V`-2 OWN Accept by certified PSEG personnel degradation after cleaning.

Visual Examination performed under order# 50071724 No residue observed or evidence of component 080000 29-RC-1240-5 ELBOW TO NOZZLE VT-2 ISI Accept by certified PSEG personnel degradation. gi$$

                                  ......  .. BB  a*
                                                  .i.i.:$

B . . ............. . ... ............. .. Visual Examination performed under order# 50071724 No residue observed or evidence of component 080010 24 HOT LEG Thermal Welds #24 HOT LEG Thermal Welds VT-2 OWN Accept by certified PSEG personnel degradation. Visual Examination performed under order# 50071724 No residue observed or evidence of component 081200 29.RC-1230-5 ELBOW TO NOZZLE VT-2 ISI Accept by certifed PSEG personnel degradation.

                                                                                                                                                                                                                 ................                          .i.-$$BBi  .
                                                                                                                                                                                                 ..........                                 .Bio..

0812100 23 HOT2- LE GBO......... Thr a .....Wed .

                                                             #2. HO T NLE     G T . e m l W dsVT-2 OWN            Accept Visual Examination performned M . _ ... i.. under by certified PSEG personnel
                                                                                                                                                                                                      .. order#

B.'.. 50071724 Q B No residue observed or evidence of component degradation. Visual Examination performed under order# 50071724 No residue observed or evidence of component 082200 292RC-1 220-5 ELBOW TO NOZZLE VT-2 OSW Accept by certified PSEG personnel degradation. Visual Examination performed under order# 50071724 No residue observed or evidence of component 082210 22 HOT LEG Thermal Welds #23 HOT LEG Thermal Welds VT-2 OWN Accept by certified PSEG personnel degradation. Visual Examination performed under order# 50071724 No residue observed or evidence of component 083300 29-RC-1 210-5 ELBOW TO NOZZLE VT-2 [St Accept by certified PSEG personnel degradation. Visual Examination performed under order# .50071724 No residue observed or evidence of component 083310 21 HOT LEG Thermal Welds #21 HOT LEG Thermal Welds VT-2 OWN Accept by certified PSEG personnel degradation.

                                                             #24a COLDato   LEG Thermal                                                                     Visual Examination performed under order# 50071724                           No residue observed or evidence of component 083420      24-STG Channel Head                              Channel Head                            VT-2               OWN             Accept               by certified PSEG personnel                                                  degradation.
                                                            #23 COLD LEG Thermal                                                                            Visual Examination performed under order# 50071724 No residue observed or evidence of component 084410      23 COLD LEG Thermal Welds Welds                                                           VT-2              OWN             Accept               by certified PSEG personnel                                                  degradation.
                                                                                                                                       'O       N               .....        ..

Salem Nuclear Generating Station, Unit 2 Page 9 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results Oieam t.eneravor *13 HEoUolM visual wxamtnaton performea unaer oroerff DUU1 I L'4 40 resiuue observed or evidence o0component 084420 23-STG Channel Head Channel Head vT-2 OWN Accept by certified PSEG personnel degradation.

                                                                                                                                                                                                                                             .... ... .. ... ..                                 . S..  >.....aa:
                                                             #22 COLD LEG Thermal                                                                                           Visual Examination performed under order# 50071724 No residue observed or evidence of component 085610           22 COLD LEG Thermal Welds Welds                                                                 VT-2             OWN                 Accept                 by certified PSEG personnel                                                                   degradation.
                            ......... '.. ..... :';;B.... .,   ,.      Bx. -- .f S..... g f;.

1 ... . .> ...... ........ ... ..... ........ .. ...... ........ ...... .. ........ ......... ........ ......... .............. Steam Generator #22 Hot/Cold visual Examination performed under order# 50071724 No residue observed or evidence of component 085620 22-STG Channel Head Channel Head VT-2 OWN Accept by certified PSEG personnel degradation. Exam.... .... ............................... ~- Exmperformed by Framatome under W/O# 0810 27.5-RC-1220-2::..:::..::..:....>-~::. PIPE TO PIPE UT-60 ISI............ Accept 50071724. No Recordable indications 0810Exam ............. . .. . performed  :,..... by >.,Framatome .... under W/O#  : Exam noted root geomrty 360- on upstream side

                                                                                                                                                                                                                                                                            .::~:....::-:. .~

27.5-RC-12Z0.-2 PIPE TO PIPE UT-45 ISI Accept 50071724. of weld.

                                                             #21 COLD LEG Thermal                                                                                           Visual Examination perfommed under order# 50071724 No residue observed or evidence of component 086510           21 COLD LEG Thermal Welds                    Welds                                              vT-2             OWN                 Accept                 by certified PSEG personnel                                                                   degradation.

Steam Generator #21 HotCold visual Examination performed under order# 50071724 No residue observed or evidence of component 086520 21-STG Channel Head Channel Head V1-2 OWN Accept by certified PSEG personnel degradation. Visual Examination performed under order# 50071724 160310 2C-23-RHH-2 HANGER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 161775 2C-23-SIG-1 1 VGUIDE VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 161875 2C-23-SIA-6 ANCHOR VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable .. .. . .. .. . ... .. .. .... ~eg

                               ........ ~fsgf
                                        . i~~gf
                                           ... s..

VAR.SUPPORTTYP.ASZ13, Visual Examination performed under order# 50071724 164175 2C-21 -SIH-10 CL- 2925,HL- 3321 VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 166025 2C-22-SIS-1 HSUPPORT VT-3 ISI Accept by certified PSEG personnel No cond~itons noted Exam acceptable Visual Examination performed under order# 50071724 167225 2C-22-SIS-16 HSUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptablel Visual Examination performed under order# 50071724 169810 2C-24-RHS-3 SUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

Salem Nuclear Generating Station, Unit 2 Page 1 0 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results

                                                                                                             ...                                                  . . . . . . . . ...                                                                  ...            *   ~     .
                  . . .. .. ..                                    .     .*..                                                          .  ~*                                           :: . : . . . . . . . . ~....   ' . : V: *                   .   .    .  .... ..                  .... . .

VAR.SUPPO TTYP.AS Visual Eaminatio pe. or ed ndr.ode#.5 07 72 VAR.SPPORTTYP.,Sz VsualExam performed into b rmtm underorde# 5012 2C 241RH-17 170225 PIP TOCL E00,LBOW1 VT-6 ISI Accept 50071724 P EGpesone No Rco rdabeIdctionsnoe Exmacp bl

                                   ~..
                               .......         'x.....
.::.:.:.~: . .:.x~.:.::.::.X .  :......,...M~x..x. ..:: .  :....................... .~

Exam prforme by .Famatme nderW.. Exam performed by Framatome under W/O# .. 6-SJ-1 241-18 ELBOW TO PIPEW UT-45 151 Accept 50071724. No Recordable Indications 1A72450TTY .FSZExam performed by PESGatpersonnel und rO# O S-1 17706-SJ 24117PIP -T E0,LBO 93UT-30 ISI Accept 50071724 No Rcondition InotdiExamt acepabl Exam performed by Framatome under W/o# 6-RJ-1 241-17 ELBOW TO PIPEW UT-60 OWN Accept 50071724 No Recordable Indications Exam performed by Framatome under W/O# 1744501 EBWTOPP U-5 s cep 0712.No Recordable Indications Augm nted0TExam b Fr atme udeby W/ p rO nn l performd A g e t dP#xa ef r e ih n

     -RJ-1 241-18 6___                               ELBOW TO PIPE                                               PT-6                 151     Accept                 undr07        de17 007 72                                                      reoRdabl abe  in Ications.on PIPETO                BANCHExam                                                        performed by Framatome under W/O#

17506-RH-1 241-18 ELONNETONPIEUT-60 OWN Accept 50071724. No Recordable Indications H T O B RA N PIPE C Augmented PT examed by perform M QSpron elun er sW Onnl A g e t dP#xa ef r e i hn 1727701-2 9C ONNECTIO N 93 PT- l1st A ccept une500r75 07 7 4re o dal7I d ca4n

Salem Nuclear Generating Station, Unit 2 Page I1 of 33 ISI Program Long Term Plan 06/15/2005 Revision 01 RFO-14 [SI Examination Results m~ in R. ... Exam performed by Framnatomne under WtO# 17206SJ-1221-1 REDUCER TO ELBOW UT-45 ISI Accept 50071724 No recordable Indications 175200Exam performed by Framnatomne under W/O# 6-SJ-1221-1 REDUCER TO ELBOW UT-70 ISI Accept 50071724 No recordable indications B;: g...

                                                                                                                                                                       ',@~~~~~~~~~~~~..

B

                                                                                                                                                               ..^,:,.g,  .%_.                               .RwB_,B,,.;::

a, Si

                                                                                                                                                                                                                 ,,,+.

l Visual Examination performed under order# 50071724 175575 21 SJ43 VALVE BODY ON LINE 6-SJ-121 VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable VAR.SUPPORT,TYP.A,SZ Visual Examination performed under order# 50071724 176180 2C-21-SIH-8 1,CL- 516,HL- 558 VT-3 lISt Accept by certified PSEG personnel No cond-Rions noted Exam acceptable

      ........:B:..B..B.               ..         S   : B                 _,B   M    M:        ~       o             @ 2B                        B   .     '       "n.                ,....'.B.                                     .@

Exam performed by Framatome under W/O# 1780 4-SJ-1 294-2 PIPE TO ELBOW UT-45 ISI Accept 50071724 No recordable indications 176850Exam performed by Framnatomne under W/O# . 4-SJ-1294-2 PIPE TO ELBOW UT-70 ISI Accept 50071724 No recordable indications fa *~~~. ....hs.¢sBa,,,

                                                                                                           >.a     >2>,g5
                                                                                                                    ....              ,>.;.a....                   ~a
                                                                                                                                                       , l .a..... 

Exam performed by Framatomne under W/O# 176900 4-SJ-1 294-3 ELBOW TO PIPE UT-45 ISI Accept 50071724 No Recordable Indications Exam performed by Framnatome under W/O# 4-SJ-1 294-3 ELBOW TO PIPE UT-70 ISl Accept 50071724 No Recordable Indications

                                         'a..
                                 ...............                                                    ss       ~      ,,i ++6; a5a 'BSss                           s         s       ..........a.
                                                                                                                                                                                  @S                                   .                          a    @

a.. .....me Frmaom under W/O#. ... Exam performed by Framnatome under W/O# 17904SJ-1 294-4 PIPE TO ELBOW UT-45 ISl Accept 50071724 No recordable indications Exam performed by Framnatomne under W/O# 4-SJ-1294-4 ELBOWTOELBOW UT450 Sl Accept 50071724 No recordable indications 177000Exam performed by Framatome under W/O# 170 4-SJ-1 294-5 ELBOW TO PIPE 70 UT-4 Sl Accept 50071724 No recordable indications l _ Exarn perforrned by Framnatomne under W/O# 17004SJ-1 29465 ELBOWTO PIPE UT-70 ISI Accept 50071724 No recordable indications Exam performed by Framatomne under W/O# 17004SJ-1294-6 PIPE TO PIPE UT-70 ISI Accept 50071724 No recordable indications PIPE TO PIPE UT4 7g fSI aaa Accept~a >og500717,<24 No rcdabl Indicatin 4- SJ 1294-6 Visual Examination performed under order# 50071724 179325 2P-22-SIS-39 . HSUIPPORT VT-3 ISl Accept by certifed PSEG personnel No conditions noted Exam acceptable

                                                                   ..... vac                                                                                                                                                                      5-;g a...........

af

                                                                                                                                                                                                                        ......... . ...... ss>Zcag~s
                                                                                                                                                                                                                       @g@@saa@aag
                                                                                                                                                                                                                    ..ca.                           g'c

Salem Nuclear Generating Station, Unit 2 Page 12 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 MMAA1 MSI Examination Resultsf VAR.SUPPORTTYF VIsual Examination performed under c 2P-22-SIH-35 5,CL- 316,HL- 272 VT-3 SIs Accept by certified PSEG personnel No conditions noted Exam acceptable aa .... .......................... Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 184200 2-SJ-1249-2FB FLANGE BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted f,.a........ .. .. a...... .f> g<<

                                                                                                                                                   ..        ..                                                                        Visual Examination performed under order# 50071724
                         ...   . .......................                                                                          ;;Y aB                                         g                    ff       '   aa...B;'B.                 a                      s.s   .            ...      ..;  B.                    .      ...     ...  .. :.. .        .......                                      .....

185240 2C-24-SIS-2179 HGUIDER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724

                                             .      B>a
                                                     ... g....~B....                                                                                                                    VT-3          ISI       Accept
                                                                                                                                                                                                                                        ..R.i by certified PSEG personnel
                                                                                                                                                                                                                                                                                                                                                                             ...            .aii.ff . ....

No conditions noted Exam acceptable N,'BBBss aag 185210 2C-24-SIG-217 HSUPPORT FLANGE BOLTING (NEAR, Vsa xmnto performned under order#; 50071724bycrfidSE Visual Exam performed on bolted connection. No 188000 2-SJ-1 247-4FB 43SJ1438) VT-2 AUG Accept Visual bycriedPE personnel performed under order# 50071724 conditions noted Examination

...     >*Rb.;.

aa . aa ... . . . .. . . . . . . . .gB gXaBg->reaaBa r~ BeBBfa BeBBB by certified PSEG personnel~sual Examination LANG (NARperformed BOTIN under order# 50071724 by certified PSEG Visual Exam performed on bolted connection. No 1898000 2-SJ-1239-2FB FLANE1BOTIN VT-2 AUG Accept personnel conditions noted

                                                              ~..........

Accept Visual Examination by certified PSEG personnel performed under order# 50071724 No Vsaconditions xmpromdo noted Exam acceptable otdcneto.N 189520 2C-24-SIS-219 HSUPPORT IVT-3 ISI 19100 2 SJ- 229- LA FB N E BO TIN VT 2 AU Ac ept by certified PSE G personnel is a conditi nstnote

                                                                   .   ~ ~ ~~                               ~                          ~       FLANGE
                                                                                                                                                           ~    BOLTINGn(NEAR
                                                                                                                                                                                    ~           ~           ~  ~            ~

Visual xmnto performed performed Vsa .....Examination under performed under order# 50071724bycriedPE order# under b.order# 50071724 etfe 50071724 SG Vsa Visual. . . . . . ..Exam.. . performed on bolted

                                                                                                                                                                                                                                                                                                                                                                                                . .xmpromdo Visual Exam performed on bolted connection. No otdcneto.N connection. No 193050                 2-SJ-1229-2FB                                                          LANGE BOLTING                                                                             VT-2         AUG         Accept                by certified PSEG personnel                                                                                                         conditions noted 193350                 2-SJ-1239-2FB                                                          LANGEJ OLTIN                                                                              VT7-2        AUG        Accept                 bycriedPE      personnel                                                                                                            conditlons noted Visual Examination performed under order# 50071724 Visual Examinathon performed under order# 50071724 No conditions noted Exam acceptable 195515                 2C-22-SIS-206                                                        VSU.JPPORT                                                                                  VT-3           ISl        Accept               by certified PSEG personnel 1895515                2C2-SJ IS3-57F                                                     FLAGEPOLTIN                                                                                   VT-3         AUG        Accept                 bcetfdPSGpersonnel                                                                                                                  Nconditions notedExmacpbl RB            B'8                        r         e              .......                           ...                                                          a..fsg....                           .. iS>                                                                                                                                     Sm
                                                                                                                                                                                                                                                                                                                                                                            .._.~~~BB~sgesBsssssss~ssss
                                                                                                                                                                                                                                                                                                                                                                                 ~aB s~ rsml.

