LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 2023

From kanterella
Jump to navigation Jump to search
Emergency Plan Document Revisions Implemented June 28, 2023
ML23192A004
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 07/10/2023
From: Barr S
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
LR-N23-0046
Download: ML23192A004 (1)


Text

10 CFR 50.54(q) 10 CFR 50.4(b)(5)

LR-N23-0046 July 10, 2023

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311

Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

Emergency Plan Document Revisions Implemented June 28, 2023.

Pursuant to 10 CFR 50.54(q) and 10 CFR 50.4(b)(5), PSEG Nuclear LLC (PSEG) is submitting 10 CFR 50.54(q) Summary Analysis Report 2021-4 6 for Offsite Dose Assessment Using the Unified Rascal Interface (URI) Procedure.

The following Emergency Preparedness document revision is included:

  • NC.EP-EP.ZZ-0314(Q), Rev. 1, Offsite Dose Assessment U sing the Unified Rascal Interface

There are no regulatory commitments contained in this letter.

Should you have any questions, or require further information regarding this submittal, please contact Ms. Megean M. Brown (856) 339-1773.

Respectfully,

Stephen T. Barr Manager, Emergency Preparedness July 10, 2023 10 CFR 50.54(q)

Page 2 10 CFR 50.4 (b)(5)

LR-N23-0046

Enclosure 1 - 10 CFR 50.54(q) Summary Analysis Report 2021-46 Enclosure 2 - NC.EP-EP.ZZ-0314(Q), Rev. 1, Offsite Dose Assessment using the Unified Rascal Interf ace

cc: USNRC Administrator, Region I USNRC Project Manager USNRC Senior Resident Inspector, Salem USNRC Senior Resident Inspector, Hope Creek NJDEP Bureau of Nuclear Engineering PSEG Corporate Commitment Tracking Coordinator PSEG Station Commitment Tracking Coordinator

LRLRN LR-N23-0046

ENCLOSURE 1

10 CFR 50.54(q) Summary Analysis Report 202 1-46

(2 Total Pages)

EP-AA-120-1001 Revision 5 AT T AC HME NT 3 10CFR50.54(q)

SUMMARY

ANALYSIS REPORT

Page 1 of 2

Revision 0

50.54Q I.D. Number: 2021-46

50.54Q

Title:

NC.EP-EP.ZZ-0314(Q), Rev. 1, Offsite Dose Assessment Using the Unified Rascal Interface (URI)

(Doc #, Rev. #, Name, If applicable)

Description of the change made to the Emergency Plan/Procedures:

  • Step 1.1.1 Removed by the EOF Duty Dose Assessors. URI is not considered the backup to the MIDAS dose assessment software and will not be used in the EOF for dose assessment. (70214877)
  • Step 1.1.2 Removed URI is the backup dose assessment software and revised remainder of the step. URI is not considered the backup to the MIDAS dose assessment software. (70214877)

Description of why the change is editorial (if not editorial, N/A this block):

N/A

Description of the licensing basis affected by the change to the Emergency Plan/Procedure (if not affected, omit this element):

Emergency Plan Section 10 discusses dose assessment capabilities and specifically discusses the capabilities of the MIDAS dose assessment software. URI is a dose assessment software program with similar capabilities but will not be used as a replacement for MIDAS. The changes do not supersede the conditions discussed in this section and satisf y the ability to perform dose assessment using alternate installations of the MIDAS software on a multitude of computers in various emergency response faculties.

Emergency Plan sections 3 and 9 also discuss the assignments of ERO positions to perform dose assessment and the capabilities of the TSCs and EOF to perform "computerized dose assessment."

A description of how the change to the Emergency Plan/Procedures still complies with regulation:

10CFR50 Appendix E discusses the need to have capability to perform dose projection using real-time meteorological information and to have a description of how these projections will be made.

MIDAS is the primary dose assessment software and will co ntinue to meet this requirement.

EP-AA-120-1001 Revision 5 AT T AC HME NT 3 10CFR50.54(q)

SUMMARY

ANALYSIS REPORT

Page 2 of 2

Revision 0

50.54Q I.D. Number: 2021-46

50.54Q

Title:

NC.EP-EP.ZZ-0314(Q), Rev. 1, Offsite Dose Assessment Using the Unified Rascal Interface (URI)

(Doc #, Rev. #, Name, If applicable)

A description of why the proposed change was not a reduction in the effectiveness of the Emergency Plan/Procedure:

The change clarifies that URI is not considered a backup to the primary dose assessment software (MIDAS) and will not be used for this purpose.

MIDAS continues to meet the requirements as stated in the PSEG Emergency Plan, 10CFR50.47 planning standards and 10CFR50 Appendix E. Based on the discussion above, there is no reduction in effectiveness of the PSEG Nuclear Emergency Plan resulting from implementation of this change.

LR-N23-0046

ENCLOSURE 2

NC.EP-EP. ZZ- 0314(Q), Rev. 1

Offsite Dose Assessment Using the Unified RAS C AL I nt erface

(47 Total Pages)

PSEG Internal Use Only

PSEG NUCLEAR L.L.C PSEG Nuclear Common EMERGENCY PREPAREDNESS NC.EP-EP.ZZ-0314(Q) - Rev. 1 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE ADHERENCE LEVEL: LEVEL 2 - REFERENCE USE Biennial Review Performed: Yes No Configuration Change Packages and Affected Document Numbers incorporated into this revision:

None OTSCs incorporated into this revision:

None Operational Experience (OPEX) incorporated into this revision:

None

Revision Summary Location Description of Change Step 1.1.1 Removed by the EOF Duty Dose Assessors. URI is not considered the backup to the MIDAS dose assessment software and will not be used in the EOF for dose assessment. (70214877)

Step 1.1.2 Removed URI is the backup dose assessment software and revise remainder of the step. URI is not considered the backup to the MIDAS dose assessment software. (70214877)

IMPLEMENTATION REQUIREMENTS: Effective Date: 4/8/2018

<Implementation Requirements Text Here>

NC.EP-EP.ZZ-0314(Q) Page 2 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

TABLE OF CONTENTS

SECTION PAGE

1.0 PURPOSE AND SCOPE................................................................................................ 3 2.0 PRECAUTIONS AND LIMITATIONS.............................................................................. 3 3.0 PREREQUISITES........................................................................................................... 4 4.0 INSTRUCTIONS............................................................................................................. 5 4.1 Start-Up.............................................................................................................. 5 4.2 Rapid Dose Assessment (if available)............................................................. 6 4.3 ERO Detailed Dose Assessment................................................................. 11 4.4 Concurrent Assessment Summation............................................................. 26 4.5 Integration Assessments................................................................................ 29

5.0 REFERENCES

AND COMMITMENTS......................................................................... 29 6.0 RECORDS.................................................................................................................... 30, URI Computer Program Loading Instructions..................................................... 31, Alternate Meteorology Methodologies................................................................ 32, Pre-Calculated Release Point Flow Rates......................................................... 33, Air Sample and Thyroid Dose Calculations........................................................ 34, Conversion Calculations.................................................................................... 37, Distance and Bearing......................................................................................... 38, Time to Threshold.............................................................................................. 39, EDE to TEDE Ratios.......................................................................................... 40, Detailed Source Term Data................................................................................ 41 0, Process Reduction Factor Determination for Hope Creek................................ 42 1, Process Reduction Factor Determination for Salem......................................... 44 2, Spent Fuel Pool Status Selection..................................................................... 46 3, Definition of Terms........................................................................................... 47

NC.EP-EP.ZZ-0314(Q) Page 3 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

1.0 PURPOSE AND SCOPE

1.1 Purpose

1.1.1. This procedure provides the methods and instructions for performing offsite dose l assessment using the Unified RASCAL Interface (URI). l

1.1.2. MIDAS is the official dose assessment software and should be used for dose l assessment in the event of an emergency. l

