Inservice Inspection Program Relief Requests S2-RR-03-V01 and V02
ML033300467
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/23/2003
From: Salamon G
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0451
Download: ML033300467 (66)


Text

{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 (I PSEG Nuclear LLC LR-N03-0451 OCT 2 3 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Gentlemen: INSERVICE INSPECTION PROGRAM RELIEF REQUESTS S2-RR-03-V01 and V02 SALEM GENERATING STATION UNIT 2 FACILITY OPERATING LICENSES NO. DPR-75 DOCKET NO. 50-311

References:

PSEG Letter LR-N03-0450, Dated 10/22/2003 "Inservice Testing Program Relief Request SC-RR-03-VOI and V02" This letter is a revision to the above cited letter to reflect that the relief sought is for Salem Unit 2 only. This supercedes in its entirety Relief Request SC-RR V01 and V02. Pursuant to 10CFR50.55a(f)(5)(iii), PSEG Nuclear is submitting, in Attachment 1 to this letter, Inservice Inspection (ISI) relief requests S2-RR-03-V01 and V02 for NRC approval. These requests address Salem 2 and are revisions to previously approved Relief Request V-24 and V-25. The earlier requests were sought based on the impracticality of performing testing in accordance with the code requirements and in consideration of the burden on the Licensee if the Code requirements were imposed on the facility. Specifically, relief requests V-24 and V-25 sought approval for the use of an alternate testing methodology to the testing specified in IWV-3522(b) in order to allow the use of a partial accumulator dump test to verify that each check valve is verified to its safety position. Inthe NRC's March 12, 1999 approval of Relief Requests V-24 and V-25, an acceptance criterion of 27.0 seconds was imposed by the staff on the alternate testing. Relief Request S2-RR-03-V01 and V02 seek to alter this acceptance criterion to 28.1 seconds due to physical plant changes which altered the original testing acceptance criterion basis. 95-2168 REV. 7i99

IC Iil. Document Control Desk LR-N03-0451 During testing of the accumulator check valves (by procedure S2.OP-ST.SJ-0006) during the current Salem Unit 2 outage, test results showed slower than expected accumulator pressure decay times. A review of the system and test results identified that a design change was implemented changing the stroke time of 21SJ54, 22SJ54, 23SJ54, and 24SJ54 during the last Salem Unit 2 outage. The subject valves are 10" Velan gate valves with SMB-3 Limitorque operators. Two modifications to these valves were made. First, the gear ratio was changed to slow the valve stroke; second, the valve was made limit-seated (vs. torque-seated). Both modifications were designed to address the high inertial forces that cause overthrusting of the valve. Overthrusting can result in significant internal valve damage due to the valve disc being driven into the valve seat with too much force. The combination of changing the gear ratio (by changing the motor pinion and the worm shaft gear sub-assembly) and limit-seating the valve achieved a reduction in maximum thrust. A consequence of this design change was slower accumulator pressure decay during check valve testing. This change does not invalidate the conclusions in the approved relief request. However, the effect of the change discussed above is as follows: Calculation S-2-SJ-MDC-1 394 (MDC-1 394), which determined the acceptance criteria for S2.OP-ST.SJ-0006, proving operability of the accumulator check valves, was not revised at the time the design change was implemented. The stroke time of the subject Motor Operated Valves (MOVs) is an input to this calculation. With the original stroke times of .2.5 seconds assumed in MDC-1 394, Revision 1, an actual predicted test time of 24 seconds was determined. By changing the MOV stroke time in MDC-1 394, Revision 2, to 19.3 seconds (the shortest and most conservative of the four valve stroke times), the new predicted test time is 26.5 seconds. Using similar criteria as applied in SER 99-028 and adding additional conservatisms, 1.6 seconds was added and an overall acceptance criteria of 28.1 seconds has been established. Attachment 1 to this letter contains the specific relief requests, S2-RR-03-V01 and V02: Attachment 2 to this letter provides General Approach Proposed For Full Open Testing Of Accumulator Check Valves. Attachment 3 to this letter is calculation S-2-SJ-MDC-1 394 Rev 2- "Accumulator Pressure Decay during Discharge Test" which is used to determine the acceptance criteria associated with the Alternate Testing. This calculation has been revised to reflect the new opening time of the SJ-54 valves. Thus far only the Unit 2 MOVs have been modified. When the Unit 1 MOVs are modified, these relief requests will be revised to incorporate the Unit 1 MOVs. PSEG Nuclear requests that the NRC approve this request by October 23, 2003 in order to support Salem Unit 2 refueling outage 2R13, which is in progress. If the reliefs are not approved, two of the subject valves will have to opened and inspected with no commensurate increase in safety. Current plant conditions 2

Document Control Desk LR-N03-0451 support this work; however, delay in approval will result in significant additional work to restore plant conditions such that the test may be performed. Opening and inspecting the two check valves would result in unnecessary worker radiation exposure and a delay in outage work. Should you have any questions regarding this request, please contact Mr. Howard Berrick at 856-339-1862. Silleey Salamon Manager - Nuclear Licensing Attachments C: Mr. H. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Fretz, Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 8B2 Washington, DC 20555 USNRC Senior Resident Inspector - Salem (X24) Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625 3

Document Control Desk LR-N03-0451 Attachment I INSERVICE INSPECTION PROGRAM RELIEF REQUESTS S2-RR-03-V01 and V02 SALEM GENERATING STATION UNIT 2 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 1

-v Salem Units 1 and 2 Inservice Test Program VALVE RELIEF REQUEST-S2-RR-03-V01 COMPONENTS: 21SJ55, 22SJ55, 23SJ55, 24SJ55 FUNCTION: These check valves are located in the discharge lines from the respective safety injection accumulators. The valves perform an active safety function in the open and closed positions. The valves must be capable of opening during a large break LOCA to provide a flow path for Si accumulator discharge to the RCS cold legs when reactor pressure drops below accumulator pressure. The valve must be capable of closure to prevent divergence of safety injection and recirculation flow subsequent to the accumulators dumping their contents. This valve also functions as an RCS pressure isolation valve. This function prevents exposing the Si accumulators to RCS pressure which would compromise accumulator pressure boundary integrity. CATEGORY: AC CLASS: 1 TEST REQUIREMENTS: Open & Closed Position - Check valves shall be exercised at least once every 3 months in accordance with the requirements of OMa-1988, Part 10-4.3.2.1. BASIS FOR RELIEF: During power operation, these valves are maintained in the closed position by RCS pressure on the downstream side of the valve disk. Quarterly exercising these valves to the full or partially open position during power operation is impracticable because the only flow path is into the RCS. The operating accumulator pressure cannot overcome normal operating RCS pressure to establish flow. Full stroke exercising these valves at cold shutdown is impracticable because of the potential for low temperature overpressurization due to insufficient expansion volume in the RCS to accept required flow. This testing could also result in the intrusion of nitrogen into the core which could interrupt the normal circulation of cooling water flow. Partial stroke exercising these valves going into cold shutdown is burdensome without a commensurate increase in the level of quality and safety. The associated motor-operated isolation valve (one per accumulator) cannot be partially stroked, but must complete a full stroke before changing direction. This could cause a complete discharge of the water volume in the accumulator and possibly inject nitrogen into the reactor coolant system, causing gas binding of the residual heat removal pumps and a subsequent loss of shutdown cooling. These valves are also verified to close by leak testing per plant technical specifications for Pressure Isolation Valves (PIV's). Reverse exercising these check valves at any time other than refueling is burdensome without a commensurate increase in the level of quality and safety. The valves are normally in the closed position. Accumulator 1

-7 Salem Units 1 and 2 Inservice Test Program VALVE RELIEF REQUEST - S2-RR-03-VO1 pressure is continuously monitored to ensure that an adequate nitrogen blanket is maintained and to verify the lack of RCS inleakage. ALTERNATE TESTING: These check valves shall be full stroke exercised to the open position during refuelings utilizing a reduced pressure, partial accident flow test method. This controlled method is performed with the reactor vessel head removed. The test method establishes accumulator pressure between 67 and 70 psig, accumulator level between 96 and 100% and refueling cavity level between 125.5 and 126.5 feet. After establishment of the fixed parameters, the test then measures the time interval required for the pressure in the associated safety injection accumulator to drop from an initial pressure to 35 psig. Engineering calculation S-2-SJ-MDC-1394 - "Accumulator Pressure Decay during Discharge Test" establishes the test conditions and acceptance criterion and concludes that this methodology is adequate in determining the associated check valve disk moves to the full open position. Information from other nuclear stations was reviewed regarding partial flow, full stroke exercising using a calculational method. The testing performed at Salem provides a valid methodology for verifying the open function even though the test method differs from the various methods reviewed. In attempting to utilize the guidance of NUREG 1482, Section 4.1.2 - "Exercising Check Valves with Flow and Nonintrusive Techniques", nonintrusive equipment was used during informational testing. These valves are Darling Valve & Manufacturing Co. "Clear Waterway" swing checks that are fabricated without a backstop. The valve design permits the disk to move sufficiently out of the flow path without contacting the valve body. Nonintrusive testing using acoustic and magnetic technology provides sufficient data for monitoring degradation on a periodic basis, however, full open acoustic indication is not detected nor is expected to show on the test trace. Nonintrusive testing does not verify full stroke exercising, however occasional use of this equipment during the pressure decay test provides useful condition monitoring information. This method of forward flow check valve testing complies with the guidance provided in Generic Letter 89-04, Attachment 1, Position 1. Regarding reverse flow exercise testing, these valves shall be verified in the closed position during the process of performing seat leakage testing at the frequency specified in Unit I TS 4.4.6.3 and Unit 2 TS 4.4.7.2.2. The open stroke frequency change was previously approved in NRC Safety Evaluation April 15,1994 (TAC Nos. M88144 and M881451) The use of the alternate testing methodology was previously approved in NRC Safety Evaluation March 12, 1999 (TAC Nos M98259 and M98260) 2

Salem Units 1 and 2 Inservice Test Program VALVE RELIEF REQUEST - SC-RR-03-V02 COMPONENTS: 21SJ56, 22SJ56, 23SJ56, 24SJ56 FUNCTION: These check valves are located in the discharge lines from the respective safety injection accumulators downstream of the branch connection from RHR. The valves perform an active safety function in the open position. The valves must be capable of opening during, a large break LOCA to provide a flow path for SI accumulator discharge to the RCS cold legs when reactor pressure drops below accumulator pressure. The valve must also be capable of opening to provide a path for low head safety injection and cold leg recirculation flow. This valve also functions as an RCS pressure isolation valve. This function prevents exposing the SI accumulators and RHR system piping to RCS pressure. CATEGORY: AC CLASS, 1 TEST REQUIREMENTS: Open & Closed Position - Check valves shall be exercised at least once every 3 months, in accordance with the requirements of OMa-1988, Part 10-4.3.2.1. BASIS FOR RELIEF: During power operation, these valves are maintained in the closed position by RCS pressure on the downstream side of the valve disk. Quarterly exercising these valves to the full or partially open position during power operation is impracticable because the only flow path is into the RCS. The operating accumulator pressure cannot overcome normal operating RCS pressure to establish flow. Full stroke exercising these valves at cold shutdown is impracticable because of the potential for low temperature overpressurization due to insufficient expansion volume in the RCS to accept required flow. This testing could also result in the intrusion of nitrogen into the core which could interrupt the normal circulation of cooling water flow. The associated motor-operated isolation valve (one per accumulator) cannot be partially stroked, but must complete a full stroke before changing direction. This could cause a complete discharge of the water volume in the accumulator and possibly inject nitrogen into the reactor coolant system, causing gas binding of the residual heat removal pumps and a subsequent loss of shutdown cooling. These valves are also verified to close by leak testing per plant technical specifications for Pressure Isolation Valves (PlIVs). Reverse exercising these check valves at any time other than refueling is burdensome without a commensurate increase in the level of quality and safety. 1

Salem Units 1 and 2 Inservice Test Program VALVE RELIEF REQUEST - SC-RR-03-V02 ALTERNATE TESTING: These check valves shall be full stroke exercised to the open position during refuelings utilizing a reduced pressure, partial accident flow test method. This controlled method is performed with the reactor vessel head removed. The test method establishes accumulator pressure between 67 and 70 psig, accumulator level between 96 and 100% and refueling cavity level between 125.5 and 126.5 feet. After establishment of the fixed parameters the test then measures the time interval required for the pressure in the associated safety injection accumulator to drop from an initial pressure to 35 psig. Engineering calculation S-2-SJ-MDC-1394 - "Accumulator Pressure Decay during Discharge Test" establishes the test conditions and acceptance criterion and concludes that this methodology is adequate in determining that the associated check valve disk moves to the full open position. Information from other nuclear stations was reviewed regarding partial flow, full stroke exercising using a calculational method. The testing performed at Salem provides a valid methodology for verifying the open function even though the test method differs from the various methods reviewed. In attempting to utilize the guidance of NUREG 1482, Section 4.1.2 - "Exercising Check Valves with Flow and Nonintrusive Techniques", nonintrusive equipment was used during informational testing. These valves are Darling Valve & Manufacturing Co. "Clear Waterway" swing checks that are fabricated without a backstop. The valve design permits the disk to move sufficiently out of the flow path without contacting the valve body. Nonintrusive testing using acoustic and magnetic technology provides sufficient data for monitoring degradation on a periodic basis however, full open acoustic indication is not detected or expected to show on the test trace. Nonintrusive testing does not verify full stroke exercising however occasional use of this equipment during the pressure decay test provides useful condition monitoring information. The valves shall be partial stroke exercised at cold shutdown during normal RHR shutdown cooling operations. This method of forward flow check valve testing complies with the guidance provided in Generic Letter 89-04, Attachment 1, Position 1. Regarding reverse flow exercise testing, these valves shall be verified in the closed position during the process of performing seat leakage testing at the frequency specified in Unit 1 TS 4.4.6.3 and Unit 2 TS 4.4.7.2.2 The open stroke frequency change was previously approved in NRC Safety Evaluation April 15,1994 (TAC Nos. M88144 and M88145). The use of the alternate testing methodology was previously approved in NRC Safety Evaluation March 12, 1999 (TAC Nos M98259 and M98260) 2