Salem Nuclear Generating Station, Unit 2 Page 13 of 33 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results visual Examination performed under orderi Visual Exam performed or 196500 2-SJ-121 9-2FB FLANGE BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted 2^ l... * .. . . . . . .g

                                                                                                                                                                                           .....   ..   .   .......  .. s. aa 'a
a. f.a visual Examination performed under order# 50071724 197320 2C-21 -SIA-241 . ANCHOR VT-3 1SI Accept by certified PSEG personnel No conditions noted Exam acceptable
                                                                                                  .         :.a.. :::: .      .... .    ...     ..   .... .:.....    ,                                              ;*
           ....... .  .......                                                                                                                                                  .    '.          visual Examination       ...         ..... performed
                                                                                                                                                                                                                               .........    ..     ......              under order# 50071724                                         ................

197420 2C-21-SIG-242 VGUIDE VT-3 IS1 Accept by certified PSEG personnel No conditions noted Exam acceptable

                                                                                                                                                                                                                                 .       .. '...... ...   .... ..         . ...                                                                                                             xx'....

Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 198350 2-SJ-1218-5FB FLANGE BOLTING VJT-2 AUG Accept by certified PSEG personnel conditions noted

                                                              .... .... .. .   . .... .... .... < . .          ~          .....                                                   :: c~.~
M ~
                                                                                                                                                                                                           ' cc ..                                                                                                                 :.:.                   ..... .... ...

Visual Examination performed under order# 50071724 199730 2C-21-SIS-714 HSUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable X. . . . .. :.:.:. .. X

                                                                                                                     .                .....                               X            .....................                                                                                           . ......  .......,....:...........         .        .    ... ...                  ..

Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 200450 125-SJ-124218FB FLANGE BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 202700 1.5-SJ-1232-1 OFB FLANGE BOLTING VT-2 AUG Accept by certified PSEG personnel conditions noted SgS RR........... 4S.... a............ a ~ssiaa

                                                                                                                                                                                                                                                                                                      ~..f SRRS S
                                                                                                                                                                                                                                                                                          >.. s^. tsSsfgg Rf Visual Examination performed under order# 50071724 22870 20-23-SIG-801                              HGUIDE                                                                  VT-3                      ISI                 Accept                    by certified PSEG personnel                                                                                    No conditions noted Exam acceptable Visual Examination performed under order# 50071724 204270 20-22-SIS-806                              HSUPPORT                                                                VT-3                       1SI                Accept                    by certified PSEG personnel                                                                                    No conditions noted Exam acceptable
                                                                               'S f fS S > s           f<          i S     g         s      . .. .. . . . .. g. R. .   .. .. . .. .

Visual Examination performed under order# 50071724.. Visual Exam performed................... on bolted connection. No

                    ;       f as a ggs  i f  aR        a     a s 204700 1.5-SJ-1222-13FB                           FLANGE BOLTING                                                          VT-2                      AUG                 Accept                    by certified PSEG personnel                                                                                    conditions noted v.isual Examination performed under order# 50071724                                                               isual Exam performed on bolted connection. No 206950 1.5-SJ-1212-8FB                            FLANGE BOLTING                                                          VT-2                      AUG                   Accept                  by certified PSEG personnel                                                                                    conditions noted Visual Examination performed under order# 50071724 208070 2C-21-SIS-193                              HSUPPORT                                                                VT-3                      ISI                 Accept                    by certified PSEG personnel                                                                                     No conditions noted Exam acceptable visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 250100 24-PMP-BOLTS 1-24                          BOLTING                                                                 VT-2                      AUG                 Accept                    by certified PSEG personnel                                                                                    conditions noted

Salem Nuclear Generating Station, Unit 2 Page 14 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-IA IRI Examinatfion Results-visual Examination performed under orderi 500I 1724 visual Exam periormed on Dolied connection. NO VT-2 AUG Accept by certified PSEG personnel conditions noted 250200 23-PMP-BOLTS 1-24 BOLTING Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No VT-2 AUG Accept by certified PSEG personnel conditions noted 250300 22-PMP-BOLTS 1-24 BOLTING

                                                                                                                                                                   ~..                                         under order#

visual Examination performed......... 50071724 visual Exam performed on bolted connection. No

                          . .    ~                .
                                ....................        .          ~    .            .       .      .            .          ,   .~.....    ..  .. :    ..... .. ................                                   .     .

conditions noted .... .. BOLTING V`1-2 AUG Accept .... by certifed PSEG personnel 250400 21-PMP-BOLTS 1-24 Examination performed under order# 50071724 by Exam noted 1/8" rounded indications on all 3 lugs PT ISI Accept MQS personnel. and were within acceptable standards. 251300 21 -PMP-LUGS 1,2,3 PUMP LUGS a: No relevant Indications in the area of Intrest. A continuous indication of low amplitude with no resultant reduction in end of shaft reflection was noted at 117.2" This Is determined to be a Ultrasonic Examination performed bt Wesdyne geometric reflector, and Is typical of shsfts of this

                                                                 #24 Reactor Coolant Pump UT                OWN      Accept                 personnel under order# 50071724                        design wit 251555        #24 RCP SHAFT                                       Shaft Visual Examination performed under order# 50071724 ON LINE 3-CV-1243                                           VT-1              IS       Accept                 by certified PSEG personnel                            No conditions noted Exam acceptable 255050        2CV2 BOLTING                                                                                                                                                       Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No VT-2              AUG      Accept                  by certified PSEG personnel                           conditions noted 2CV2 BOLTING                                         ON LINE 3-CV-1243 ON LINE 3-CV-1243 (FIG. A-                                                                                    Visual Examination performed under order# 50071724 VT-1               ISI      Accept                 by certified PSEG personnel                           No conditions noted Exam acceptable 255100        2CV277 BOLTING                                      10)

Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No ON LINE 3-CV-1243 (FIG. A-VT-2 AUG Accept by certified PSEG personnel conditions noted 2CV277 BOLTING 10) ON LINE 3-CV-1241 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No VT-2 AUG Accept by certified PSEG personnel conditions noted 255150 2CV79 BOLTING 12) ON LINE 3-CV-1241 (FIG. A- Visual Examination performed under order# 50071724 VT-1 IS Accept by certified PSEG personnel No conditions noted Exam acceptable 2CV79 BOLTING 12) _-995a a .aa_.a'.., ,..

                                    ..........................     ...        ..........   ....    ............... p..

9a9.'.,','9" '.:.Ca ai..'............... Visual Examination performed under order# 50071724 ii a aa9ca ON LINE 3-CV-1241 (FIG. A-VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 255200 2CV275 BOLTING 12) ON LINE 3-CV-1241 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No VT-2 AUG Accept by certified PSEG personnel conditions noted 2CV275 BOLTING 12)

Salem Nuclear Generating Station, Unit 2 Page 15 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results ON LINE 3-CV-1241 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No

12) VT-2 AUG Accept by certified PSEG personnel conditions noted 255250 2CV80 BOLTING B ,'fB' : .>.s..f
                                                                                                                                          '    f     : R B.. .      .B ON LINE 3-CV-1231 (FIG. A-                                               Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No
13) VT-2 AUG Accept by certified PSEG personnel conditions noted 255300 2CV77 BOLTING ON LINE 3-CV-1231 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No
13) VT-2 AUG Accept by certified PSEG personnel conditions noted 255350 2CV274 BOLTING ON LINE 3-CV-1231 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No
13) VT-2 AUG Accept by certified PSEG personnel conditions noted 255400 2CV78 BOLTING ... .... ...
                                                                                                                                                                 .Z     .f      ..           BR fR"RB    ....      ...            .>.           R B__......_......._.._._...._._.....                                                               >:
                                       .    . ~..
                                              ,.     , .      ONLINE ..2-CV-1 . . . ..275
                                                                                      .,  ~.

(FIG. A- Visual

                                                                                                                                        .. .   ....Examination
                                                                                                                                                   .      .. ...       performed
                                                                                                                                                                           . .         under order# 50071724 .VisualExam performed on bolted connection. No 15 SHT 1)                            VT-2         AUG   Accept         by certified PSEG personnel                                                  conditions noted 255450  2CV75 BOLTING ON LINE 6-PR-1205 (FIG. A-                                              Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No
17) VT-2 AUG Accept by certified PSEG personnel conditions noted 255550 2PR5 BOLTING Visual Examination performed under order# 50071724 ON LINE 6-PR-1205 (FIG. A-
17) VT-i AUG Accept by certified PSEG personnel No conditions noted Exam acceptable 2PR5 BOLTING ON LINE 6-PR-1204 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection No
18) VT-2 AUG Accept by certified PSEG personnel conditions noted 255600 2PR4 BOLTING
                        ..                       B
                                                 ;.-  BRfs .' Z R.  ...... ..

ON LINE 6-PR-1203 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection No

19) VT-2 AUG Accept by certified PSEG personnel conditions noted 255650 2PR3 BOLTING ON LINE 3-PR-i207 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2PR7 BOLTING 20) VT-2 AUG Accept by certified PSEG personnel conditions noted 565 ON LINE 3-PR-1207 (FIG. A- Visual Examination performed under order# 50071724
20) VT-i ISI Accept by certified PSEG personnel No conditions noted Exam acceptable
   . 2PR7 BOLTING ON LINE 3-PR-1207 (FIG. A-                                               Visual Examination performed under order# 50071724
20) VT-1 ISI Accept by certified PSEG personnel under order# 50071724 No conditions noted Exam acceptable 255700 2PR2 BOLTING ON LINE 3-PR-1207 (FIG. A- Visual Examination performed Visual Exam performed on bolted connection No
20) VT-2 AUG Accept by certified PSEG personnel conditions noted 2PR2 BOLTING ON LINE 3-PR-1206 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No
24) VT-2 AUG Accept by certified PSEG personnel conditions noted 255725 2PR6 BOLTING RBR f~

Bjg<*BZ RfR B 2zy gfgRB~g rffigftxfBRB~ 'iBB~s

Salem Nuclear Generating Station, Unit 2 Page 16 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results

   .....              .....                             *,~~~......                                                                                                                                  .              ...                             ~.

ON LINE 4-PS-1231 (FIG. A- Visual Examination performed under order# 50071724 255800 2PS28 BOLTING 26 SHT 2) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable ON LINE 4-PS-1231 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2PS28 BOLTING 26 SHT 2) VT-2 AUG Accept by certified PSEG personnel conditions noted

       .....    .....         ......                                                            ...            .. . g:V.C
                                                                                                                        .            .'.'               . .' '.        . : :...  ....     :: ..             .f.                                                                         .   ..

ON LINE 4-PS-1 231 (FIG. A- Visual Examination performed under order# 50071724 255850 2PS3 BOLTING 26 SHT 2) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable ON LINE 4-PS-1231 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2PS3 BOLTING 26 SHT 2) VT-2 AUG Accept by certified PSEG personnel conditions noted

             .... . ............. ................  ::.M M..M,. .,..                                                               ..........                .........                ...                                                                    .          .......                             ,.

ON LINE 4-PS-1231 (FIG. A- Visual Examination performed under order# 50071724 2PS29 BOLTING 26 SHT 3) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 255900 ON LINE 4-PS-1231 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2PS29 BOLTING 26 SHT 3) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 4-PS-1211 (FIG. A- Visual Examination performed under order# 50071724 255950 2PS24 BOLTING 28) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable ON LINE 4-PS-1211 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2PS24 BOLTING 28) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 4-PS-i1211 (FIG. A- Visual Examination performed under order# 50071724 255975sas B::.t.i:..... 2PS1 BOLTING  :  : ... f.::.  :: 28)

                                                                            .. :::S:....                               VT-i
                                                                                                                          ...... . ....       ISI
                                                                                                                                               .............        Accept      by certified PSEG personnel                                                             .      A.          No conditions noted Exam acceptable aa-fiBsf5
                                                                                                                                                                                                                                                                                 ... aBS ON LINE 4-PS-i1211 (FIG. A-                                                                          Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2PS1 BOLTING                                             28)                                         VT-2                   AUG                   Accept      by certified PSEG personnel                                                                                conditions noted ON LINE 4-PS-1211 (FIG.A-                                                                            Visual Examination performed underorder# 50071724 25002PS25 BOLTING                                                    28)                                         VT-i                   ISI                   Accept      by certified PSEG personnel                                                                                No condrtions noted Exam acceptable ON LINE 4,PS-1211 (FIG. A-                                                                           Visual Examination performed under order# 50071724 Vsual Exam performed on boted connection. No 2PS25 BOLTING                                            28)                                         VT-2                  AUG                    Accept      by certified PSEG personnel                                                                                conditions noted ON LINE 14-RH-1211 (FIG. A-                                                                          Visual Examination performed underorder# 50071724 Visual Exam performed on bolted connection. No 257850             2RH1 BOLTING                                             61 )                                        VT-2                  AUG                    Accept      by certified PSEG personnel                                                                                conditions noted ON LINE 14RH-1211 (FIG. A-                                                                           Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 257900             2RH2 BOLTING                                             61)                                         VT-2                  AUG                    Accept      by certified PSEG personnel                                                                                conditions noted

_I_.......... ............ . .. ..... . .................................... .

                                                                                                                                                                                                                                               ,..................................~......                                       .:.

Salem Nuclear Generating Station, Unit 2 Page 17 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results

                   .. . . . . . . . .                                            ............._                                                 _ _ ___..                                                                     __.. ....                                                                    .t . . 1 ..:..

ON LINE 12-RH-1 251 (FIG. A Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 257950 2RH26 BOLTING 62) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 10-SJ-1 241 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258000 24SJ54 BOLTING 63) VT-2 AUG Accept by certified PSEG personnel conditions noted

                                                                                                                                                                                                                                                              .5-sf                                                                         ....................

ON LINE i10-SJ-1241 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258050 24SJ55 BOLTING 63) VT-2

                                                                                                                                                     ....             ~.AUG Accept by certified PSEG personnel conditions noted
            ....                                                                ON LINE 10-SJ-1 241 (FiG. A-                                                                                                                       Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258100   24SJ56 BOLTING                                                          63)                                                            VT-2                        AUG                              Accept                 by certified PSEG personnel                                                                             conditions noted ON LINE 10-SJ-1231 (FIG. A-                                                                                                                        Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258150   23SJ54 BOLTING                                                          64)                                                            VT-2                        AUG                              Accept                 by certified PSEG personnel                                                                             conditions noted
                                   .... .                   ~
                                             ., . :. . ., . . . .. . . . .. . .                                                           .. .                                .. .....'   ~
                                        ....                                    ON LINE     ::.::..:....::....