1.2 Scope

1.2.1. None

2.0 PRECAUTIONS AND LIMITATIONS

2.1 Precautions

2.1.1. Sections/Steps in this procedure may be PERFORMED in the order deemed appropriate for the emergency situation. Only Sections/Steps that are applicable to the specific URI dose assessment mode of operation being PERFORMED need to be followed. _______

2.1.2. Initials should be used in the place keeping sign-offs next to the step being PERFORMED. Place keeping may be suspended for simple and repetitive steps, after first use, if approved by supervisor in accordance with HU-AA-104-101. _______

2.1.3. When performing dose assessment for Salem the R-46 Main Steam Line Monitor should only be use as an effluent monitor if a primary to secondary leak is occurring and the Steam Generator is releasing directly to atmosphere through the safety relief valve(s) SRV or through the atmospheric vent (MS-10). If the R-46 monitor is changing, verification of an atmospheric pathway should be obtained. _______

2.2 Limitations

2.2.1. This procedure is used for dose assessment during emergencies for the purposes of providing input to protective action decisions. The Integration Assessment mode is not addressed in this procedure as it is solely used to perform evaluation after the event. _______

2.2.2. Prior to starting dose assessment activities determine the active effluent pathways by checking for effluent flows. _______

Hope Creek - NPV, SPV, FRVS and HTV

Salem - Plant Vent (Steam Generator to Atmosphere must be determined by visual observations)

NC.EP-EP.ZZ-0314(Q) Page 4 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

2.2.3. Dose Assessment should be performed using 10 or 15 minute average radiation monitor system (RMS) and meteorological (MET) data. IF instantaneous monitor readings quickly increase by > a factor of 10 instantaneous data may be used but

THEN shall be followed up with 10-15 minute average data when considering a change to Protective Actions. All input parameters are entered into URI manually. _______

2.2.4. URI can only calculate doses for a single release pathway at one time.

IF releases are occurring via multiple release pathways

THEN individual dose assessments will need to be run for each release separately and added together using the Summation process. When considering multiple release pathways and the highest release rate is more than a factor of 100 from other releases, these other pathways would not have to be included in the assessment. _______

2.2.5. IF there are multiple releases from Salem and/or Hope Creek

THEN Summation is used to add the offsite doses, for each pathway, to allow decision makers to determine if the projected dose will exceed the EPA Protective Action Guideline (PAG) of >1,000 mRem TEDE or

>5,000 mRem Thyroid CDE beyond the Site Boundary. _______

2.2.6. URI contains many reports and operations that can be useful when running or evaluating dose assessment data. These functions may not be explicitly called within the body of this procedure but are described in separate attachments or forms or are described in the URI User manual/Annex documents. These are listed in the references section of the procedure. _______

3.0 PREREQUISITES

3.1 Responsibilities

3.1.1. The EOF Duty Dose Assessor will: _______

ENSURE dose assessment systems are operable when the EOF is staffed and start evaluation of radiological conditions prior to activation, dose assessment will be initiated as directed by the Radiological Support Manager. Dose Assessment results are not included with the Station Status Checklist (SSCL) until a declared release is in progress.

MONITOR radiological and meteorological parameters and PERFORM additional dose assessments periodically and as conditions change.

NC.EP-EP.ZZ-0314(Q) Page 5 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

INFORM the Radiological Support Manager (RSM) when conditions change.

NOTE

This is an administrative procedure and the procedure actions may be performed in any sequence or may not apply.

For definitions of terms refer to Attachment 13. _______

4.0 INSTRUCTIONS

4.1 Start-Up

4.1.1. START the URI application for the affected site. Either URI Hope Creek or URI Salem (Salem URI is used for both units). (If multiple releases both URI Salem and URI Hope Creek can be open on the same computer simultaneously.) _______

4.1.2. IF the program fails to start or has fatal error,

THEN GO TO another computer where URI is installed and/or request IT assistance from the IT Supervisor in the EOF. _______

4.1.3. IF dose assessments are being run during a drill or exercise,

THEN the Print This is a Drill on all reports checkbox option shall be checked, on the initial screen. This will automatically indicate that the data is for a drill on all printed or viewed reports. _______

4.1.4. SELECT Rapid Assessment from the File menu or toolbar (Lightning Bolt icon) (Detailed Assessment is the preferred method in the EOF.)

(Section 4.2)

OR

4.1.5. SELECT Detailed Assessment from the File menu or toolbar (Cloud icon) (Section 4.3). _______

4.1.6. IF assessment data is already available,

THEN SELECT Sum Assessment from the file menu or toolbar (blue Sigma icon) (Section 4.4) when it's desired to evaluate multiple pathways for a PAR decision. _______

NC.EP-EP.ZZ-0314(Q) Page 6 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

4.2 Rapid Dose Assessment (if available)

4.2.1. DETERMINE the Source Term as follows:

1. IF the Fuel Clad barrier has been declared as a Loss or Potential Loss per the Emergency Action Levels,

THEN SELECT Fuel Clad Damage as "Yes". _______

2. IF the Fuel Clad barrier remains intact per the Emergency Action Levels,

THEN

a. SELECT Fuel Clad Damage as "No".
b. IF the Reactor Power Level has changed by >15% / hour since the start of the event,

THEN SELECT Conditions for Coolant Spiking as "Yes",

OTHERWISE SELECT Conditions for Coolant Spiking as "No". _______

3. IF damage has occurred to spent fuel,

THEN SELECT "Damaged Spent Fuel Assembly". _______

4.2.2. DETERMINE the Reactor Shutdown status as follows:

1. For Non-ATWS events (BWR) or Non-ATWT events (PWR):
a. IF the reactor is NOT shutdown,

THEN ENSURE the "Reactor Shutdown" checkbox is unchecked. _______

b. IF the reactor is shutdown, THEN

(1) CHECK the "Reactor Shutdown" checkbox. _______

(2) ENTER the Date and Time the reactor was shutdown. _______

c. IF a spent fuel event, THEN

(1) CHECK the "Last Irradiated" checkbox. _______

(2) ENTER the Date and Time core with the involved fuel assembly was last shutdown. _______

NC.EP-EP.ZZ-0314(Q) Page 7 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

2. For ATWS events (BWR) or ATWT events (PWR):
a. IF the reactor power is >=5%,

THEN ENSURE the "Reactor Shutdown" checkbox is unchecked. _______

b. IF the reactor power is <5%, THEN

(1) CHECK the "Reactor Shutdown" checkbox. _______

(2) ENTER the Date and Time the reactor power was reduced below 5%. _______

c. SELECT the "Release Point Pathway" that best represents the release in progress. Additional detail for each pathway, including available effluent monitors, is available by hovering the mouse over each pathway description. _______
d. SET the meteorological data as follows:

(1) SELECT the applicable meteorological tower (in URI different elevations are considered separate towers) by checking the corresponding checkbox in the Use column of the Meteorological Data table. IF multiple towers are present,

THEN SELECT the tower that best represents the release point height. _______

NOTE

Only ONE on-site tower may be selected for any single assessment. _______

(2) IF the meteorological data is available from the plant computer system, THEN

ENTER the Wind Speed in mph for the appropriate tower. _______

ENTER the Wind Direction the wind is coming FROM for the appropriate tower. _______

ENTER the T, if T is not available enter the Stability Class letter. _______

NC.EP-EP.ZZ-0314(Q) Page 8 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

IF the meteorological data is not available from the plant computer system,

THEN SEE Attachment 2 for further instructions for determining Wind Speed, Wind Direction and Stability Class. _______

SELECT the precipitation status that best represents the current precipitation. IF precipitation is unknown,

THEN SELECT None from the dropdown list. The following can be used as guidance: _______

None - No rain or snow.

Light Rain - Drizzle, < 0.1 inches / hour.

Moderate Rain - Heavy Drizzle, 0.1 to 0.3 inches /

hour.

Heavy Rain - > 0.3 inches / hour.

Light Snow - Visibility > 0.63 miles.