Attachment 2 INSERVICE INSPECTION PROGRAM RELIEF REQUESTS S2-RR-03-V01 and V02 SALEM GENERATING STATION UNIT 2 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 General Approach Proposed For Full Open Testing Of Accumulator Check Valves 1

General Approach Proposed For Full Open Testing Of Accumulator Check Valves PSEG procedure S2.OP-ST.SJ-0006(Q). Inservice Testing Safety Injection Valves Mode 6 provides instructions necessary to perform Inservice Inspection and Testing lAW Technical Specification 4.0.5 for the following Safety Injection (Accumulator) check valves: o 21SJ55 and 21SJ56 - 21 Accumulator Discharge to Cold Leg o 22SJ55 and 22SJ56 - 22 Accumulator Discharge to Cold Leg o 23SJ55 and 23SJ56 - 23 Accumulator Discharge to Cold Leg o 24SJ55 and 24SJ56 - 24 Accumulator Discharge to Cold Leg The testing procedure involves open-stroke testing each tank's discharge check valves with the reactor depressurized and the vessel head removed. The initial tank liquid volume is set to 96 - 100%, and initial tank pressure is set at 67 - 70 psig. Flow is initiated by opening the tank MOV. Per the procedure, the valve is to be stroked fully open, left in the open position until the Accumulator reaches a pressure of 35 psig, and then closed. Tank pressure is set low enough to prevent injection of nitrogen gas into the RCS. Velocities achieved should also be sufficient to fully stroke the valves, according to calculation. The bases for the testing is captured in Calculation No. S-2-SJ-MDC-1 394, Accumulator Pressure Decay During Discharge Test. The purpose of this calculation is to establish a mathematical model of test conditions to develop acceptance criterion for establishing the valves tested go full open. The description, below, will describe the calculation with reactor head removed as is currently performed during testing. The following parameters are fixed by procedure. o The Unit is in Mode 6 (Defueled) with the Upper Internals installed. o Safety Injection Accumulators are at a fixed and defined pressure. o Safety Injection Accumulators are at a fixed and defined level. o Refueling Cavity is at a fixed and defined level. o Acceptance criteria - Maximum blowdown time in seconds. During valve stroking, Accumulator pressure and level measurements, which are acquired from inputs from normal plant instrumentation, are recorded. Based on the measured level and pressure change with time, the relationship between the check valve disc angle, flow rate and pressure difference are calculated using information supplied by Westinghouse Letter PSE 530 for full lift velocity for the valves being tested. Loss factor for the MOV isolation valve as well as friction losses associated with the piping system are calculated. Equations of motion are then solved simultaneously. The calculation solves six unknown variables simultaneously using a FORTRAN computer program. The following are calculated to determine flow and pressure at a point in time under a variety of disc angles: 1

General Approach Proposed For Full Open Testing Of Accumulator Check Valves o Accumulator level elevation o Accumulator gas pressure o MOV loss factor o Check valve Delta P o Derivatives o Values at new time step 2

Attachment 3 INSERVICE INSPECTION PROGRAM RELIEF REQUESTS SALEM GENERATING STATION UNITS 1 AND 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 Calculation S-2-SJ-MDC-1394 (Rev 2) 1

NC.DE-AP.ZZ-0002(Q) FORM I CALC NO.: S-2-SJ-MDC-1394 CALCULATION COVER SHEET Page 1 of 4 0 REVISION: 2 CALC. TITLE: i Accumulator Pressure Decay During Discharge Test

  1. SHTS (CALC): l # ATT I # SHTS: I # IDVI50.59 SHTS: #TOTAL T SHTS: 5 CHECK ONE:

0 FINAL El INTERIM (Proposed Plant Change) E FINAL (Future Confirmation Req'd) ED VOID SALEM OR HOPE CREEK: 0 Q-LIST 0 IMPORTANTTOSAFETY ED NON-SAFETYRELATED HOPE CREEK ONLY: OQ OQs E]Qsh OF [R 0 STATION PROCEDURES IMPACTED, IF SO CONTACT RELIABILITY ENGINEER I El CDs/ADs INCORPORATED (IF ANY): DESCRIPTION OF CALCULATION REVISION (IF APPL.1: DCP's 80017352, 80017353, 80017354, 80017355 changed the stroke times of valves 21SJ54, 22SJ54, 23SJ54, and 24SJ54. This change will Increase the accumulator pressure decay time. The revised acceptable pressure decay time has been recalculated In this revision of the calculation. PURPOSE: Determine the acceptance criterion of the pressure decay time for the accumulator discharge test. The acceptance criterion will be Incorporated In procedure S2.OP-ST.SJ-0006. CONCLUSIONS: The pressure decay time acceptance criterion Is 28.1 seconds. Sinaur Date _ .. Prne Name .I Signature Printed Nam Date ORIGINATORJCOMPANY NAME: Vijay Chandra/PSEG Nuclear Oct. 21, 2003 REVIEWER/COMPANY NAME: James Murphy/PSEG Nuch l6 22 12&3 VERIFIER/COMPANY NAME: James Murphy/PSEG Nu k 6 l 2-2 l 2c03 PSEG SUPERVISOR APPROVAL: Paul Lindsay /J ) 0 ILl.0 3 I Nuclear Common Revision 9

TNT E/fCuScvu1\T) 2-SJ- SNO.Mf)- I394 SHEET

   "" PSEG PE                      U4c             D 5uCH PI-7ha      REFERENCE                         'LO ORIGINATOR V.C-fAfD24e                         HHL                                          OF 0        CALCULATION CONTINUATION SHEET DATE PEER REVIEW I
                                                                                        .  -o

__ _rT DATE -a.Atoyll T-hSL F CrIF claljT~sT S

    *i. ) N T~o .Ue TJON'                       4.*   ...  ...  .      4  ..   .          .   % . 4      *
2. ~Descizip-Tiom -i-c~Nipm-RrloATIOM -
     ':3. fA-PJA-yG /                                4      %            I       Is       a      40       4          7.

3.1 ACCuU UL A To-& a . d . 10 g 3, 2 PR s;oR 4\ -4 4 ..4 1 I . 10*

             !3 .'      CH T*V A- VE                SJ 55            ..      S        4 3L,   LtCiA'TF       V(6LVOE           SJ 3Lf                                           *       .0       17
3. 5: ptpfiN4 bETwAt-EN~ACCVPYIULAT6)S ?4 Cd~oA -DLeg 18
3. 4, FIPINL3 br:ETIAEE7' iO LEC7 fAtf1D PkFSSVRIZE7~ 20 3 -7' EZUATIOWS CFF MoTt4PJ (RcE'ht&flEIai)4l-J 2-1 3.-7.2I. w
                              ~uMAt  I           eAYEf         T~IOT1M ( RE PrCmKf HOml OFF)                           2.6
4. f( SOL-TS 5 4 .. .4 .. Is 3 5 . CLo-NC~t- UIS ION 4 5 37 (o . . S . . . 4 a A T-TA "C ~MVTT .I (ViL-VE QTR"1E 'TIMES&)

DE-AP.ZZ-0002(0) ATTACHMENT 2 W.6821ImM 14

NC.D5-AP.ZZ-0002(Q) FORM 2 CALCULATION CONTINUATION SHEET SHEET: 2 A CALC. NO.: S-2-SJ-MDC-1394

REFERENCE:

V. Chandra 2 ORIGINATORDATE REV: Oct. 20, 2003 James Murphy REVIEWERNERIFIER,DATE l' L 3 Revision History Revision No. Date Description 0 Oct. 24,1994 Calculation was Issued to correct the exi3ting acceptance criterion of 37 sec. 1 Feb. 5,1996 Minor typographical errors were corrected. There was no change In the results. 2 Oct. 21, 2003 DCP's 80017352, 80017353, 80017354, 80017354 changed the stroke times of 21 SJ54, 22SJ54,23SJ54, and 24 SJ54 valves. This change would result in a revised acceptance criterion. A minor error In the accumulator tap elevation was

  . ___________    ____________     corrected.

Page Revision Index Page Revision Page Revision Page Revision Pa e Revision

. ____       _      2                 ID               O3                                                       _ __ _

_ __ _ _ 1_ 2. 13 / I a 2 '. 4 2.. 1+ O0 23

                                                                          .22 2..                       3 SIX
       ~~              °           Z16i 2-w     ~   ______  O         -2    2 5 23   I I

_ __0 3 4 _____ 7 O 17 :2 I .2. 2-8 o2- 2 07 57 2. _ 2. 1 00 2Pi_ 3_8 Nuclear Common Revtslo_ _ Nuclear Common Revistn 9

NC.DE.APRZZ-0002(0) FORM 2 CALCULATION CONTINUATION SHEET SHEET: 3 CALC. NO.: S-2-SJ-MDC-1394

REFERENCE:

V. Chandra 2 ORIGINATORDATE REV: Oct. 20,2003 James Murphy REVIEWERNERIFIER,DATE 8O 2 I 2.63

1. INTRODUCTION Accumulator dump test is done In Mode 6 In accordance with procedure S2.OP-ST.SJ-0006(O), Rev. 8. According to this procedure, the reactor head Is off during the test condition. In revision 1 of this calculation (S-2-SJ-MDC-1394), an acceptance criterion of the pressure decay time was calculated based on the 12.5 second opening stroke time of SJ54 valves. DCP's 80017352,80017353,80017354,80017355, revised the stroke time of SJ54 valves. However, the acceptance criterion calculated in revision I was not revised. As a result, when discharge test was performed on 21 accumulator by opening 21 SJ54 valve, the pressure decay time exceeded the acceptance criterion and 21SJ55 and 21SJ56 valves were declared Inoperable (Notification 20182455).

In this revision of the calculation, a revised acceptance criterion of the accumulator pressure decay time has been calculated. The SJ54 valve opening stroke Vmas were measured and are given In Attachment land were used. Although the test Is done with the reactor head off, the acceptance criterion was also calculated for the situation when the reactor head Is on and the venting occurs through the pressurizer. RevisIon 9 Nuclear Coomoo Nuclear Common RevisIon 9

TITLEAcrUm, PRsTur IDNO. 22- SJ MD l-13t. SHEET QU'J no P1

                  ~~~~~DECA) IbuKlim(_

N Scieir D aES T REFERENCE OF ORIGINATOR V.CHAMRA 10 1 4OF 0 CALCULATION CONTINUATION SHEET DATE PEER REVIEW 1 sU fs9L. C 95 DATE B Y C~~Nfl6~~uMTIe~

2. DE~SCR1PTI ot J UF F I u RE IAJKO4& I-F G.LEV~J vt1~~J7~

T-H/T ft ~E UJVo.LV-TV t VDN 'THIE T E7 T9 MTO?.I ODJ) -TfE.VALVE

          .1 Te Ac trm ui- Ac&              V0-IS     ET&WEEN       6-7 AwZ 70
AS THE- VIVLVE YPENS, THE WAE STA1?TSTO'0 CeM E OUT L,5r ,TH A 0cv tw&ATOK,, A-ND~ PRESUR uiZ CP< L ~L~rt-KR 9E'S TH t- PO\)'.S "WE 6PE-rN 4 h? i FK6M T7HE PPFuP S ZE, ( vE)~j-TC1)-r .TO ie. COtTAI m7I../jT  :*
       -T~oUC-jIR OFN7P,14'J-s            qFA7D (~y RFmjvovtlq T1 Sk-FETJ .\JALTrS.

FIC~luR( lk, SHW -THE RELt-V\rftV, 6M NFE7r7\T[S THKA-ft[E ImV0LVr-) K'uIhW T1ET TE-S- I S DOiVE?&/I- I RRtTOK H NE~ft.p* F. M)I -5 SI uIrTIOIJ~ -TUW t~j4,Tcf< Acctm'iuLA-T6P~~~~~~~~~ Th~~~ pf~~~crr~~~ IS DL*~~~~~C-n~~~f~~CED TO Tflt~~~~~~.? DE-AP.ZZ-0002(0) ATTACHMENT 2

                                                                                                   *"I-O7 am "a

TITLE Accom'ilt)JT/ro, PRESSURE IECAy O PSEG Iyot~(S T)-cnwl 0 CALCULATION CONTINUATION SHEET ORIGINATOR VAhDoA DATE PEERREVIEW I o 15Sr' 1994 ~Lj Li L DATE _ HL 2LI 7,

                                                                                  ..i.

PREssu~mck Ar eCVM3LfTO K h zIF - .-F - 3 PEACTO& 6J55 SJ5~~j 5J5 - F11VURE 1A. 5CHEMATJlc A-Pr~~iJ4mENT D AC,-Up ULATOR" 1?EAC-TO , A--- V"4TED, M -sSu&IXER. (1Tt.eT cow~FicioRATiot4 wrivi REACTO*.IiE-rD OM) DE-AP.ZZ-0002(0) ATTACHMENT 2

                                                                                       "-*so nIu S."