10-SJ-1231 .. (FIG. A- ....... ....... :c.. Visual Examination . performed order# 50071724 Visual Exam performed on bolted connection. No under............... 23SJ55 BOLTING 64) VT-2 AUG Accept by certified PSEG personnel conditions noted 258200 ON LINE 10-SJ-1 231 (FIG. A- Visual Examination performed under order# 50071724 23SJ55 BOLTING . .....

64) ,..........'.....................

VT-i ISI Accept by certified PSEG ................................. personnel No conditions noted Exam acceptable

                                                                                                                                                        .................................                                                                                                                                                                           ...............      ~..............

ON LINE 10-SJ-1 231 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258250 23SJ56 BOLTING 64) VT-2 AUG Accept by certfined PSEG personnel conditions noted

.::..  ?,a ................. Ry . . sssa8 ON LINE 10-SJ-1 221 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258300 22SJ54 BOLTING 65) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 10-SJ-1221 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258150 2SJ55 BOLTING 65) VT-2 AUG Accept by certified PSEG personnel conditions noted 258350ON LINE 10-SJ-1 221 (FIG. A- Visual Examination performed under order# 50071724j Z2SJ55 BOLTING 65) VT-I ISI Accept by certified PSEG personnel No conditions noted Exam acceptable ON LINE 10-SJ-1221 (FIG. A- Visual Examination performed underorder# 50071724 2540 2SJ56 BOLTING 65) LINE 10-SJ-1221 (FIG. A- VT-1 ON ISI Accept by certified Visual PSEG personnel Examination performed under order# 50071724 Visual No conditions noted Exam Exam performed on acceptable bolted connection. No 22SJ56 BOLTING 65) VT-2 AUG Accept by certified PSEG personnel conditions noted
                            ...                                                                                                                  .;...........                                      ..... i        B                      .S..

ON LINE 10-SJ-12131 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 21 SJ54 BOLTING 66) VT-2 AUG Accept by certified PSEG personnel conditions noted 258450 ON LINE I0-SJ-12131 (FIG. A- Visual Examination performed under order# 50071724 21 SJ54 BOLTING 66) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable R;............... >9...af..

Salem Nuclear Generating Station, Unit 2 Page 18 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results

                                                                                                                                                                                                                   -                                                                           r.                      . .*.*.             ... .        ..     . **
                                                                                                                                                                                                                     ~.    ...      :....          .....          .... .,... ..........           . . ....... . ..                          ~

ON LINE 10-SJ-1 21 1 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258500 21 SJ55 BOLTING 66) VT-2 AUG Accept by certified PSEG personnel conditions noted

                                     . . . . . . ..- ON LINE 10-SJ-1211 (FIG. A-                              :..                 :..:.                                Visual  .. ExamInat~on
                                                                                                                                                                                      . . . . . . . . . . . . .. . .... performed underorder# 5007i724 Visual Exam performed on bolted connection. No 258550   21 SJ56 BOLTING                              66)                                             VT-2                     AUG                Accept                 by certified PSEG personnel                                                                                             conditions noted
                                                           . . :. ..: . :  :::::: .:;: :::::;;:        .        :.                                                        .. . .. . .           : : : C.                                               ..                                 .:..            C :":        .       . . ... . . . . . . . . : :. ....     . ..       ....      .. .

ON LINE B-Si-1 262 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258600 22SJ49 BOLTING 67 SHT 1) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 8-SJ-1252 (FIG. A- Visual ExaminatIon performed under order# 50071724 Visual Exam performed on bolted connection. No 258650 21 SJ49 BOLTING 69 SHT 1) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 8-SJ-1245 (FIG. A-. Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258600 24RH27 BOLTING 71) VT-2. AUG Accept by certified PSEG personnel

                                                                                                                                                                                                      .........................................................                                 conditions noted 25800ON                                           LINE 8-SJ-1 245 (FIG. A-                                                                                     Visual Examinatlon performed under order# 50071724 24RH27 BOLTING                                71)                                             VT-i                    Sl                  Accept                by certified PSEG personnel                                                                                             No conditions noted Exam acceptable ON LINE 8-RH-i1235 (FIG. A-                                                          .......                      Visual Examination .............performed under order# 50071724 Visual Exam performned on bolted connection. No 258750   23RH27 BOLTING                                62)                                             VT-2                    AUG                 Accept               by certified PSEG personnel                                                                                              conditions noted ON LINE 8-SJ-i242 (FIG. A-                                                                                        Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 258800   24SJ43 BOLTING                                73)                                             VT-2                  AUG                 Accept                 by certified PSEG personnel                                                                                              conditions noted ON LINE 6-SJ-i1241 (FIG. A-                                                                                       Visual ExamInation performed under order# 50071724 258024Si156 BOLTING                               74)                                             VT- 1                   Sl                  Accept               by certified PSEG personnel                                                                                              No conditions noted Exam acceptable 2580ON                                            LINE 6-SJ-1241 (FIG. A-                                                                                      Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 24SJ1 56 BOLTING                             74)                                              VT-2                    AUG                 Accept               by certified PSEG personnel                                                                                              conditions noted ON LINE 8-SJ-1232 (FIG. A-                                                                                        Visual Examination performed under order# 50071724 Vsual Exam performed on bolted connection. No 258900   23SJ43 BOLTING                               76)                                              VT-2                   AUG                Accept                 by certified PSEG personnel                                                                                              conditions noted ON LINE 8-RH-i1231 (FIG. A-                                                                                      Visual Examinatlon performed under order# 50071724 Visual Exam performed on bolted connection. No 258950   23Si1 56 BOLTING                             77)                                              VT-2                    AUG                 Accept               by certified PSEG personnel                                                                                              conditions noted B8                                                                          ......xex           ..............

efBa.....

                                                                                                      ......                                                 &                                                          :8i...
                                                                                                                                                                                                                         ,.,,.,BZi
                                                                                                                                                                                                                            .>.;.x.

a fS8a.................................. f ...... . ...... ON LINE 6-SJ-iZ22 (FIG. A- Visual Examination performed under order# 50071724 2 BOLTING 7SJ43 79) VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 2500ON LINE 6-SJ-i222 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No Z2SJ43 BOLTING 79) VT-2 AUG Accept by certified PSEG personnel conditions noted _ _ _ Xf ........-

                                                                                      .       X    ,;        e                   ....   .          ...................                                                   BB e S.. . a. .as f.fS
                                                                                                                                                                                                                                         '     .a...

B..e.. Bf f . _____

Salem Nuclear Generating Station, Unit 2 Page 19 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results _____ _ mp......~ l ieqlre ~ orrim nt~ ............................. .. ....

                                                                                                                                                                                                                                                                                                                      ~
                                                                                                                                                                                                                                                                                                   . . .....             .       s2.y          *    .     .

ON LINE. . . 6-SJ-1 221 ..(FIG. A-..... ...... ..... .... .. Visual Examination performed under order# 50071724 Visual ............... Exam performed on bolted

                                                                                                                                                                                                                                                                                 . ...... . ... . ~                             ..

connection. No 259050 22SJ156 BOLTING 80) VT-2 AUG Accept by certified PSEG personnel conditions noted M AR-16M M ... ON LINE 6-SJ-1 212 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 259100 21SJ43 BOLTING 81) VT-2 AUG Accept by certified PSEG personnel conditions noted ___________________._____..... ON LINE 6-SJ-1 211 (FIG. A- Visual  : : ..Examination performed ... under

                                                                                                                                                                                                                     .. ........ ... order# 50071724               Visual Exam performed on bolted                                 ....... connection.
                                                                                                                                                                                                                                                                                                                                                 .         No 259150  21 SJ156 BOLTING         99)                                                 VT-2          AUG              Accept                           by certified PSEG personnel                                                                                    conditions noted 5ON                           LINE 6-SJ-1 21 1 (FIG. A-                                                                                    Visual Examination performed under order# 50071724 21 SJ156 BOLTING         99)                                                 VT-i          ISI              Accept                           by certified PSEG personnel                                                                                    No conditions noted Exam acceptable ff,8f, aa.

ag f . .. . . . . . . . .. . . . . . . . . . . . . . . .. . . 8B~afa~s~fyffg

                                                                                                                            ..>.f~~f
                                                                                                                            .,X,                                                          . . . . . . . . . .. . . .<

B99ffBaf fg8 s fa ON LINE 4-SJ-1 295 (FIG. A- Visual Examination performed under order# 50071724 259200 2SJ13 BOLTING 84) VT-I ISI Accept by certified PSEG personnel No conditions noted Exam acceptable ON LINE 4-SJ-1295 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2SJ13 BOLTING 84) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 4.SJ-294 (FIG. A- . Vsual Exaination . performed under order# 50071724 25202SJ135 BOLTING 85) ON LINE 4-SJ-1294 (FIG. A- VT- 1 1IS Accept by Visual certified Examination PSEG personnel performed under order# 50071724 Visual No conditions Exam performed noted Exam on acceptable bolted connection. No 2SJ135 BOLTING 85) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 4-SJ-1293 (FIG. A- Visual Examination performed under order# 50071724 2SJ12 BOLTING 84) VT-i ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 2530ON LINE 4-SJ-1 293 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 2SJ12 BOLTING 84) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 4-SJ-i1282 (FIG. A- Visual Examination performed under order# 50071724 Vsual Exam performed on bolted connection. No 259350 22SJ40 BOLTING 86) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 4-SJ-i1272 (FIG. A- Visual Examination performed under order# 50071724 254021 SJ40 BOLTING 87) VT-I ISI lAccept by certified PSEG personnel No conditions noted Exam acceptable 2540ON LINE 4-SJ 1272 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 21 SJ40 BOLTING 87) VT-2 AUG Accept by certified PSEG personnel conditions noted ON LINE 3-SJ-i1292 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 25402SJ150 BOLTING 84) VT-2 AUG Accept by certified PSEG personnel _________________noted___ 2540ON LINE 3-Si-i1292 (FIG. A- Visual Examination performed under order# 50071724 2SJ1 50 BOLTING 84) VT-i ISI Accept by certified PSEG personnel No conditions noted Exam acceptable g_ .g.~ .. _ i "_ B,. _ _ .. . ..

Salem Nuclear Generating Station, Unit 2 Page 20 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results _ _.. . .. I m ' . .

                                                                                                                                                                                                              ..........       .B                                             .

ON LINE 1.5-SJ-1212 (FIG. A- Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 259500 21 SJ388 BOLTING 107) VT-2 AUG Accept by certified PSEG personnel conditions noted

                  .:                                                          ....  ..................................   ,,.,:...'B      .

ON .. LINE 1.5-SJ1-1 222 (FIG. A-

                                                                  ...............                                                                           +:. .. : performed under Visual Examination                        order# 50071724 4:::...~.:*~:.*...;;:..... .. Visual
                                                                                                                                                                                                              .                  Exam
                                                                                                                                                                                                                                   ....   .performed
                                                                                                                                                                                                                                              ..         . on bolted connection. No 259550     22SJ1388 BOLTING                 105)                                     VT-2                         AUG                Accept   by certifed PSEG personnel                                      conditions noted ON LINE 1.5-SJ-1 232 (FIG. A                                                                      Vsual Examination performed under order# 50071724 Vsual Exam perfomed on bolted connection. No 259600     23SJ388 BOLTING                  103)                                     VT-2                         AUG                Accept   by certified PSEG personnel                                     conditions noted ON LINE 1.5-SJ-1242 (FIG. A-                                                                      Visual Examination performed under order# 50071724 Visual Exam performed on bolted connection. No 259650     24SJ388 BOLTING                  101)                                     VT-2                         AUG                Accept   by certified PSEG personnel                                     conditions noted SHELL BTO TRANSITION                                                                              Exam performed by Framatome under WIO#

22-STG-SBTC CONE UT-OL ISI Accept 50071724 No recordable indications 271600 SHELL B TO TRANSITION Exam performed by Framatome under W/O# 22-STG-S BTC CONE UT-45 ISI Accept 50071724 No recordable indications SHELL B TO TRANSITION Exam performed by Framatome under WIO# 22STG-SBTC CONE UT-60 ISI Accept 50071724 Norecorable Indcations ~~~~~~~~~Exam .:................ performed by Framatome under WIO#;>> . A.A.. 27002-CVCT-2 SHELL TO LOWER HEAD UT-45 ISI Accept 50071724 No recordable indications 2703 Exam performed by Framatome under WIO# 2-CVCT-2 SHELL TO LOWER HEAD UT-60 ISI Accept 50071724 No recordable Indications VESSEL SUPPORT Exam performed by Framatome under WIO# 275040 2-CVCT-2VS- (1-8) IA INTEGRAL ATTACHMENT PT ISI IBM Accept 50071724 .... No Recordable Indications ..... '.5BfR~sR>"f+.;' 5'%' ':;R=S ............ Exam performed by Framatome under WIO#l 273521-RHRHEX-1 FLANGE TO SHELL UT-60 1SI Accept 50071724 No recordable indications 275365Exam performed by Framatome under WIO# 21-RHRHEX-1 FLANGE TO SHELL UT-45 ISI Accept 50071724 No recordable indicatl ns___ Exam performed by Framatome under WIO# FANG 21-RRHE-2 SELLTO UT45 II Acept 5W7724No recordable indications 27 5370 21 H HE 2S H L TO F NGU T 5 . 15A c e t5 0 1performed Exam 2 by Framatome under WIO# _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 21-RHRHEX-2 SHELL TO FLANGE UT.60 ISI Accept 5071724 No recordable indications

                                            ..                                                                                               Exam performed by Framatome Under WIO#

330060 14SBF-2241-3PSI THRU 4 2-FWH-2422 MT ISI Accept 50071724. No Recordable Indicationsd

Salem Nuclear Generating Station, Unit 2 Page 21 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 R9:t)_1A IQl 11xyzminnfinn Reaatillfc Exam performed by Framatome under 330140 1144BF-2241-8PL-1 THRU 8 2-FWH-24-24 MT Is' Accept 50071724. No Recordable Indications. VAR.SUPPORT,TYP.H,SZ10, Visual Examination performed under order# 50071724 330740 2-FWH-22-19 CL- 2523,HL- 2657 VT-3 PRE Accept by certified PSEG personnel No conditions noted Exam acceptable ys aaYX -Y s as..........$$f$$ yffa. s $a sfafaS. $y~i yS ss~_f2 Exam performed by Framatome under W/O# 350099 8-CS-2225-25 TEE TO PIPE PT ISI Accept 50071724. No Recordable Indications 350101 8-CS-2225-26 PIPE TO VALVE 22CS44 PT ISI Accept Exam performed by framatome under W/O# 50071724 No recordable Indications. Exam performed by Framatome under W/O# 350102 8-CS-2225-27 TEE TO FLANGE PT ISI Accept 50071724 No Recordable Indications. aass^^XBsa s.a...$.ya~a....... ......... . . ................ ... B:>a~s

                                                                          .... ~ .. .e .s¢ Visual Examination performed under order# 50071724 360103                2A-CVCG-418             GUIDE                                              VT-3                   ISl              Accept        by certified PSEG personnel                           No conditions noted Exam acceptable VAR.SUPPORTTYP.ASZ                            .............                                              Visual ExamInation performed under order# 50071724 360643                2A-CVCH-406A            3,CL- 207,HL- 203                                  VT-3                   ISl              Accept        by certified PSEG personnel                           No conditions noted Exam acceptable Visual Examination performed under order# 50071724 360835               2A-SIG-1299             TGUIDE                                             VT-3                   ISI              Accept        by certified PSEG personnel                           No conditions noted Exam acceptable
                                                ..                                                                                                    Visual Examination performed under order# 50071724         .    .. . .. .