Moderate Snow - Visibility 0.31 to 0.63 miles.

Heavy Snow - Visibility < 0.31 miles.

e. DETERMINE the Release Duration by either using the default of 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> or an estimate provided by Operations or Engineering:

(1) ENTER the estimated Release Duration. _______

f. DETERMINE if the effluent monitors are available. In some cases effluent monitors may not be available even if they are associated with a release pathway due to plant conditions, such as loss of power, sample flow, or detector failure. _______
g. IF effluent monitors are available for the selected pathway,

THEN SELECT Yes. This is the preferred method for performing dose assessments. _______

h. IF multiple monitors or multiple lists of monitors are presented,

THEN SELECT the appropriate monitor. _______

NC.EP-EP.ZZ-0314(Q) Page 9 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

i. ENTER the monitor reading for the selected monitor _______
j. Depending on the pathway selected and the associated selected monitor effluent flow rate data may be required.

DETERMINE applicable flow as follows:

(1) IF a Release Point Flow Rate is requested,

THEN ENTER the flow rate in the units requested from SPDS. (A default value should be present based on max capacity, if unknown use the default value.) _______

(2) IF a Calculated S/G Flow Rate is requested,

THEN ENTER the following for the faulted Steam Generator only. _______

Pressure Number of SRVs open Number of ADVs or PORVs open

(3) IF a Calculated Steam Table Flow Rate is requested, THEN

SELECT either Temperature or Pressure from the options and then ENTER the corresponding system parameter value. _______

ENTER the Mass Flow rate. _______

k. IF effluent monitors are NOT available for the selected pathway,

THEN SELECT No. Depending on the pathway selected the following options are available. _______

l. IF the Estimated RCS Leak Rate option is enabled, THEN

(1) ENTER the Reactor Coolant System leak rate in gpm. OR _______

(2) SELECT the I Dont Know option. An assumed leak rate will be calculated. _______

m. IF the Containment Leakage option is enabled, THEN NC.EP-EP.ZZ-0314(Q) Page 10 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

(1) ENTER the High Range Area monitor reading.

OR _______

(2) SELECT the No Monitor Available or Applicable option. Calculated damage assumptions will be used. _______

n. IF accident is spent fuel and monitors and containment leakage are not applicable, THEN

(1) SELECT Unmonitored Damaged Spent Fuel Assembly. _______

NOTE

If any errors are present there will be a message on the Process Assessment button frame and the "Calculation cannot be completed until all errors are resolved". _______

o. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NOTE

1. Calculating doses out to 10 miles would be assumed to be the usual choice in almost every situation even if a 50 mile calculation is also needed.
2. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles. The 50 mile assessment does NOT provide doses within 10 miles. Use the 10 mile assessment for information within 10 miles. _______
p. If the estimated total release exceeds the available activity (e.g. total normal coolant inventory or total core inventory) by a pre-defined amount, a warning will be provided that the projected release may be excessive.

The assessment may still be processed OR the assumptions in the assessment can be modified. If not modified the note will state "Total released activity exceeds the estimated available activity. Inventory comparison warning ratio of X.XX was OVERRIDDEN by the user." _______

NC.EP-EP.ZZ-0314(Q) Page 11 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

q. IF the assessment total release warning occurs,

THEN SELECT whether to continue despite the warning or to return to the Rapid form to modify the assessment assumptions to reduce the projected activity. _______

r. SELECT Print or Print Preview from the Menu or Toolbar to view or print the dose assessment results. _______
s. PROVIDE the dose projection to the Radiological Support Manager for comparison to the Emergency Action Levels and the Current Protective Action Recommendation. _______
t. CAUTION: The report also contains the Recommended Classification. Disregard any Recommended Classifications by the URI dose assessment software.

Use the protective action procedure to determine the appropriate response to the dose assessment results.

ENSURE this section of the report is blacked out before transmission to any other organization, to avoid confusion. _______

4.3 ERO Detailed Dose Assessment

4.3.1. SELECT Detailed Assessment from the File menu or toolbar (Cloud icon). _______

4.3.2. DETERMINE the Source Term as follows:

1. DETERMINE the Source Term for the assessment based on the core conditions and/or type of accident that has occurred.

Discuss the Source Term conditions with the RSM if necessary. _______

2. IF the source term is from the Reactor Coolant System (RCS) without core damage

THEN SELECT Normal Coolant.

3. IF any of the following have occurred:

The reactor has changed power level by >15% / hour since the start of the event.

A rapid depressurization of the RCS has occurred.

Chemistry has determined that an Iodine spike has occurred.

THEN CHECK the Spiking checkbox. _______

NC.EP-EP.ZZ-0314(Q) Page 12 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

4. IF Spiking was selected,

THEN DETERMINE the Spiking Factor. _______

5. IF a post power change RCS DEI sample result is available,

THEN CALCULATE the Spiking Factor as follows:

a. SELECT Calculations => Spiking Factors from the menu and then ENTER the DEI concentration. _______
b. IF the calculated spiking factor is <1,

THEN ENTER 1. _______

c. IF the calculated Spiking Factor is >1 and < 1000,

THEN ENTER the calculated value. _______

d. IF the calculated Spiking Factor is > 1000,

THEN ENTER a value of 1000. _______

6. IF a post power change RCS sample is not available,

THEN ACCEPT the default Spiking Factor, which is 30. _______

NOTE

RCS source term basis will allow special isotopes like tritium to be scaled to the other isotopes in the release since the release rates are based on the coolant release. Core damage source terms will not include tritium or other isotopes that are not related to the core inventory. Use Summation (discussed below) to include tritium or other special isotopes for core damage releases. _______

4.3.3. IF the source term is from the RCS with core damage,

THEN SELECT Reactor Core Accident. _______

4.3.4. SELECT the Type of Damage (Clad/Melt) as determined by technical support. IF the information is not available,

THEN SELECT Clad. _______

4.3.5. IF the source term is from spent fuel damage,

THEN SELECT Spent Fuel Accident. _______

NC.EP-EP.ZZ-0314(Q) Page 13 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

4.3.6. IF the spent fuel release is unmonitored and other alternate source term estimates are unavailable,

THEN SELECT Un-Monitored Spent Fuel Accident with No other method available. _______

4.3.7. IF the source term is from a Waste Gas Decay Tank or other special mix not related to the core or coolant,

THEN SELECT the Waste Gas Tank. _______

4.3.8. OPEN the Pathways form to determine the release point Pathway as follows:

1. SELECT the pathway that best represents the release in progress. _______

NOTE

Additional detail for each pathway, including available effluent monitors and methodologies, is available by hovering the mouse over each pathway button to the right of the form. _______

4.3.9. DETERMINE the correct process reduction settings and (if applicable)

Spent Fuel Pool condition using the descriptions in the Users Guide and Attachments 10, 11, and 12. Default values will be initially selected based current selections if changes are appropriate the defaults can be changed. _______

NOTE

Depending on the selected pathway, reduction processes will be enabled or disabled. IF disabled, THEN they are not included in the pathway reduction factor calculation.

The default meteorological tower will be suggested for the pathway chosen unless directed otherwise the default tower should be used. _______

4.3.10. ENTER the Site Meteorological Tower data as follows:

1. SELECT the applicable Site meteorological tower (in URI different elevations are considered separate towers) to be used in the assessment by checking the corresponding checkbox in the Use column of the Meteorological Data table, if not previously checked when the pathway was selected. _______

NC.EP-EP.ZZ-0314(Q) Page 14 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

2. IF multiple Site Towers are present,

THEN SELECT the tower that best represents the release point height. _______

NOTE

Only ONE on-site tower may be used at one time. _______

3. IF the meteorological data is available from the plant computer system, THEN
a. ENTER the Wind Speed in mph the appropriate tower. _______
b. ENTER the Wind Direction the wind is coming FROM for the appropriate tower. _______
c. ENTER the T or the Stability Class directly. _______

4.3.11. IF the meteorological data is not available from the plant computer system,

THEN SEE Attachment 2 for further instructions for determining Wind Speed, Wind Direction and Stability Class.

