LR-N11-0382, Inservice Inspection Activities - 90-Day Report

From kanterella
Jump to navigation Jump to search
Inservice Inspection Activities - 90-Day Report
ML12032A134
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/19/2012
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N11-0382
Download: ML12032A134 (5)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 M 1iB Ma

~PSEG NuclearLLC LR-N 11-0382 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Salem Nuclear Generating Station Unit 1 Facility Operating License No. DPR-70 NRC Docket No. 50-272

SUBJECT:

Inservice Inspection Activities Day Report This letter submits the Owners Activity Report for Inservice Inspection (ISI) activities conducted at the Salem Generating Station Unit No. 1 during the twenty-first refueling outage. This report is submitted in accordance with Code Case N-532-4 "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as required in Section Xl, Division 1,"

and within its ninety (90) day reporting requirement. to this letter contains the required Salem Unit 1 Owners Activity Report.

There are no commitments contained in this letter.

Should you have any questions regarding this submittal, please contact C. M. Dahms at (856) 339-5456.

President - Salem Enclosures (1) 001 0d-

  • ", 'JII Document Control Desk JAN 19 Z202 Page 2 LR-N11-0382 C Mr. W. Dean, Administrator - Region I Mr. R. Ennis, Project Manager - Salem Mr. D. Schroeder, USNRC Senior Resident Inspector - Salem (X24)

Mr- P. Mulligan, NJBNE Manager IV Mr. T. Cachaza, Commitment Tracking Coordinator Salem Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. Milton Washington, Chief Inspector - Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance

Document Control Desk LR-N 11-0382 Salem Unit I Owners Activity Report - S1 R21 In Accordance With ASME Section XI and Code Case N-532-4

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number S1RFO21 Owner PSEG Nuclear LLC, PO Box 236, Hancocks Bridge, NJ 08038 Plant Salem Generating Station Unit No. 1 Commercial Service Date July 1, 1977 Refueling Outage No. 21 Current Inspection Interval ISI - Fourth (4th) {CISI - Second (2nd)}

Current Inspection Period ISI - First (1st) {CISI - First (lst)}

Edition and Addenda of Section XI Applicable to the inspection plan ISI and CISI - 2004 Edition Date and revision of inspection plan ISI - May 2011, Revision 0 {CISI - October 2010, Revision 0}

Code Cases used N-532-4, N-706-1, N-722-1, N-770-1 & N-460 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supportinE the completion of S 1RFO21 conform to the requirements of Section XI.

Signed Edley T. Giles/ II Program Manager //

Owner or Owner's Designee, Title Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, during the period April 30, 2010 to November 22, 2011, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Ross Goodwin Commissions NB 14086 A,N,I NJ955 Inspector's Signature National Board, State, Province, and Endorsements Date f-Z2 /2//LqI!

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Exam Item Item Description Evaluation Description Category Number None TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/

Class Completed Replacement Plan Number Through wall tubing leaks on Replaced all degraded tubing in-kind Main Steam tubing upstream 10/13/2010 60089251 3 of the valves 21/23MS227 Valve required welding and machining 06/10/2010 60090649 3 2SW120 flanges degraded of all three flange faces.

Leak occurred at weld on Excavated defect and performed weld 2"x2"x3/4" TEE on F-3164 repair 07/07/2010 60090841 3 (S2SW -2SWE250)

Through wall leak (RCP seal Replaced valve 1CV284 and some 4" injection return line) at inlet piping on both sides of valve. 07/22/2010 60091094 2 weld on 4" 1CV284 3/8" tubing leak downstream Replaced welded tubing and fittings on 3 of ISWI67 instruments lines with Swagelok fittings 3/8" BIT Flow Instrument Replaced welded tubing and fittings on 2 tubing leak at 1SJ169 instruments lines with Swagelok fittings 03/07/2011 60095167 Leak at 12SW823 Test Replaced tubing 06/29/2011 60093312 3 Connection 3Replaced welded flange assembly 06/02/2011 60096936 3 Tubing leak atl 6SW226 _________________ ______

3 Tubing leak at 1PD2803 Repaired tubing 08/16/2011 60098244 Repaired tubing 1 60098224 3 Tubing leak at 11 SW237 08/17/2011 60098341

- 2 -