380100 MSS-zo4 SUPPORT VT-3 ISl Accept by certified PSEG personnel No conditions noted Exam acceptable 32-MS-241- iPS-3 1THRU Exam performed by Framatome Under W/O# 381030 12 PA-209 MT AUG Accept 50071724 No Recordable Indications

 .... ....           Ss. 2fsPSB         ~                  p'~'$f$t$                              -i            s                 s ~a$               w         a                      <              ; yS         S~PPB     S       f      B$

VALVE BODY FLANGE TO Exam performed by Framatome under W/O# 384020 8.MS-2212-3 VALVE 21 MS 12 MT ISl Accept 50071724 No Recordable Indications.

                                                   .S                                                                                                 Visual Examination performed under order# 50071724 384727               2-MSAG-150              GUIDE                                              VT-a3                  IS               Accept       by certified PSEG personnel                           No conditions noted Exam acceptable Visual Examination performed under order# 50071724 385628               2-MSAS-126 IA          INTEGRAL ATTACHMENT                                 VT-I                   ISl              Accept       by certified PSEG personnel                           No conditions noted Exam acceptable

Salem Nuclear Generating Station, Unit 2 Page 22 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results visual examination performea unoer oroerff 5u I 1 Z4 385650 2-MSAH-1 27 HANGER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

                                           .............  ......   . .... i.    .    .l.......                             .....

Exam performed by Framatome under W/O# 500020 12-PR-2201 -1PS-1 THRU 4 PIPE SUPPORT PT ISI Accept 50071724 No recordable Indications is.aBBB>.Sa... . ... ..... a x::AB..

B':r ..... ........ ..:..... .  :

Visual Examination performed under order# 50071724 501865 2C-21 -RHS-8 SUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable f.$-aS .1. .... ..t . B BB B>aB ix-XRxaBBa B B BB Ba~aks s B Visual Examination performed under order# 50071724 502433 2-RHRH-22-21 HANGER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable VAR.SUPPORT,TYP.A,SZ10, Visual Examination performed under order# 50071724 503323 2-RHRH-21 -10 CL- 1197,HL- 1197 VT-S ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

                      ... ......                                            .........                 . ..       ......... :..                    r...~......:.*                                                   *..~.

VAR.SUPPORT,TYP.C,SZ10 Visual Examination performed under order# 50071724 573105 2-RHRH-22-23 CL- 1261 ,HL- 1328 VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable PT exam performed noted .250" rounded surface indication which is above the .2125" allowable size. A supplemental UT was performed (Ref: UT-04-353) to to evaluate indication and was found Exam performed by Framatome under W/O# acceptable REF: ASME Section Xli 1998/2000 573420 12-RH-2252-42 ELBOW TO PIPE PT ISI Accept 50071724 Table IWB-3514-2 PT exam performed noted .250" rounded surface indicalion which is above the .2125" allowable size. A supplemental UT was performed (Ref: UT-04-353) to to evaluate Indication and was found Exam performed by Framatome under W/O# acceptable REF: ASME Section XI 1998 2000 573420 12-RH-2252-42 ELBOW TO PIPE UT-70 ISI Accept 50071724 Table IWB-3514-2 VAR.SUPPORT,TYP.A,SZ Visual Examination performed under order# 50071724 574135 2P-22-SIH-31 7 CL- 537,HL- 446 VT-S [SI Accept by certified PSEG personnel No conditions noted Exam acceptable

                                                                                                                                                 ~a ~x aRt 2BB paasfS       ...

a~s aB Bf-:gSa gh 2B B. R.

                                                                                                                                                              .....B.

BaR sf.'Ba aR  :.sis

                                                                                                                                                                     ...........sa.

Vsual ExamInat~on performed under order# 50071724

xaW:<egB~~ fi ~fs B.:is~stx fy.Z BB SfBh B

i'.

                                                                                                                                                                       ...........Rf~f 700120            2-CSG-136                                 HGUIDE                                              VT-S                ISI                     Accept                        by certified PSEG personnel                                No conditions noted Exam acceptable

Salem Nuclear Generating Station, Unit 2 Page 23 of 33 ISI Program Long Termn Plan Revision 01 06/1512005 RFO-14 ISI Examination Results l go _ Ra......

                                                                                                                                                                                               \/lsual Examination performed under order# 50071724 VT-3                  ISI                 Accept     by certified PSEG personnel                                                          No conditions noted Exam acceptable 700420       2-CSH-1 12                                                          HHANGER
.R'..f..::v.,': . .: . . g:,........................R:
                                                                                                                                     ,,1',;~~~~...

Exam performed by Framatome under W/O# Multiple Rounded Indications measuring 1/1 6" to PT ISI Accept 50071724 1/8, noted 360* around pipe in weld only. 700910 8-CS-2227-65 TEE TO VALVE 21 CS44

         ..gi~:2  '.>.Wi.;,j ' ................................ ...                                   .. ....... .7.             j         -j         j o        j.

Exam performed by Framatome under W/O# PT ISI Accept 50071724 No Recordable indications 700920 8-CS-2227-66 TEE TO FLANGE B  ; a$ ii i B .:  :  ;: <  :

                                                                                .Bf:..::6                                                 :B Exam perfromed by Framatome under W/O#

PT ISI Accept 50071724 No Recordable Indications 700930 .8-CS-2227-67 FLANGE TO PIPE

   ..             -    ii....         f                             ... ...............
                                                     .f _............                                                                                                       W    ~;:P Visual Examination perfromed under order# 50071724 VT-3                  ISI                 Accept    by certifed PSEG personnel                                                           No conditions noted Exam acceptable 705650        2-CSG-131                                                           HGUIDE
                                                                                                                                                                                             ;                                                                 .-N.R'.:':o,'iSw;R>:

Visual Examination performed under order# 50071724 V`T-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 705820 2-CSS-1 13 HSUIPPORT

      ..       '           R .i ,:..........,->  S,
                                              ++SiBP Visual Examinatlon performed under order# 50071724 VT-3                  ISI                 Accept    by certified PSEG personnel                                                          No conditions noted Exam acceptable 706440        2A-CVCA-454                                                         ANCHOR

_ Visual Examination performed under order# 50071724 VT1-3 JISI Accept by certified PSEG personnel No conditions noted Exam acceptable 706550 12A-CVCS-440 SUPPORT Visual Examination performed under order# 50071724 VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 706960 12A-CVCG-508 GUIDE

                                                                                                                                                                                                  .....                    aiainpefre udrodr x ..............                                                                                  ..#5012
                     ....                                                                                                                                          ... .                                                                                                              ocniiosntdEamacpal 712100~~~~~~~~~~~~
                                                           ~                          UPR     ~~~~~~~~~~       ~a...82,                         T3                S                    cet a a  a bycriidPSGprone jaf
                                                                                                                                                                                                                               ........      ii         ff                  -

af aS . R ;.sa ....... . ..... ..... a

                                                                                                                                                                                                 .........          .s                  ~o e unde....... ...... r     ....                                      ...
                                                                                                                                                                                                                                                                                                      .50071724.

i> Rff 71.6 is aRf a G31 fa~f R R~f fR af S > fS R~a ~aa g aaa a. RS.R.... Acet b.eriidPEGpronlNocniinsntdEamacpal ff Ra..R..... ~f.- .... 6isf

Salem Nuclear Generating Station, Unit 2 Page 24 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Resultsq Exam perfunnea by Pramatun IUM LOWER HEAD TO SHELL UT-60 Isl Accept 50071724 No Recordable Indications 2-BIT-B

                                                                                                                                 .Exam          performed by Framatorne Under W/O#

LOWER HEAD TO SHELL UT01 ILSI Accept 50071724 No Recordable Indications 2-BIT-8 715190 Exam performed by Framatome Under W/O# LOWER HEAD TO SHELL UT-45 SI Accept 50071724 No Recordable Indications 2-BIT-B Exam performed by Framatome Under W/O# 2-BIT-B LOWER HEAD TO SHELL UT-57 Isl Accept 50071724 1 - . . - I . I I 1 . . . No. . Recordable Indications

                                                                                                                                        . ..                             I
                                                                                                 -.              . . - I .

l1 SY "Nei.4l4^YRR lU~.. .v....... .......

                     >4 RB                                                             4 Visual Examination performed under order# 50071724 SUPPORT                             VT1-3     JISI           Accept     by certified PSEG personnel                            No conditions noted Exam acceptable 720120           2-CCA-5
               ~~~~~~~~~~~~~~~~.                     . ,B
                                                   . R.      ."R  g..RRlR
                                                        . RR......R+

VAR.SUPPORT,TYP.F,SZ13, Visual Examination performed under order# 50071724 CL- ,HL- VT1-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 720360 2-CCS-50 MW MO pswimaaXgss'RBRBa..-sg Ma*ss . aR;a _ Visual Examination performed under order# 50071724 VT -1 ISI Accept by certified PSEG personnel -No conditions noted Exam acceptable 720365 2-CCS-50 IA INTEGRAL ATTACHMENT Vlsual Examination performed under order# 50071724 VT1-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 720450 12-CCA-31 ANCHOR 10 mom:Y

                                                                                                                                                                                               -                 y    ~    ^~      . .i ...s~
                                                                                                                                                                                                                                         .ay-_-_B SB.R0^^8;;gBB Visual Examination performed under order# 50071724 INTEGRAL ATTACHMENT                  VT 11      ISl          Accept     by certified PSEG personnel                            No conditions noted Exam acceptable 720455            2-CCA-31 IA Visual Examination performed under order# 50071724 ANCHOR                               VT-3        ISl         Accept     by certifled PSEG personnel                            No conditlons noted Exam acceptable 720500            2-CCA-36 RS.>>BW                          YS       -      ;SyR+§                   sR      y      Y       .B~~~~,,             ~~~>

gsB yB Visual Examination performed under order# 50071724 INTEGRAL ATTACHMENT VT-1 ISI Accept by certified PSEG personnel No conditions noted Exarn acceptable 720505 12-CCA-36 IA CIL- ,HL- VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 720530 12-CCS-39 VAR.UPPOTTY.GS11,Visual Examination performed under order# 50071724 CL-IHL VT1-3 ISI Accept by certified PSEG personnel No condhtions noted Exam acceptable 720570 12-CCG-41

       - S.0....
           ...S f'f.t>.:.S, RBSsfafssBefmt RR.z.

Salem Nuclear Generating Station, Unit 2 ISI Program Long Term Plan Page 25 of33 06/15/2005 Revision 01 RFO-14 ISI Examination Results

                                                                                                     .........XA .:i:::~l ji:. CO9 d 6EX                           :.............
                                                                                                                                                                            .  ~      $   ::X  X  X :X
                                                                                                                                                                                                     ..... S...............

R.......... ........................ .......... .m.X X. X X:...:.... .. . . ..... : ... Visual Examination performed under order# 50071724 720780 2-CCG-17 GUIDE VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

     . BB$<
 ,,j:.E'$.B   $B ...........
                 ?R.
        .~,B.W$i.s      gg.-._                                                                                                                                                  Visual Examination performed under                          order# 50071724 721820         2-AFS-1         00                        HSUPPORT      . ..........      ,

VT-3 ISI Accept by certified PSEG personnel ~*. No conditions ~noted ...Exam acceptable Visual Examination performed under order# 50071724 721825 2-AFS-100 IA INTEGRAL ATTACHMENT VT-I ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722450 2-AFA-1 11 ANCHOR VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722540 SWPS-28 SUPPORT VT-S ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order#t 50071724 722545 SWPS-28 IA INTEGRAL ATTACHMENT VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722560 SWPS-16 SUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722590 SWPG-20 GUIDE VT-3 PRE Accept by certified PSEG personnel No conditions noted Exam acceptable

                                                  . .. .g... .A.............................
                                                .:.X.X                 .                        W-p 0ag.Efp                                                                                                         . ...s.....j   s~fwffaf 2s Visual Examination performed under order# 50071724 722610         SWPG-50                                    GUIDE                                        VT-3           1SI                       Accept                           by certified PSEG personnel                                                 No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722615         SWPG-50 IA                                 INTEGRAL ATTACHMENT                          VT-i           ISI                       Accept                          by certified PSEG personnel                                                  No conditions noted Exam acceptable t~~~~~~~~~~~~.......                                                                             .... .~a                                        ...ES.8 affai~sSXS2:rfisfssgfoffg~s~SBB B

Visual Examnination performed under order# 50071724 0SWPG-21 GUIDE VT4 PRE Accept by certified PSEG personnel No conditons noted Exam acceptable Visual Examination performed under order# 50071724 SWPG-21 GUIDE VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722630 SWPG-21 IA INTEGRAL ATTACHMENT VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 722660 SWPS-17 SUPPORT VT-3 IS[ Accept by certified PSEG personnel No conditions noted Exam acceptable

Salem Nuclear Generating Station, Unit 2 Page 26 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results t.. T __ f ....

                                                                                                                                       ...... . . ... . . .. ..                                                 .. . - * - --                           t tn n Visual Examination performed under order# 50071724 SUPPORT                                    VT-3                 ISI        Accept                        by certified PSEG personnel                                       No conditions noted Exam acceptable 722800     SWPS-37
. ; ... BB . f ... ... ..f.;........ia
                                                                                                                                             ....        .      Visual Examination performed ..X      under order# 50071724 SUPPORT                                    VT-3                 IS!        Accept                        by certified PSEG personnel                                       No conditions noted Exam acceptable 722820     SWPS-32 S            .....                                                                               .

B S .... .. .. ... Visual Examination performed under order# 50071724 Of fiBBBfSB;.

                      .. .. s  ...                                                                                                                                                                                                No conditions noted Exam acceptable 722860     MSWG-42                                       SUPPORT                                    VT-3                 ISI       Accept                        by certified PSEG personnel
                                                                                        .  . ~     .. . .,,.....                          .......'                 .. ..~........................................                                                               . ..