4.3.12. SELECT the precipitation status that best represents the current precipitation. IF precipitation is unknown,

THEN SELECT None from the dropdown list. The following can be used as guidance: _______

None - No rain or snow.

Light Rain - Drizzle, < 0.1 inches / hour.

Moderate Rain - Heavy Drizzle, 0.1 to 0.3 inches / hour.

Heavy Rain - > 0.3 inches / hour.

Light Snow - Visibility > 0.63 miles.

Moderate Snow - Visibility 0.31 to 0.63 miles.

Heavy Snow - Visibility < 0.31 miles.

NC.EP-EP.ZZ-0314(Q) Page 15 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

4.3.13. DETERMINE the Reactor Status as follows:

1. IF the Source Term is Normal Coolant or Reactor Core Accident, THEN
a. For Non-ATWS (BWR)/Non-ATWT (PWR) events IF the reactor is not shutdown,

THEN ENSURE the Reactor Shutdown checkbox is unchecked. _______

b. IF the reactor is shutdown,

THEN CHECK the Reactor Shutdown checkbox. _______

c. ENTER the Date and Time the reactor was shutdown. _______
d. For ATWS (BWR)/ATWT (PWR) events

(1) IF the reactor power is >5%,

THEN ENSURE the Reactor Shutdown checkbox is unchecked. _______

(2) IF the reactor power is <5%, THEN

CHECK the Reactor Shutdown checkbox. _______

ENTER the date and time the reactor power was reduced below 5%. _______

4.3.14. IF the Source Term is Spent Fuel Accident,

THEN CHECK the Last Irradiated checkbox. _______

4.3.15. IF it can be determined when the fuel assemblies involved were last in the core,

THEN ENTER the date and time. _______

4.3.16. IF the date the fuel assembly was last in the reactor cannot be determined,

THEN ENTER the date of the most recent shutdown ended. _______

NC.EP-EP.ZZ-0314(Q) Page 16 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

4.3.17. IF the source term is from an Altenate mix (e.g. Waste Gas Decay Tank), THEN

1. IF the Date and Time the tank was isolated can be determined, THEN
a. CHECK the Decay From checkbox. _______
b. ENTER the date and time the tank was isolated. _______
2. IF the Date and Time cannot be determined,

THEN ENSURE the Decay From checkbox is not checked. _______

4.3.18. IF any other source term was selected,

THEN ENSURE the Reactor Shutdown checkbox is not checked. _______

4.3.19. DETERMINE the Release Duration by either of the following methods:

1. ENTER the estimated Release Duration or accept the default.

OR _______

4.3.20. DETERMINE the methodology to be used for the dose assessment.

Monitored Release - Uses installed effluent monitors. GO TO Step 4.3.21. _______

Containment Leakage - Uses the coolant or core conditions including percent core damage or containment high radiation monitor readings. GO TO Step 4.3.24. _______

RCS Leakage - Uses a Reactor Coolant System leak rate. GO TO Step 4.3.27. _______

Release Point Sample - Uses actual effluent sample results in uCi/cc. GO TO Step 4.3.30. _______

NOTE

This is the best way to include tritium in a core damage scenario. _______

Field Team - Back calculates based on field team survey and sample results. GO TO Step 4.3.33. _______

GRR (Gross Release Rates) - Uses either gross Particulate, Iodine and Noble Gas release rates or individual isotopic release rates in uCi/sec. GO TO Step 4.3.36. _______

NC.EP-EP.ZZ-0314(Q) Page 17 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Unmonitored Spent Fuel - Tab is automatically selected when the Un-Monitored Spent Fuel Accident with No other method available check box is selected. There are no user inputs on the Tab frame. The Unmonitored spent fuel method uses extent of core involved, pool condition, process reduction factor, fuel damage condition and release duration to determine a gross release rate that is not scaled to any plant measurement. GO TO Step 4.3.39. _______

4.3.21. Monitored Release

1. SELECT the effluent pathway's most appropriate monitor. _______
2. ENTER the monitor reading for the selected monitor. _______

NOTE

Depending on the pathway selected and the associated selected monitor additional flow rate data may be required. _______

3. DETERMINE applicable flow related data as follows:
a. IF a Release Point Flow Rate is requested,

THEN ENTER the flow rate in the units requested.

Default values may be present and would be based on the maximum flow for the pathway, if available enter the actual flow from the pathway. _______

b. IF a Calculated S/G Flow Rate is requested,

THEN ENTER the following for the faulted Steam Generator only. _______

Pressure

Number of SRVs open

Number of ADVs or PORVs open

c. IF the requested flow is for the HTV monitor,

THEN REFER to NC.EP-EP.ZZ-0313, Attachment 5, Table 1 (HTV Flow Values). DETERMINE the Torus pressure from the HC SPDS and FIND the corresponding flow in Table 1, in cfm. _______

NC.EP-EP.ZZ-0314(Q) Page 18 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

d. IF a Calculated Steam Table Flow Rate is requested, THEN

(1) SELECT either Temperature or Pressure from the options and then ENTER the corresponding system parameter. _______

(2) ENTER the Mass Flow rate of the faulted generator only. _______

4.3.22. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NOTE

Use the 10 mile assessment for information within 10 miles. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles.

The 50 mile assessment does NOT provide doses within 10 miles. _______

4.3.23. GO TO Step 4.3.42, Dose Assessment Results. _______

4.3.24. Containment Leakage

1. SELECT the appropriate Method from any enabled options. _______
2. IF % Fuel Damage is selected,

THEN ENTER the percent damage that corresponds to the Source Term, Type of Damage (Clad or Melt). _______

3. IF the Containment Radiation Monitor is selected,

THEN ENTER the corresponding high range radiation monitor reading. _______

4. DETERMINE the appropriate containment gas space volume Release Mode from the enabled options as follows.
a. SELECT "Leakage" when using the default percent primary containment leakage or a percent leakage determined through calculation. ENTER the leak rate as a percent. To determine the preset default leakage, hover the mouse over the textbox. _______

NC.EP-EP.ZZ-0314(Q) Page 19 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

b. IF the primary containment gaseous volume is leaking due to isolation failures, such as open valves or failed penetrations that do not meet the requirement of a Catastrophic Failure,

THEN SELECT "Failure to Isolate". _______

c. IF the primary containment has at least a 1-ft2 hole providing a direct release path to the environment,

THEN SELECT "Catastrophic Failure". _______

d. SELECT "Calc'd Cont. Leak Rate" when using a calculated leak rate. ENTER the leak rate in cfm. _______
e. SELECT Venting using Pressure Change when intentionally venting a pressurized containment to use a calculated average flow rate based on the containment volume, pressure change in PSIG and release duration. _______

4.3.25. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NOTE

Use the 10 mile assessment for information within 10 miles. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles.

The 50 mile assessment does NOT provide doses within 10 miles. _______

4.3.26. GO TO Step 4.3.42, Dose Assessment Results. _______

4.3.27. RCS Leakage

1. SELECT the appropriate Method from any enabled options. _______
2. IF % Fuel Damage is selected,

THEN ENTER the percent damage that corresponds to the Source Term, Type of Damage (Clad or Melt). _______

3. DETERMINE the appropriate RCS liquid leakage Release Mode from the enabled options as follows:
a. IF the leak rate is unknown,

THEN SELECT Unknown Leak Rate. _______

NC.EP-EP.ZZ-0314(Q) Page 20 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

b. IF the leak rate is known,

THEN SELECT Calculated RCS Leak Rate and ENTER the coolant leak rate in gpm. _______

4.3.28. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NOTE

Use the 10 mile assessment for information within 10 miles. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles.