Q Ps ~ 2-SJ- Maoc- 3 TrLEAC¢ V ULVT LA IDNO. 5 SHEET PRE~ssURcZEr~ IPIGIU M

                        ~ut~RINq (5CtfA rc
                                          -rE s -T..

REFERENCE

                                                                                             ~~~~~~~~~OF ORIGINATOR V-0CA9ADRA10                          HL CALCULATION             DATE     2f     19__                                      -

CONTINUATION SHEET PEER REVIEW - - DATE -c7 rtZ {u FKMURE i6. SC41HEvMATIC ('E MENToF A CeUM ULvAI3/4A A KA-VALVE~S A-ttD R~eACrTOR .C AVIy ('TEST comrFIluRATlIM~ W-iITH ~EACT61.. -K £fIr 6FF). DE-AP.ZZ-0002(Q) ATTACHMENT 2 j sons nm *Mn

pSE TrrrLE/)ccromuL I)Tt

                              ~~PREsSU/RE T)FCAY Cf D Nrg li scflA/h64 WIDNO. 5 - 2, REFERENCE7
                                                                                - MJ. e- 1j39L 1        SHEET ORIGINATOR    VIPANf A   Lo___

CALCULATION DATE I SCFI)994 CONTINUATION SHEET PEER REVIEW ____ ____ ___ DATE ______ ANALIGIS IN.THS SC-Tiot'3 -A MATrH~mAT/C/L ft~nr-L c Acepmft)L-,ATO DUMvP ?RCCrS5 ffAs RGF7\J D)EVJLO EJ> S. INC CPRETSSVRE7 D1FF6CRrNcu AekOtS5 77HC RF-rT4? Ca c i I2~cW FD. THEL It~JCTTA-L FTFEY-Te OF Ae'crvrout-hT~r D19cH~itc-? PIPwqC tWA PPESLS'uRI? Z'E7 ScrRj"C PIPIMIC7 //4vNfCA - ' COA/ El?tD. DE-AP.ZZ-0002(Q) ATTACHMENT 2 14-t7 tisM "I

TITLE lCJn7VULNATSr, IDNO. G SJ- MDc-1.394 SHEET z5 Ad PtRSS50ft D~r/'. 0 .PSI G ftE 5 7 I- S'T REFERENCE

                                                                                                                                         ~~~~~~~~~~

ORIGINATOR v.CkID£A e cN~L *AV49t 2 0 CALCULATION CONTINUATION SHEET DATE PEER REVIEW I~s1'pI~ Hi4f199-,21 d OTtTk 4 U DATE wrvq-?z ] 3 - 3.1 ACCup'11ILTOK ' ACCUPIULATO-k~ LEVEL E LE VATION~ I S C71 V INA/A Fl CluRe 2. Ft L E L~ fP-LoIkj Lie*TO, TNE lJAT6R.V0LU-ME-1tJ -THE7 Are u muL ATO0& A s A *pFU i4 o,7 ONJ F wA.7 6f, L.FVrzL PLEVATION. UPe~f TX"WI -rI ACeuVMLftdjA LE~VEL~ h)tA TC. VO ~1-O C AwV.p LtVEL L-LrvATrJQN-j LE\IEL-wATERVOi-uw1cU L G \J E L. ELIEVATiMO'JF

                                                                    ~~~WA  TC/? SURFAcc 0                     0                      700-j NOT        PXFMC-D            594.2.

L-E T zA = eLe-vATiotJ a-F ltl/,iT7?, LEVEL I J THE Accumu~tL-ATof Z.V pL.() rf)E~! 6F WAJATU IN' 7HE- AcrLakTayZ VW A

                           -    ~      .725i-            A3~7                                                '- LAB IA                P 4      +.

JI tj rL t1JA TC- Vo j umE C opp trs fli 9D g -Fo C4'6d L- E-VE-L _ 3 0 L Ft 3 pfg6m uFPS4* TAgLr C.- 2. I---- Rev. I %~~

                                                                                                                                  /4\

IWIT16L Ml-TIR6 M V~t-U F--r ll~50- 93o-1 44 IDE-AP.ZZ-0002(0) ATTACHMENT 2 Inn37 hIM "tI

TITLE flohwUL.AT&. IDNO.S- 2.- Sj- M)e- 13L94 SHEET Ma~~Rg s~upt Drcay a

    %all,  PSEG-        DORICti     DIScIArit          REFERENCE ORIGINATOR     V.IADRN l  D      .DI^Jl 2 l          l                     OF CALCULATION          DATE      15S0PI59Aj      1I OCT 2&-

CONTINUATION SHEET PEER REVIEW adsfl l DATE YtfQy10t2.z3 l--

K. C.
2. ACCUMULATOR~ LE-\/ L 3, t~E L -7 A n O
                           .      KLATWIGtjjHp            t fe# 21  13, 4~j ..

EL 5-DE-AP.ZZ-0002(Q) ATTACHMENT 2 beansz hSm31

J.. MD > 394. QA3 TITLE Al e FrULATOrf. ID NO. 5-2 - SHEET 5 Se DURINiG DJSimrr

                             %O~~~~~~~~~~~~~~~~~~~~O TEST REFERENCE                                              1t ORIGINATOR      V.CflA,3DbA                              l 4            0 a       CALCULATION CONTINUATION SHEET DATE PEER REVIEW ms art DATE        _____      e_.                                    _

3.2.

i. PRG SSuRIZER, Flc1L)RC1' 3 SHOW)S.TH9 PRES55URIZCf\ L.EVE'L-,t3 Vs. C-LevATIOM~. OF WA/TEPRLt-VEL. TAI1LE 2 8ELOtI)
         .SHOWS       THEc (ELAlTIoIJ5HIP                 86TWC-rr-            WAJTD~iLECVELE'LEVATI~kl LuVEL          ft-vD 'TH-W kJA7CIQ VfoLlv                 u         t   Tlm         R;*Ctz-7 TMLE.2... PRE-s~uRizOZ                       Lr=\EL.       t tJTE7          VL,01-t/MC7 i- P\JTEL P L EzV nT Iap L \EvEL      %         WAAT"      VOLUIMEJ ELE'fA71,01J OF

___ H i_______ (4 {t)

                                                                   / 52 75' .

10 o~ 764" '7 4O'.I f6 1265'0.O 2zzq LE T Z= PRESSRIZE?\ LrE'JzL 5LEVATIO'J Pf)

                  \L      t   38>368qZv-             4O02',~ ;               118.-54.2Z             15275 . t.

DE-AP.ZZ-0002(Q) ATTACHMENT 2 ff04117 OM S-il

1nTLErCCA1VpVLA-Ta- ID NO. 5._2-.5 j-m c- 1391 4 SHEET 0 I~SI?~~l)R E5tjgI RI)S (CHAY REFERENCE II OF

                                 -.0       Si ORIGINATOR V4-CHAP*CA,

_t: o6 q . CALCULATION CONTINUATION SHEET DATE PEER REVIEW a 1 5SPPI S DATE _ -p-L - FI.Ciu~g 3. *PRe s'su Riz M - LEVE L LlFVAVTf-6'A R;LATVovstilp, - LP.q,] iooZ, LV'fl1- ,Lr 152-75ft-S 40-1 /oLEivrL, EL - 12,91 (t-o0 L'oIt: EL- 6L /17*9 4( I i DE-AP.ZZ-0002(0) ATTACHMENT 2I 31-031 nu 1-I

TITLE AC V1A VL rTe7 IDNO. s5z- SHEET A o1PRSsE PPESSI . J 0 ec

                ~~~~~U7OF C      )IiP 31t          gSE       REFERENCE                      .O S           CALCULATION CONTINUATION SHEET ORIGINATOR V.CHANCIRA DATE PEER REVIEW 15scr 1_

BUS_ w~~~~ DATE

                                            'I,
                                            ! I   .

IC/

                                                                           . :   I t.
                                                                                              . I  ; -   -
                                                                                                .    .            I
           .C-:H c K VALVE :$:J55 Iii- THI S se CTIONfJ;.                                 UA Ti ON -lHIPf RG                             6TAJ~E-AJ frLVF           D$ISC A-0WLE) F:L WRAIT 0 htO PR E SUR E-- DIFF7P7EtJcu H/A-s PATEAI                                      CWL/)t-TCn1>

N r LUID is tjp - 5L~73 -:Re 4 ( I41I, TM E IE-brTL Ow SiI P f! ET WC?J DDiE W~E T, .LFLOL'U \.%4EL 6CI j i1-~jP) D/ fS EFFcE T1VE- W Elq'T I.v FLU-lb DJSITYJ N' 1~0O~A~c~j FACTOP, ~I~

                           -' ___TET__                                         T   A NJ AD          !IK        OV.r
  'DE-AP.ZZ-0002(0)                                                                                               ATTACHMENT 2
                                                                                                                        >-@OZDum h-e

Q P S E G ~O~~~~~~ksSR iTLEAchvLAVToP, P~tR~SL, t T76ST. PSEGCg5 IDNO. S SJ- MEC- 19j REFERENCE __ __ ;O SHEET OF ORIGINATOR V.CHAPDRA A 0 _ L 4 . CALCULATION CONTINUATION SHEET DATE PEER REVIEW dry 14 ofa 99 _ __ DATE __ __ __ U's ( mq T~K MJ.07 T )I OJ OF 'F(L4uk L If- P/9~~~~~~~~~~~~~ c2N) C-7~~~~~~~~~~

     .c-p RC-
         'T HF       CpoYJ PON ?%rIT-              EL UIj b F$                      Crf~ IM THE bIR Er Tb7J FL, 0 W      =FO             t-               -vQ*v                  -V() h/l
                                    *.         '~ *V       (        -~1           ,.
                                                              ~~~~-I)~

A: VAL VE FLO W A E7A P6~( S atr Af = C rI (I 4~et) 1 Arp. 11 Ar. (I - -, (0 - 2- (4) /A CdWTfOJ PA(TrP,

                            'APOE z    I        f \1
                    -,   2. A F         .    (I-              ()

ApiPIF FROMYf PPETviouS -P6LTO C "

v. C2 L-, LE T 2- CAD v22e4ADc&

f-- N - if -6< 0 DE-AP.ZZ-0002(Q) ATTACHMENT 2 b10o27 uSM l-A

a TITLE h CC VYLJ)Tt$?- DLR~iPSEJCfRl 7:ST ORIGINATOR U)) V.CHANDRA r o IDNO.

                                                                  'cl REFERENCE L

2.- S J- ho' tC-/ LL_4_ 3 94 SHEET OF 0 CALCULATION CONTINUATION SHEET DATE PEER REVIEW 15SPi 1 teS DATE vq

. dI&

I- oe 4 2.4 t A .A'; . 0< 2-CH00~5E THE? PO.53ITIVE SICTM\ SA.{( j t .#1 (5s) EqUVATIOIJS (4). &-JDr(5) PROV1bE TgFt-ato RATE X, TrHEc ctl rr v\A-L v-E. i . 6(5- J)4- ( PHOOJE Coq 69AfTf0M tO/Tt(

                                                                 .J t M WJwD F-MM)
                      /
                                   .5~

1, u4 0-l* 0 3 SLL)C f3'

                         - 2 b 3b - sI-0 DE-AP.7ZZ-0002(0)                                                                          ATTACHMENT 2 14el1 ZSM 342 m

I TITLEE Acc MUL1TCK ID NO. 2 ,- 5J- DC-e I39 S 4 SHEET 0 PSI~suRhI Pjic, Dprsctfkgr4 REFERENCE OF ORIGINATOR V-CHtvDRAlLLL O . CALCULATION CONTINUATION SHEET DATE PEER REVIEW 14 or

                                                                     =

L___ ____9_ DAE _ _ _ _ _ _ _ _ _ _ F!ROm \AWEST'I'Al 110USE LETTEZ6 PSf~ P-& Tu F UL.L L If orCCuP AIT 2 0ft,/ Vc vcE-L c/T VIauE pipe-. AT 2 c t/ CE-if 3 8.3 t*c3 v.2-cl<

                           -{(             (~t~                    -   . v  2-
                       -    L-~~c                   7       jL             -          w)    75)
                         -     a)- 5 S2-iFULL       0r
                            =
2. AF
                                          ~pupc (I- A-. 0 /

AF e- Apipc 2 I- r-T 2-( I- 0 )5' - f~~OW\ ~, T ATA 5 U T (P P5 IOr e2 30) L dpC nf! \fAt VL\Ez= o

       &D                         -       -L
b. ol Lix 60= 53-b o .O0c)35 (1/4. o .- Lt DE-AP.ZZ-0002(Q) ATTACHMENT 2 n431 25is 24t

re-0EL'5JPEG TITLE ACCUMLLATOK IDNO. SJ- 1394 SHEET pgcSS~uRE Dr.CAy{ DURLJC7 D£SCHAR6 £ REFERENCE O F ki TEFST ~~~~~~~~~~~ ORIGINATOR v.CA&JDRA lo _ __4__ CALCULATION DATE 14 et 19Lt CONTINUATION SHEET PEER REVIEW ___ DATE 181? ecu _ i - , , 13 - .98 'v 2 '.