SSs '.SSss ~ ~ S B f, .. .. . .. , < .... s . ~is ..... Visual Examination performed under order# 50071724 GUIDER VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 722950 MSWG-49A Visual Examination performed under order# 50071724 MSWG-42 GUIDE VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 722860

            .            . S f  .S.               ._...BB                  .     .  . BB.B.. .       ... . ..........          SS f           SB2.2.2BB.Bf..'BB S s       ......          .              f Visual Examination performed under order# 50071724 S.

MSWG-40 SUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 723020

                                                                                   .                                                                             Visual Examination performed under order# 50071724 GUIDER                                   VT-3                  ISI       Accept                        by certified PSEG personnel                                       No conditions noted Exam acceptable 7234030    MS24WG-500 Visual Examination performed under order# 50071724 VALVE RS             AITVT-3                                   ISI       Accept                        by certified PSEG personnel                                       No conditions noted Exam acceptable 7234290    2C-2SWRG400 B fs;                              Ss; i......                                    .............. a              a        z t:.:.s fS          :<;S4a f BB >             r84 4 44      4 18 s~f  ;B      a     B       4 BB 8    ">gB                          5 a        8 Visual Examination performed under order# 50071724 GUIDE RS             AITVT-3                                    ISI      Accept                         by certified PSEG personnel                                      No conditions noted Exam acceptable 725420      A2P-SWGR41 Visual Examination performed under order# 50071724 GUIDE                                     VT-3                   ISI       Accept                        by certified PSEG personnel                                      No conditions noted Exam acceptable 725970     A2-SWG-333 Visual Examination performed under order# 50071724 GUIDE                                     VT-3                   ISI       Accept                        by certified PSEG personnel                                      No conditions noted Exam acceptable 726040     A2-SWG-320 Visual Examination performed under order# 50071724 HANGER                                   VT-3                   ISI       Accept                        by certified PSEG personnel                                      No conditions noted Exam acceptable 726370    2A-SWH-46

Salem Nuclear Generating Station, Unit 2 Page 27 of 33 IS1 Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results visual Examination perfrrmed under orderw 726480 I 2AFE4 I PUMP SUPPORT Vr-3 ______ I ISI Accept

                                                                                                                                                                                                                          .1.

by certified PSEG personnel INo conditions noted Exam acceptable Visual Examination performed under order# 50071724 726490 2AFE4 IA INTEGRAL ATTACHMENT VT-1 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

                                   . .......  .. C. .... .. :. .. C ........ ......                                       C..                                       . . . . ....... . . . ...         . .                                      .....
                                                                                                                                                                                                                                    . . .. . .~.                Visual Examination performed under order# 50071724                                        ..            . .. .

726600 2CCE1 TANK SUPPORT VT-3 1SI Accept by certifed PSEG personnel No conditions noted Exam acceptabie a  ; x h sh ...... .. .. .ay...... ... ~ .. ._ - --- -- Visual Examination performed under order# 50071724 726610 2CCE1 IA INTEGRAL ATTACHMENT VT-i ISI Accept by certified PSEG personnel No conditions noted Exam acceptable Visual Examination performed under order# 50071724 726860 2SWE5 PUMP SKIRT SUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable 08ff g:..... a ~;BSgg X_ ......x

                                                                                                                                                                                    \fxgSa...

faa g. Visual Examination performed under order# 50071724 .  ; .... .. .. .gsx 729058 2-CSG-154 HGUIDE VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable

                                         >->>>E~l}g^a                             B>g           .BBg@ .f.             ..                                                          . .. .ga~                                                                                                                                                         .>x......

Visual Examination performed under order# 50071724 731120 2A-SIS-203 IA INTEGRAL ATTACHMENT VT-1 ISl Accept by certified PSEG personnel No conditions noted Exam acceptable

                                                                                                                                                                                                                                                     .... ...                                             . ...... . .    .     ...      .. . . ..        . .. .  ... .     .  . .. . . .    . . . . . . . .. . .. . .. . . C. . .. . . .. . .
                                                                                                                                        ... .. C.. . .. C.C....C.                                   ..........................                .. .......

Visual Examination performed under: . order# ......... 50071724 .... . .. ................ ...... . .... . ............ . 731130 2A-SIS-203 SUPPORT VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable CC. ..k .C.* . . C.C. C

                                                                      . .X: :... C . :C
                                                                                      . C. X.

VAR.SUPPORT,TYP.C,SZ C... . .. . CCC..CC CCC:C.CCCC.C C* .CC . . .C.C

                                                                                                                                              . ..C
                                                                                                                                                  ..C.
                                                                                                                                                     .C
                                                                                                                                                      ..C       CC . C .:
                                                                                                                                                        . . . . .C         C. .. ....
                                                                                                                                                                                    . . .... . ..                   :. .       .. :.        :..:C. . .....    .

Vsual Examination performed under order# 50071724 733925 21-AFWH-51 l5,CL-345,HL-337 VT-3 ISI Accept by certified PSEG personnel No conditions noted Exam acceptable NO.21 Accumulator Instrumentation Nozzels Vsual Examination performed under order# 50071724 734262 2SJE6 Penetrations VT-2 OWN Accept by certified PSEG personnel No conditions noted Exam acceptable NO.22 Accumulator Instrumentation Nozzels Vsual Examination performed under order# 50071724 734263 2SJE7 Penetrations VT-2 OWN Accept by certified PSEG personnel No conditions noted Exam acceptable NO.23 Accumulator Instrumentation Nozzels Vsual Examination performed under order# 50071724 734264 2SJE8 Penetrations VT-2 OWN Accept by certified PSEG personnel No conditions noted Exam acceptable

Salem Nuclear Generating Station, Unit 2 Page 28 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results NO.24 Accumulator Instrumentation Nozzels Visual Examination performed under order# 50071724 734265 12SJE9 Penetrations VT-2 OWN Accept by certified PSEG personnel No conditions noted Exam acceptable L . .i=;*i.*

                                                                              .~.   ...   *.*.
                                                                                             .~..*.
                                                                                                 .*.*.. . .~.*.*.*.*.
                                                                                                                              ..          ....       ...*. .. *. .~.*..              i.~ *....

Visual examination performed by the following personnel. John O'Neil, Wayne Denlinger, Pete Durant, Walt Sheets, Bill Brammeler, Wally Visual Examination performed under order# 50071724 Wikoff, Paul Lindale, Patrick Cusick, and David 950000 SPT-2-RC-001 ALL CLASS 1 SYSTEMS VT-2 ISI Accept by certified PSEG personnel Mora, Level 11-

        <;g~g>             g    s    -    Eal-------,

(AF) AUXILIARY FEED Visual Examination performed under order# 50071724 950050 SPT-2-AF-001 WATER SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry sf gl.lifloffs g Bsg s sa S ~~~~~~~~~~~............... . ............ .g~s ggga fe llB: ~ f fga

                                                                                                                                                                                                                                                                       %.a ag Seal leak into collection system at #22 Aux Feed (AF) AUXILIARY FEED                                                                                      Visual Examination performed under order# 50071724 Pump previously identified. No effect on pump 950100      SPT-2-AF4-02                                        WATER SYSTEM                                            VT-2         ISI        Accept                   by certified PSEG personnel                                                                        operability.

(AF) AUXILIARY FEED Visual Examination performed under order# 50071724 950200 SPT-2-AF4004 WATER SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 950260 SPT-2-CA-002 (CA) CONTROL AIR VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry Visual Examination performed under order# 50071724

         .     ........ .    ..   >.         C....                                      ....

950270 SPT-2-CA-003 (CA) CONTROL AIR VT-2 ISI Accept by certified PSEG .personnel ... ... . No leakage from pressure retaining boundry (CC) COMPONENT Visual Examination performed under order# 50071724 950300 SPT-2-CC4O01 COOLING SYSTEM VT-2 ISI Accept by cerified PSEG personnel No leakage from pressure retaining boundry (CC) COMPONENT Visual Examination performed under order# 50071724 950400 SPT-2-CC-003 COOLING SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry (CC) COMPONENT Visual Examination performed under order# 50071724 ggR gs .SPT-2-CC-05 950500 .fg. '. .. .....i > > ;. COOLING SYSTEM VT-2 ISI Accept by certified PSEG personnel

                                                                                                                                                                                               .........                                                                   No leakage from pressure                  retaining boundry (CS) CONTAINMENT SPRAY                                                                                   Visual Examination performed under order# 50071724 950700      SPT-2-CS-002                                        SYSTEM                                                  VT-2        ISI         Accept                   by certified PSEG personnel                                                                        No leakage from pressure retaining boundry (CS) CONTAINMENT SPRAY                                                                                  Visual Examination performed under order# 50071724 950750      SPT-2-CS-003                                        SYSTEM                                                  VT-2        ISI         Accept                  by certified PSEG personnel                                                                         No leakage from pressure retaining boundry

Salem Nuclear Generating Station, Unit 2 ISI Program Long Term Plan Page 29 of 33 Revision 01 RFO-14 ISI Examination Results J ivIsual eFxa01111LIU1I DejnUmmIu UIIer arUI:tt aVu1 IZ4 950800 SPT-2-CS-004 SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry X (OR) DEMINERALIZED <. .2... .. Visual Examination performed under order#. 500717i24 .. 951150 SPT-2-DR-001 WATER __SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage.....from.. pressure retaining boundry

     ...     . .. ....      :                                 :. ,.:.:.:........*.........                                                                                             i.;

(FP) FIRE PROTECTION Visual Examination performed under order# 50071724 951200 SPT-2-FP4001 SYSTEM VT-2

                                                                                                 ... .. ..    ....... .. . ISI. Accept
                                                                                                                                      .. by certified PSEG personnel                ---- --...-.--..-.----                    No leakage from pressure retaining boundry (RC) REACTOR COOLANT                                                         Visual Examination performed under order# 50071724 951 450    SPT-2-RC4004                                        SYSTEM                            VT-2                         ISI   Accept  by certified PSEG personnel                                                          No leakage from pressure retaining boundry (RH) RESIDUAL HEAT                                                           Visual Examination performed under order# 50071724 951600     SPT-2-RH-02                                         REMOVAL SYSTEM                    VT-2                         ISI   Accept  by certified PSEG personnel                                                          No leakage from pressure retaining boundry
                        ....  ...:..C.CC.C.CC.:..C.:..:.CC.C.CC.C..C.C..C....................                                              Visual Examination performed under order# 50071724 951650     SPT-2-SA40O1                                        (SA) STATION AIR SYSTEM VT-2                                   ISI   Accept  by certified PSEG personnel                                                          No leakage from pressure retaining boundry

____.__....___......___ _____________________.. ........... ... .. ... . . :.. CC..::C. Visual Examination performed under order# 50071724 951700 SPT-2-SA-002 (SA) STATION AIR SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 951750 SPT-2-SF-001 (SF) SPENT FUEL SYSTEM VT-2 ISl Accept by certified PSEG personnel No leakage from pressure retaining boundry (SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 951500 SPT-2-SJ-001 SYSTEM VT-2 ISl Accept by certified PSEG personnel No leakage from pressure retaining boundry (SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 951850 SPT-2-SJ-02 SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry (SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 951900 SPT-2-SJ-003 SYSTEM VT-2 ISl Accept by certified PSEG personnel No leakage from pressure retaining boundry (SJ) SAFETY INJECTION Visual ExamInatlon performed under order# 50071724 951950 SPT-2-SJ4004 SYSTEM VT-2 ISl Accept by certifed PSEG personnel No leakage from pressure retaining boundry (SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 952000 SPT-2-SJ-005 SYSTEM VT-2 iSl Accept by certified PSEG personnel No leakage from pressure retaining boundry

                ..       .        .....                                 g fg.

Salem Nuclear Generating Station, Unit 2 Page 30 of 33 ISI Program Long Term Plan Revision 01 06/15/2005 RFO-14 ISI Examination Results

          .........    " :4..    .....             .... :4::.4                                                                                           ..                             ~*.**:                                                                 .**.:.....                           ~:                       :   .

(SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 952050 SPT-2-SJ-006 SYSTEM. VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry (SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 952100 SPT-2-SJ-007 SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry

                                                                   ;     R$*      **  >$   R. *..:       .i                      .

(SJ) SAFETY INJECTION Visual Examination performed under order# 50071724 952150 SPT-2-SJ-008 SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 952350 SPT-2-SS-003 (SS) SAMPLING SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry R>'~~~.

                                                                                                                                                                                                                     ,i*
i. ..,B .. . . . . . . iR "RR:R
                                                                                                                                                                                                                                                         ;:'i._
                                                                                                                                                                                                                                                .. R......

Visual Examination performned under order# 50071724 952400 SPT-2-SS-004 (SS) SAMPLING SYSTEM VT-2 1SI

                                                                                                                    ..  .. f' RfB Accept R. "     ...

by certified PSEG personnel No leakage from pressure retaining boundry s.R...BRf v

                                                                                                                                                                                                                               '*$R
                                                                                                                                                                                                                                B'$

Visual Examination performed under order# 50071724 952700 SPT-2-SS-010 (SS) SAMPLING SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 No leakage R from pressure retaining .... boundry

                                                                                                                                                                                                                                                                                                                       ...... R                 *Y 952750

... f......  : - f $

       . . SPT-2-SS-011       $ $aa (SS):f,,SAMPLING R        R   aaa SYSTEM             VT-2             ISI              Accept        by certified PSEG personnel                                                            ..                                                               f~    saaR                       *

(SW) SERVICE WATER.. ... . . ... Visual Examination performed under order# 50071724 No leakage from pressure retaining boundry

                                                                                                                                                                                                                                                                                                  *aa
                                                                                                                                                                                                                                                                                             .*f.. .f.R..aaas....

f> z$a a..faa$ ..................................... 953100 SPT-2-SW-002 SYSTEM VT-2 ISI Accept by certified PSEG personnel (SW) SERViCE WATER Visual Examination performed under order# 50071724 953150 SPT-2-SW-003 SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry (SW) SERVICE WATER Visual Examination performed under order# 50071724 953250 SPT-2-SW-005 SYSTEM VT-2 ISI Accept by certified PSEG personnel No leakage from pressure retaining boundry (SWR) WSERIE WATOERY Visual Examination perfromed under order# 50071724 953350 9553150 SPT-2-SW-007 SPT-2-SWR-003 SYSTEM VT-2 ISI Accept Accept by certified PSEG personnel No leakage from from pressure pressure retaining boundry

                                                                                                              .....     ...                                                                                                                                           .....                                                 . .'a~
                                                                                                                                                                                                                                                                                                                                .'a~: ..           ---;f$

a$~ Rf RR B$aaBRRRfB RRB'RBBf

                                                                                                                                                             . ..a:..........
                                                                                                                                                            .$.aRBf                 ~    ..                                                              ..... Z.....        .........               f   B:B:       a              ..
.~jaj .......... a.................