The 50 mile assessment does NOT provide doses within 10 miles. _______

4.3.29. GO TO Step 4.3.42, Dose Assessment Results. _______

4.3.30. Release Point Sample

1. ENTER the release point flow rate in cfm. _______
2. ENTER the release concentrations in uCi/cc for each corresponding isotope. _______
3. For tritium or other special isotope not scaled to the core inventory:
a. USE Release Point Sample in combination with other scaling methods. _______
b. IF other scaling methods are used to determine the release rate of core activity,

THEN ENTER ONLY the tritium concentration for the Release Point Sample Method to include the tritium. _______

c. IF using Release Point Sample to add a special isotope like tritium,

THEN DO NOT include the other sample results IF another scaling method is used for the core inventory.

Including the other sample results in combination with other scaling methods will duplicate the doses from the core inventory release. _______

NC.EP-EP.ZZ-0314(Q) Page 21 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

NOTE

Release point sample should be used only if noble gas, iodine and particulate data is available OR to include a special isotope like tritium that is not scaled to the core inventory. Leaving a class of effluent blank will cause the dose assessment to be incomplete but if values are actually zero, that is acceptable for a complete dose assessment. _______

4.3.31. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NOTE

Use the 10 mile assessment for information within 10 miles. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles.

The 50 mile assessment does NOT provide doses within 10 miles. _______

4.3.32. GO TO Step 4.3.42, Dose Assessment Results. _______

4.3.33. Field Team results

1. ENTER the downwind distance in miles the sample was taken.

The program assumes the sample was taken at or close to the plume centerline. _______

NOTE

Distance may not exceed 10 miles, so 50 mile assessments are not available in the Field Team method. _______

2. ENTER the closed window exposure rate in mR/hr. _______
3. Field Team air sample results
a. IF a field team air sample is available, THEN

(1) USE the air sample calculator tool in URI to calculate a field team sample result as described in Attachment 4. _______

(2) IF the concentration is < the calculated Lower Limit of Detection (LLD),

THEN ENTER 0, otherwise ENTER the I-131 concentration in µCi/cc. _______

NC.EP-EP.ZZ-0314(Q) Page 22 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

b. The Air Sample Calculator provides a button to transfer the air sample result to the field team assessment form. _______
c. IF a field team air sample result is not available,

THEN BLANK the I-131 concentration value. Do not enter 0. Entering zero will cause the iodine and particulate source term to be set to zero. _______

NOTE

Field team air samples should not be used with very long (approx. greater than 10000 hours) decay times. With long decay times, the field team air sample is not used. _______

d. ENTER the time the field team survey data was taken. _______
4. ENTER a location where the sample was taken, if desired (optional). _______

4.3.34. IF all errors have been resolved,

THEN PRESS the 10 Miles button on the Process Assessment frame to run the dose assessment. _______

4.3.35. GO TO Step 4.3.42, Dose Assessment Results. _______

4.3.36. Group Release Rates

1. DETERMINE the methodology as follows:
a. IF a total Noble Gas, Iodine, and Particulate release rate is available,

THEN SELECT Total Noble Gas, Iodine, and Particulate Release Rates. _______

b. ENTER the release rate for each Group Release Rate. _______

NC.EP-EP.ZZ-0314(Q) Page 23 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

NOTE

Group Release Rate calculations should be used only if noble gas, iodine and particulate channel data is available. Leaving a class of effluent blank will cause the dose assessment to be incomplete by assuming that group is actually zero, but if values are actually zero, that is acceptable for a complete dose assessment. _______

c. IF individual isotopic release rates are available,

THEN SELECT Individual Isotopic Release Rates. _______

d. ENTER the release rates in µCi/sec for each corresponding isotope. _______

NOTE

Group Release Rate individual isotopic release rate calculations should be used only if noble gas, iodine and particulate channel data is available.

Leaving a class of effluent blank will cause the dose assessment to be incomplete but if values are actually zero, that is acceptable for a complete dose assessment. _______

4.3.37. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NOTE

Use the 10 mile assessment for information within 10 miles. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles.

The 50 mile assessment does NOT provide doses within 10 miles. _______

4.3.38. GO TO Step 4.3.42, Dose Assessment Results. _______

4.3.39. Unmonitored spent fuel

4.3.40. IF all errors have been resolved,

THEN PRESS the 10 Miles or 50 Miles button on the Process Assessment frame to run the dose assessment. _______

NC.EP-EP.ZZ-0314(Q) Page 24 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

NOTE

Use the 10 mile assessment for information within 10 miles. Use 50 miles if it is expected that the doses may exceed PAGs at or beyond 10 miles.

The 50 mile assessment does NOT provide doses within 10 miles. _______

4.3.41. GO TO Dose Assessment Results below (4.3.42). _______

4.3.42. Dose Assessment Results

1. If the estimated total release exceeds the available activity (e.g.

total normal coolant inventory or total core inventory) by a pre-defined amount, a warning will be provided that the projected release may be excessive. The assessment may still be processed OR the assumptions in the assessment can be modified. If the results are not modified a note will state that the "Total released activity exceeds the estimated available activity.

Inventory comparison warning ratio of X.XX was OVERRIDDEN by the user."

2. IF the assessment total release warning occurs

THEN, SELECT whether to continue despite the warning or to return to the "Detailed" form to modify the assessment assumptions. _______

3. To print or preview the dose assessment results, SELECT one of the options from the toolbar on the assessment method tab. The following reports are available. _______
a. Dose Assessment Report - This report contains assessment results and release information. It may be:

Previewed from the print preview toolbar button (page and magnifying glass icon).

Printed to the default printer from the print toolbar button (printer icon).

Printed to a Microsoft XPS document file from the print toolbar button (printer icon). The file can be attached to e-mail or WebEOC forms for distribution and viewed via a web browser.

b. Receptor Point Report - This report contains calculated values for the predetermined receptor points. It may be:

Previewed from the print preview toolbar button.

NC.EP-EP.ZZ-0314(Q) Page 25 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Printed to the default printer from the print toolbar button.

Printed to a Microsoft XPS document file from the print toolbar button. The file can be attached to e-mail or WebEOC forms for distribution and viewed via a web browser.

c. Evacuation Area Graphic - Provides a graphic of the sectors / areas that exceed the General Emergency Protective Action Guideline values for this dose assessment only (globe icon). This graphic is printed on the dose assessment report.
d. Results may be viewed or printed on a map. From the Detailed Assessment main menu or toolbar, SELECT View => View Receptor Point Locations or select the world icon at the upper left. _______

(1) SELECT the 2, 5 or 10 mile map to view for 10 mile assessment. 50 mile map view is preset for 50 mile assessment from the Map menu bar option. _______

(2) SELECT the footprint results for either TEDE Dose or CDE Thyroid Dose from the Display menu bar option. _______

(3) SELECT a map Zoom Level. _______

(4) SELECT the Display Options from the Options menu bar selection. _______

RASCAL Sectors - Draws the 36 NRC sectors on the map which represents the close in doses to ~ 2.25 miles (10 mile assessment) or ~ 11 miles (50 mile assessment). RASCAL sectors are 10° each, split into 8 distance segments.

Sector 1 starts at 5° and arcs in a clockwise direction.

RASCAL Puffs - Draws the 41 x 41 grids on the map which represents the doses beyond 2.25 miles (10 mile assessment) or at and beyond 10 miles (50 mile assessment). Column 1 is on the left with row 1 on the bottom.

NC.EP-EP.ZZ-0314(Q) Page 26 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Sectors - Displays the classic 16, 22.5° sectors.

Mile Circles - Displays the 2, 5 and 10 mile distances for 10 mile assessment and 10, 25 and 50 mile distances for 50 mile assessment.

Receptor Points - Displays the preset points of interest. Additional information can be obtained by double clicking each point as needed.

Show Balloon - Displays an information balloon when the mouse is dragged across the map.

