LR-N02-0453, Supplemental Information Inservice Inspection Program Relief Requests S2-RR-03-V01 and V02
| ML033090091 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/24/2003 |
| From: | Salamon G Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N02-0453 | |
| Download: ML033090091 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG Nuclear LLC LR-N03-0453 OCT 24AM U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Gentlemen:
SUPPLEMENTAL INFORMATION INSERVICE INSPECTION PROGRAM RELIEF REQUESTS S2-RR-03-V01 and V02 SALEM GENERATING STATION UNIT 2 FACILITY OPERATING LICENSES NO. DPR-75 DOCKET NO. 50-311
References:
PSEG Letter LR-N03-0451, Dated 10/23/2003 "Inservice Testing Program Relief Request S2-RR-03-V01 and V02" This letter forwards supplemental information requested during a Conference Call with NRC Salem Project Manager and members of the NRC staff on October 23, 2003 regarding the subject relief requests.
Enclosed please find a copy of the requested spreadsheet previously forwarded by fax.
Should you have any questions regarding this request, please contact Mr.
Howard Berrick at 856-339-1862.
Sincere G. Sa amon Manager - Nuclear Licensing Attachment A17 952168 REV. 7/99
Document Control Desk LR-N03-0453 2
C:
Mr. H. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Fretz, Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 8B2 Washington, DC 20555 USNRC Senior Resident Inspector - Salem (X24)
Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625
Document Control Desk LR-N03-0453
- 1 DATE SJ 54 (seconds) l l SJ 55156 (seconds) l ll_____
21 22 22 21 22 23 24 10/13/2000 22.9 22.5 23.9 24.5 11/07/2000 11.48 10.7 11.5 11.1 01/13/2002 15.78 CROD 02 Failed to close property 04/10/2002 22.7 22.9 04/11/2002 20.6 23.1 04/18/2002 11.4 11.1 PMT 04/26/2002 21.3(B) 20.8(B) 22.2(B)
DCP 80017354 - Gear and wiring change 04/29/2002 23.35(B) 22.06 DCP 80017354 - Gear and wiring change 10/15/2003 27.9 24.4 24 26.98 time since DCP 5.2 3.8 1.9 3.88 (B) = Baseline time