Salem Nuclear Generating Station, Unit 2 ISI Program Long Term Plan Page 31 of 33 06/15/2005 Revision 01 RFol.1A ISI Favnminnfinn Palmvilftt Notification# 20227708 Generated for Boric Acid collection at flange to flange region of valve Visual Examination performed under order# 50071724 22BR84 No leakage from pressure retaining 958010 NR-SPT-2-BR-001 (BR) BORON RECOVERY lVT-2 AUG Accept by certified PSEG personnel boundry

                    ;T. .                                                                                               g.                ;                                                                                                                                             .l -.. . ,,----;:.

Visual Examination performed under order# 50071724 958020 NR-SPT-2-CS-001 (CS) CONTAINMENT SPRAY VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry

                                                                             .           .        ~~ ................

g . . s .. l-f

                                                                                                                                                                                                                           . ff~

ff f .g sg l .... fBs fg gsf f f gg0..... Visual Examination performed under order# 50071724 958030 NR-SPT-2-CS-002 (CS) CONTAINMENT SPRAY VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry

      .~

s .. :*:. :.... aW .........

                                                                                                                                                                                                      *K*ffa>5.f~fffaa                                            ~..

(CV) CHEMICAL & VOLUME Visual Examination performed under order# 50071724 958040 NR-SPT-2-CV-001 CONTROL VT-2 AUG Accept by certified PSEG personnel . No leakage from pressure retaining boundry

                                                                                                                                                                                                                                                . x    <. M.....<...                                    .     ...... .......
                                                                                                                                                                                                                                                                                                                             .              ~   .  .......

(CV) CHEMICAL & VOLUME Visual Examination performed under order# 50071724 958050 NR-SPT-2-CV-002 CONTROL VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry

                                                                                           ;sc<Bfs~~~~~~~~...      s...                                                                                               >.saffc S~sCfc>SSf,                                                                                                                       ...   . .   .. ..... . ...........-

(CV) CHEMICAL & VOLUME Visual Examination performed under order# 50071724 958060 NR-SPT-2-CV-003 CONTROL VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry Notification# 20221227 Generated for wet boric (CV) CHEMICAL & VOLUME Visual Examination performed under order# 50071724 acid leak from packing on valve 2CV54 No 958070 NR-SPT-2-CV-004 CONTROL VT-2 AUG Accept by certifled PSEG personnel leakage from pressure retaining boundry Notiflcatlon# 20221226 generated for dried boric acid on body to bonnet surface and around plug in (CV) CHEMICAL c :,.g.,s~~lf 2 s* & VOLUME acS.......

                                                                                                                          *ac~c~cS Scf    .. .............             .      ... ....    .. i.*.......g2
                                                                                                                                                                                            <<B   ~g*

SS1S2gBBBc f Visual Examination performed under order# 50071724 side of valve 2CV7 No leakage from pressure 958080 NR-SPT-2-CV-005 CONTROL VT-2 AUG Accept by certified PSEG personnel retaining boundry (CV) CHEMICAL & VOLUME lVisual Examination performed under order# 50071724 958090 NR-SPT-2-CV-006 CONTROL VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry (CV) CHEMICAL & VOLUME Visual Examination performed under order# 50071724 958100 NR-SPT-2-CV-007 CONTROL VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry

                                                                                                                                                                                                  .           Visual Examination performed under order# 50071724 958110      NR-SPT-2-RH-001                                              (RH) REHEAT REMOVAL                                                           VT-2                 AUG              Accept              bycertified PSEG personnel                                                                                     No leakage from pressure retain~ng boundry

Salem Nuclear Generating Station, Unit 2 Page 32 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results

                          . . ..                                                                                                  ..               . .     . . ..    ..                                    ....                        ,. .....                    :.: .             .. . .. . . . . . . . . . . .. x...                       ' 'I..

___T W a R e Coda .a ent 3_a........ . . Visual Examination performed under order# 50071724 958120 NR-SPT-2-RH-002 (RH) REHEAT REMOVAL VT-2 AUG Accept by certified PSEG personnel No leakage from pressure retaining boundry

                                                                                                                                                                                                                                                           .s. .,           . i             .          X.             <    S.             >

Visual Examination performed under order# 50071724 958130 NR-SPT-2-SI-001 (SJ) SAFETY INJECTION VT-2 AUG Accept by certified PSEG personnel ... .. ... No leakage .. from pressure retaining boundry

                                                                                ..  .    . ..     ..    . .                    . s S.l.s ag t.... s     .. S a ts>i.iisss
                                                                                                                                                              .....   ..   ...    ......               .      . ...... assgssgssSsS'SaS.s ga
                                                                                                                                                                                                                         .at.a
                                                                              .                                                                                                       Visual Examination performed under order# 50071724 958140 NR-SPT-2-SI-002                                                (SJ) SAFETY INJECTION                     VT-2              AUG                      Accept                      by certified PSEG personnel                                                      No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 958150 NR-SPT-2-SI-003                                                (SJ) SAFETY INJECTION                     VT-2              AUG                      Accept                      by certified PSEG personnel                                                      No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 958160 NR-SPT-2-SS-WO1                                                (SS) SAMPLING SYSTEM                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 958170 NR-SPT-2-SS-W02                                                (SS) SAMPLING SYSTEM                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      No leakage from pressure retaining boundry Visual Examination performed under order# 50071724 958180 NR-SPT-2-SS-003                                                (SS) SAMPLING SYSTEM                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      No leakage from pressure retaining boundry
                                         . .m:o                                    . .                                                   .       .       .     . . . .m,    . , :,..                  ..                     . .  .. .. .     .     .         ....                                         :::*~:              . ...... .. .
                                                                                                                                                                                                                     . .Notificaton                                                                      generated for boric acid leaks on the pack of the following valves 21 SS1 81 Not#

Visual Examination performed under order# 50071724 2027484 & 23 SS185 Not# 20Z7465.No 958190 NR-SPT-2-SS-004 (SS) SAMPLING SYSTEM VT-2 AUG Accept by certified PSEG personnel leakage from pressure retaining boundry gg....BffSS5S.B.. ss g fgxxesvg

                                                                                                                .............                    t sss              ss            s     sSxgg        Exgx BSS$B .mg f         gs                               i              B       sg ssssg                                    s   s8ius
                                                                     #21 WASTE GAS DECAY                                                                                              Visual Examination performed under order# 30093692 958200 NR-SPT-2-WG-001                                                TANK                                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      Test Results Acceptable
                                                                     #22WASTE GAS DECAY                                                                                               Visual Examination performed under order# 30092929 958210 NR-SPT-2-WG-002                                                TANK                                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      est Resutrs Acceptable
                                                                     #23 WASTE GAS DECAY                                                                                              Visual Examination performned under order# 30092278 958220 NR-SPT-2-WG4003                                                TANK                                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      est Results Acceptable
                                                                     #24 WASTE GAS DECAY                                                                                              Visual Examination performed under order# 30091486 958230 NR-SPT-2-WG-004                                                TANK                                      VT-2              AUG                      Accept                      by certified PSEG personnel                                                      Test Results Acceptable

Salem Nuclear Generating Station, Unit 2 Page 33 of 33 06/15/2005 ISI Program Long Term Plan Revision 01 RFO-14 ISI Examination Results V lOiUO za~l I l~tIVu pcilullmICU Ut 958240 NR-SPT-2-WG-005 HEADER VT-2 AUG Accept by certified PSEG personnel est Results Acceptable

d.  :'...> . .,.B'.*.B0-
                                                                                     *..+H WASTE GAS COMPRESSORS SUCTION                                   Visual Examination performed under order# 30094320 958250 NR-SPT-2-WG-006             HEADER               VT-2   AUG    Accept             by certified PSEG personnel                                           est Results Acceptable
                                                                                                                                                              #21 & #22 Waste Gas Compressor test results SAT The following notifications were generated for 2 failed gauges. Notification# 20228368 for
                                  #21 & #22 WASTE GAS                                  Visual Examination performed under order# 30093443 Gauge # 2PL1 6926 and Notification# 20228367 958260 NR.SPT-2-WG-007             COMPRESSORS          VT-2   AUG    Accept            by certified PSEG personnel                                            for Gauge # 2PL1 6927.
                     .*I.........                                                                                   .......

Notification# 20227003 generated for pipi to tank weld at bottom of ladder area on 32 Waste (WL) WASTE LIQUID Visual Examination performed under order# 50071724 Monitor Tank.No leakage from pressure retaining 958270 NR-SPT-2-WL-001 SYSTEM VT-2 AUG Accept by certified PSEG personnel boundry

LR-N05-0380 Document Control Desk ENCLOSURE 4 Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION UNIT 2 RFO #14 IWE EXAMINATION RESULTS

Salem Nuclear Generating Station, Unit 2 0611512004 ISI Program Long Term Plan Page 1 of 15 RFO #14 IWE I IWL Examination Results Revision 1 I ISun VU CA0111IIGILIUII pnUMIeIIU Wy LC.ILIIIUW rL;U ms NuVaIeu oU O ,WI IIIiI LIIIC IIUlau IU LU IU WU IM LUUdUIj 820200 LNR-S2-QUAD-OOOCI78 TO 100 MC Visual VT-G Accept under order# 50071724 findings on visible part of liner QUADRANT D FROM 78 Visual examination performed by certified PSEG personnel Containment Liner partial insulated 78' to 100', No 820300 LNR-S2-QUAD-OOOD-078 TO 100 MC Visual VT-G Accept under order # 50071724 recordable findings on visible part of liner QUADRANT A MECH No Visual examination performed during RFO-14 component 824700 PEN-S2-M-28 PEN AT 70 EL. MC Visual VT-G N/A is Inaccessible at this time. Inaccessible, Containment Sump QUADRANT D MECH No Visual examination performed during RFO-14 component 824800 PEN-S2-M-29 PEN AT 70 EL. MC Visual VT-G N/A Is Inaccessible at this time. Inaccessible, Containment Sump QUADRANT A MECH Visual examination performed by certified PSEG personnel 824900 PEN-S2-M-30 PEN AT 50 EL. MC Visual VT-G Accept under order # 50071724 No Recordable Findings QUADRANT D MECH Visual examination performed by certified PSEG personnel 825000 PEN-S2-M-31 PEN AT 50 EL. MC Visual VT-G Accept under order# 50071724 No Recordable Findings Concrete plug removed, Notification # 20236302 for QUADRANT D FUEL Visual examination performed by certified PSEG personnel breakdown of coating 4-8 Oclock. Area cleaned VT & 825700 PEN-S2-M-38 TRANS TUBE AT 91 EL. MC Visual VT-G Accept under order # 50071724 UT performed, No recordable findings. PEN-S2-M-38-BLIND QUADRANT D FUEL Visual examination performed by certified PSEG personnel 825750 FLANGE TRANS TUBEAT91 EL MC Visual VT-G Accept underorder# 50071724 No recordable findings, 4 bolts CONCRETE SURFACES Visual examination performed by certified PSEG personnel 900000 CON-S2-QUAD-OOOA-01 QUAD A CYL ROW 01 CC Visual VT-G Accept under order # 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 900100 CON-S2-QUAD-OOOA-02 QUAD A CYL ROW 02 CC Visual VT-G Accept under order # 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 900200 CON-S2-QUAD-OOOA-03 QUAD A CYL ROW 03 CC Visual VT-G Accept under order # 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 900300 CON-S2-QUAD-OOOA-04 QUAD A CYL ROW 04 CC Visual VT-G Accept under order # 50071724 No Recordable Findings Main Steam area Inner Penetration non-Rad side North East containment wall el.120 on floor a piece of CONCRETE SURFACES Visual examination performed by certified PSEG personnel wood is protruding from outside in 11x 8' x 4" sticking 900400 CON-S2-QUAD-OOOA-05 QUAD A CYL ROW05 CC Visual VT-G Accept under order# 50071724 out, Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 900500 CON-S2-QUAD-OOOA-06 QUAD A CYL ROW 06 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 900600 CON-S2-QUAD-OOOA-07 QUAD A CYL ROW 07 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 900700 CON-S2-QUAD-OOOA-08 QUAD A CYL ROW 08 CC Visual VT-G Accept under order# 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 2 of 15 RFO A14 IWE / IWL Examination Results Revision 1 1-Iviual exminiatiu penurmeu Dy ceiiieu etu persunneIl Coating snoUWs caraKing. .dEKming mostly Is coatng 900800 CON-S2-QUAD-OOOA-09 QUAD A CYL ROW 09 CC Visual VT-G Accept under order #50071724 not concrete, CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 900900 CON-S2-QUAD-000A-10 QUAD A CYL ROW 10 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 901000 CON-S2-QUAD-OOOA-1 1 QUAD A CYL ROW 11 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901100 CON-S2-QUAD-OOOA-12 QUAD A CYL ROW 12 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901200 CON-S2-QUADOOOA-13 QUAD A CYL ROW 13 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901300 CON-S2-QUAD-OOOA-14 QUAD A CYL ROW 14 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 901400 CON-S2-QUAD-OOOA-15 QUAD A CYL ROW 15 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 901500 CON-S2-QUAD-OOOA-16 QUAD A CYL ROW 16 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901600 CON-S2-QUAD-OOOA-17 QUAD A CYL ROW 17 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901700 lCON-S2-QUAD-000A-18 QUAD A CYL ROW 18 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901800 CON-S2-QUAD-OOOA-19 QUAD A CYL ROW 19 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 901900 CON-S2-QUAD-OOOA-20 QUAD A CYL ROW 20 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 902000 CON-S2-QUAD-OOOA-21 QUAD A CYL ROW 21 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 902100 CON-S2-QUAD-OOOA-22 QUAD A CYL ROW 22 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 902200 CON-S2-QUAD-OOOA-23 QUAD A CYL ROW 23 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 902300 CON-S2-QUAD-OOOA-24 QUAD A CYL ROW 24 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 902400 CON-S2-QUAD-OOOA-25 QUAD A CYL ROW 25 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 902500 CON-S2-QUAD-0008-01 QUAD B CYL ROW 01 CC Visual VT-G Accept under order # 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 3 of 15 RFO #14 IWE / IWL Examination Results Revision 1 1 Coating shows cracking. Cracking mostly is coating not concrete, Spalling In joint area 3' x 3', , Slight surface erosion and staining from pipe coming out of Rad Monitor detection shed releasing liquid, EI.106' CONCRETE SURFACES Visual examination performed by certified PSEG personnel 3rd form over a stud is protruding from wall, 902600 CON-S2-QUAD-000B-02 QUAD B CYL ROW 02 CC visual IVT-G Accept under order # 50071724 Notification 20234570 Coating shows cracking. Cracking mostly Is coating not concrete, Spalling in joint area 3 x 3',, Slight surface erosion and staining from pipe coming out of Rad Monitor detection shed releasing liquid,EI.1 15'cut CONCRETE SURFACES Visual examination performed by certified PSEG personnel pipe Is protruding from wall with stain running down 902700 CON-S2-QUAD-OOB-03 QUAD B CYL ROW 03 CC Visual VT-G Accept under order # 50071724 concrete, Notification 20234570 Coating shows cracking. Cracking mostly is coating not concrete, Slight surface erosion and staining from CONCRETE SURFACES Visual examination performed by certified PSEG personnel pipe coming out of Rad Monitor detection shed 902800 CON-S2-QUAD-000B-04 QUAD B CYL ROW 04 CC Visual VT-G Accept under order # 50071724 releasing liquid, Notification 20234570 Coating shows cracking. Cracking mostly is coating not concrete, Surface Spalling Injoint Z x 5, North East side of containment facing Equipment hatch to CONCRETE SURFACES Visual examination performed by certified PSEG personnel left side pipelstud Is protruding from concrete, 902900 CON-S2-QUAD-OOOB-05 QUAD B CYL ROW 05 CC Visual VT-G Accept under order #50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 903000 CON-S2-QUAD-OOOB-06 QUAD B CYL ROW 06 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 903100 CON-52-QUAD-OOOB-07 QUAD B CYL ROW 07 CC Visual VT-G Accept under order# 50071724 not concrete Coating shows cracking. Cracking mostly is coating CONCRETE SURFACES Visual examination performed by certified PSEG personnel not concrete, , Spalling Injoint areas Z x , 1' x Z, 903200 CON-S2-QUAD-OOOB-08 QUAD B CYL ROW 08 CC Visual VT-G Accept under order # 50071724 Notification 20234570 Coating shows cracking. Cracking mostly Is coating CONCRETE SURFACES Visual examination performed by certified PSEG personnel not concrete, Spalling in joint areas Z x Z,1' x Z, 903300 CON-S2-QUAD-000B-09 QUAD B CYL ROW 09 CC visual VT-G Accept under order # 50071724 Notification 20234570