(5) SELECT File / Print from the menu bar to print the contents of the map displayed in the window to the default printer. _______

(6) SELECT File / Print to XPS to print the contents of the map displayed in the window to a Microsoft XPS document file. The file can be attached to e-mail or WebEOC forms for distribution and viewed via a web browser. _______

4.3.43. PROVIDE the dose projection to the Radiological Support Manager for comparison to the Emergency Action Levels (EAL) and the Current Protective Action Recommendation. No Protection Action Recommendations (PAR) are suggested by this program.

4.3.44. CAUTION: The report also contains the Recommended Classification.

Disregard any Recommended Classifications by the URI dose assessment software. Use the protective action procedure to determine the appropriate response to the dose assessment results. ENSURE this section of the report is blacked out before transmission to any other organization, to avoid confusion. _______

4.4 Concurrent Assessment Summation

4.4.1. SELECT Sum Assessment from the File menu or toolbar (blue Sigma icon). _______

4.4.2. DETERMINE the summation as follows:

1. SELECT the existing assessment results to sum. _______

NC.EP-EP.ZZ-0314(Q) Page 27 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

NOTE

Summed assessments should be concurrent - within minutes of each other or ongoing and overlapping.

Summation may be the best way to include special isotopes like tritium that are not included in the core inventory but are separately assessed from release point samples or other methods. _______

2. ENTER (type or drag-and-drop) the file names in the file name grid. _______
3. Details of the content of the included files can be viewed by hovering the mouse over the file name in the Summation form. _______

NOTE

A mixture of 10 and 50 mile assessments will not sum.

Up to five concurrent assessments may be summed. _______

4. ENABLE or DISABLE summation of individual entered files by selecting the Include checkbox on each line. _______
5. DELETE files from the list using the red x icon. _______

4.4.3. Dose Assessment Results

1. SELECT one of the reports below and choose options from the toolbar on the assessment method tab to either print or preview the dose assessment results. _______
2. Dose Assessment Report - This report contains assessment results and release information. It may be:

Previewed from the print preview toolbar button (page and magnifying glass icon).

Printed to the default printer from the print toolbar button (printer icon).

Printed to a Microsoft XPS document file from the print toolbar button (printer icon). The file can be attached to e-mail or WebEOC forms for distribution and viewed via a web browser.

NC.EP-EP.ZZ-0314(Q) Page 28 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

3. Evacuation Area Graphic - Provides a graphic of the sectors /

areas that exceed the General Emergency Protective Action Guideline values for this dose assessment only (globe icon).

This graphic is printed on the dose assessment report.

4. Receptor Point Report - This report contains calculated values for the predetermined receptor points. It may be:

Previewed from the print preview toolbar button (page and magnifying glass icon).

Printed to the default printer from the print toolbar button (printer icon).

Printed to a Microsoft XPS document file from the print toolbar button (printer icon). The file can be attached to e-mail or WebEOC forms for distribution and viewed via a web browser.

5. Results may be viewed or printed on a map. From the Detailed Assessment main menu or toolbar, SELECT View => View Receptor Point Locations or select the world icon at the upper left.
a. SELECT the 2, 5 or 10 mile map to view for 10 mile assessment. 50 mile map view is preset for 50 mile assessment from the Map menu option. _______
b. SELECT the footprint results for either TEDE Dose or CDE Thyroid Dose from the Display menu option. _______
c. SELECT a map Zoom Level. _______
d. SELECT the Display Options from the Display menu selection. _______

RASCAL Sectors - Draws the 36 NRC sectors on the map which represents the close in doses to ~

2.25 miles (10 mile assessment) or ~ 11 miles (50 mile assessment). RASCAL sectors are 10° each, split into 8 distance segments. Sector 1 starts at 5° and arcs in a clockwise direction.

RASCAL Puffs - Draws the 41 x 41 grids on the map which represents the doses beyond 2.25 miles (10 mile assessment) or at and beyond 10 miles (50 mile assessment). Column 1 is on the left with row 1 on the bottom.

Sectors - Displays the classic 16, 22.5° sectors.

NC.EP-EP.ZZ-0314(Q) Page 29 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Mile Circles - Displays the 2, 5 and 10 mile distances for 10 mile assessment and 10, 25 and 50 mile distances for 50 mile assessment.

Receptor Points - Displays the preset points of interest. Additional information can be obtained by double clicking each point as needed.

Show Balloon - Displays an information balloon when the mouse is dragged across the map.

e. SELECT File / Print from the menu to print the contents of the map displayed in the window to the default printer. _______
f. SELECT File / Print to XPS from the menu to print the contents of the map displayed in the window to a Microsoft XPS document file. The file can be attached to e-mail or WebEOC forms for distribution and viewed via a web browser. _______

4.4.4. PROVIDE the dose projection to the Radiological Support Manager. _______

4.4.5. CAUTION

The report also contains the Recommended Classification.

Disregard any Recommended Classifications by the URI dose assessment software. Use the protective action procedure to determine the appropriate response to the dose assessment results. ENSURE this section of the report is blacked out before transmission to any other organization, to avoid confusion. _______

4.5 Integration Assessments

NOTE

Integration Assessments are available in the URI program but are not intended for use for making protective action recommendations by the ERO. Integrations are intended for longer term follow-up and overall assessment of an event later or after the fact. Instructions for Integration Assessments are provided in a separate document. _______

END of Instructions

5.0 REFERENCES

AND COMMITMENTS

5.1 Commitments

5.1.1. None

5.2 Performance References

5.2.1. EP-Aid-025, Get Weather from NOAA NC.EP-EP.ZZ-0314(Q) Page 30 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

5.3 Developmental References

5.3.1. 10CFR50.47(b)(14), Emergency Plans

5.3.2. 10CFR50, Appendix E.IV.F, Emergency Planning and Preparedness for Production and Utilization Facilities

5.3.3. NUREG 0654/FEMA-REP-1, Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (and Supplements)

5.3.4. Unified RASCAL Interface Users Guide

5.3.5. Response Technical Manual RTM-Vol 1, Rev. 5

5.3.6. NUREG 1228 Source Term Estimation During Incident Response to Severe Nuclear Power Plant Accidents October 1988

5.3.7. Integration Assessment User Guide

6.0 RECORDS

Manager - EP to ensure that procedure is retained as a record.

NC.EP-EP.ZZ-0314(Q) Page 31 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 1, URI Computer Program Loading Instructions

In the event the URI computer program does not run when initiated, go to any other computer that has URI installed and run URI from that location. URI is installed on multiple computers in the EOF. If any further assistance is needed contact the IT Supervisor in the EOF.

For additional information refer to:

VTD #433147

Critical Software Package #A-5-ZZ-NCS-0443 Volume 2 is the URI Install / Recovery Software Media and can be retrieved from Records Management if necessary

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 32 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 2, Alternate Meteorology Methodologies

A. IF the site meteorological data is unavailable from the plant computer system, THEN the following data will need to be obtained from another source:

Wind Speed - MAKE sure the supplied speeds are in mph which are the same units as those used by the selected meteorological tower. _______

Wind Direction FROM - IF wind directions are supplied as compass points (N, NNE, NE, etc.), THEN they can be converted directly by DOUBLE CLICKING the corresponding cell in the table and SELECTING the direction. _______

Stability Class or Delta T - MAKE sure the supplied Delta T values are in the same units as those required EP-Aid 50, Determination of Stability Class. _______

B. OBTAIN the data in the following preferred order:

Any other Emergency Facility SPDS computer. Network problems could possibly only cause issues in one facility or possibly more. _______

Call the National Weather Service (NWS) in Mount Holly, NJ at 609-261-6604 (direct line to Duty Forecasters desk) or 609-261-6602 (main line to building). _______

NWS Mount Holly Website Online use EP-Aid-025, Get Weather from NOAA. _______

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 33 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 3, Pre-Calculated Release Point Flow Rates

The values below are the maximum fan capacities for the indicated vent pathway.