.eq L1L.fLI. C. ( i- /-, 4p)

PLR.*t*WO~V TL CH- "hvS N~KE V tcfCI r VA~LVES 1PHM -L4C FRGrm THIW DEF1I'JTIOV~ Ae~VEF 0 IDE-AP.ZZ-0002(Q) ATTACHMENT 2

                                                                                                     "-*<V mm aft m

TITLE AC t UftlL A T Of ID NO. 5 -- S j- M D C-113 9 4 SHEET' 0 ) IPSi?~~Ii vRj lD

                                             )1     1     c C7
                                                      -Tc- ST REFERENCE                                      V7
                                                                                                              ~~~~~~~~~~

ORIGINATOR V-CHAXqDRA V +MYRA I VAcfMIS 2l o CALCULATION 1 DATE ePI 9 20 , ZSJAsl(c T 20 CONTINUATION SHEET PEER REVIEW dm DATE S c at ______ III I; , GATE..\/iLv-E C7 £J-V~L~~fr7J(N . ZfT.: 5: A 7 V

         *: THE FOLLt'UiINQ( T/&LEI                    SHOAS .TH-E.             PFLA/3ToA)gHlp- :

i3-,:EmWEEN~ ,Vfi-LV E -61tJ F P/C T1 0iO' A-A) $av i1)D/rw sjO",4&

        *\J7AL\fcE       C2V.

Nc't% ?Dt~lm'njs1oN-L vfrL.VF Cv = , :J C ,*

  • W~HFRF, -C \, 0 = FULL- OPEcJ . AhLf F hcrtJoo C6V0 o00 .

e OIC 5 Q I10 o 10 o .30 0* l b t o 'fL. ,o- 2o 4 o 2.77 0a3536 o- 70

a. 6,0.y6 0 90 0.'767
  • i'c6 i

FULL Cq)EN \fN\-vE Loss FACTO?, 071. 0' 15, L05- FheT&, AT' W. POSIT/OfJr -c-jcVj) 'I I. * ~~~~~~~~~~~~~~~~~~~~I

                                                                                                  . iI DE-AP.ZZ-0002(Q)                                                                                 ATTACHMENT 2 l"WSM 2-ft

NC.02-AP.ZZ-0002(Q) FORM 2 CALCULATION CONTINUATION SHEET SHEET: 17 A CALC. NO.: S-2-SJ-MDC-1394

REFERENCE:

I - I V. Chandra ORIGINATOR,DATE REV: Oct. 20, 2003 REVIEWERNERIFIER,DATE . SJ5 VAL-~E-S ArtrAL- 65 ' ' -r S Tg 7~ T/ P)66' 1-~Fai7r a e- Ir"P& OL L VLk S c3PEU ~R~.Tr~E

                                 \3 ~~LM~                                       EEKENCt7 21SJ54.                             Z)~-cj                  A TTA 01ME'r"           L
               '22 S 3 5 1                         (3,3                            3/4 2s SJ5~j-                          23                             3/4'
               '2                                  2 OC:.\                                   Mr TO ~rE~TH~ kA~fSV~c 0p~rJA'TIft'U                   (SePET            T, EO~ACC~PTM3CFC(1T~1aJ'~                                                    E7S~

RevisIon 9 Nuclear Comnmon Common Revsison 9

TITLE A CcVpnoL A TtK ID NO, 2. SJ - m DC- 13 94 SHEET OPSE&au a, NgURIP4(7 PlIc-frfy Cj REFERENCE lo ORIGINATOR V.CHAtA0l Cl 0 CALCULATION DATE 155rX I.j CONTINUATION SHEET PEER REVIEW DATE .. 7f' - - PIFlkc

                             .        Tvj, I            J
                                                       ,A CcU MoL ATR- AAJT)D                 '2OLD. LEG TAS Le . . G '-MOWS                                  - PlPl.Nq'h-AlD.F1TTj/VCr DF-r,61LS
E4 -U Oc. O. '39Lf )5 A1-*1
  . .           Ae                     LI S37     .          -5 1 1,5t 27*'4 b      -cr' I.            t       0* 57' 5 t I.
                        =       22-1!0                  ,c-L . =~LEI'N        -7ilC    LT           O'F     PIPE      S E'5?C7 MEJT El
                                                                        /Ors:A       A,.

FOLLow.~.aP, "iI THE DE TAL- cdFr RI ('TrIOM`

           .1-)E: -51 CR IPT I04                                    REF. OcAi~                 Ls~rk     Ti-o~

io4 75 . Lf LtO4~t F 0-2D7' PIPE OI39 4

   .I'p~.ox             IC .(     cp% JoI 2 jb P'pc                                                er29                      0397
     .OgE         TrEr         NRf<                                                                D-Sl.

TWO Tr-CE RUN~S oI 2 o 77 O-359~

  • FO't.' LR 5-LL O. 39 o -S4 3-Cl T sfg -eT OT\17 LK uE O.I 0o6O) 0O 5 ' 8
    *tR~r-r- sf~ 3 00 t~.L.                                                                       0* 8                      2.7O o03-5Lt o~

0 E:nq sl Rhwc

0. s ,

0 gt7 E )Q _f 6. LIL 1 k (VALVES AiE tJO- 1JCLUI)(1 HdEtC.. r- 3.s3f' t I-'- DE-AP.ZZ-0002(Q) ATTACHMENT 2 i ~ ism S-* W~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~n~~

S S J- mvDc-1391f LOF

                                     ?2 3 ykcuam
                                   -1" is        F& M          eaMr             IV'~ e SL. 7 8-/O "

re, Po,,AjT7COW O EC-,6 e4 ?770

     /a.6Ic1   cq28 7    _ _   _ _     _  _ _ _ _ _   _ _

l,d,02 /5oc'I() /.()__ A-rx4K-~ - crfwvve i,30/-/16A> 3a i./L/ ; /Z-F/' 9,3-49,V. 4A416-B&CAALrA4 CB) tek 2146P)w (at) zp POINT

TITLE AOCVmL'LA7e. PRIF-55RC F)rCj~y o PSEG -rFST ORIGINATOR 0 CALCULATION CONTINUATION SHEET DATE PEER REVIEW DATE PINOJC PSETwrt-N tioTr LEqG A7'PPRES~ugiZe-Q, (Su'RCic LINEJ). A1.6OOT 5 -(I L OM 6q. AksO irs. Two. I).T 2'jq

         -VIS                    1 L               6 S ._                207 A7 I ft              31 q 3                                        ( THIS      IS JJ E-r7L,1A         LE '
             .F t                  3 I 1f 03b1so      l-    1 Compmo)E      TO A~ OF A                                                                  A Ct(IA)UL-A70A ISCW1 L-I~J mEs) .C                      7

.  :  : . - I .

f. .  :.  :

i I. . I.

. .: . . I I . I I *. ....

I j . .: I . . - 0 DE-AP.ZZ-0002(Q) ATTACHMENT 2 weary rsmS."

TITLE A Ct EJPIVL ATO'f,. o PSEG PRCS.UiZ TEST(' ORIGINATOR F)E:CfI IS.I"7 V. CALCULATION DATE R4 _~ _ CONTINUATION SHEET PEER REVIEW I DATE _ _6 _ _

  .3. C7.!jEQ     VATIOi'JS 'Cr             tOO71ON .( RE AC.Tpp -- N&~ 0i1m3)-

FuK FLO!W\J T(Rouciff A SE-Ries cf vmeu6s fV/kVETC~- Pi G PE TM U Fa1tOVLL6tJN EqUATILoti.OF MO-TION' I-S "VPLIcdetLE Z11) -,(P telzp . (£LL>

                                                                                   .C i A,.

I

                                                                                                      +/-)2
                                                                                                           ?.

I -I"-C1 P. 4 Al i a t E e4* LA~ I. ~j ( .2 2 1 t 2.0-7 ) ,~ S -SLUC ,{1 1 7 C4. 4 , ALI 2- 1-A4. 2-~ stv

                                       -  3--715           S L- L
                                          = S-5iF-2          .ff-7 3 5'75      2.

m, 4t 65 .5 , do =(PA-1 IZR)- e CPp+ e Ap) - 3)' -t

                                                       -       4   VALVES
                                    =SUMr~        :-F  Fg(C71tOKAL         PRESSURE             D)RcV /r-RaksS vALVE 5
                                          ~j5.),                     , hfgc S J 5C.       J\JA   3*f S IND  ?J
                         =      LjoojI,) VfOL.- PLOWDJRATE
    #10Te?%       .
                         =      cA
                                 - s PfessvkZE                   IN 'TNE Acr~tumvit1Tmd&
                         -. CIAS Pkcs,,.t                     IN -1tir RESSURIZ69Ij DE-AP.ZZ-0002(Q)                                                                                         ATTACHMENT 2 MOR21IBM a-"

TrrLEA/C VUL 4 TI 5 NC. mC- 1394 SHEET pSE 0 PSI P 1uRI6 PREssORr Pr-Cby D,~ISC'tE- REFERENCE 2 OF ORIGINATOR V.CH Mo4 D 0 CALCULATION CONTINUATION SHEET DATE PEER REVIEW i4 oC7199_ he- _ DATE f  ?/attF. m i ZA . .~ 9 5' 7 2.. (7) FRom' A0CCUm UL~T Q6-P ClTU)IZ7/ id = IS 5 o-VNA (8)

                                                                                   . VM -- NITjR'q67d VWLUMTE c~s 'rx)Pfi~js)a7i' I S                C7ov VDPRM      y                               Jf) 1'/HE- .4Ccvz-kr4 TE. fTp L-t- 0 (0  .1 IN (7'. 2E.P UA-Tj OM
                                                ,Y)

P'A VA .*:::.

                                          .iVI ANO  -
          .1I .. .
                                    '~~~Ao(.VANO)~~~~~~~(9)
        &-- .. ,Ip. A TitE Ri)-T E' oT- Cjic                -f      C oFP Ci~s-aLUME- 1'M 7HL AC Co PI        L/\ATO-             IS (I oj ckt EOy?\        'St~CT(O1J         .3 ' 2-I40 ) .2,    3 Zp              -hp-                                          (U) a I2 1S q ALso d Vw-p                                            (12) 64 EQ U~ AII0N~ (6 ) T-h KouC,m 0,-)                         CyAJ        f~C     cOLVfLED S1rYLT.A-JEouSLy, TH u IUi m~iowtl 'V*R1fvleSI,'-,I                               .   )    P~A     7ZA..)'   p,   *V),A  )   AlJAJ S

I DE-AP.ZZ-0002(Q) ATTACHMENT 2 9"327 IBM "IF

TITLE ACcum V L I1TW IDNO. 5 SJ- MI) C-/I394 SHEET

   %6J""  PSEG                        V SCI1 DuRINCI Vj5;CIR1e     E  TE5TREFERENCE              O       F ORIGINATOR IJCNAIDRA                              LL                 OF S       CALCULATION                DATE      14 OT199_

CONTINUATION SHEET PEER REVIEW a_____ DATE 4e1v INITIAL C0o9iUTVI6M4S: H e' PAP

                  ~~~~~~

U ImCT A FORT7KAJ onPv-C 9C 7k* - ti a LIS T I "L iqer C06)-PV)TFK& PK,00R~M IS SIIOPiJ ItQ~ TFflE? FOLLOLWIAloq ., P- r cs. DE-AP.ZZ-0002(0) ATTACHMENT 2 O4S17 hIM 342

C Last change: VC 21 Oct 2003 4:22 pm DIMENSION VVOF(12),CVCV(12) OPEN(1,FILE-'Acchon free.out', STATUS-'old') DATA VVOF/0.,.05,.1,.2,.3,.4,.5,.6,.7,.8,.9,1./ DATA CVCV/0., 0.0194, 0.055, 0.1, 0.146, 0.204, 0.277,0.3536,0.4613,0.6086,0.767,1./ C PARAMETERS GAM-1.3 S-2-- SJ-MDC - isq'i Rev. )_ G=32.174

      .RHO-1.94 AREA-0.394 DT=0.01                                  CM14 PLrrvt_     PPo\e7 MM    LI!9T7sAi(7 PPRES-14.7*144.

C INITIAL CONDITIONS TIME-0.1 REU-TC' F/ON NSTEP--1 VNAZ-419.99 C* VLVE (S

  • VNqAtzVNAZ *, .'-

PAZ-84.7*144. S J 4 e1wJI J-PA-PAZ Q-.001 VWP-758. WRITE(1,101) 101 FORMAT(T191TIME', T28'ACCUMULATOR PRESSURE FLOW RATE') 103 FORMAT(T19'(SEC.)',T28' (PSIG) (GPM) 'dl) WRITE(1,103) 31 NSTEP-NSTEP+1 TIME-TIME+DT C CALCULATE ACCUMULATOR LEVEL ELEVATION VWA-1350.-VNA ZA-(VWA+7814.85)/95.72 - C CALCULATE PRESSURIZER LEVEL ELEVATION ZP-(VWP+4092.3)/38.34 C CALCULATE ACCUMULATOR GAS PRESSURE PA.PAZ*(VNAZ/VNA)**GAM

C CALCULATE SJ54 LOSS FACTOR VOT1-19.3 GVKZ-.15 IF(TIME .LT. VOT1) THEN VOP-TIME/VOTI CALL INTER(VOF,CVND,12,VVOF,CVCV)

GVK-GVKZ/(CVND*CVND) ELSE GVK-GVKZ ENDIF C CALCULATE CHECK VALVE DP VEL-Q/AREA AV2- 38.3/(VEL*VEL) SINPHI=0.5*(SORT(AV2**2+4.)-AV2) IF (SINPHI .GE. 0.9532) SINPHI-0.9532 DPCHK=2.*8.98*RHO*VEL*VEL*(1.-SINPHI) C CALCULATE DERIVATIVES DQDT-(PA+RHO*G*ZA-PPRES-RHO*G*ZP-35.75*Q*ABS(Q)

                -0.5*GVK*1.94*Q*ABS(Q)/AREA**2 - DPCHK)/468.9 DVNADT=Q DVWPDT-Q C  CALCULATE VALUES AT NEW TIME STEP QQuQ*DQDT*DT VVNAVNA+DVNADT*DT VVWP=VWP+DVWPDT*DT IF (TIME .LE. 2.) THEN IF(MOD(NSTEP,10) .EQ. O)WRITE(1,102) TIME,+(PA/144.-14.7),
      #    Q*7.48*60.