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 4 of 15 RFO #f1AIWE I IWL xFyamination Resqults Revision 1 Coating shows cracking. Cracking mostly is coating CONCRETE SURFACES Visual examination performed by certified PSEG personnel not concrete, Spalling in joint 3' x 4, Notification 903400 CON-S2-QUAD-OOOB-1 0 QUAD B CYL ROW IO cc Visual VTr-G Accept under order # 50071724 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 903500 CON-S2-QUAD-OOOB-11 QUAD B CYL ROW 11 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 903600 CON-S2-QUAD-OOOB-12 QUAD B CYL ROW 12 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 903700 CON-S2-QUAD-OOOB-13 QUAD B CYL ROW 13 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 903800 CON-S2-QUAD-OOOB-14 QUAD B CYL ROW 14 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 903900 CON-S2-QUAD-OOOB-15 QUAD B CYL ROW 15 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904000 CON-S2-QUAD-OOOB-16 QUAD B CYL ROW 16 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 904100 CON-S2-QUAD-OOOB-17 QUAD B CYL ROW 17 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904200 CON-S2-QUAD-OOOB-18 QUAD B CYL ROW 18 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904300 CON-S2-QUAD-OOOB-1 9 QUAD B CYL ROW 19 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904400 CON-S2-QUAD-OOOB-20 QUAD B CYL ROW 20 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904500 CON-S2-QUAD-OOOB-21 QUAD B CYL ROW 21 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904600 CON-S2-QUAD-OOOB-22 QUAD B CYL ROW 22 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904700 CON-S2-QUAD-OO0B-23 QUAD B CYL ROW 23 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904800 CON-S2-QUADO000B-24 QUAD B CYL ROW 24 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 904900 CON-S2-QUAD-OOOB-25 QUAD B CYL ROW 25 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 905000 CON-S2-QUAD-OOOC-01 QUAD C CYL ROW 01 CC Visual VT-G Accept under order # 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 5 of 15 RFO #14 IWE / IWL Examination Results Revision 1 Coating shows cracking. Cracking mostly is coating not concrete, between equipment hatch and Fuel Handling/penetration wall next to ground cable 2 rows up a stud w/nut is protruding from concrete, bent piece of pipe or stud protruding from concrete. Entry required between containment and FH bldg. Security Door 226 with HP support, floor Is sandtar coating CONCRETE SURFACES Visual examination performed by certified PSEG personnel attached to concrete wall is no longer adhering in QUAD C CYL ROW 02 CC Visual VT-G Accept under order # 50071724 some locations.. Notification 20234570 905100 ICON-S2-QUAD-000C-02 Coating shows cracking. Cracking mostly Is coating CONCRETE SURFACES Visual examination performed by certified PSEG personnel not concrete. Steel concrete forms (2)of them are still QUAD C CYL ROW 03 CC Visual VT-G Accept under order # 50071724 Inplace. , Notification 20234570 905200 CON-S2.QUAD-OOOC-03 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spalling ranging up to 6' and 14 wide, QUAD C CYL ROW 04 CC Visual VT-G Accept under order # 50071724 Notification 20234570 905300 CON-S2-QUAD-OOOC-04 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD C CYL ROW 05 CC Visual VT-G Accept under order # 50071724 not concrete 905400 CON-S2-QUAD-OOOC-05 Coating shows cracking. Cracking mostly is coating not concrete, between (outer) penetration and CONCRETE SURFACES Visual examination performed by certified PSEG personnel equipment hatch 2 inserts w/staining coming down 905500 CON-S2-QUAD-OOOC-06 QUAD C CYL ROW 06 CC Visual VT-G Accept under order # 50071724 concrete, Notification 20234570 Coating shows cracking. Cracking mostly Iscoating not concreteEfflorescence Is present In 5 locations CONCRETE SURFACES Visual examination performed by certified PSEG personnel coming from the ceiling out of fine lined cracks, QUAD C CYL ROW 07 CC Visual VT-G Accept under order # 50071724 Notification 20234570 905600 CON-S2-QUAD-O00C-07 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD C CYL ROW 08 CC Visual VT-G Accept under order # 50071724 not concrete 905700 CON-S2-QUAD-OOOC-08 Coating shows cracking. Cracking mostly is coating CONCRETE SURFACES Visual examination performed by certified PSEG personnel not concrete, between (outer) penetration and QUAD C CYL ROW 09 CC Visual VT-G Accept under order #50071724 equipment hatch 4 inserts wlstaining 905800 CON-S2-QUAD-OOOC-09

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 6 of 15 RFO #14 IWE I IWL Examination Results Revision 1 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6'and 1-4' wide,. 905900 CON-S2-QUAD-OOOC-10 QUAD C CYL ROW 10 CC Visual VT-G Accept under order # 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6 and 1-4 wide, 906000 CON-S2-QUAD-OOOC-11 QUAD C CYL ROW 11 CC Visual VT-G Accept under order # 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6 and 1-4 wide, 906100 CON-S2-QUAD-OOOC-12 QUAD C CYL ROW 12 CC Visual VT-G Accept under order # 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 906200 CON-S2-QUAD-OOOC-13 QUAD C CYL ROW 13 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6 and 1-4 wide, 906300 CON-S2-QUAD-OOOC-14 QUAD C CYL ROW 14 CC Visual VT-G Accept under order# 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6 and 1-4 wide, 906400 CON-S2-QUAD-000C-15 QUAD C CYL ROW 15 CC Visual VT-G Accept under order # 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 906500 CON-S2-QUAD-OOOC-16 QUAD C CYL ROW 16 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6 and 1-4 wide, 906600 CON-S2-QUAD-OOOC-17 QUAD C CYL ROW 17 CC Visual VT-G Accept under order # 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Surface spatting ranging up to 6 and 1-4 wide, 906700 CON-S2-QUAD-OOOC-18 QUAD C CYL ROW 18 CC Visual VT-G Accept under order # 50071724 Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 906800 CON-S2-QUAD-OOOC-19 QUAD C CYL ROW 19 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 906900 CON-S2-QUAD-OOOC-20 QUAD C CYL ROW 20 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 907000 CON-S2-QUAD-OOOC-21 QUAD C CYL ROW 21 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 907100 CON-S2-QUAD-OOOC-22 QUAD C CYL ROW 22 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 907200 CON-S2-QUAD-OOOC-23 QUAD C CYL ROW 23 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 907300 CON-S2-QUAD-OOOC-24 QUAD C CYL ROW 24 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Iscoating 907400 CON-S2-QUAD-OOOC-25 QUAD C CYL ROW 25 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel 907500 CON-S2-QUAD-OOOD-01 QUAD D CYL ROW 01 CC Visual VT-G Accept under order # 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 907600 CON-S2-QUAD-000D-02 QUAD D CYL ROW 02 CC Visual VT-G Accept under order # 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 907700 CON-S2-QUAD-OOOD-03 QUAD D CYL ROW 03 CC Visual VT-G Accept under order# 50071724 No Recordable Findings

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 7 of 15 RFO #14 IWE / IWL Examination Results Revision 1 CONCRETE SURFACES Visual examination performed by ce ldPSEG personnel 907800 CON-S2-QUAD-OOOD-04 QUAD D CYL ROW 04 cc Visual VT-G Accept under order #50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 907900 CON-S2-QUAD-OOOD-05 QUAD D CYL ROW 05 CC Visual VT-G Accept under order # 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 908000 CON-S2-QUAD-OOOD-06 QUAD D CYL ROW 06 CC Visual VT-G Accept under order# 50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel 908100 CON-S2-QUAD-OOOD-07 QUAD D CYL ROW 07 CC Visual VT-G Accept under order #50071724 No Recordable Findings CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 908200 CON-S2-QUAD-OOOD-08 QUAD D CYL ROW 08 CC Visual VT-G Accept underorder# 50071724 not concrete Coating shows cracking. Cracking mostly is coating not concrete, between plant vent duct and inner CONCRETE SURFACES Visual examination performed by certified PSEG personnel penetration El140' bolt winsert protruding from 908300 CON-S2-QUAD-OOOD-09 QUAD D CYL ROW 09 CC Visual VT-G Accept under order #50071724 concrete stain, Notification 20234570 Coating shows cracking. Cracking mostly is coating not concrete, south west side of containment between CONCRETE SURFACES Visual examination performed by certified PSEG personnel vent and inner penetration el.145 2 bolts protruding 908400 CON-S2-QUAD-OOOD-10 QUAD D CYL ROW 10 CC Visual VT-G Accept under order #50071724 from concrete w/stain, Notification 20234570 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 908500 CON-S2-QUAD-OOOD-1 1 QUAD D CYL ROW 11 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 908600 CON-S2-QUAD-000D-12 QUAD D CYL ROW 12 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 908700 CON-S2-QUAD-OOOD-13 QUAD D CYL ROW 13 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 908800 CON-S2-QUAD-OOOD-14 QUAD D CYL ROW 14 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 908900 CON-S2-QUAD-OOOD-15 QUAD D CYL ROW 15 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909000 CON-S2-QUAD-OOOD-16 QUAD D CYL ROW 16 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909100 CON-S2-QUAD-OOOD-17 QUAD D CYL ROW 17 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909200 CON-S2-QUAD-OOOD-18 QUAD D CYL ROW 18 CC Visual VT-G Accept under order# 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 8 of 15 RFO #14 IWE / IWL Examination Results Revision 1 COUNCK t I t SURFMACES visual examination pertormed uy cerlled rMb" pefbursnnel Coaling s ga-ia nowsuldwU119. %ldumlgl Am~tww :_t~ ~tn monlIy ls oaully 909300 CON-S2-QUAD-OOOD-19 QUAD D CYL ROW 19 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909400 CON-S2-QUAD-OOOD-20 QUAD D CYL ROW 20 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909500 CON-S2-QUAD-OOOD-21 QUAD D CYL ROW 21 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909600 CON-S2-QUAD-OOOD-22 QUAD D CYL ROW 22 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909700 CON-S2-QUAD-OOOD-23 QUAD D CYL ROW 23 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909800 CON-S2-QUAD-OOOD-24 QUAD D CYL ROW 24 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 909900 CON-S2-QUAD-OOOD-25 QUAD D CYL ROW 25 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES QUAD-D ELECT PEN Visual examination performed by certified PSEG personnel Expansion seallmoisturelintrusion barrier Medium 910000 CON-S2-QUAD-000D-078 AREA CC Visual VT-G Accept under order # 50071724 Rust, clean and paint Not.20234644 CONCRETE SURFACES QUAD-C MECH PEN Visual examination performed by certified PSEG personnel Expansion seal/moisture/intrusion barrier Medium 910100 CON-S2-QUAD-OOOC-078 AREA CC Visual VT-G Accept under order # 50071724 Rust, clean and paint Not.20234644 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 910200 CON-S2-QUAD-OOOA-26 QUAD A DOME ROW 26 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 910300 CON-S2-QUAD-OOOA-27 QUAD A DOME ROW 27 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 910400 CON-S2-QUAD-OOOA-28 QUAD A DOME ROW 28 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 910500 CON-S2-QUAD-OOOA-29 QUAD A DOME ROW 29 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 910600 CON-S2-QUAD-OOOA-30 QUAD A DOME ROW 30 CC Visual V`T-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 910700 CON-S2-QUAD-OOOA-31 QUAD A DOME ROW 31 CC Visual VT-G Accept under order# 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 9 of 15 RFfl #1A IWF I IWL Exyiminatinn Resilltz Revision 1 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 910800 ICON-S2-QUAD-oooA-32 QUAD A DOMEROW321CC Visual VT-G lAccept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 910900 CON-S2-QUAD-OOOA-33 QUAD A DOME ROW 33 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911000 CON-S2-QUAD-OOOA-34 QUAD A DOME ROW 34 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 911100 CON-S2-QUAD-OOOA-35 QUAD A DOME ROW 35 CC Visual VT-G Accept underorder# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 911200 CON-S2-QUAD-OOOA-36 QUAD A DOME ROW 36 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911300 CON-S2-QUAD-OOOA-37 QUAD A DOME ROW 37 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911400 CON-S2-QUAD-OOOA-38 QUAD A DOME ROW 38 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911500 CON-S2-QUAD-OOOA-39 QUAD A DOME ROW 39 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911600 CON-S2-QUAD-OOOA-40 QUAD A DOME ROW 40 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911700 CON-S2-QUAD-OOOA-41 QUAD A DOME ROW 41 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911800 CON-S2-QUAD-OOOA-42 QUAD A DOME ROW 42 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 911900 CON-S2-QUAD-OOOA-43 QUAD A DOME ROW 43 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912000 CON-S2-QUAD-OOOA-44 QUAD A DOME ROW 44 CC Visual VT-G Accept under order# 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 10 of 15 RFO #14 IWE / IWL Examination Results Revision 1 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912100 CON-S2-QUAD-OOOA-45 QUAD A DOME ROW 45 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912200 CON-S2-QUAD-OOOA-46 QUAD A DOME ROW 46 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912300 CON-S2-QUAD-000B-26 QUAD B DOME ROW 26 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912400 CONWS2-QUAD-OOOC-26 QUAD C DOME ROW 26 CC Visual VT-G Accept underorder# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912500 CON-S2-QUAD-OOOD-26 QUAD D DOME ROW 26 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912600 CON-S2-QUAD-000B-27 QUAD B DOME ROW 27 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912700 CON-S2-QUAD-OOOC-27 QUAD C DOME ROW 27 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Iscoating 912800 CON-S2-QUAD-OOOD-27 QUAD D DOME ROW 27 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 912900 CON-S2-QUAD-000B-28 QUAD B DOME ROW 28 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 913000 CON-S2-QUAD-OOOC-28 QUAD C DOME ROW 28 CC Visual VT-G Accept underorder# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 913100 CON-S2-QUAD-OOOD-28 QUAD D DOME ROW 28 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 913200 CON-S2-QUAD-000B-29 QUAD B DOME ROW 29 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 913300 CON-S2-QUAD-OOOC-29 QUAD C DOME ROW 29 CC Visual VT-G Accept under order # 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 11 of 15 RFO #14 IWE / IWL Examination Results Revision I CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 913400 CON.S2-QUAD-OOOD-29 QUAD D DOME ROW 29 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD B DOME ROW 30 CC Visual VT-G Accept under order # 50071724 not concrete 913500 CON-S2-QUAD-OOOB-30 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating QUAD C DOME ROW 30 CC Visual VT-G Accept under order # 50071724 not concrete 913600 CON-S2-QUAD-OOOC-30 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating CON-S2-QUAD-OOOD-30 QUAD D DOME ROW 30 CC Visual VT-G Accept under order # 50071724 not concrete 913700 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating CON-S2-QUAD-OOOB-31 QUAD B DOME ROW 31 CC Visual VT-G Accept under order # 50071724 not concrete 913800 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 913900 CON-S2-QUAD-OOOC-31 QUAD C DOME ROW 31 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating CON-S2-QUAD-OOOD-31 QUAD D DOME ROW 31 CC Visual VT-G Accept under order # 50071724 not concrete 914000 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 914100 CON-S2-QUAD-OOOB-32 QUAD B DOME ROW 32 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 914200 CON-S2-QUAD-OOOC-32 QUAD C DOME ROW 32 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating CON-S2-QUAD-OOOD-32 QUAD D DOME ROW 32 CC Visual VT-G Accept under order # 50071724 not concrete 914300 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 914400 CON-S2-QUAD-OOOB-33 QUAD B DOME ROW 33 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 914500 CON-S2-QUAD-OOOC-33 QUAD C DOME ROW 33 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 914600 CON-S2-QUAD-OOOD-33 QUAD D DOME ROW33 CC sual T-G Accept underorder# 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 12 of 15 RFO #14 IWE / IWL Examination Results Revision 1 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 914700 CON-S2-QUAD-OOOB-34 QUAD B DOME ROW 341CC Visual VT-G lAccept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 914800 CON-S2-QUAD-OOOC-34 QUAD C DOME ROW 34 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 914900 CON-S2-QUAD-OOOD-34 QUAD D DOME ROW 34 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 915000 CON-S2-QUAD-OOOB-35 QUAD B DOME ROW 35 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 915100 CON-S2-QUAD-OOOC-35 QUAD C DOME ROW 35 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 915200 CON-S2-QUAD-OOOD-35 QUAD D DOME ROW 35 CC Visual VT-G Accept under order #50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 915300 CON-S2-QUAD-OOOB-36 QUAD B DOME ROW 36 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 915400 CON-S2-QUAD-OOOC-36 QUAD C DOME ROW 36 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 915500 CON-S2-QUAD-OOOD-36 QUAD D DOME ROW 36 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 915600 CON-S2-QUAD-OOOB-37 QUAD B DOME ROW 37 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 915700 CON-S2-QUAD-OOOC-37 QUAD C DOME ROW 37 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 915800 CON-S2-QUAD-OOOD-37 QUAD D DOME ROW 37 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 915900 CON-S2-QUAD-OOOB-38 QUAD B DOME ROW 38 CC Visual VT-G Accept under order # 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 [SI Program Long Term Plan Page 13 of 15 RFO #14 IWE I IWL Examination Results Revision 1 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 916000 ICON-S2-QUAD-000C-38 QUAD C DOME ROW 381CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916100 CON-S2-QUAD-OOOD-38 QUAD D DOME ROW 38 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916200 CON-S2-QUAD-OOOB-39 QUAD B DOME ROW 39 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916300 CON-S2-QUAD-OOOC-39 QUAD C DOME ROW 39 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916400 CON-S2-QUAD-OOOD-39 QUAD D DOME ROW 39 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 916500 CON-S2-QUAD-OOOB-40 QUAD B DOME ROW 40 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916600 CON-S2-QUAD-OOOC-40 QUAD C DOME ROW 40 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916650 CON-S2-QUAD-OOOD-40 QUAD D DOME ROW 40 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 916700 CON-S2-QUAD-OOOB-41 QUAD B DOME ROW 41 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916800 CON-S2-QUAD-000C-41 QUAD C DOME ROW 41 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 916900 CON-S2-QUAD-OOOD41 QUAD D DOME ROW 41 CC Visual VT-G Accept under order # 50071724 not concrete CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 917000 CON-S2-QUAD-00OB42 QUAD B DOME ROW 42 CC Visual VT-G Accept under order# 50071724 not concrete CONCRETE SURFACES CVisual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating 917100 CON-S2-QUAD-000C-42 QUAD C DOME ROW 42 CC Visual VT-G Accept under order# 50071724 not concrete