Site Point Description Flow Rate Salem Plant Vent Effluent Fan 125,000 CFM Containment Leakage:

Design Basis 0.1% per day 1.82 CFM 10% per day 1.82E+02 CFM 100% per day 1.82E+03 CFM Catastrophic Failure 100% in one hour 4.37E+04 CFM Hope Creek FRVS Effluent Fan 9,000 CFM SPV Effluent Fan 440,000 CFM NPV Effluent Fan 41,600 CFM HTV (at Primary Containment Design 6.29E+04 CFM Pressure)

Containment Leakage:

Design Basis 0.5% per day 1.10 CFM 10% per day 2.13E+01 CFM 100% per day 2.13E+03 CFM Catastrophic Failure 100% in one hour 5.11E+03 CFM

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 34 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 4, Air Sample and Thyroid Dose Calculations

From the Detailed Assessment Form menu, SELECT Calculations => Air Sample Calculations IF AVAILABLE _______

SELECT the Particulate Filter counting equipment. _______

IF a particulate filter is not available, THEN SELECT None. _______

IF the field team used a Count Rate Meter to count the particulate filter, THEN SELECT the specific meter used _______

ENTER the count rate meter Background Count Rate in CPM. _______

ENTER the particulate filter gross Count Rate in CPM. _______

IF the field team used a Counter (scaler) to count the particulate filter, THEN SELECT the specific meter used. _______

ENTER the Background Count Time in minutes. _______

ENTER the Background counts. _______

ENTER the Filter Count Time in minutes. _______

ENTER the particulate filter gross counts. _______

IF the field team used an Exposure Rate Meter to count the particulate filter, THEN SELECT the specific meter used. _______

ENTER the Exposure rate meter Background in mR/hr. _______

ENTER the particulate filter gross reading in mR/hr. _______

SELECT the Iodine Cartridge counting equipment. _______

IF an iodine cartridge is not available, THEN SELECT None. _______

IF the field team used a Count Rate Meter to count the iodine cartridge, THEN SELECT the specific meter used. _______

ENTER the count rate meter Background Count Rate in CPM. _______

ENTER the iodine cartridge gross Count Rate in CPM. _______

Page 1 of 3 NC.EP-EP.ZZ-0314(Q) Page 35 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 4, Air Sample and Thyroid Dose Calculations (continued)

IF the field team used a Counter (scaler) to count the iodine cartridge, THEN SELECT the specific meter used. _______

ENTER the Background Count Time in minutes. _______

ENTER the Background counts. _______

ENTER the cartridge Count Time in minutes. _______

ENTER the cartridge gross counts. _______

IF the field team used an Exposure Rate Meter to count the iodine cartridge, THEN SELECT the specific meter used. _______

ENTER the Exposure rate meter Background in mR/hr. _______

ENTER the cartridge gross reading in mR/hr. _______

IF the sample was returned with a flow rate and a sample collection time, THEN SELECT Utilize Flow Rate and Sample Collection Times. _______

SELECT the appropriate flow rate, CFM or LPM. _______

ENTER the sample flow rate. _______

ENTER the sample collection time in minutes. _______

IF the sample was returned with a total flow, THEN SELECT Enter Total Flow. _______

SELECT the appropriate volume units, Cubic Feet or Liters. _______

ENTER the total sample flow. _______

Page 2 of 3 NC.EP-EP.ZZ-0314(Q) Page 36 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 4, Air Sample and Thyroid Dose Calculations (continued)

NOTE

Once all errors have been resolved, particulate filter and iodine cartridge results in µCi/cc will be calculated along with a Lower Limit of Detection (LLD). _______

IF the net sample results are below the calculated LLD, THEN the LLD in the corresponding units will be displayed. The resultant value will not be used in the calculated total I-131 concentration. _______

PRESS the Transfer to Field Team Calc button to automatically enter the calculated total I-131 concentration in the I-131 Conc. textbox on the Field Team tab. _______

IF an Optional Estimated Thyroid Dose Calculation is needed, THEN ENTER the time the team was in the plume in hours in the Exposure Time textbox.

The estimated Thyroid Dose in rem will be calculated. _______

PRESS Print to print the sample results report. _______

PRESS Cancel to exit and close the form. _______

Page 3 of 3 NC.EP-EP.ZZ-0314(Q) Page 37 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 5, Conversion Calculations

URI provides methods to perform conversion calculations to recalculate data obtained from other non-standard sources to units usable within URI. Conversion calculations exist to convert:

Concentrations and flow rates to release rates Distances Velocities Volumes

From the Detailed Assessment form menu, SELECT Calculations =>

Conversion Calculations. _______

ENTER the value(s) into the appropriate textboxes. _______

SELECT the units to match the entered value(s). _______

SELECT the units to convert to. _______

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 38 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 6, Distance and Bearing

URI provides methods to determine distance and bearing from any two points given a latitude and longitude of each. These can be either predetermined fixed points or any two points consisting of a latitude and longitude. This can be useful if field teams return survey result locations in geographic coordinates.

From the Detailed Assessment form menu, SELECT Calculations =>

Distances and Bearings. _______

SELECT the data format to use for inputting coordinates. _______

SELECT the method which best meets the data supplied _______

Point to Point - Determines the distance and bearing based strictly on predetermined receptor points.

The user cannot enter or modify any point locations.

SELECT the Point A Receptor Point of interest. _______

SELECT the Point B Receptor Point of interest. _______

The Distance and Bearing will be calculated from Point A to Point B.

Point to Any Lat/Lon - Determines the distance and bearing based on a predetermined receptor point and any entered Latitude and Longitude.

SELECT the Point A Receptor Point of interest. _______

ENTER the Point B Latitude and Longitude. Latitudes north of the equator are Positive values. Longitudes west of the Prime Meridian are Negative values. _______

The Distance and Bearing will be calculated from Point A to Point B.

Any Lat/Lon to Any Lat/Lon - Determines the distance and bearing based on any entered Latitude and Longitude.

ENTER the Point A Latitude and Longitude. Latitudes north of the equator are Positive values. Longitudes west of the Prime Meridian are Negative values. _______

ENTER the Point B Latitude and Longitude. Latitudes north of the equator are Positive values. Longitudes west of the Prime Meridian are Negative values. _______

The Distance and Bearing will be calculated from Point A to Point B.

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 39 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 7, Time to Threshold

URI provides an optional time to threshold report that calculates when the threshold will be exceeded at each of the predetermined RASCAL reporting distances. The report uses the highest dose calculated for each distance divided by the release duration to obtain a rate. This rate is then used to calculate the number of hours and minutes until each of the thresholds is exceeded. This report:

Does not account for any subsequent decay of deposited radionuclides over the displayed time frame.

Reported times do not account for previously released doses or deposition due to previous releases.

Thresholds are reported for the Unusual Event, Alert, Site Area Emergency and General Emergency classifications.

IF no threshold value was set by the administrator for a classification, THEN N/A is reported.

IF a calculated time to threshold exceeds 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, THEN >100:00 is displayed.

SELECT the Print button to print the report to the default printer. _______

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 40 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 8, EDE to TEDE Ratios

URI provides a report that calculates the ratios of EDE to TEDE with Iodine and without Iodine. These ratios are useful in determining how readings on external dosimeters (Deep Dose Equivalent) might correspond to TEDE values.

From the Detailed Assessment form menu, SELECT Calculations => EDE to TEDE Ratios.

Ratios will be calculated for the key distances of 2, 5 and 10 miles.

EDE/TEDE Ratio with Iodine is an indication of the amount of iodine in the release mix. The greater the amount of iodine the greater the whole body dose that may not be measured on a self reading dosimeter. As the ratio gets smaller (approaches 0) the actual TEDE will increase but will not be accounted for on the self reading dosimeter. Dose limits should be adjusted accordingly to ensure TEDE is not exceeded if individuals such as field team members or emergency workers will be entering these areas.

Some states require these ratios to perform dose limit calculations. The calculated ratios can be printed and supplied to the state as needed.

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 41 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 9, Detailed Source Term Data

Though each URI printed dose assessment report provides a calculated release rate, additional source term data is available that might be useful to external entities performing dose assessments using other assessment programs. This report contains a complete listing of the isotopes of interest, isotopic half-life, process reduction factor effects and available fractions.