ELSE IF(MOD((NSTEP+10),100) .EQ. 0)WRITE(1,102) TIME,+(PA/144.-14.7), f# Q*7.48*60. ENDIF 102 FORMAT(F23.3,8F17.2) C UPDATE THE OLD VARIABLES Q-QQ VNA-VVNA VWP=VVWlP IF(TIME .GT. 40.) STOP

GO TO 31 END SUBROUTINE INTER(X,Y,N,XX,YY) -%-2-s

                                                        -mbC-S54 kvi2.

DIMENSION XX(N),YY(N) IF(X .LT. XX(1) .OR. X .GT. XX(N)) GO TO 3 DO 2 J=2,N IF(X .GE. XX(J-1) .AND. X .LE. XX(J)) GO TO 101 GO TO 2 P~.2 5 101 Y-YY(J-1)+(YY(J)-YY(J-1))*(X-XX(J-1))/ 1 (XX(J)-XX(J-1)) RETURN 2 CONTINUE 3 WRITE(6,1) X,(XX(I),I-1,N) 1 FORMAT(' BEYOND RANGE',G10.4,5X,20G10.4) RETURN END

TITLE Acrumu-LA-Tok ID NO. S S J- M DC- 139q SHEET O0 PSI~~~~G - 'TOF

                    ~~~~~PRSGEIsur SHA-R-jE-ORIGINATOR V.CUAJRA             0 REFERENCE V. wACA I             __  _

OF4 Lt4 CALCULATION DATE .t199 ZI or2 vm C __ CONTINUATION SHEET PEER REVIEW age ___ DATE lut(Ll/ovv t-t-'6. I__ I 3~.7.2.. -cou ATrOA1S~ 0F MO ToI4O ( RrA cT6& 'Hrf 6FF~) I-E -T = 'A 1&pMssv/Tl IN THE-? ~Cfivry Zc EEfTert FtJ)T7 uFC zjc) - -. 2:1 ,~ '\(AL ~ ~

                                                                                                               '     .        S A.4 r   /
                                                                                  .L Aw el.)             (Jt
              '2-- -             "t1-9    *-2211               =     92.7S-e It 3,  7r.tjt~

I.. A 4., - .

                                     - 5.715' ,

. I C, -kj2 - 11 .

                                                   ,ft I AL 1 5.75'- '2-L2~.7I              2

( N t C ZA ) - ( c t q zr- ) . (IZ)

                                                 - 4 VA          I-VB s z                      -t s~ftm          fe~          RNJ (7)

E*4 (I 4) A c35-72) S~q E? A 5 C-N(a) 7 IS 50o-Vt\ (15) v~A j (16) SA- E As rQ NA(.9)

         ,0"i~ ~           A                      (17)                      S74 l-1l FE         s6-1j
                                                                                                   ~1)               C Id?

dlt-0 DE-AP.ZZ-0002(0) ATTACHMENT 2

                                                                                                                                ".*IV  21m "I*

TITLE A Ic um ut- AT6P I NO.NSEE 0 PSEG PR ESSUR EDGD OS DU RPI I 7 D I S CaE J-mDC-194SHE REFERENCE OF ORIGINATOR V-CHMHDRAl D *l 0 CALCULATION CONTINUATION SHEET DATE PEER REVIEW 21 m a4_4_ DATE t -t2q1 AU PRC$IN).-THj I IHIS. TE-"T', 'Ttl vII1-'Y' ftMS THF ~A 7/I'CR L EXrL CH"C44ES: NMF67L I 1l& E-U T Hal, f 1gE7 i-, - .IQ.7 '~f VIIL L.a,E:-' sCD

                             -C
                              "         z 1 7x4           tf U. ILF'7 L)-~

A:II PiJ S (1) .- I ROVLI1i (Ii,] WN W FI -<O/VC S S DE-AP.ZZ-0002(0) ATTACHMENT 2 Ne017 isM 542

C Last change: VC 21 Oct 2003 4:28 pm DIMENSION VVOF(12),CVCV(12) OPEN(1,FILE-'Acchoff free.out', STATUS='0LD') DATA VVOF/O.,.05,.1,.2,.3,.4,.5,.6,.7,.8,.9,1./ DATA CVCV/0., 0.0194, 0.055, 0.1, 0.146, 0.204,

    #t         0.277,0.3536,0.4613,0.6086,0.767,1./

C PARAMETERS GAM-1.3 5 - SJ-r D)C- 13Th Rev. 2-. G.32.174 RHO-i1.94 Dr~ ke? 4Mi LASTINC7 AREA=0.394 CO pV EA, pRo r DT=0.01 PCAV-14.7*144. C INITIAL CONDITIONS R tEA CTAR,1IH TIME-0.1 m LM l' £2 FRE:E VNAZ-419. 9 VNA-VNAZ 5P4-l 5k 1% 39, R See, PAZ-84 .7*144. PA-PAZ Q-.001 ZCAV=127. WRITE(1,101) 101 FORMAT(T19'TIME', T28'ACCUMULATOR PRESSURE FLOW RATE') 103 FORMAT(T19'(SEC.)',T28' (PSIG) (GPM) '.1/) WRITE(1,103) 31 NSTEP=NSTEP+1 TIME-TIME+DT C CALCULATE ACCUMULATOR LEVEL ELEVATION VWA-1350. -VNA ZA=(VWA+7814.85)/95.72 % C CALCULATE ACCUMULATOR GAS PRESSURE PA-PAZ*(VNAZ/VNA)**GAM C CALCULATE SJ54 LOSS FACTOR VOT1-19.3 V GVKZ=.15 IF(TIME .LT. VOT1) THEN VOF-TIME/VOT1 CALL INTER(VOF,CVND,12,VVOF,CVCV) GVK-GVKZ/(CVND*CVND) ELSE GVK-GVKZ ENDIF C CALCULATE CHECK VALVE DP VEL-Q/AREA AV2=38.3/(VEL*VEL) SINPHI-0.5*(SQRT(AV2**2+4.)-AV2) IF (SINPHI .GE. 0.9532) SINPHI=0.9532 DPCHK-2.*8.98*RHO*VEL*VEL*(1.-SINPHI) C CALCULATE DERIVATIVES DQDT-(PA+RHO*G*ZA-PCAV-RHO*G*ZCAV-35.75*Q*ABS(Q)

    #t         -0.5*GVK*1.94*Q*ABS(Q)/AREA**2 - DPCHK)/428.7 DVNADT-Q C  CALCULATE VALUES AT NEW TIME STEP QQ.Q+DQDT*DT VVNA-VNA+DVNADT*DT IF (TIME .LE. 2.) THEN IF(MOD(NSTEP,10) .EQ. 0)WRITE(1,102] TIME,+(PA/144.-14.7),
    #     Q*7.48*60.

ELSE IF(MOD((NSTEP+10),100) .EQ. O)WRITE(1,102) TIME,+(PA/144.-14.7),

    #     Q*7.48*60.

ENDIF 102 FORMAT(F23.3,8F17.2) C UPDATE THE OLD VARIABLES Q-QQ VNA-VVNA IF(TIME .GT. 41.) STOP GO TO 31 END SUBROUTINE INTER(X,Y,N,XX,YY) DIMENSION XX(N),YY(N) IF(X .LT. XX(i) .OR. X .GT. XX(N)) GO TO 3

DO 2 J-2,N IF(X .GE. XX(J-1) .AND. X .LE. XX(J)) GO TO 101 GO TO 2 101 Y-YY(J-l)+(YY(J)-YY(J-l))*(X-XX(J-l))/ 1 (XX(J)-XX(J-1)) RETURN 2 CONTINUE 3 WRITE(6,1) X,(XX(I),I-1,N) 6 S J- M1) C- t s 9 4 P.". - 1 FORMAT(' BEYOND RANGE',G10.4,SX,20G10.4) RETURN END

TITLE ACC UrrULA l IDNO. 5 2- S J- vDC- 13 SHEET Q E~PSE& u p&E-SSLRE- DE-oily DVRINC DISCHA&elC

                                      'TE:ST.

REFERENCE IO OF ORIGINATOR Veetf1DRAm ".cNANV 2 _ 4 CALCULATION DATE 1 4OCT 104 21 0(7. 2003 CONTINUATION SHEET PEER REVIEW C lear DATE ldt' (9'f1 li 04o3 4-. RE L T' T N~'i FiJ(~ L-L~o. T H R E~ CA & L JoR~ 6- om F 4d . jRE z-PI wTHEF h~c .j 2.C /JEC4 'VALVE' IS FRE&- Z.C H&-* vfAL\VE MAtOYI)V1 SI-VIAC7 --JC7L-C F-RO,- C-LOSE7 PeoSITWo'l IS 6.O C-RE-Es, T/n LEs 4 .1 ,4. 2,fr AWf)4.. -2 SHO TH E Cc PRESWER TIME' /1i T6Py A-KfD DISCii~-p- FLOIJ.RhTE TrIrl ,0 bHIST'tly FOiR Efrt-I( CA S F, TtIC SF C.vVES HE-R PL-O-TTEuI

                 ~ RILUfUS4'I               Awt k, 2..

CASE./4 wA-s Rut'J £e%. RE-ATraKf HE1$Vd6¶F &~frFIGCufA-TIeotN AWD -THE QC-'tZ4 TA-i-VU TW)~S CITJ-St YCD (1 F RE E Te Ffle5\E7, 'TR E Ac e oT vUL-ATeR PR E SSeV fj-J Se~Hr c FL-oL g(rTE's f~fE SKtOc~tJ trJ -T~4LE t.

                       ~,CO       PtRI Solr)      CF R~ESU L'TS . eF                       TMj!A4&         4,(4
                   ~~  IT      I $ -Co ICLu E                  TH A-7           1:1-lU      Pf,.E-S -5 R c b m~y
            'TI ry        IiC R       EW   t iZLh    !E UNL   A WH E TR E& -t HE                            cES T I & DdMr WIv-IJ      -THE       HCE-Mr     O-N       6f\     6FF. (ACTVrAfCt-Y                       flP--W5WC4>'

TI tjtv W I T h ,'Zr4-CT6P\ HCA-O O~ rf f.5 O~S- *,15 L t?--~ T hb'Aj DE-AP.ZZ-0002(Q) ATTACH MENT 2 9"-M1 ONM3-ft

TI 9LE 4 A CC rVLfT-fR PRES /A) DI9HARe o RATE TIME ACCUMULATOR PRESSURE FLOW RATE (SEC.) (PSIG) (GPM) 0.110 70.00 0.45 0.210 69.99 164.18 0.310 69.98 241.78 0.410 69.97 318.75 0.510 69.95 394.99 S S d- biC- I39t4 k'%, 2 0.610 69.92 470.45 0.710 69.89 545.13 c[C~--c-K AftVE 'S FR t 0.810 69.86 619.07 0.910 69.82 692.35 IS oN Rcc,' L-t 1.010 1.110 69.78 69.73 772, 14 887.79 1V) 3Se-, 1.210 69.67 1010.82 1.310 69.61 1134.00 1.410 69.54 1256.11 1.510 69.47 1376.81 1.610 69.39 1495.91 1.710 69.30 1613.26 1.810 69.20 1728.74 1.910 69.10 1842.21 2.010 68.99 1947.45 3.010 67.69 2638.34 4.010 66.09 3170.58 5.010 64.31 3589.22 6.010 62.42 3874.58 7.010 60.48 4107.54 8.010 58.55 4257.08 9.010 56.64 4361.32 10.010 54.79 4404.47 11.010 53.02 4404.78 12.010 51.33 4377.50 13.010 49.73 4340.18 14.010 48.21 4285.90 15.010 46.77 4222. 96 16.010 45.41 4148. 19 17.010 44.12 4066.23 18.010 42.91 3981.22

19. 010 41.77 3895.71 20.010 40.69 3805.64
21. 010 39.67 3711.51 22.010 38.71 3610.71 23.010 37.80 3528.14 24.010 36.94 3428.49 25.010 36.13 3322.20 26.010 35.36 3215.85
27. 011 34.64 3111.24 71ME: = 26-5Uses Win P= 3 S plv.t 28.011 33.96 3008.78 29.011 33.32 2908.51 30.011 32.72 2810.37 31.011 32.15 2714.27 32.011 31.61 2620.13 33.010 31.09 2527.84 34.010 30.61 2437.36 35.010 30.15 2348.62 36.010 29.72 2261.57 37.010 29.31 2176.19 38.010 28.92 2092.45 39.009 28.55 2010.35
40. 009 2B.20 1929.90

TAM L& 42 AO V uLfr-Pss tUp7 6 5CH( c F40w RATEM

p. 3 TIME ACCUMULATOR PRESSURE FLOW RATE (SEC.) (PSIG) (GPM)