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 14 of 15 Revision 1 RFO #14 IWE / IWL Examination Results CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD D DOME ROW 42 CC Ivisual VT-G Accept under order # 50071724 not concrete 917200 CON-S2-QUAD-000D-42 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD B DOME ROW 43 CC Visual VT-G Accept under order # 50071724 not concrete 917300 CON-S2-QUAD-OOOB.43 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD C DOME ROW 43 CC Visual VT-G Accept under order # 50071724 not concrete 917400 CON-S2-QUAD-OOOC-43 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating QUAD D DOME ROW 43 CC Visual VT-G Accept under order # 50071724 not concrete 917500 CON-S2-QUAD-OOOD-43 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD B DOME ROW 44 CC Visual VT-G Accept under order# 50071724 not concrete 917600 CON-S2-QUAD-000B-44 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD C DOME ROW 44 CC Visual VT-G Accept under order # 50071724 not concrete 917700 CON-S2-QUAD-000C-44 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD D DOME ROW 44 CC Visual VT-G Accept under order # 50071724 not concrete 917800 CON-S2-QUAD-OOOD-44 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD B DOME ROW 45 CC Visual VT-G Accept under order # 50071724 not concrete 917900 CON-S2-QUAD-OOOB-45 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly Is coating QUAD C DOME ROW 45 CC Visual VT-G Accept under order# 50071724 not concrete 918000 CON-S2-QUAD-OOOC-45 CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating QUAD D DOME ROW 45 CC Visual VT-G Accept under order #50071724 not concrete 918100 CON-S2-QUAD-OOOD-45 Coating shows cracking. Cracking mostly Is coating not concrete. 10 North of ladder, 3 areas of spalling-3'x3W,6 and 7x7" with a depth of 1/4" to 518" deep. CONCRETE SURFACES Visual examination performed by certified PSEG personnel East of lightning rod I area of spalling 1"x3" with a QUAD B DOME ROW 46 CC Visual VT-G Accept under order #50071724 depth of 1/2", Notification 20234570 918200 CON-S2-QUAD-OOOB-46

Salem Nuclear Generating Station, Unit 2 06/15/2004 ISI Program Long Term Plan Page 15 of 15 RFO #14 IWF I IWL Examination Resuilts Revision 1 918300 ICON-S2-QUAD-000C-46 CONCRETE SURFACES QUAD C DOME ROW 461CC iVisual VT-G Accept Visual examination performed by certified PSEG personnel under order # 50071724 Coating shows cracking. Cracking mostly is coating not concrete. CONCRETE SURFACES Visual examination performed by certified PSEG personnel Coating shows cracking. Cracking mostly is coating 918400 CON-S2-QUAD-000D-46 QUAD D DOME ROW 46 CC Visual VT-G Accept under order #50071724 not concrete.

LR-N05-0380 Document Control Desk ENCLOSURE 5 Form OAR-1, Table 1 SALEM NUCLEAR GENERATING STATION, UNIT 2 RFO#14 FLYWHEEL EXAMINATION RESULTS

Salem Nuclear Generation Station, Unit 2 ISI Program Long Term Plan Page 1 of I RFO #14 Flvwheel Examination Re Revision 00 Magnetic Particle examination was done on Salem RCP# 2 Magnetic Particle examination was performed under Flywheel. Coating Thickness measurement of 0.0025w was contract# 1250147 by Framatome personnel at their 005000 1S-76P917 #24 RCP Motor Flywheel Surface MT Accept the average noted. Lynchburg locatalon Liquid Penetrant examination was performed under Liquid Penetrant Examination was doneon RCP# 2 flywheel contract# 1250147 by Framatome personnel at their 005000 1S-76P917 #24 RCP Motor Flywheel Surface PT Accept bore area. No recordable Indications were noted. Lynchburg locatalon. Ultrasonic examination was performed under Flywheel Is 2 pieces bolted together. both plates were contract# 1250147 by Framatome personnel at their 005000 1S-76P917 #24 RCP Motor Flywheel Volumetric UT Accept scanned from accessible surfaces. Lynchburg locatalon.

LR-N05-0380 Document Control Desk ENCLOSURE 6 Form OAR-I, Table I SALEM NUCLEAR GENERATING STATION, UNIT 2 ISI LONG TERM PLAN INSERVICE INSPECTION

SUMMARY

FOR THIRD INTERVAL

06/15/2005 Salem Nuclear Generating Station, Unit 2 Completion Code Compliance Summary - 3rd Interval /ist Period / 1st Outage ISI - Code Edition - 1998 12000 Addenda Table I Page 1 I a Annn I t rnln " I n:ngvrn "I I 0-A Li 170 LU 70 VU U7O U70 Qee Note X 1 B-B 8 5 0 0% 0 0% 0 0% 0% B-D 30 30 2 7% 0 0% 0 0% 7% See Note #2 B-E 3 0 0 0% 0 0% 0 0% 0% See Note #1 B-G-1 12 6 0 0% 0 0% 0 0% 0% See Note #1 B-G-2 83 83 27 33% 0 0% 0 0% 33% B-K 48 7 1 15% 0 0% 0 0% 15% B-L-1 4 1 0 0% 0 0% 0 0% 0% See Note #1 B-L-2 4 0 0 0% 0 0% 0 0% 0% B-M-1 2 2 2 100% 0 0% 0 0% 100% See Note #1 B-M-2 30 1 1 4% 0 0% 0 o0% 4% See Note #3 B-N-1 9 8 0 0% 0 0% 0 0% 0% B-N-2 1 1 0 0% 0 0% 0 0% 0% See Note #1 B-N-3 15 13 0 0% 0 0% 0 0% 0% See Note #1 B-O 2 0 0 0% 0 0% 0 0% 0% See Note #1 B-P 3 3 1 50% 0 0% 0 0% 50% B-P/C-H 2 2 1 0% 0 0% 0 0% 0% C-A 55 19 5 10% 0 0% 0 0% 10% C-B 24 8 0 0% 0 0% 0 0% 0% C-C 220 26 4 11% 0 0% 0 0% 11% C-D 9 2 0 0% 0 0% 0 0% 0% C-G 24 3 1 5% 0 0% 0 0% 5% C-H 53 45 16 31% 0 0% 0 0% 31% C-HID-B 3 3 2 0% 0 0% 0 0% 0% D-A 236 32 11 30% 0 0% 0 0% 30% D-B 59 58 18 31% 0 0% 0 0% 31% F-A 1695 305 78 29% 0 0% 0 0% 29% R-A 3014 181 23 16% 0 0% 0 0% 16% See Note#4

1) Deferral Permissible 4) Risk Informed Was Implemented In The Second Interval B-A B-G-1 Third Period. Replacing ASME Categories B-F. - I B-E B-L-1 and C-F-2 B-N-2 B-O B-M-1 B-N-3
2) Ref. Table IWB-2500-1, Exam Category B-D, Program (B) Note 2
3) To Be Examined Only If Disassembled For Maintenance, Repair or Volumetric Exam. (Reference- ISI Program)

LR-N05-0380 Document Control Desk ENCLOSURE 7 Form OAR-1, Table I SALEM NUCLEAR GENERATING STATION UNIT 2 IWE/IWL EXAMINATION

SUMMARY

FOR THE FIRST INTERVAL

Salem Nuclear Generating Station, Unit 2 ISI Program Long Term Plan Inservice Inspection Examination Summary For IWE/IWL First Interval Code Edition - 1998 /1998 Addenda TABLE I I P E 4D= - -. lnn 2 - - 'I A O I Fol"n TTT-VT1-T 7i.,7,,7 7,'isW7 Notes

1) IWE/IWL Implemented in 2000 RFO# II And a Separate Data Base Was Created in 2003 RFO# 13 To Clearly Identify IWE/IWL Inspection Interval.
2) Inaccessible Components Will Be Examined when They Become Accessible.

LR-N05-0380 Document Control Desk ENCLOSURE 8 Form OAR-1, Table 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE

a Salem Nuclear Generating Station Unit 2 RFO-14 OAR Report ITABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Item Flaw Flaw or Relevant Condition Found: Category Number Description Characterizati During Scheduled Section Xl on Examination or Test (Yes or No)

                        - ____________ I             L                I THERE WERE NO ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE DURING RFO-14 4

Page 1

LR-N05-0380 Document Control Desk ENCLOSURE 9 Form OAR-1, Table 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE

Salem Nuclear Generating Station Unit 2 t RFO-14 OAR Report TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Salem Unit 2 Nuclear Generating Station (For the period 11127/2003 TO 05/1112005) Flaw or Relevant Condition Found Repair During Scheduled Repair Replacement, Section XI Replacement Code or Corrective Item Examinationlor Date Plan Number Class Measure Description Description of work Test (Yes or No) Complete RR Plan Evaluation. 3 Replacement Service Water Spool Replacement by No 4/12/2005 60040855 70035132 Piece welding 2-SW -P-3 374 E__ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ 3 Replacement Instrument Tubing Replacement by No 7/2/2004 60044354 70038272 IT-1216-HB and welding IT -2345-H B _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ 3 Replacement Containment Spray Replacement by No 10/21/2004 60044821 70038858 Spool Piece welding S2-CS-201 5 _ _ _ _ _ _ _ 2 Replacement Spring Can Hanger Replacement of No 4/29/05 60054090 70046232 hanger rods _ _ __ __ _ _ _ _ _ _ 2 C -C V C H -9 0 9 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2 Replacement Instrument Tubing Replacement by No 5/4/2005 60054046 70046922 S2-IT-51 5HA welding _ __ __ _ _ _ _ _ _ _ _S 2 -IT -5 1 6 H A _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Page I}}