From the Detailed Assessment form menu, SELECT Calculations => Source Term Data.

The calculated source term data will be displayed.

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 42 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 10, Process Reduction Factor Determination for Hope Creek

A. DETERMINE the Holdup Times as follows:

1. IF the holdup time is not applicable to the actual release pathway, THEN SELECT Specific Time and ENTER 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> _______
2. Turbine Building
a. IF ventilation is running, THEN SELECT < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. _______
b. IF ventilation is off, THEN SELECT best option based on estimated building leakage rate OR select <2 hours if unknown. _______
3. Drywell / Suppression Pool / Torus
a. IF the affected volume has remained static with no significant additions to the source term and a specific holdup time can be determined, THEN SELECT the appropriate range from the options provided OR SELECT the Specific Time option and THEN ENTER the holdup time in hours. _______
b. IF Catastrophic Failure is selected as the basis for flow for the dose assessment, THEN SELECT <2 hours. _______
c. IF the affected area has not remained static and there have been significant recent additions to the source term, THEN SELECT < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This is the normally selected option if fuel damage is on-going. _______
4. Reactor Building / Secondary Containment
a. IF the release is not through a normal ventilation pathway, such as a blowout panel or hole in the side of the building, THEN SELECT < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. _______
b. IF the release is through a normal ventilation pathway, THEN SELECT a holdup time based on one of the following:

(1) IF FRVS is not running (normal building HVAC flow, SPV), THEN SELECT < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> _______

(2) IF FRVS is running, THEN SELECT 2-24 hours. _______

Page 1 of 2 NC.EP-EP.ZZ-0314(Q) Page 43 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 10, Process Reduction Factor Determination for Hope Creek (continued)

B. DETERMINE the Torus / Suppression Pool Status as follows:

1. IF the effluent stream does not pass through the Torus / Suppression Pool or is unknown, THEN SELECT Bypassed. _______
2. IF the effluent stream is passing through the Torus / Suppression Pool and the Torus / Suppression Pool water temperature is > 212°F, THEN SELECT Saturated, OTHERWISE SELECT Subcooled. (If Torus Pressure is elevated check with Engineering for the Saturation Temperature, at that temp. and substitute that for >212 °F above). _______

C. DETERMINE the Spray status as follows:

1. IF Spray is not applicable to the actual release pathway, THEN SELECT Off. _______
2. IF Spray is running, THEN SELECT On. _______
3. IF Spray is not running or the status of Spray cannot be determined, THEN SELECT Off. _______
4. IF the volume has remained static with no significant additions to the source term and a specific spray time can be determined, THEN SELECT Specific Time option and then ENTER the spray run time in hours. This is not a normally selected option if fuel damage is on-going. _______

D. DETERMINE filter status as follows:

1. IF the filter is not applicable to the actual release pathway, THEN SELECT Not Working. _______
2. IF the filter is working or the status of the filter cannot be determined, THEN SELECT Working. _______
3. IF the filter is not working, THEN SELECT Not Working. _______

Page 2 of 2 NC.EP-EP.ZZ-0314(Q) Page 44 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 11, Process Reduction Factor Determination for Salem

A. DETERMINE the Holdup Times as follows:

1. IF the holdup time is not applicable to the actual release pathway, THEN SELECT Specific Time and ENTER 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />. _______
2. Turbine Building
a. SELECT < 2 Hours if ventilation is running. _______
b. IF ventilation is off, THEN SELECT best option based on estimated building leakage rate OR select <2 hours if unknown. _______
3. Auxiliary Building
a. SELECT < 2 Hours if ventilation is running. _______
b. IF ventilation is off, THEN SELECT best option based on estimated building leakage rate OR select <2 hours if unknown. _______
4. Primary Containment
a. IF the affected volume has remained static with no significant additions to the source term and a specific holdup time can be determined, THEN SELECT the appropriate range from the options provided or SELECT the Specific Time option and then ENTER the holdup time in hours. _______
b. IF the affected volume has not remained static with significant additions to the source term, THEN SELECT < 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This is the normally selected option if fuel damage is on-going. _______
c. IF Catastrophic Failure is selected as the basis for flow for the dose assessment, THEN SELECT <2 hours. _______

B. DETERMINE the spray status as follows:

1. IF Spray is not applicable to the actual release pathway, THEN SELECT Off. _______
2. IF Spray is running, THEN SELECT On. _______
3. IF Spray is not running or the status of Spray cannot be determined, THEN SELECT Off. _______

Page 1 of 2 NC.EP-EP.ZZ-0314(Q) Page 45 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 11, Process Reduction Factor Determination for Salem (continued)

4. IF the volume has remained static with no significant additions to the source term and a specific spray time can be determined, THEN SELECT Specific Time option and then ENTER the spray run time in hours. This is not a normally selected option if fuel damage is on-going. _______

C. DETERMINE filter status as follows:

1. IF the filter is not applicable to the actual release pathway, THEN SELECT Not Working. _______
2. IF the filter is working or the status of the filter cannot be determined, THEN SELECT Working. _______
3. IF the filter is not working, THEN SELECT Not Working. _______

D. DETERMINE Steam Generator Status as follows:

1. IF the event is at PWRs THEN:
a. IF the Steam Generator wide range level indicator is > 100%,

THEN SELECT Solid. _______

b. IF the Steam Generator wide range level indicator is < 10%,

THEN SELECT Dry. _______

c. IF the Steam Generator wide range level indicator is > 10%

and < 100%, THEN SELECT Boiling. _______

d. IF the Steam Generator water level cannot be determined and is being fed secondary water, THEN SELECT Boiling, OTHERWISE SELECT Dry. _______

Page 2 of 2 NC.EP-EP.ZZ-0314(Q) Page 46 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 12, Spent Fuel Pool Status Selection

DETERMINE the spent fuel status as follows:

IF the spent fuel pool is normally cooled and the incident involves cooled fuel under water, THEN SELECT Under water. _______

IF the spent fuel pool is draining, fuel is overheating, the pool may be boiling, but there is still some heat removal and the fuel is not yet on fire, THEN SELECT Partially Covered. _______

IF the pool is essentially dry and a Zr - air reaction (fire) has begun, THEN SELECT Dry. _______

Page 1 of 1 NC.EP-EP.ZZ-0314(Q) Page 47 of 47 OFFSITE DOSE ASSESSMENT USING THE UNIFIED RASCAL INTERFACE Rev: 1

Attachment 13, Definition of Terms

ATWS: Anticipated Transient Without SCRAM (BWR).

ATWT: Anticipated Transient Without TRIP (PWR).

Committed Dose Equivalent (CDE): The internal dose equivalent to parts of the body (individual organs) that will be received from an intake of radioactive material by an individual over a 50-year period of time.

Committed Effective Dose Equivalent (CEDE): The internal dose equivalent to parts of the body (individual organs) that will be received from an intake of radioactive material by an individual over a 50-year period of time weighted for the relative radiosensitivity and risk associated with the individual organ and summed for the entire body.

Deep Dose Equivalent (DDE): The dose equivalent to the whole body that will be received from radiation external to the body.

Protective Action Guidelines (PAGs): Radiation exposure guidelines which are used to determine when appropriate protective actions are to be taken on the part of emergency workers and the general public. These actions typically include sheltering and evacuation and may include prescription of KI. (EPA-400)

Protective Action Recommendations (PARs): A recommendation made by company personnel to the offsite authorities on the appropriate protective actions to be taken on the part of the general public. The PARs are based on plant conditions or dose projections using the PAGs for guidance.

Total Effective Dose Equivalent (TEDE): A method of converting exposure to radiation to the biological effects that it will cause to the human body. It combines the external and internal ionizing radiation exposure. The TEDE is the sum of Deep Dose Equivalent and Committed Effective Dose Equivalent.

Page 1 of 1