S-2i- S J- - 13994,pe.2 0.110 70.00 0.45 0.210 69.99 164.18 0.310 69.98 241.78 CHEEK VAL2VE PM^%}FUK 0.410 69.97 318.75 0.510 69.95 394.99 S 0a 0.610 69.92 470.45 413 R ACT-A FK 15ON 0.710 69.89 545.13 NLrCtf -Er)I O 0.810 69.86 619.07 S j 5 4 oEN 10 STR6E 0.910 69.82 692.35 1.010 69.78 772.14 TV 2 fec, 1.110 69.73 887.79 1.210 69.67 1010.82 1.310 69.61 1134.00 1.410 69.54 1256.11 1.510 69.47 1376.81 1.610 69.39 1495.91 1.710 69.30 1613.26 1.810 69.20 1728.74 1.910 69.10 1842.21 2.010 68.99 1947.45 3.010 67.70 2582.12 4.010 66.16 3015.34 5.010 64.48 3323.85 6.010 62.74 3532.50 7.010 60.97 3695.60 8.010 59.21 3790.50 9.010 57.49 3849.96 10.010 55.83 3865.05 11.010 54.23 3851.21 12.010 52.70 3819.73 13.010 51.25 3782.07 14.010 49.86 3733.64 15.010 48.55 3680.10 16.010 47.30 3619.34 17.010 46.11 3554.57 18.010 44.98 3488.44 19.010 43.91 3422.33 20.010 42.90 3353.34 21.010 41.93 3282.19 22,010 41.01 3212.35 23.010 40.14 3144.20 24.010 39.31 3077.69 25.010 38.52 3012.73 26.010 37.76 2949.23 27.011 37.04 2887.12 28.011 36.35 2826.31 29.011 35.69 2766.73 30.011 35.06 270 8.3 3 > -TIME, 3 oIlErw 5 -t, t'N-'35 'd 31.011 34.46 2651.03/' 32.011 33.88 2594.79 33.010 33.32 2539.54 34.010 32.79 2485.24 35.010 32.28 2431.85 36.010 31,79 2379.31 37.010 31.32 2327.60 38.010 30.86 2276.66 39.009 30.43 2226.47 40.009 30.01 2176.98

TrPŽELE P 3 Acecrr~tL/re4 Pr.~IEssM) DIS'C/f4 ?(O( g/X - C9A TIME ACCUMULATOR PRESSURE FLOW RATE (SEC.) (PSIG) (GPM) S SJ- m bC- 1394 Rev 2 0.110 70.00 0.45 0.210 69.99 164.18 age M VI 0.310 69.98 241.78 KSublet JLE 7 ' 7VCCf 0.410 69.97 318.75 0.510o 69.95 394-99 R SHe IS OM 0.610 69.92 470.45 0.710 69.89 545.13 S35 6P rR 0.810 69.86 619.07 1 0.910 69.82 692.35 T(ME l'9 ". 1.010 69.78 772.14 1.110 69.73 887.79 1.210 69.67 1008.44 1.310 69.61 1124.97 1.410 69.54 1236.94 1.510 69.47 1344.11 1.610 69.39 1446.32 1.710 69.30 1543.50 1.810 69.21 1635.61 1.910 69.12 1722.68 2.010 69.02 1799.65 3.010 67.87 2226.40 4.010 66.57 2475.50 5.010 65.20 2624.60 6.010 63.81 2709.49 7.010 62.43 2765.92 8.010 61.08 2789.03 9.010 59.76 2796.51 10.010 58.48 2786.43 11.010 57.25 2766.27 12.010 56.06 2740.57 13.010 54.92 2712.97 14.010 53.82 2682.00 15.010 52.76 2649.57 16.010 51.75 2615.01 17.010 50.77 2579.47 18.010 49.83 2543.88 19.010 48.93 2508.46 20.010 48.07 2472.12 21.010 47.23 2435.41 22.010 46.43 2399.42 23.010 45.66 2364.17 24.010 44.91 2329.62 25.010 44.19 2295.74 26.010 43.50 2262.51 27.011 42.83 2229.88 28.011 42.19 2197.84 29.011 41.56 2166.36 30.011 40.96 2135.42 31.011 40.37 2104.99 32.011 39.81 2075.06 33.010 39.26 2045.60 34.010 38.73 2016.60 35.010 38.22 1988.04 36.010 37.72 1959.90 37.010 37.24 1932.17 3B.010 36.77 1904.83 39.009 36.32 1877.87 40.009 35.88 1851.27

(jitL-t 4t 4 AcCeth uLL £1To- PRSr S f& hiA) 5 tc( FOnoRA 7 TIME ACCUMULATOR PRESSURE. FLOW RATE (SEC. (PSIG) (GPM) s - MD C- 10,94 P-v 2.S CHZ-EV< t\E IS FREE o .110 70.00 0.45 0.210 69.99 164 .61 0.310 69.98 242.41 0.410 69.97 319.57 0.510 69.94 395.99 So 5k NT0.oT.= iC 3 0.610 69.92 471.63 0.710 69.89 546.48 0.810 69.86 620.59 0.910 69.82 694.04 1.010 69.78 774.60 1.110 69.73 B92.36 1.210 69. 67 1016. 66 1.310 69.61 1140.75 1.410 69.54 1263.64 1.510 69.47 1385.05 1.610 69.38 1504.82 1.710 69.29 1622.79 1.810 69.20 1738 .85 1.910 69.09 1852 .87 2.010 68 .98 1958.04 3.010 67.68 2645.61 4.010 66.08 3179.17 5.010 64.29 3599.07 6.010 62.40 3885.53 7.010 60.46 4122.29 B.010 58.51 4275.47 9.010 56.60 4384.67 10.010 54.74 4432.70 11.010 52.96 4438.69

12. 010 51.26 4417.98 13.010 49.64 4387.92
14. 010 48.11 4340.99 15.010 46.65 4285.74 16.010 45.28 4218.67 17.010 43.97 4344 .63 18.010 42.74 4067.87 19.010 41.58 3990.75 20.010 40.48 3908 . 79 21.010 39.44 3822.80 22.010 38.46 3738.42 23.010 37.52 3656.46
24. 010 36.64 3576.87 25.010 35.80 3497.20
26. 010 35.00 3407.30
27. 011 34.25 3315.17 28.011 33. 53 3224 .22 29.011 32.85 3135.23 30.011 32.21 3048.34 31.011 31.60 2963.48 32.011 31.02 2880.56 33.010 30.47 2799.50 34.010 29.94 2720.20
35. 010 29.44 2642.58
36. 010 28.97 2566.58
37. 010 28.52 2492.12 38 .010 28.08 2419.14 39.009 27.67 2347.60 40.009 27.28 2277.46 41.009 26.90 2208.67

80 s . i. a I

                                                                  ;        0         a               .         0     0     a             .         .
........I a .
                                                                                                                                                                                 .      .     .       .             :   :    I      :          :         :     :    1.

I I I I I .... .... L...

         .... I... I----                    ....             ---- I---- ---I---- ----                             ---                                                   ...        .......... ... 4....                               .... ... I....I----I---- I...                           .........

I ............. I.-Ill.-.-

, I I I I  :

I:I---- 1.  : .1  :  :

         ........                           ---              .... ;---- I...       11----    .... I.... 1-1    .... I...    ...4----I---- ;---- ---.... I.... I... 4--- 11                     ....    ....             .... I....         ---I.... I---- I---                         .... 4....  ......... ........ :....
                .                                                                                    .         . .                       .                                       .       I                          :   : 1. :                 I.        :     :    I
                        .          .      .                                                                                .                       .        .         .                        . I
                                                                                                                                                                                                            .       .   .    .      .       I  .         .     .    .              .    .     .      .

70 - . . . . . . . . . . . . . . I .... i...4 ........ II---,

                                                                                                        .... I...                                                                                                                                                                             .... I....

I . I I. I I  : r... . ...  :  : I.........: w

                         ....      I....

I L.... I kU" 2 I

                                                                                                         ...t...
                                                                                                        ... A...
                                                                                                                                                                                                                                                                                              .... I----
                                                                                                                                                                                                                                                                                                          ---- L---
                                                                                                                                                                                                                                                                                                          ........      . ... i....       1-...

to 'S 60 V) a I.. C- _4 _- - --- --- ---

                                                                                                                    >4 a,                                                                                                                                      4.................
                                                                                                                                                                                              . .....         .    .4   F--+----         ----- -      t--F...... . .              4.....4...........      ...-         -" -- --
&0 E

3 . 40 I. F-A--'-4--A-

                                                                   +-=

K.~~~~~~~~~~~~~~~~~~~-- C7 I...... Edl 30 4 F1 .t.A.....~-lt,....... 20 0 5 10 15 20 25 30 '35 40 45 Time (see) I- - -valvemaximumswing=60deg ----- valvemaximumswing=30deg -valve isfreel 4ccetol/at7 0g, PR&SSu$Er TIME~nI*~TcOycRa/C F144.I. HEAYD ( c. ( 9-2 k-fl v-0OT.

                                                                                      .1 I

II

                                                                                                   ****      *        ,        .
  • 2  :  : ..:  :~~~~...
                     -------              ~~~~~~~~7*---........-I.-.           . . .            . . .
                                                                                                               ..-....                                                               -r.

4 - t

                                                                                                                                                                                                     --T.........                     ......
  • I. . . I I I I
                                                                            ***~~~~~~~~~~~~~~~~~~~~5~~~*     ,        I                          . .       .. I~..                                      I- -- - - - -
                                                                                                           ~. . .....~~~~~~~~~~~~~~~~~.-
                                                                 ~~~~~~... ..                  s.
  • S .t...i....i...., J-.~~~ . . ................. fl .... .........

f.~~~~~~~~~~ 2.. ~. .........

     *.4...               . * .dz~~-                                                                                                    .. .         ....                                                                       I        I
                                                                                 .... ~ L ~ a~~ ~~~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~.                                                                                ............-          r
2  : 2 2 ~ --- .... 2 2  :~~~~44--.... ~
 *   *.*   ..~~~~~~~~~~~~~~~~~~~~                                        .    ..        ..
                                                                                               .....       .                                                                                                 --------           L--- L--
                                                                                                                                                                                 ~I                       ..........
                                                                                                                                                                                                                             ~Tt-+..         2-77          .-     T ... .........                                   1                    IT                :....................I.

I . S .I . *. . . . . . * . .

  • a * . . * . . 1 2 2 . .~~~~~~~~~~~~~~~~~~~~~~~~.

5 10 15 20 25 30 35 40 45~~

        -  valve maximum~~
            -   -                          swin.. 60.....         - -- -    ------ e 4am.mswng..30d.                                                           -va-ve-s-fre FIL~~

C FLO4) k~ZZ~~ISCH4~'C k/~~~T~7 T~~t'Th ItI*T&I~~S (A~~ACT4Z u~~ f~o ~ LA

NC.DE-AP.ZZ..002(0) FORM 2 CALCULATION CONTINUATION SHEET SHEET: 34 CALC. NO.: S-2-SJ-MDC-1394

IREFERENCE:

ORGNATOR,DATE IREV. REVIEWERIVERIFIER,DATE I IOLzz21 O3 1 I

5. CONCLUSIONS As calculated InSection 4.0, the pressure decay time from 70 psig to 35 pslg Is nearly 26.5 seconds when the check valves are free. The pressure decay time when the check valve swings to a maximum open angle of 60 degrees Is 30.1 seconds. As recommended In SER 99-028 Issued for Relief Request V-24 and V-25 on March 12, 1999, the acceptance criterion should be 1.5 second less than the pressure decay time for 60 degree swing case. This would reduce the acceptance criterion to 28.6 seconds. Also since the test Is done with reactor head off, the pressure decay time acceptance criterion will be further reduced by 0.5 seconds because the pressure decay time with the reactor head off Is 0.5 second less than the pressure decay time with the head on.

Therefore, the acceptance criterion to declare the valves operable shall be 28.1 seconds. It Is clear from the plots of flow rate (Fig. 4.2), the maximum flow rate during the test exceeds the minimum flow rate required (3537 gpm corresponding to 20 ft/sec velocity In 0.394 ft2 flow area) to open the valve to its full open position. tS A 50.59 Safety Evaluation __-h~~~4i ~eem-~ attached to this calculatIon. Common Nuclear 9~~~~~~~~~~~~ Rev~~~~~~~~~~~~~~~~~~~~ Nuclear Commnon Reylelon 9

OgT PSI~~G o~~~& TTrLEACru10VL/V7UP PSEDORINt Dial"C{M4 IDNO. 5 SJ-MI)C-REFERENCE38 1,94 SHEET 32DCA ORIGINATOR I.CHARDk V. A OF . CALCULATION CONTINUATION SHEET DATE PEER REVIEW F 155srf M 0P 2.11 O 0 d 40 DATE i- . . . L . I

                                                                                            , I
                *6   . a t

REf CR L-N'Ct-S-APPLICTIO tJ :Qu'i1 D RtFS p*CH1 C-a 'v1)L-Vt-s- i NU-CL -ftR Pfw: Eo('J -RE-PO-T .- 'Pff NP 47? N -EDPe j, ERRt7fT

                                                                                                       )

3.psBp -1 DELtrA 'COVTHrR~J ('a, DA4"wjiPte, 0-T VJu.1T 2-

                                       ,~-

S-. S ALF-M2. ACCUTIWLAITOAP W(t..U-vE VS'. ,l.EVtL-Ct4jRE-. C. Cf DEb ICA~ .'RC - 06O'2 C' jv fheC F1 7-. 7.. pS~U~R(ZEKWAT.8 Vflr74WL Ujr~ VS.  % t L.-v DT. m 2-)y1 5 DE-AP.ZZ-0002(Q) ATTACHMENT 2 W14 am I-"

                           -... -  --^^ elm4n           ITflM1in 9i' Aq   14:34/8T. 14:34/NO. 3561526~556 P I NFROM C()JJPOMENT ENG' G FAX bu,'JJz                     -       W 0,--THE-S POT CHANroE-S MUJST BE ATTACI-ED FOR 1rICLD, US'     S-2. SJ -M~I            -I'9k&J2.

SH.MD-EU.ZZ-OO 11(Q) A'TrACEMEN 15 (Cout~d) OrdenIe 'M2L644 ~.valve D.1-4i2y-TEST DATA REVIEW TEST RESULTS TEST REULTS. PARAMETER )NO. TMu- NO,-YK 1 DAT WA 'A A Targe 7Tbm 0 N ____ (CM~Z (FT-LDS 1-1j4.. NWA WN Thrg Reading ?5'9e'/ Pr*5y Maxbmu Aflowmbl (C14) Awiinud Staffing Box C9164 vG AV'.- AV0G.;' AVG:;

                  -m ioM)-%S 32ximU122 Swok Thme (SEWNDS)                             I                 __________-

Opmu Dypsa TIM NA I Se______ SAT/UN~SAT DmaliwOda~ By: 40hMi416inpe w ReViewed By:. / -*c- , Sakm/hHope Creck Pj664 off667 Page Rev. 6

FROM COMPONENT ENG'G FAX 609.339-2210 (TUE) 10. 21' 03 14:35/ST. 14:34/NO. 3561526556 P 2 _ *t J.. -  %, %.oilwuJ mucc t t AnrJ r Pn rr.U Ua - -

       -~~~~~~~~                          s S 3- tA)D(- I I 4 Reqd .. r A'T-T 4. - 'f 6P                            SH.MD-EU.Zz-ooI1(c ATrACUMENT 15 (Cont'I)

Orders I.eOD/46,f Valve TD E5- DA TEST DATA FE3Y l

                                             'TARGET                                              (SLP PARAMETERfS;o)                                        n         O.M                    o Tn~~mp    T~z~M                  Om             CZ an      c Wmi Req Torque a ccsi (r-Lzs)                -;/-            N/A                       NAI WM=zii Allowable TbrunReadin                                                                               06 Att. 13, Maxfmum Torque S                     -       ____

Maxim=m AllowbeW (C14) Toque_________ (CONAN/A Awmul smIfhg BOXVC. VO V: WV AVCP I?7( Laud (SBL) - (LEM) (packing logo) MAXqoMAX:~ COz Bypmn Thm N/A N/ANI 1.5O JN Deas Obmined By: __________LD Reviet'd ly: / - o-ZJ-740L Se f -&> .4,611,6 SaIl n/Hope Creek PaSs a a64 6 ofot 677K rcY. y 66

FROM COMPONENT ENG' G FAX 6()9.339-2210 (TUE) 10. 21' 03 14:35/ST. 14:34/NO. 356)526556 P 3 s s J- mc- 1?g4,f.w R-v-2 ATT I. p 2 O i S.MD-Eu.lzool(oJ AT*AEMNT 1S (ot'd) Ord° ntlCDI 4t Vdvali 23 - 5z-6q TEST DATA RLM W TEST RESULTS TESRESESULTS TARGET V O) IM L TEST 'OINTS TEST PARAMETERS Pr - job) T NO., n NO. TM DATE T ATE Targcrmug@(c~r) ~ K/A cum cm cu-/ 7 cm Win Piq Toq c: _ (CS2) FX-LES) NIA MIA N1A AU, 13 Maximu Torque Swt Mxi mbl (04). A1w7 9- -_43 Toarqu (FC-Ll) a N/A _ Z N/A AUumSd Shdfn Bi VAVO: A,/4 AVG:. LAW (SBL) - ;Lm o . 5Io

                                   *ad*
                                      -m                              .        ' bA-X2r        O/?
                                                  .~                                               -

opm Tb K/A . /A KWA 15.as

                    .            /

D Qbc By: Zs&2 as, Rt6fbR r dvewvBy:. I c~ - SaI/Hopc ca. Pap 64 of67 Rev. 6

NC.CC-AP.ZZ-0010(Q) FORM-1 CERTIFICATION FOR DESIGN VERIFICATION (SAP Standard Text Key '"NRICDV1") Reference No. S-2-SJ-MDC-1394, Revision 2

SUMMARY

STATEMENT The calculation revision affected pages were reviewed line-by-line. All revised input was reviewed and It corresponding output was reviewed and found acceptable. The methodology of devising the acceptance criteria is equivalent to the SER and is con-sidered acceptable. An additional margin of 0.5 seconds was given to the acceptance criteria to account for when the IST is done with the reactor head Is off Is acceptable and conservative. The individual named below In the right column hereby certifies that the design verification for the subject document has been completed, the questions from the generic checklist have been reviewed and addressed as appropriate, and all comments have been adequately incorporated. SAP Order/Operation final confirmations are the legal equivalent of signatures. - I, Paul Lindsay /2! v4tbt Jags Murph~y / Oct6.er 21, 2003 Design Verifier Assigned By Name of Design Verifier / Date (print name of Manager/Director) Design Verifier Assigned By Name of Design Verifierl Date (print name of Manager/Dlirector)* Design Verifier Assigned By Name of Design Verifier / Date (print name of Manager/Director) A1 Design Verifier Assigned By Name of Design Verifier I Date (print name of Manager/Director) if bwe Manager/Supervw acts as the Design Verifer, the narne of the next higher level o technical management Isrequired hIthe left cokm Page 1 of 1

NC.CC-AP.ZZ-001 0(Q) FORM-2 COMMENT I RESOLUTION FORM FOR DESIGN DOCUMENT REVIEWICHECKING OR DESIGN VERIFICATION (SAP Standard Text Key UNR/CDV2") REFERENCE DOCUMENT NO. /REV. S-2-SJ-MDC-1394, Revision 2 COMMENTS 1.0 Section 1: See minor editorial comments on marked up sheet. ' 2.0 Calculation needs to Reference the following DCPs for the following valves: v-

        . 21SJ54 - DCP 80017352
  • 22SJ54 - DCP 80017353
        . 23SJ54 - DCP 80017354
        . 24SJ54 - DCP 80017355 3.0      Section 3.1 & Figure 2: Elevation of taps for Accumulator Level could not be verified through References given.

Drawing 218213 states that drawings RI-123. sheet 16 and 17, give the elevation of taps to be app roximately 91A6 feet and 85.92 feet versus the calculation values of 92.03 and 86.49. This Is a difference of 0.57 feet and 0.57 feet respectively. Make necessary adjustments. ax 4.0 Reference 4 (S2.0P-DD.ZZ-0D74) Is now voided and should be replaced by S2.0P-TM.ZZ-0002, revision 7. 5.0 Section 3.4: Valve stroke times are for closing stroke times but the calculation Is using It for valve opening stroke times. Make a note Inthe calculation that the two are approximately equal (if they are). If opening stroke times are different then reanalyze the calculation. v 6.0 Add calculation and revision number to figures 4.1 and 4.2. V 7.0 Since the SER actually used 1.5 seconds from the decay time of the 60 degree case to determine the acceptance criteria, the calculation should also use 1.5 seconds from 30.8 seconds plus the additional 0.5 seconds for the reactor head off difference for a new acceptance criteria of 28,8 seconds. RESOLUTION

o. Ad i-fPoUR DO2.PS WvRn& L\ s aE, 2 . t7LrTI"OS WAft, tvj . f &jS viSED A0Ce-Y1D/Fy.
/-.      Pe~ar 5    ,^s     Q    SrR07t         TIMr-S       WC96 US C-D            A-rT,-         xceTe     i        'vscuL~Dco to,,t 6'. D ohit
7. Dare ACCEPTANCE OF RESOLUTION Mft resbklskn feSp0ngS At, 0-at~t4%kN,-

James Murphy October 21, 2003 Vijay Chandra 2t tT Q SUBMITTED BY DATE RESOLVED BY DATE Page 1 of 1

NC-NA-AS.ZZ-0059(Q) FORM-I REGULATORY CHANGE PROCESS DETERMINATION Document lD.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST Page l of 3 Activity

Description:

TIe acceptance criteria for Accumulator pressure decay time has been increased due to an increased stroke time of the SJ54 valves (see Screening for a more detailed description). Note that more than one process may apply. If unsure of any answer, contact the cognizant departmentfor guidance. Activities Affected No Yes Action

1. Does the proposed activity Involve a change to the Technical 1 LI If Yes, contact Licensing; process In Specifications or the Operating License? accordance with NC.NA-AP.ZZ-0035(Q)
 ._________________________________                                                  LCR No.

Does the proposed activity involve a change to the Quality U If Yes, contact Quality Assessment; process Assurance Plan? Examples: in accordance with ND.QN-AP.ZZ-0003(Q)

  • Changes to Chapter 17.2 of UFSAR
3. Does the proposed activity involve a change to the Security Plan? Z L If Yes, contact Security Department; process Examples: in accordance with NC.NA-AP2ZZ-033(Q)
  • Change program in NC.NA-AP.ZZ-0033(Q)
  • Change indoor/outdoor security lighting
  • Placement of component or structure (permanent or temporary) within 20 feet of perimeter fence
  • Obstruct field of view from any manned post
  • Interfere with security monitoring device capability
  • Change access to any protected or vital area 4- Does the proposed activity Involve a change to the Emergency Z L If Yes, contact Emergency Preparedness Plan? Examples:
  • Change ODCM/accident source term
  • Change liquid or gaseous effluent release path
  • Affect radiation monitoring instrumentation or EOPJAOP setpoints used In classifying accident severity
  • Affect emergency response facilities or personnel, including control rm
  • Affect communications, computers, information systems or Met tower
5. Does the proposed activity involve a change to the ISI Program 0 E] If Yes, contact Reliability Programs IS/IST; Plan? Examples: rocess in accordance with
  • Affect Nuclear Class 1,2, or 3 Piping, Vessels, or Supports NC.NA-AP.ZZ-0027(Q)

(Guidance in NC.DE-AP.ZZ-0007(Q) Form-I I)

6. Does the proposed activity involve a change to the [ST Program If Yes, contact Reliability Programs ISI/IST; Plan? Examples: process in accordance with
  • Affect the design or operating parameters of a Nuclear Class 1, NC.NA-AP.Z7,0070(Q) 2, or 3 Pump or Valve (Guidance in NC.DE-AP.ZZ-0007(Q)

Form-IS) Nuclear Common Rev. 5

NC.NA-AS.ZZ-0059(Q) FORM-I REGULATORY CHANGE PROCESS DETERMINATION Document l.D.: S-2-SJ-MDC-1394 .  ; Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST Page 2 of 3 Activities Affected No YCe Action

7. Does the proposed activity involve a change to the Fire l Protection If Yes, contact Design Engineering; process Program? Examples: in accordance with NC.DE-PS.ZZ-000l(Q)
  • Change program in NC.DE-PS.ZZ-0001 (Q)
  • Change combustible loading of safety related space
  • Change or affect fire detection system
  • Change or affect fire suppression system/component
  • Change fire doors, dampers, penetration seal or barriers
  • See NCDE-AP.ZZ-0007, Forms 3, 4 and 14 for details
3. Does the proposed activity Involve Maintenance which restores If Yes, process in accordance with SSCs to their original design and configuration? Examples: NC.WM-AP.ZZ-000l(Q)
  • CM or PM activity
  • Implements an approved Design Change?
  • Troubleshooting (which does not require 50.59 screen per SH.MD-AP.Z7,0002)
9. Is the proposed activity a temporary change (T-Mod) which meets Z 5 If Yes, contact Engineering; process in all thefollowing conditions? ccordance with NC.DE-AP.ZZ-0030(Q)
  • Directly supports maintenance and IsNOT a comoensatory measure to ensure SSC operability.
  • Will be in effect at power operation less than 90 days.
  • Plant will be restored to design configuration upon completion.
  • SSCs will NOT be operated in a manner that could impact the function or operability of a safety related or Important-to-Safety system.
10. Does the proposed activity consist of changes to maintenance If Yes, process in accordance with procedures which do NOT affect SSC design, performance, C.NA-AP.ZZ-000I(Q) operation or control?

Note: Procedure information affecting SSC design, performance, operation or control, Including Tech Spec required surveillance and Inspection, require50.59 screening. Examples Include acceptance criteria for valve stroke times or other SSC function, torque values, and types of materials (e.g., gaskets, elastomers, lubricants, etc.) I l; Does the proposed activity involve a minor UFSAR change If Yes, process in accordance with (including documents Incorporated by reference)? Examples: NC.NA-AP.Z7,0035(Q)

  • Reformatting, simplification or clarifications that do noi change the meaning or substance of information .
  • Removes obsolete or redundant Information or excessive detail
  • Corrects Inconsistencies within the UFSAR
  • Minor correction of drawings (such as mislabeled ID)
12. Does the proposed activity involve a change to an Administrative l
  • If Yes, process in accordance with Procedure (NAP, SAP or DAP) governing the conduct of station NC.NA-AP.ZZ-000I (Q) and operations? Examples: NC.DM-APZZ-000 I (Q)
  • Organization changes/position titles
  • Work control/ modification. processes .

Nuclear Common Rev. 5

, f NC.NA-AS.ZZ-0059(Q)

FORM-I REGULATORY CHANGE PROCESS DETERMINATION Document l.D.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST Page 3 of 3 Activities Affected No Yes Action

13. Does the proposed activity involve a change to a regulatory 1 If Yes, contact Licensing and process in commitment? accordance with NC.NA-AP.ZZ-0030(Q)
14. Does the activity impact other programs controlled by regulations, E If Yes, process Inaccordance with operating license or Tech Spec? Exampke: applicable procedures such as:
  • Chemical Controls Program NC.NA-AP.0038(Q)
  • NJ "Right-to-know" regulations NC.LR-APZZ-0037(Q)
  • OSHA regulations
  • NJPDES Permit conditions
  • State and/or local building, electrical, plumbing, storm water management or "other" codes and standards
  • 10CFR20 occupational exposure
15. Has the activity already received a IOCFR50.59 Screen or 71 Take credit for 10CFR50.59 Screen or Evaluation under another process? Examnpls: Evaluation already performed.
  • Calculation
  • Design Change Package or OWD change ID:
  • Procedure for a Test or Experiment
  • DR/Nonconformance
  • Incorporation ofpreviously approved UFSAR change
                                          .                                 _~~

If any other program or regulation may be affected by the proposed activity, contact the department indicated for further review in accordance with the governing procedure. Ifresponsible department determines program Is not affected, attach written explanation. If ALL of the answers on the previous pages are "No," then check A below: A. El None of the activity is controlled by any of the processes above, therefore a 10CFR50.59 review IS required. Complete a IOCFR50.59 screen. If one or more of the answers on the previous pages are "Yes," then check either B or C below as appropriate and explain the regulatory processes which govern the change: B. Q All aspects of the activity are controlled by one or more of the processes above, therefore a I OCFR50.59 review ISNOT required. C. 3 Only part of the activity is controlled by the processes above, therefore a I OCFR50.59 review IS required. Complete a 50.59 screen. Explanation: I Preparer. James MurphvI . October 2,2003 Printi ad Name Date Reviewer: Viiav Chandra October 22. 2003 Printed Name Date Nuclear Common Rev. 5

ib NC.NA-AS.ZZ-0059(Q) FORM-2 IOCFR5O.59 SCREENING Page I of 6 Revision 0 Document ID.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST

   . Applicability:

Salem I Salem 3 (Gas Turbine) PSEG Common X Salem 2 Hope Creek Salem I & 2 Common Hope Creek & Salem Common

1. Brief Description of activity Change to: 0 Facility 0 Procedures a Methodology QTest/Experiment 5 Fission Barrier "hat is being changed and why Surveillance test procedure S2.OP-ST.SJ-0006, Revision 8, tests that the forward flow of check valves SJ55 and SJ56 for Accumulators Numbers 21, 22,23, and 24 are unobstructed and the valve disc is non-degraded or free moving. The procedure and Relief Requests V-24 and V-25 satisfy Technical Specification section 4.0.5 requiring that in-service testing of ASME Code Class 1,2 and 3 components be performed in accordance with ASME Section XI.. The Accumulator check valves are said to be full open in the existing ST procedure when
  • the Accumulator pressure reaches 35 psig In a time period no longer than 27 seconds. The justification for the time limit acceptance criteria is found In design calculation S-2-SJ-MDC-1394, Revision 1. The NRC accepted the results of the calculation (with some modifications) as a sufficient means of testing the Accumulator check valves (Reference SER 99-028).

Since the issuance of SER 99-028, the time to stroke isolation valve SJ54 for Accumulator Numbers 21,22,23,

  • and 24 has increased (DCPs 80017352, 80017353, 80017354 and 80017355). The DCPs increased the stroke times and neglected to incorporate the appropriate configuration chaniges In design documentation. As a result of the increased stroke time of SJ54, the pressure decay time in 2R13 exceeded 27.0 seconds for 21
  *. Accumulator .(Reference Notification 20162455). Increasing the stroke time of SJ54 will increase the acceptance criteria for forvward flow of the Accumulator check valves. As a result of the increased stroke times, design calculation S-2-SJ-MDC-1394 was revised to determine the appropriate acceptance criteria of 28.1 seconds.

Design Functions The design function of check valves SJ55 and SJ56 is to freely open during a large break loss of coolant accident (LOCA) and provide a flow path for the Safety Injection (SI) Accumulator discharge to the cold legs of the Reactor Coolant System (RCS). The check valves must be capable of freely closing to prevent divergence of SI and Recirculation flow after Accumulator discharge. The check valves must also prevent leakage from the RCS back into the Accumulator when they are normally closed. Effect on DesignFunctions The revision of S-2-SJ-MDC;1394 to increase the forward flow acceptance criteria from 27 seconds to 28.1

  -      seconds does not affect the check vaives capabilities of opening, closing or the prevention of back leakage. It does not affect the reliability of the check valves to perform it design function of opening, closing or to prevent back leakage. It does not affect the time it would take for the check valves to open or close during a postulated accident. It does not affect the check valves ability to prevent back flow from the RCS to the Accumulator during normal operating conditions.

Nucleai Common Rev. 5 E111111111111

NC.NA-AS.ZZ-0059(Q) FORM-2 10CFR50.59 SCREENING Page 2 of 6 Revision 0 Document I.D.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST The revised acceptance criteria does not alter the performance of the check valves during a design basis event. This is used to validate that the check valves achieve the full open position and as precursor to Indicate valve obstruction or degradation.

2. Summarize regulatory change determination (Other applicable regulatory processes Identified on Form-1)

The proposed activity requires a change to SER 99-028, a regulatory commitment.

3. Does the proposed activity require a change to Technical Specifications or the Operating License? Yes a No 0 If YES, then a License Amendment Isrequired prior to Implementation of the activity.

LCR Number: N/A

4. Does the proposal require a UFSAR change? YesD NoO UFSAR Change Notice No N/A (See below)

Describe UFSAR change: Nuclear Common Rev. 5

NC.NA-AS.ZZ-0059(Q) FORM-2 10CFR50.59 SCREENING Page 3 of 6 Revision 0 Document I.D.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST

5. 50.59 Screening Ouestions

_ ~~~~~Answe r ALL screening questions Yes No

a. Does the proposed activity involve a change to the facility that adversely affects a UFSAR described design function?
b. Does the proposed activity involve a change to procedures that adversely a fects how UFSAR described SSC design functions are performed or controlled? 0 0
c. Does the proposed activity revise or replace evaluation methodology described in the UFSAR that either:
  • is used Inthe safety analyses or 0 .
  • establishes the design bases?

d Does the proposed activity involve a test or experiment NOT described in the UFSAR? (SSC is utilized or controlled in a manner that is outside the reference bounds of its design or inconsistent with analyses or 0 0 descriptions in the UFSAR)

e. Does the proposed activity affect a design basis limit for a fission product barrier (fuel cladding, reactor coolant system boundary or containment? 0 E
6. If a 50.59 Evaluation is not required, provide justification for that determination:

Calculation S-2-SJ-MDC.1394, Revision 2, determined that the Accumulator would reach a pressure of 35 psig from 70 psig in 26.5 seconds with a free check valve disc. The time span Is based on an increased stroke time of SJ54 ,with the reactor head on and non-degraded check valve discs that are free floating and able to fully open to approximately a travel angle of 72.4 degrees. Partially degraded valves whose discs only traveled 60 degrees from the fully closed position were able to decay the Accumulator from 70 psig to 35 psig In30.1 seconds. Recent measured decay times from 2R13 indicate that the Accumulator pressure decay times are In the range of 24.0 to 27.9 seconds (21 Accumulator Is27.9 seconds; 22 Accumulator is 24.4 seconds; 23 Accumulator is 24.0 seconds; 24 Accumulator Is 27.0 seconds: Reference Operation Logs on October 15, 2003 for Procedure S2.OP-ST.SJ-0006). The revised acceptance criteria used in the ST procedure is chosen based on a decay time that Is less than the decay time determined for the case with the valve 60 degrees open and greater than the decay time determined for the free disc case. In addition, the calculation states the decay time is 0.5 second less when the reactor head is off. In order to be consistent with SER 99-028, the acceptance criteria is determined to be 1.5 seconds less than the decay time for the 60 degree case and an additional 0.5 second less for when the IST Isperformed with the reactor head off or 28.1 seconds. The acceptance criteria of 28.1 seconds is considered to bound the analysis data and all future In-service Tests lo ensure the Accumulator check valves are non-degraded and unobstructed. The proposed activity does not Involve a change to the facility that adversely affects a UFSAR described design function. The design functions of the Accumulator check valves as stated in Section I of this Screening are to freely open without obstruction during a LOCA and provide a flow path for the Si Accumulator discharge to the cold legs of the RCS, The check valves must be capable of closing to prevent divergence of SI and Recirculation flow after Accumulator discharge. The check valves must also prevent leakage from the RCS back into the Accumulator when they are normally closed. The In-service Test determines the time the Accumulator pressure decays to ensure the check valves are non-degraded and free of obstruction. The decay Nuclear Common Rev. 5

NC.NA-AS.ZZ-0059(Q) FORM-2 I OCFR50.59 SCREENING Page 4 of 6 Revision 0 Document I.D.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST time has changed due to a longer stroke time of motor-operated SJ54 valve during the IST. During normal operating conditions though, the SJ54 valves are normally open to ensure an unobstructed and free flow path from the Accumulator to the RCS. Therefore, the proposed activity of Increasing the acceptable value of the Accumulator's pressure decay time does not hinder or alter by any means the check valves' abilities to perform their design functions to freely open, close or prevent back leakage. The proposed activity does not involve a change to procedures that adversely affects how UFSAR described SSC design functions are performed or controlled. The operation of the Accumulator check valves is not specifically proceduralized Inthe UFSAR, but Section 52.8 does state how the Accumulator check valves should be inspected. The Salem UFSAR states that In-service Testing of ASME Code Class 1, 2 and 3 components be performed in accordance with ASME Section XI. This Is accomplished through Procedure S2.OP-ST.SJ-0006 and Relief Requests V-24 and V-25. The proposed change does not alter the purpose or methodology of the procedure or adversely affect the way in which the check valves will operate during a postulated accident. The increased acceptance criteria of decay time will ensure the Accumulator check valves are non-degraded and unobstructed. Therefore, the proposed activIty does not adversely affect how the UFSAR described design functions are performed or controlled. The proposed activity does not revise or replace evaluation methodology described in the UFSAR that Isused in safety analyses or to establish design bases. Calculation S-2-SJ-MDC-1394 is used to establish acceptance criteria to demonstrate the time it would take to decay the Accumulator pressure with non-degraded and unobstructed check valves. Although the methodology and results of the calculation are not used Insafety analyses or used to establish design bases, it can still be shown that the methodology has not been altered to establish the new acceptance criteria for decay time. The only revision to the calculation is the input parameter for stroke time for valve SJ54 and does not constitute a fundamental change to the methodology used to establish the decay time. The revision of the calculation to determine pressure decay time does not involve a test or experiment of any kind. Therefore, the proposed activity does not involve a test or experiment NOT described in the UFSAR. The design functions of the Accumulator check valves and consequently the Accumulator are unaffected. Therefore, the Accumulator will deliver the required flow to the RCS as analyzed during a postulated accident and the design basis limits for a fission product barrier are unaffected. All the Screening questions, as explained Insection 5 and 6, are answered NO. Therefore, further evaluation is not warranted. Nuclear Common Rev. 5

NC.NA-AS.ZZ-0059(Q) FORM-2 10CFRSD.59 SCREENING Page S of 6 Revision 0 Document l.D.: S-2-SJ-MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST

6.

Conclusions:

0 Ifall Screening questions in Section 5 are answered NO, then a 50.59 Evaluatlon is not required. Q If any Screening question IsYES, then perform a 50.59 Evaluation (Form-3). 50.59 Evaluation No: .

7. List the documents reviewed containing relevant information, including section numbers (UFSAR. Tech Specs, and others):

UFSAR Sections

  • 52.7.1.5 intersystem Leakage Detection, Revision 20 52.8. Inservice Inspection Program, Revision 20 5.53 Reactor Coolant Piping, Revision 20 63 Emergency Core Cooling System, Revision 20 UFSAR Tables Table 6.3-10 Accumulator Inleakage, Revision 6 Technical Specifications 4.0 Salem Unit I Applicability, Surveillance Requirements, sub-section 4.0.5, Amendment 256 4.0 Salem Unit 2 Applicability, Surveillance Requirements, sub-section 4.0.5, Amendment 237 SER 99-028 Relief Requests V-24 and V-25 Regarding Testing Of Accumulator Check Valves, Salem Nuclear Generating Station, Unit Nos. I and 2 (TAC No. M98259 and M98280), March 12, 1999.

Nuclear Common Rev. 5

NC.NA-AS.ZZ-0059(Q) FORM-2 10CFR50.59 SCREENING Page 6 of 6 Revision 0 Document I.D.: S-2-SJ.MDC-1394 Revision: 2

Title:

ACCUMULATOR PRESSURE DECAY DURING DISCHARGE TEST COMPLETION AND APPROVAL October 21.2003 James Mumhv Februayr 20; 2004 (J --- PREPARER (SIGN)0 DATE NAME (PRINT) QUAL EXPIRES October 22.2003 Vilav Chandra February 20. 2004 (SIGN) AkIER DATE NAME (PRINT) QUAL EXPIRES October 22. 2003 Paul Lfndlay 3 k/0 V APPROV'AL (SIGN) DATE NA]iME (PRINT) QUAL EXPIRES Nuclear Common Rlev. 5}}